| number = ML17263A433 | | number = ML17263A433 | ||
| issue date = 09/20/2017 | | issue date = 09/20/2017 | ||
| title = | | title = Response to Request for Additional Information Regarding License Amendment Request to Revise Emergency Plan Staff Augmentation Response Times | ||
| author name = Northard S | | author name = Northard S | ||
| author affiliation = Northern States Power Company, Minnesota, Xcel Energy | | author affiliation = Northern States Power Company, Minnesota, Xcel Energy |
Revision as of 17:55, 1 February 2019
Letter Sequence Response to RAI | |
---|---|
Initiation Administration | |
MONTHYEARML17055C3592017-02-23023 February 2017
[Table View]License Amendment Request: Revision to Emergency Plan Staff Augmentation Response Times Project stage: Request ML17066A3612017-03-0707 March 2017 NRR E-mail Capture - Prairie Island Nuclear Generating Plant, Units 1 and 2 - Acceptance of Requested Licensing Action Amendment to Revise Emergency Plan Staff Augmentation Response Times Project stage: Acceptance Review L-PI-17-032, Response to Request for Additional Information Regarding License Amendment Request to Revise Emergency Plan Staff Augmentation Response Times2017-09-20020 September 2017 Response to Request for Additional Information Regarding License Amendment Request to Revise Emergency Plan Staff Augmentation Response Times Project stage: Response to RAI ML17362A2022018-03-0505 March 2018 Issuance of Amendment Concerning Revision to the Prairie Island Nuclear Generating Plant, Units 1 and 2 Emergency Plan (CAC Nos. MF9345 and MF9346; EPID L-2017-LLA-0175) Project stage: Approval 2017-03-07 |
ML17263A433 | |
Person / Time | |
---|---|
Site: | Prairie Island |
Issue date: | 09/20/2017 |
From: | Northard S Northern States Power Company, Minnesota, Xcel Energy |
To: | Document Control Desk, Office of Nuclear Reactor Regulation |
References | |
CAC MF9345, CAC MF9346, L-PI-17-032 | |
Download: ML17263A433 (24) | |
Similar Documents at Prairie Island | |
---|---|
Category:Letter
MONTHYEARIR 05000282/20230042024-02-0101 February 2024
[Table view]Integrated Inspection Report 05000282/2023004 and 05000306/2023004 ML23356A1232024-01-29029 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting) ML24024A0722024-01-24024 January 2024 Independent Spent Fuel Storage Installation, Onticello, Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML24017A0182024-01-19019 January 2024 Confirmation of Initial License Examination ML23356A0032024-01-17017 January 2024 Issuance of Amendments Revise Technical Specification 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report (PTLR) L-PI-23-034, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 3.7.8, Cooling Water (Cl) System,2024-01-0202 January 2024 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 3.7.8, Cooling Water (Cl) System, L-PI-23-035, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications Section 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report2023-12-20020 December 2023 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications Section 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report IR 07200010/20234012023-12-20020 December 2023 Independent Spent Fuel Storage Installation Security Inspection Report 07200010/2023401 ML23349A0572023-12-15015 December 2023 and Independent Spent Fuel Storage Installation, Revision to Correspondence Service List for Northern States Power - Minnesota ML23215A1672023-12-15015 December 2023 Acceptance of Requested Licensing Action Amendment Request to Revise Surveillance Requirement 3.8.1.2 Note 3 IR 05000282/20234012023-12-13013 December 2023 Security Baseline Inspection Report 05000282/2023401 and 05000306/2023401 L-PI-23-033, Supplement to License Amendment Request to Revise Technical Specification 3.8.1, Surveillance Requirement 3.8.1.2, Note 32023-12-0505 December 2023 Supplement to License Amendment Request to Revise Technical Specification 3.8.1, Surveillance Requirement 3.8.1.2, Note 3 ML23304A1632023-11-15015 November 2023 Supplemental Information Needed for Acceptance of Requested Licensing Action Amendment Request to Revise SR 3.8.1.2 Note 3 ML23319A3182023-11-15015 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation IR 05000282/20230032023-11-0808 November 2023 Integrated