{{#Wiki_filter:ATTACHMENT 1 TO AEP:NRC!1143A SNUBBER T/S CHANGE UPDATE 9306290073 930618'I PDR ADOCK 05000315',.P,'DR p
{{#Wiki_filter:ATTACHMENT 1 TO AEP:NRC!1143A SNUBBER T/S CHANGE UPDATE
INDEX BASES 3/4.9.2 3/4.9.3 INSTRUMENTATZON......................................
          'DR 9306290073 930618
DECAY TIME.SECTION 3 4.7 PLANT SYSTEMS (Continued) 3/4.7.8 HYDRAULIC SNUBBERS.....................
',.P, ADOCK 05000315
..9..9~..3/4.7.9 FIRE SUPPRESSION SYSTEMS.......................9
'I PDR
'.3/4 7.10 FIRE RATED ASSEMBLIES.
 
3 4.8 ELECTRICAL POWER SYSTEMIC~~~~~~~~~~.~~~~~~~....3 4.9 REFUELING OPERATIONS 3/4.9.1 BORON CONCENTRATION......
p INDEX BASES SECTION                                                                                                               PAGE 3 4.7   PLANT SYSTEMS         (Continued) 3/4.7.8                                         ....... ............. . .9..9                                 .. 3 3/4 7-9 3/4.7.9 HYDRAULIC SNUBBERS.
~..........................-
FIRE SUPPRESSION             SYSTEMS .......................9                                   '.~
PAGE 3 3/4 7-9 8 3/4 7-7 B 3/4 7 9 B 3/4 8-1 B 3/4 9-1 B 3/4 9-1 B 3/4 9-1 3/4.9.4 CONTAINMENT BUILDING PENETRATZONS....................
8 3/4 7-7 B 3/4 7 9 3/4 7.10 FIRE RATED ASSEMBLIES.
B 3/4 9-1 3/4.9:5 COMMUNICATIONS.
3 4.8 ELECTRICAL POWER SYSTEMIC                     ~       ~ ~ ~ ~ ~ ~ ~ ~ ~ . ~ ~ ~ ~ ~ ~ ~ ....               B 3/4 8-1 3 4.9 REFUELING OPERATIONS 3/4.9.1   BORON   CONCENTRATION......                   ~ ..........................-                             B 3/4 9-1 3/4.9.2    INSTRUMENTATZON......................................                                                    B 3/4 9-1 3/4.9.3   DECAY    TIME.                                                                                            B 3/4 9-1 3/4.9.4   CONTAINMENT BUILDING                   PENETRATZONS....................                                   B 3/4 9-1 3/4.9:5   COMMUNICATIONS.                                                                                           B 3/4  9-1 3/4 9.6   MANIPULATOR CRANE               OPERABILITY.......................                                       B 3/4 9-2 3/4.9.7   CRANE TRAVEL SPENT FUEL STORAGE                                   BUILDING...             .......       B 3/4 9-2 3/4 9 '   RESIDUAL HEAT REMOVAL AND COOLANT                                   CIRCULATZON........                   B 3/4 9-2 3/4.9.9   CONTAINMENT PURGE AND EXHAUST ISOLATION SYSTEM..B                                                   .   . B 3/4 9-2 3/4.9 10   AND 3/4.9.11           WATER LEVEL-REACTOR VESSEL AND STORAGE POOL B ~ ~ e ~ ~ ~ ~ ~ ~ ~ ~ ~ o ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~   B 3/4  9-3 3/4.9.12   STORAGE POOL VENTILATION                       SYSTEM......................                             B 3/4  9-3 3/4.9.13   SPENT FUEL CASK MOVEMENT. ~                       ................... .......             ~              B 3/4 9-3 3/4.9.14   SPENT FUEL CASK DROP PROTECTION                               SYSTEM...............                     B 3/4 9-3 3 4.10     SPECIAL TEST EXCEPTIONS 3/4 '0Bl SHUTDOWN MARGINe                   ~           ~   ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ B   ~ ~ ~ B 3/4 10-1 3/4.10.'2 GROUP HEIGHT, INSERTION                         AND POWER             DISTRIBUTION LIMITS~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~     ~ ~ ~ ~ ~ ~ ~                                                 B 3/4 10-1 COOK NUCLEAR PLANT         -   UNZT 1                         XIV                                   AMENDMENT NO.       QQ,~%
3/4 9.6 MANIPULATOR CRANE OPERABILITY.......................
