L-PI-23-034, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 3.7.8, Cooling Water (Cl) System, | 2 January 2024 | Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 3.7.8, Cooling Water (Cl) System, | |
L-PI-23-035, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications Section 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report | 20 December 2023 | Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications Section 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report | Hydrostatic Nondestructive Examination Pressure and Temperature Limits Report |
L-PI-23-033, Supplement to License Amendment Request to Revise Technical Specification 3.8.1, Surveillance Requirement 3.8.1.2, Note 3 | 5 December 2023 | Supplement to License Amendment Request to Revise Technical Specification 3.8.1, Surveillance Requirement 3.8.1.2, Note 3 | Safe Shutdown Surveillance Frequency Control Program Offsite Circuit |
ML23262B037 | 19 September 2023 | Response to NRC Request for Additional Information Regarding the 2023 Monticello and Prairie Island Plant Decommissioning Funding Status Reports | |
L-PI-22-034, Response to RAI, Alternative RR-08 Related to Pressure Isolation Valve Monitoring and Testing | 14 July 2022 | Response to RAI, Alternative RR-08 Related to Pressure Isolation Valve Monitoring and Testing | |
ML22161A915 | 10 June 2022 | and Prairie Island Nuclear Generating Plant, Units 1 and 2 - Response to a Request for Additional Information Xcel Energy Amendment Request to Create a Common Emergency Plan and Emergency Operations. | Safe Shutdown Health Physics Network Offsite Dose Calculation Manual Earthquake Minimum staff Fire Protection Program Grace period |
L-PI-22-033, Response to Request for Additional Information Prairie Island Nuclear Generating Plant, Units 1 and 2, Amendment to Adopt 24-Month Operating Cycles | 10 June 2022 | Response to Request for Additional Information Prairie Island Nuclear Generating Plant, Units 1 and 2, Amendment to Adopt 24-Month Operating Cycles | |
L-PI-21-047, Response to Request for Additional Information 24-Month Cycle Amendment Prairie Island Nuclear Generating Plant, Units 1 and 2 | 7 December 2021 | Response to Request for Additional Information 24-Month Cycle Amendment Prairie Island Nuclear Generating Plant, Units 1 and 2 | Fire Protection Program |
L-PI-21-045, Response to Request for Additional Information Cooling Water System License Amendment Request | 4 November 2021 | Response to Request for Additional Information Cooling Water System License Amendment Request | |
L-PI-21-032, Response to Request for Additional Information Amendment Request to Adopt TSTF-471 and 571-T for Prairie Island | 30 September 2021 | Response to Request for Additional Information Amendment Request to Adopt TSTF-471 and 571-T for Prairie Island | Shutdown Margin Recently irradiated fuel |
L-PI-20-026, Response to Request for Additional Information: License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiativ | 1 September 2020 | Response to Request for Additional Information: License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4 | Safe Shutdown High Radiation Area Mission time Fire Barrier Safe Shutdown Earthquake Internal Flooding Probabilistic Risk Assessment FLEX Fukushima Dai-Ichi Surveillance Frequency Control Program Large early release frequency |
L-PI-20-023, Independent Spent Fuel Storage Installation, Response to Request for Additional Information: License Amendment Request to Expand the Storage Capacity of the Independent Spent Fuel Storage Installation (ISFSI) | 10 June 2020 | Independent Spent Fuel Storage Installation, Response to Request for Additional Information: License Amendment Request to Expand the Storage Capacity of the Independent Spent Fuel Storage Installation (ISFSI) | Tornado Missile Safe Shutdown Earthquake Finite Element Analysis FLEX Aging Management Earthquake Fuel cladding |
ML20045E894 | 14 February 2020 | Response to a Request for Additional Information for Proposed 10 CFR 50.55a(z)(2) Alternatives to Utilize ASME Code Case N-786-3, Alternative Requirements for Sleeve Reinforcement of Class 2 and 3 Moderate-Energy Carbon Steel Piping, and AS | |
ML20127J000 | 7 November 2019 | Xcel Reply to PIIC Expansion Application | |
L-PI-19-037, Response to Request for Additional Information: 10 CFR 50.55a Requests Nos. 1-RR-5-10 and 2-RR-5-10, Proposed Alternative to Reactor Vessel Inservice Inspection (ISI) Intervals | 16 September 2019 | Response to Request for Additional Information: 10 CFR 50.55a Requests Nos. 1-RR-5-10 and 2-RR-5-10, Proposed Alternative to Reactor Vessel Inservice Inspection (ISI) Intervals | |
L-PI-19-029, Supplement to Response to Request for Additional Information: Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components For... | 5 August 2019 | Supplement to Response to Request for Additional Information: Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components For... | High winds Internal Flooding Probabilistic Risk Assessment Large early release frequency |