Inspection Report 05000282/2023003 and 05000306/2023003 ML23311A3572023-11-0707 November 2023 Core Operating Limits Report (COLR) for Prairie Island Nuclear Generating Plant (PINGP) Unit 2. Cycle 33. Revision 0 ML23285A3062023-10-12012 October 2023 Implementation of the Fleet Standard Emergency Plan for the Monticello Nuclear Generating Plant and the Prairie Island Nuclear Generating Plant ML23270B9022023-09-29029 September 2023 Review of Reactor Vessel Material Surveillance Program Capsule N Technical Report L-PI-23-025, License Amendment Request to Revise Technical Specification 3.8.1, Surveillance Requirement 3.8.1.2, Note 32023-09-28028 September 2023 License Amendment Request to Revise Technical Specification 3.8.1, Surveillance Requirement 3.8.1.2, Note 3 ML23265A2532023-09-26026 September 2023 Review of Reactor Vessel Material Surveillance Program Capsule N Technical Report ML23262B0372023-09-19019 September 2023 Response to NRC Request for Additional Information Regarding the 2023 Monticello and Prairie Island Plant Decommissioning Funding Status Reports ML23256A1682023-09-13013 September 2023 Independent Spent Fuel Storage Installation and Monticello Nuclear Generating Plant - Voluntary Security Clearance Program 2023 Insider Threat Program Self-Inspection L-PI-23-023, Baffle Former Bolts Alternate Aging Management Strategy2023-09-11011 September 2023 Baffle Former Bolts Alternate Aging Management Strategy IR 05000282/20230052023-08-30030 August 2023 Updated Inspected Plan for Prairie Island Nuclear Generating Plant Report 05000282/2023005 and 05000306/2023005 IR 05000282/20230102023-08-17017 August 2023 NRC Inspection Report 05000282/2023010 and 05000306/2023010 ML23222A0122023-08-10010 August 2023 Independent Spent Fuel Storage Installation and Monticello Nuclear Generating Plant - Changes in Foreign Ownership, Control or Influence IR 05000282/20230022023-08-0303 August 2023 Integrated Inspection Report 05000282/2023002 and 05000306/2023002 ML23214A2032023-08-0202 August 2023 Request for Information for an NRC Quadrennial Comprehensive Engineering Team Inspection: Inspection Report 05000282/2024010; 05000306/2024010 ML23206A2342023-07-25025 July 2023 Independent Spent Fuel Storage Installation, and Monticello Nuclear Generating Plant, Changes in Foreign Ownership, Control or Influence ML23202A0032023-07-21021 July 2023 Independent Spent Fuel and Independent Spent Fuel Storage Installation, Monticello Nuclear Generating Plant, Submittal of Quality Assurance Topical Report (NSPM-1) ML23199A0922023-07-18018 July 2023 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000306/2023004 ML23195A1732023-07-14014 July 2023 Revision of Standard Practice Procedures Plan L-PI-23-018, License Amendment Request to Revise ISFSI Technical Specification 4.4 to Allow Use of a Code Alternative to ASME Code, NB-5130, Examination of Weld Edge Preparation Surfaces, for the TN-40HT2023-07-14014 July 2023 License Amendment Request to Revise ISFSI Technical Specification 4.4 to Allow Use of a Code Alternative to ASME Code, NB-5130, Examination of Weld Edge Preparation Surfaces, for the TN-40HT ML23181A0192023-06-30030 June 2023 Independent Spent Fuel Storage Installation, Revision to Correspondence Service List for Northern States Power - Minnesota ML23178A2422023-06-28028 June 2023 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch III L-PI-23-006, License Amendment Request to Revise Technical Specification 3.7.8 Required Actions2023-06-22022 June 2023 License Amendment Request to Revise Technical Specification 3.7.8 Required Actions L-PI-23-016, 2022 10 CFR 50.46 LOCA Annual Report2023-06-14014 June 2023 2022 10 CFR 50.46 LOCA Annual Report IR 05000282/20234202023-06-0101 June 2023 Security Baseline Inspection Report 05000282/2023420 and 05000306/2023420 ML23150A1722023-05-30030 May 2023 Preparation and Scheduling of Operator Licensing Examinations 2024-02-01 Category:Response to Request for Additional Information (RAI) MONTHYEARL-PI-23-034, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 3.7.8, Cooling Water (Cl) System,2024-01-0202 January 2024