 
B 3/4 9-1 B 3/4 9-2 3/4.9.7 CRANE TRAVEL-SPENT FUEL STORAGE BUILDING...
t 0
.......B 3/4 9-2 3/4 9'RESIDUAL HEAT REMOVAL AND COOLANT CIRCULATZON........
  )
B 3/4 9-2 3/4.9.9 CONTAINMENT PURGE AND EXHAUST ISOLATION SYSTEM..B..B 3/4 9-2 3/4.9 10 AND 3/4.9.11 WATER LEVEL-REACTOR VESSEL AND STORAGE POOL B~~e~~~~~~~~~o~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~3/4.9.12 STORAGE POOL VENTILATION SYSTEM......................
    ,I
3/4.9.13 SPENT FUEL CASK MOVEMENT.~...................
 
~.......B 3/4 9-3 B 3/4 9-3 B 3/4 9-3 3/4.9.14 SPENT FUEL CASK DROP PROTECTION SYSTEM...............
TABLE 3 '-4 SNUBBER VISUAL INSPECTION INTERVAL NUMBER OF UNACCEPTABLE SNUBBERS Population                     Column A              Column B                Column C or Category                 Extend Interval        Repeat Interval        Reduce Interval Notes 1 and 2             Notes 3 and 6       Notes 4 and 6         Notes 5 and 6 80 100 150 200                                                                           13 300                                                 ~ 12                     25 400                                                   18                     36 500                           12                     24                     48 750                           20                     40                     78
B 3/4 9-3 3 4.10 SPECIAL TEST EXCEPTIONS 3/4'0Bl SHUTDOWN MARGINe~~~~~~~~~~~~~~~~~~~~~~~~~B~~~3/4.10.'2 GROUP HEIGHT, INSERTION AND POWER DISTRIBUTION LIMITS~~~~~~~~~~~~~~~~~~~~~~~B 3/4 10-1 B 3/4 10-1 COOK NUCLEAR PLANT-UNZT 1 XIV AMENDMENT NO.QQ,~%
. 1000 or greater                 29                     56                     109 Note 1:     The next visual inspection interval for a snubber population or category size shall be determined based upon the previous inspection interval and the number of unacceptable snubbers found during that interval. Snubbers may be categorized, based upon their accessibility during power operation,, as accessible or inaccessible. These categories may be examined separately or jointly. However, the licensee must make and document that decision before any inspection and shall use that decision as the basis upon which to determine the next inspection interval for that category.
0)t ,I TABLE 3'-4 SNUBBER VISUAL INSPECTION INTERVAL NUMBER OF UNACCEPTABLE SNUBBERS Population or Category Notes 1 and 2 Column A Extend Interval Notes 3 and 6 Column B Repeat Interval Notes 4 and 6 Column C Reduce Interval Notes 5 and 6 80 100 150 200 13 300~12 25 400 18 36 500 12 24 48 750 20 40 78.1000 or greater 29 56 109 Note 1: The next visual inspection interval for a snubber population or category size shall be determined based upon the previous inspection interval and the number of unacceptable snubbers found during that interval.Snubbers may be categorized, based upon their accessibility during power operation,, as accessible or inaccessible.
Note 2:     Interpolation between population or category sizes and the number of unacceptable- snubbers is permissible. Use next lower integer for the value of the limit for Columns A, B, or C       if that integer includes a fractional value of unacceptable     snubbers   as determined by interpolation.
These categories may be examined separately or jointly.However, the licensee must make and document that decision before any inspection and shall use that decision as the basis upon which to determine the next inspection interval for that category.Note 2: Interpolation between population or category sizes and the number of unacceptable-snubbers is permissible.
