L-PI-14-113, Updated Final Response to NRC Request for Information Per 10CFR50.54(f) Re Seismic Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident

From kanterella
Jump to navigation Jump to search
Updated Final Response to NRC Request for Information Per 10CFR50.54(f) Re Seismic Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident
ML17297A346
Person / Time
Site: Prairie Island Xcel Energy icon.png
Issue date: 01/16/2015
From: Davison K
Northern States Power Company, Minnesota, Xcel Energy
To:
Document Control Desk, Office of Nuclear Reactor Regulation
Shared Package
ML17297A332 List:
References
L-PI-14-113
Download: ML17297A346 (3)


Text

CONTAINS 8YN81 'NITMMObQ liROM PUilblC Cl~CLQ§l.IR!E UNC5R 2 390 fl Xcel Energr Prairie Island Nuclear Generating Plant 1717 Wakonade Drive East Welch, MN 55089-9642 January 16, 2015 L-Pl-14-113 10 CFR 50.54(f)

U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Prairie Island Nuclear Generating Plant - Unit 1 Docket No. 50-282 Renewed Operating License No. DPR-42 PINGP Unit 1 - Updated Final Response to NRC Request for Information Pursuant to 10 CFR 50.54(f} Regarding the Seismic Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident

References:

1. NRG Letter, "Request for Information Pursuant to Title 1O of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3, of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident," dated March 12, 2012, ADAMS Accession No. ML12053A340.
2. NSPM Letter to NRC, "PINGP Unit 1 - Final Response to NRG Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident,"

dated November 26, 2012, ADAMS Accession No. ML12334A495

3. NRG Letter, "Request for Additional Information Associated with Near-Term Task Force Recommendation 2.3, Seismic Walkdowns,"

dated November 1, 2013, ADAMS Accession No. ML133048418.

4. NSPM Letter to NRC, "Prairie Island Nuclear Generating Plant, Units 1 and 2, Response to Requests for Additional Information Associated with Near-Term Task Force: Recommendation 2.3, Seismic Walkdowns," dated November 27, 2013, ADAMS Accession No. ML133338457.
5. NSPM Letter to NRC. "PINGP Unit 1 - Proposed Resolution of the Remaining Seismic Walkdowns Associated With NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic

Document Control Desk Page2 Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Daiichi Accident," dated September 12, 2013, ADAMS Accession No. ML13259A028.

On March 12, 2012, the Nuclear Regulatory Commission (NRC) Staff issued a request for information regarding Near-Term Task Force (NTIF) insights from the Fukushima Dai-ichi aecident, to all NRC power reactor licensees and holders of construction permits in active or deferred status (Reference 1). Enclosure 3 of the March 1.2, 2012 letter contains specific Requested Actions, Requested Information, and Required Responses associate_d with NTTF Recommendation 2.3, Seismic. Northern States Power Company, a Minnesota cor.poration (NSPM)., doing business as Xcel Energy, submitted the required response to the Requested Information for NTIF Recommendation 2.3, Seismic, for Prairie Island Nuclear Generating Plant (PINGP) in a letter d_ated November26, 2012 (Refer.ence 2). In Reference 2, as later amended in Reference 5, NSPM ~ommitted to complete seismic walkdowns of inaccessible components during the Fall Refueling Outage (RFO) 1 R29. NSPM also committed to provide an updated seismic walkdown report with the results of the walkdowns *of the inaccessible components 60 ,days following the, completion of RFO 1R29.

The purpose of this letter is* to submit, as enclosures, an.updated seismic walkdown report with a summary of the results .from the walkdowns of the inaccessible components completecl during RFO 1H29. This letter completes all regulatory c.ommitments associated with the seismic.walkdown, specifically, "NSPM will complete th.e Seismic Walkdowns of the. lna'ccessible components listed in Appendix D, Plan for Future Seismic Walkdown of Inaccessible Equipment," and "NSPM will provide an updated seismic walk down report with the results of the walkdowns of the inaccessible components," (contained in Reference 2). contains Sem;itive Unclassified Non-Safeguards Information (SUNS!) of which the loss, issue, modification, or unauthorized access can reasonably be foreseen to harm the public interest, or the commercial or financial interests of NSPM. NSPM requ.ests that this SUNSI information be withheld under 10 CFR 2.390(d) (1 ). Pages which contain SUNS! information have been marked with a header, and the sensitive information, such as locations of safety-related components, has been marked. provides a redacted version of Enclosure 1 for public disclosure.

If there are any questions, or if additional information is needed, please contact Stevie DuPont, Principal Licensing Engineer, at 651-267-7421.

Summa:rv of Commitments This letter.-contains no new commitments and closes two existing commitments.

Document Control Desk Page 3 I declare under penalty of perjury that the foregoing is true and correct.

Executed on January 16, 2015.

fa"..Jyfo,<? if.,~

Kevin Davison iftVtjM Site Vice President, Prairie Island Nuclear Generating Plant Northern States Power Company - Minnesota Enclosures (2)

1. Seismic VValkdovm Report, in response to ths 50.54 (f) information rsqyested regar:ding FukYshima N@ar Turm Task For:c@ R@comm@ndation 2 3* Se.isr:nic l.Jpdatee Transmittal For Prairie Island Nuclear Generating Plant Unit 1 (SUNS!-)
2. Seismic Walkdown Report, in response to the 50.54(f) information requested regarding Fukushima Near Term Task Force Recommendation 2.3: Seismic Updated Transmittal For Prairie Island Nuclear Generating Plant Unit 1 (REDACTED) cc: Administrator, Region Ill, USNRC Director, Office of Nuclear Reactor Regulation (NRR), USNRC NRR Project Manager, Prairie Island Nuclear Generating Plant, USNRC Senior Resident Inspector, Prairie Island Nuclear Generating Plant, USNRC