[Table view]Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 3.7.8, Cooling Water (Cl) System, L-PI-23-035, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications Section 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report2023-12-20020 December 2023 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications Section 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report L-PI-23-033, Supplement to License Amendment Request to Revise Technical Specification 3.8.1, Surveillance Requirement 3.8.1.2, Note 32023-12-0505 December 2023 Supplement to License Amendment Request to Revise Technical Specification 3.8.1, Surveillance Requirement 3.8.1.2, Note 3 ML23262B0372023-09-19019 September 2023 Response to NRC Request for Additional Information Regarding the 2023 Monticello and Prairie Island Plant Decommissioning Funding Status Reports L-PI-22-034, Response to RAI, Alternative RR-08 Related to Pressure Isolation Valve Monitoring and Testing2022-07-14014 July 2022 Response to RAI, Alternative RR-08 Related to Pressure Isolation Valve Monitoring and Testing ML22161A9152022-06-10010 June 2022 and Prairie Island Nuclear Generating Plant, Units 1 and 2 - Response to a Request for Additional Information Xcel Energy Amendment Request to Create a Common Emergency Plan and Emergency Operations. L-PI-22-033, Response to Request for Additional Information Prairie Island Nuclear Generating Plant, Units 1 and 2, Amendment to Adopt 24-Month Operating Cycles2022-06-10010 June 2022 Response to Request for Additional Information Prairie Island Nuclear Generating Plant, Units 1 and 2, Amendment to Adopt 24-Month Operating Cycles L-PI-21-047, Response to Request for Additional Information 24-Month Cycle Amendment Prairie Island Nuclear Generating Plant, Units 1 and 22021-12-0707 December 2021 Response to Request for Additional Information 24-Month Cycle Amendment Prairie Island Nuclear Generating Plant, Units 1 and 2 L-PI-21-045, Response to Request for Additional Information Cooling Water System License Amendment Request2021-11-0404 November 2021 Response to Request for Additional Information Cooling Water System License Amendment Request L-PI-21-032, Response to Request for Additional Information Amendment Request to Adopt TSTF-471 and 571-T for Prairie Island2021-09-30030 September 2021 Response to Request for Additional Information Amendment Request to Adopt TSTF-471 and 571-T for Prairie Island L-PI-20-026, Response to Request for Additional Information: License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiativ2020-09-0101 September 2020 Response to Request for Additional Information: License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4 L-PI-20-023, Independent Spent Fuel Storage Installation, Response to Request for Additional Information: License Amendment Request to Expand the Storage Capacity of the Independent Spent Fuel Storage Installation (ISFSI)2020-06-10010 June 2020 Independent Spent Fuel Storage Installation, Response to Request for Additional Information: License Amendment Request to Expand the Storage Capacity of the Independent Spent Fuel Storage Installation (ISFSI) ML20045E8942020-02-14014 February 2020 Response to a Request for Additional Information for Proposed 10 CFR 50.55a(z)(2) Alternatives to Utilize ASME Code Case N-786-3, Alternative Requirements for Sleeve Reinforcement of Class 2 and 3 Moderate-Energy Carbon Steel Piping, and AS ML20127J0002019-11-0707 November 2019 Xcel Reply to PIIC Expansion Application L-PI-19-037, Response to Request for Additional Information: 10 CFR 50.55a Requests Nos. 1-RR-5-10 and 2-RR-5-10, Proposed Alternative to Reactor Vessel Inservice Inspection (ISI) Intervals2019-09-16016 September 2019 Response to Request for Additional Information: 10 CFR 50.55a Requests Nos. 1-RR-5-10 and 2-RR-5-10, Proposed Alternative to Reactor Vessel Inservice Inspection (ISI) Intervals L-PI-19-029, Supplement to Response to Request for Additional Information: Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components For...2019-08-0505 August 2019 Supplement to Response to Request for Additional Information: Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components For... L-PI-19-014, Response to Request for Additional Information: Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2019-04-29029 April 2019 Response to Request for Additional Information: Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors L-PI-18-063, Response to Request