COOK NUCLEAR PLANT   - UNIT 1             3/4 7-31                           AMENDMENT NO ~
Use next lower integer for the value of the limit for Columns A, B, or C if that integer includes a fractional value of unacceptable snubbers as determined by interpolation.
 
COOK NUCLEAR PLANT-UNIT 1 3/4 7-31 AMENDMENT NO~
PLANT SYSTEMS 3 4.7.9   FIRE SUPPRESSION SYSTEMS FIRE SUPPRESSION WATER SYSTEM LIMITING CONDITION   FOR OPERATION 3.7 '.1   The fire suppression water system shall be considered to be   OPERABLE with:
PLANT SYSTEMS 3 4.7.9 FIRE SUPPRESSION SYSTEMS FIRE SUPPRESSION WATER SYSTEM LIMITING CONDITION FOR OPERATION 3.7'.1 The fire suppression water system shall be considered to be OPERABLE with: a.Three fire suppression system pumps,'ach with a capacity of 2500 gpm, with their discharge aligned to the fire suppression header, b.Two fire water tanks,'ach with a minimum usable volume of 565,000 gallons (34,0 feet level indication).
: a. Three fire suppression system pumps, 'ach with a capacity of 2500 gpm, with their discharge aligned to the fire suppression header,
co An OPERABLE flow path capable of taking suction from either one of the fire water tanks and transferring the water through distribution piping (with OPERABLE sectionalizing valves)up to the yard hydrant curb control valves, to the hose station valve(s)and water suppression system controlling valve(s).The hose station valve(s)and the water suppression system controlling valve(s)that aze required to be in the flow path are given in Specifications 3.7.9.5 and 3,7.9.2, respectively.
: b. Two fire water tanks, 'ach with a minimum usable volume of 565,000 gallons (34,0 feet level indication).
APPLICABILITY:
co   An OPERABLE   flow path capable of taking suction from either   one of the fire water tanks and   transferring the water through distribution piping (with OPERABLE sectionalizing valves) up to the yard hydrant curb control valves, to the hose station valve(s) and water suppression system controlling valve(s). The hose station valve(s) and the water suppression system controlling valve(s) that aze required to be in the flow path are given in Specifications 3.7.9.5 and 3,7.9.2, respectively.
At all times.ACTION: a~With one pump inoperable, restore the inoperable pump to OPERABLE status within 7 days or provide an alternate backup pump.b.With one fire water tank inoperable, restore the inoperable tank to OPERABLE status within 30 days or establish a backup water system supply.c~With the fire suppression water system otherwise inoperable:
APPLICABILITY: At   all times.
1.Restore the fire suppression water distribution system to OPERABLE status within 24 hours, or 2.Establish a backup fire suppression water system within 24 hours.d.The provisions of Specifications 3.0.3 and 3.0,4 are not applicable.
ACTION:
+These pumps and tanks are shazed between Units 1 and 2.COOK NUCLEAR PLANT-UNIT 1 3/4 7-33 AMENDMENT NO.M, 430,  
a ~ With one pump   inoperable, restore the inoperable pump to OPERABLE status within   7 days or provide an alternate backup pump.
: b. With one fire water   tank inoperable, restore the inoperable tank to OPERABLE status within 30 days or establish a backup water system supply.
c ~ With the fire suppression water system otherwise inoperable:
: 1. Restore the   fire suppression water distribution system to OPERABLE status within   24 hours, or
: 2. Establish   a backup fire suppression water system within 24 hours.
: d. The provisions of Specifications 3.0.3 and 3.0,4 are not applicable.
+ These pumps and tanks are shazed between       Units 1 and 2.
COOK NUCLEAR PLANT   - UNIT   1         3/4 7-33           AMENDMENT NO. M, 430,
 
'
'
PLANT SYSTEMS SURVEILLANCE RE UIREMENTS 4.7.9.1.1 The fire suppression water system shall be demonstrated OPERABLE: a.At least once per 7 days by verifying the water supply contained in the fire water tanks.b.At least once per 31 days on a STAGGERED TEST BASIS by starting each pump and operating it for at least 15 minutes on recirculation flow.C~At least once per 31 days by verifying that each valve (manual, power operated, or automatic) in the flow path that is not locked, sealed, or otherwise secured in position, is in its correct'osition.