L-PI-19-014, Response to Request for Additional Information: Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors | 29 April 2019 | Response to Request for Additional Information: Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors | High winds Internal Flooding Probabilistic Risk Assessment FLEX Large early release frequency |
L-PI-18-063, Response to Request for Additional Information: Revise License Condition Associated with Implementation of NFPA 805 | 6 December 2018 | Response to Request for Additional Information: Revise License Condition Associated with Implementation of NFPA 805 | Safe Shutdown Mission time |
L-PI-18-051, Response to Request for Additional Information: Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program | 17 September 2018 | Response to Request for Additional Information: Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program | Probabilistic Risk Assessment Large early release frequency |
L-PI-18-038, Supplement to License Amendment Request to Revise License Condition Associated with Implementation of NFPA 805 | 10 July 2018 | Supplement to License Amendment Request to Revise License Condition Associated with Implementation of NFPA 805 | Probabilistic Risk Assessment Fire Protection Program |
ML18131A223 | 11 May 2018 | Prairie and Monticello - Response to Request for Additional Information Regarding Proposed Alternative to Utilize Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Di | |
L-PI-17-042, Response to Request for Additional Information Regarding License Amendment Request to Revise the NDE Inspection Interval for Special Lifting Devices | 6 November 2017 | Response to Request for Additional Information Regarding License Amendment Request to Revise the NDE Inspection Interval for Special Lifting Devices | Nondestructive Examination Liquid penetrant |
ML17279A121 | 4 October 2017 | Enclosure 2 to L-PI-17-041, Westinghouse-Prepared RAI Responses CE-17-3, Rev. 1, Attachment 2 and Enclosure 3, Marked-Up Technical Specification Page 4.0-7 | |
L-PI-17-035, License Amendment Request to Revise the Emergency Action Level (EAL) Scheme - Supplement and Response to Requests for Additional Information | 27 September 2017 | License Amendment Request to Revise the Emergency Action Level (EAL) Scheme - Supplement and Response to Requests for Additional Information | Safe Shutdown Time of Discovery High winds Reactor Vessel Water Level Ultimate heat sink Offsite Dose Calculation Manual Fire Barrier Safe Shutdown Earthquake Internal Flooding Probabilistic Risk Assessment Operating Basis Earthquake Operator Manual Action Spent Fuel Pool Instrumentation Safeguards Contingency Plan Earthquake Fuel cladding Pressure Boundary Leakage Grace period Backfit Unidentified leakage |
L-PI-17-032, Response to Request for Additional Information Regarding License Amendment Request to Revise Emergency Plan Staff Augmentation Response Times | 20 September 2017 | Response to Request for Additional Information Regarding License Amendment Request to Revise Emergency Plan Staff Augmentation Response Times | High Radiation Area Probabilistic Risk Assessment Job Performance Measure |
L-PI-17-007, Response to Request for Additional Information on License Amendment Request to Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactors | 6 March 2017 | Response to Request for Additional Information on License Amendment Request to Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactors | Hot Short Probabilistic Risk Assessment Thermoset Large early release frequency |
L-PI-17-002, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 3.8.7 to Remove Non-Conservative Required Action | 16 February 2017 | Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 3.8.7 to Remove Non-Conservative Required Action | Safe Shutdown Anticipated operational occurrence Emergency Lighting |
L-PI-16-100, Response to NRC Request for Information - License Amendment Request for Spent Fuel Pool Criticality Technical Specification Changes | 16 February 2017 | Response to NRC Request for Information - License Amendment Request for Spent Fuel Pool Criticality Technical Specification Changes | |
L-PI-16-090, Response to Request for Additional Information on License Amendment Request to Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactors | 14 December 2016 | Response to Request for Additional Information on License Amendment Request to Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactors | Hot Short Safe Shutdown Fire Barrier Probabilistic Risk Assessment Large early release frequency Fire Protection Program Fire Watch Very Early Warning Fire Detection |
ML16351A210 | 13 December 2016 | External Flooding Assessment Focused Evaluation. (Redacted) | Fukushima Dai-Ichi Flooding Focused Evaluation |
ML16288A097 | 14 October 2016 | and Monticello - Response to Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools | |
L-PI-16-076, Supplement to the Response to March 12, 2012, Request for Information Enclosure 2, Recommendation 2.1, Flooding, Required Response 2, Flood Hazard Reevaluation Report | 29 September 2016 | Supplement to the Response to March 12, 2012, Request for Information Enclosure 2, Recommendation 2.1, Flooding, Required Response 2, Flood Hazard Reevaluation Report | Hydrostatic Fukushima Dai-Ichi |