for Additional Information: Revise License Condition Associated with Implementation of NFPA 8052018-12-0606 December 2018 Response to Request for Additional Information: Revise License Condition Associated with Implementation of NFPA 805 L-PI-18-051, Response to Request for Additional Information: Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program2018-09-17017 September 2018 Response to Request for Additional Information: Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program L-PI-18-038, Supplement to License Amendment Request to Revise License Condition Associated with Implementation of NFPA 8052018-07-10010 July 2018 Supplement to License Amendment Request to Revise License Condition Associated with Implementation of NFPA 805 ML18131A2232018-05-11011 May 2018 Prairie and Monticello - Response to Request for Additional Information Regarding Proposed Alternative to Utilize Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Di L-PI-17-042, Response to Request for Additional Information Regarding License Amendment Request to Revise the NDE Inspection Interval for Special Lifting Devices2017-11-0606 November 2017 Response to Request for Additional Information Regarding License Amendment Request to Revise the NDE Inspection Interval for Special Lifting Devices ML17279A1212017-10-0404 October 2017 Enclosure 2 to L-PI-17-041, Westinghouse-Prepared RAI Responses CE-17-3, Rev. 1, Attachment 2 and Enclosure 3, Marked-Up Technical Specification Page 4.0-7 L-PI-17-035, License Amendment Request to Revise the Emergency Action Level (EAL) Scheme - Supplement and Response to Requests for Additional Information2017-09-27027 September 2017 License Amendment Request to Revise the Emergency Action Level (EAL) Scheme - Supplement and Response to Requests for Additional Information L-PI-17-032, Response to Request for Additional Information Regarding License Amendment Request to Revise Emergency Plan Staff Augmentation Response Times2017-09-20020 September 2017 Response to Request for Additional Information Regarding License Amendment Request to Revise Emergency Plan Staff Augmentation Response Times L-PI-17-007, Response to Request for Additional Information on License Amendment Request to Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactors2017-03-0606 March 2017 Response to Request for Additional Information on License Amendment Request to Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactors L-PI-17-002, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 3.8.7 to Remove Non-Conservative Required Action2017-02-16016 February 2017 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 3.8.7 to Remove Non-Conservative Required Action L-PI-16-100, Response to NRC Request for Information - License Amendment Request for Spent Fuel Pool Criticality Technical Specification Changes2017-02-16016 February 2017 Response to NRC Request for Information - License Amendment Request for Spent Fuel Pool Criticality Technical Specification Changes L-PI-16-090, Response to Request for Additional Information on License Amendment Request to Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactors2016-12-14014 December 2016 Response to Request for Additional Information on License Amendment Request to Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactors ML16351A2102016-12-13013 December 2016 External Flooding Assessment Focused Evaluation. (Redacted) ML16288A0972016-10-14014 October 2016 and Monticello - Response to Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools L-PI-16-076, Supplement to the Response to March 12, 2012, Request for Information Enclosure 2, Recommendation 2.1, Flooding, Required Response 2, Flood Hazard Reevaluation Report2016-09-29029 September 2016 Supplement to the Response to March 12, 2012, Request for Information Enclosure 2, Recommendation 2.1, Flooding, Required Response 2, Flood Hazard Reevaluation Report ML16279A4792016-09-29029 September 2016 Flood Hazard Reevaluation Report - Response to Requested Information L-PI-16-067, License Amendment Request to Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactors- Response to Request for Additional Information2016-08-17017 August 2016 License Amendment Request to Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactors- Response to Request