PLANT SYSTEMS SURVEILLANCE RE UIREMENTS 4.7.9.1.1 The fire suppression water system shall be demonstrated                     OPERABLE:
d.At least once per 6 months by performance of a system flush of above ground internal distribution headers and fire hydrants.e.At least once per 12 months by cycling each testable valve in the flow path through at least one complete cycle of full travel.At least once per 18 months by performing a system functional test which includes simulated automatic actuation of the system throughout its operating sequence, and: 1.Verifying that each automatic valve in the flow path actuates to its correct position, 2.Verifying that each pump develops a flow of at least 2500 gpm at a system head of at least 300 feet of water by observing three points (minimum, rated, and peak)on the pump's performance curve, 3.Cycling each valve in the flow path that is not testable during plant operation through at least one complete cycle of full travel, and 4.Verifying that each pump starts in its preplanned sequence to maintain the fire suppression water system pressure greater than or equal to 100 psig.ge At least once per 3 years by performing a series of flow tests so that every fire main segment (excluding individual system supplies)has been verified to be clear of obstruction by a full flow test.COOK NUCLEAR PLANT-UNIT 1 3/4 7-34 AMENDMENT NO.M, 480,  
: a. At least once per 7 days by verifying the water supply contained in the fire water tanks.
: b. At least once per 31 days on a STAGGERED TEST BASIS by starting each pump and operating     it for at least 15 minutes on recirculation flow.
C ~ At least once per 31 days by verifying that each valve (manual, power operated, or automatic) in the flow path that is not locked, sealed, or otherwise secured in position, is in its       correct'osition.
: d. At least once per   6 months by performance of a system                 flush of above ground   internal distribution headers   and fire hydrants.
: e. At least once per 12 months by cycling each testable valve in the flow path through at least one complete cycle of full travel.
At least once per 18 months by performing a system functional test which includes simulated automatic actuation of the system throughout its operating sequence, and:
: 1. Verifying that each automatic valve in the flow path actuates to its correct position,
: 2. Verifying that each pump develops a flow of at least 2500 gpm at a system head of at least 300 feet of water by observing three points (minimum, rated, and peak) on the pump's performance curve,
: 3. Cycling each valve in the flow path that is not testable during plant operation through at least one complete cycle of full travel, and
: 4. Verifying that   each pump starts in its preplanned                   sequence   to maintain the fire suppression water system pressure greater than or equal to 100 psig.
ge   At least once per   3 years by performing a series of flow tests so that every fire   main segment (excluding individual system supplies) has been verified to be clear of obstruction by a       full               flow test.
COOK NUCLEAR PLANT   - UNIT 1         3/4 7-34         AMENDMENT NO.                 M,   480,
 
PLANT SYSTEMS SURVEILLANCE RE UIREMENTS      Continued 4,7.9.1.2  The  fire  pump  diesel engines shall  be demonstrated  OPERABLE:
: a. At least once per    31 days by verifying:
: 1. The  fuel storage tanks contain at least    160 gallons of fuel, and
: 2. The  diesels start from ambient conditions and operate for at least  30  minutes.
b.-  At least once per 92 days by verifying that a sample of diesel fuel from the fuel storage tanks obtained in accordance with ASTM-D4057-81 is within the acceptable limits specified in Table 1 of ASTM-D975-81 when checked for viscosity, water and sediment.
c ~  At least once per    18 months by subjecting the diesels to an inspection in accordance with procedures prepared in conjunction with the manufacturer's recommendations for this class of standby service 4.7.9.1.3  The  fire pump  diesel starting battery banks  and chargers  shall  be demonstrated  OPERABLE:
: a. At least once per    7 days by verifying that:
: 1. The  electrolyte level of    each battery is  above the plates,  and
: 2. The output battery voltage of each bank is greater than      24 volts.