ML16279A479 | 29 September 2016 | Flood Hazard Reevaluation Report - Response to Requested Information | |
L-PI-16-067, License Amendment Request to Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactors- Response to Request for Additional Information | 17 August 2016 | License Amendment Request to Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactors- Response to Request for Additional Information | Safe Shutdown Probabilistic Risk Assessment Multiple Spurious Operation Thermoset Large early release frequency Fire Protection Program Very Early Warning Fire Detection |
L-PI-16-063, Seventh Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events | 17 August 2016 | Seventh Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events | Safe Shutdown Earthquake FLEX Fukushima Dai-Ichi Spent Fuel Pool Instrumentation B.5.b Mitigating Strategies |
L-PI-16-005, License Amendment Request to Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactors - Response to Request for Additional Information | 24 May 2016 | License Amendment Request to Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactors - Response to Request for Additional Information | Hot Short Safe Shutdown Unanalyzed Condition Fire Barrier Probabilistic Risk Assessment Large early release frequency Fire Protection Program Fire Watch Weak link |
ML16144A806 | 23 May 2016 | Supplement to License Amendment Request for Spent Fuel Pool Criticality Technical Specification Changes: Response to RAI-2 (Enclosure 1) & Marked-Up Technical Specification Page (Enclosure 2) | |
L-PI-16-040, Supplement to License Amendment Request for Spent Fuel Pool Criticality Technical Specification Changes: Westinghouse-Prepared Response to RAI, CE-16-237, Attachment 2 (Enclosure 4) | 23 May 2016 | Supplement to License Amendment Request for Spent Fuel Pool Criticality Technical Specification Changes: Westinghouse-Prepared Response to RAI, CE-16-237, Attachment 2 (Enclosure 4) | |
ML16133A041 | 9 May 2016 | Response to March 12, 2012, Request for Information Enclosure 2, Recommendation 2.1, Flooding, Required Response 2, Flood Hazard Reevaluation Report | Fukushima Dai-Ichi |
L-08-001, Response to Requests for Additional Information - License Amendment Request to Revise Technical Specifications to Adopt TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation, Revision 2, Using the Consolidated.. | 14 April 2016 | Response to Requests for Additional Information - License Amendment Request to Revise Technical Specifications to Adopt TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation, Revision 2, Using the Consolidated.. | |
L-PI-16-029, Response to Requests for Additional Information - License Amendment Request to Revise Technical Specifications to Adopt TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation, Revision 2,,Using the Consolidated.. | 31 March 2016 | Response to Requests for Additional Information - License Amendment Request to Revise Technical Specifications to Adopt TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation, Revision 2,,Using the Consolidated.. | Past operability |
L-PI-16-004, License Amendment Request to Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactors- Response to Request for Additional Information | 20 January 2016 | License Amendment Request to Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactors- Response to Request for Additional Information | Safe Shutdown Fire Barrier Probabilistic Risk Assessment Thermoset |
L-PI-16-001, Enclosure 2: Responses to Open and Pending Items from the NRC Audit Report | 14 January 2016 | Enclosure 2: Responses to Open and Pending Items from the NRC Audit Report | High winds Shutdown Margin Tornado Missile Safe Shutdown Earthquake FLEX Design basis earthquake Spent Fuel Pool Instrumentation B.5.b Mitigating Strategies Earthquake |
L-PI-15-105, License Amendment Request (LAR) to Revise Technical Specifications (TS) to Adopt TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process - Response to Request.. | 30 December 2015 | License Amendment Request (LAR) to Revise Technical Specifications (TS) to Adopt TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process - Response to Request.. | |
L-PI-15-052, License Amendment Request to Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactors - Response to Request for Additional Information - 90-Day Responses | 19 June 2015 | License Amendment Request to Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactors - Response to Request for Additional Information - 90-Day Responses | Hot Short Safe Shutdown Fire Barrier Probabilistic Risk Assessment Coatings Multiple Spurious Operation Thermoset Foreign Material Exclusion Cable Tray Ignition Maintenance Rule Program Fire Protection Program Fire Watch Very Early Warning Fire Detection |
L-PI-14-113, Updated Final Response to NRC Request for Information Per 10CFR50.54(f) Re Seismic Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident | 16 January 2015 | Updated Final Response to NRC Request for Information Per 10CFR50.54(f) Re Seismic Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident | Fukushima Dai-Ichi |