for Additional Information L-PI-16-063, Seventh Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events2016-08-17017 August 2016 Seventh Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events L-PI-16-005, License Amendment Request to Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactors - Response to Request for Additional Information2016-05-24024 May 2016 License Amendment Request to Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactors - Response to Request for Additional Information ML16144A8062016-05-23023 May 2016 Supplement to License Amendment Request for Spent Fuel Pool Criticality Technical Specification Changes: Response to RAI-2 (Enclosure 1) & Marked-Up Technical Specification Page (Enclosure 2) L-PI-16-040, Supplement to License Amendment Request for Spent Fuel Pool Criticality Technical Specification Changes: Westinghouse-Prepared Response to RAI, CE-16-237, Attachment 2 (Enclosure 4)2016-05-23023 May 2016 Supplement to License Amendment Request for Spent Fuel Pool Criticality Technical Specification Changes: Westinghouse-Prepared Response to RAI, CE-16-237, Attachment 2 (Enclosure 4) ML16133A0412016-05-0909 May 2016 Response to March 12, 2012, Request for Information Enclosure 2, Recommendation 2.1, Flooding, Required Response 2, Flood Hazard Reevaluation Report L-08-001, Response to Requests for Additional Information - License Amendment Request to Revise Technical Specifications to Adopt TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation, Revision 2, Using the Consolidated..2016-04-14014 April 2016 Response to Requests for Additional Information - License Amendment Request to Revise Technical Specifications to Adopt TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation, Revision 2, Using the Consolidated.. L-PI-16-029, Response to Requests for Additional Information - License Amendment Request to Revise Technical Specifications to Adopt TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation, Revision 2,,Using the Consolidated..2016-03-31031 March 2016 Response to Requests for Additional Information - License Amendment Request to Revise Technical Specifications to Adopt TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation, Revision 2,,Using the Consolidated.. L-PI-16-004, License Amendment Request to Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactors- Response to Request for Additional Information2016-01-20020 January 2016 License Amendment Request to Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactors- Response to Request for Additional Information L-PI-16-001, Enclosure 2: Responses to Open and Pending Items from the NRC Audit Report2016-01-14014 January 2016 Enclosure 2: Responses to Open and Pending Items from the NRC Audit Report L-PI-15-105, License Amendment Request (LAR) to Revise Technical Specifications (TS) to Adopt TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process - Response to Request..2015-12-30030 December 2015 License Amendment Request (LAR) to Revise Technical Specifications (TS) to Adopt TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process - Response to Request.. L-PI-15-052, License Amendment Request to Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactors - Response to Request for Additional Information - 90-Day Responses2015-06-19019 June 2015 License Amendment Request to Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactors - Response to Request for Additional Information - 90-Day Responses L-PI-14-113, Updated Final Response to NRC Request for Information Per 10CFR50.54(f) Re Seismic Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident2015-01-16016 January 2015 Updated Final Response to NRC Request for Information Per 10CFR50.54(f) Re Seismic Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident 2024-01-02 |
Text
Document Control Desk Page 2 Summary of Commitments This letter makes no new commitments and no revisions to existing commitments.
I declare under penalty of perjury, that the foregoing is true and correct. Exec ed o ber ZQ_, 2017. orthard Site Vice President, Prairie Island Nuclear Generating Plant Northern States Power Company-Minnesota Enclosure cc: Administrator, Region Ill, USNRC Project Manager, Prairie Island, USNRC Resident Inspector, Prairie Island, USNRC State of Minnesota