: b. At least once per 92 days by verifying that the specific gravity is appropriate for continued service of each battery.
c ~  At least once per    18 months by  verifying that:
: 1. The batteries, cell plates and battery packs show no visual indication of physical damage or abnormal deterioration, and
: 2. The battery-to-battery and terminal connections are clean, tight, free of corrosion, and coated with anti-corrosion material, COOK NUCLEAR PLANT  - UNIT  1        3/4 7-35          AMENDMENT NO. M,  480,    ~ f
 
PLANT SYSTEMS SURVEILLANCE RE UIREMENTS      Continued 4.7.9.2    Each  of the above required water spray and/or sprinkler      systems  shall be  demonstrated to be OPERABLE:
: a. At least once per 12 months by cycling each testable valve in the flow path through at least one complete cycle of full travel as provided by Technical Specification 4,7,9.1,1,e.
: b. At least once per  18 months:
: 1. By performing a system  functional test which includes simulated automatic actuation of the syst: em, and:
a)  Verifying that the automatic valves in the flow path actuate to their correct positions on a test signal, and'.
b)  Cycling each valve in the flow, path that is not testable during plant operation through at least one complete cycle of  full travel.
By visual inspection of deluge    and preaction system piping (this is not required for    systems supervised by air) to verify their integrity.
: 3. By visual inspection of each    open head deluge nozzle  'to verify that there is no blockage, c ~  At least once per  3 years by performing an    air flow test through the piping of  each open head deluge system and    verifying each open head deluge nozzle is unobstructed.
The fire protection water flow surveillance testing may be suspended until the completion of the fire protection water storage tank and fire pump installations (May 31, 1993). The surveillance testing suspended as a resu                lt o t s amendment will be initiated at its normal frequency within four              mo th s our mon oof the new fire protection water storage tanks and fire pumps being decl        ec are d 0 P E RABLE, with the exception of unit outage required testing which would be completed before the end of the next scheduled unit outage.
COOK NUCLEAR PLANT      - UNIT 1          3/4 7-37    AMENDMENT NO. 400, 430, 444,
 
PLANT SYSTEMS FIRE  HOSE STATIONS LIMITING CONDITION    FOR OPERATION 3,7.9.5  The  fire hose  stations              shown  in Table 3.7-7 shall          be OPERABLE:
APPLICABILITY: Whenever equipment in the areas protected by the                                fire  hose stations. is required to be OPERABLE.
ACTION:
: a. With one or more of the fire hose stations shown in Table 3.7-7 inoperable: 1) For those areas where the inoperable fire hose station is the primary means of fire suppression (areas where no fixed systems aze provided or areas where the fixed systems aze inoperable), within 1 hour, route an additional equivalent capacity fire hose to the affected area(s), from an OPERABLE hose station(s) per Specification 4.7.9.5, or 2) within 1 hour, verify that the fixed fire suppression system(s) that also protects the affected area(s) serviced by the fire hose station(s) is OPERABLE.
b,  The  provisions of Specifications 3.0.3 and 3.0.4 are not applicable.
SURVEILLANCE RE UIREMENTS 4 '.9.5  Each  of the fire hose stations                  shown in Table 3.7-7 shall            be demonstrated    OPERABLE:
: a. At least once per                31 days by a    visual inspection of the. fire hose stations to assure                all required equipment is at the station.
: b.  $ t least once per 18 months by:
: 1. Removing the hose                for visual inspection          and  re-racking,  and
: 2. Replacement    of            all  degraded gaskets          in couplings.
: c. At least once per                3  years by:
: 1. Partially  opening each hose                station valve to verify            OPERABILITY and no  flow  blockage.'.
Conducting a hose hydrostatic test at a pressure of 150 psig or at least 50 psi greater than the maximum pressure available at that hose station, whichever is                  greater.'he fire protection water flow surveillance testing may be suspended until the completion of the    fire protection water storage tank and fire pump installations (May 31, 1993). The surveillance testing suspended as a result of this amendment will be initiated at its normal frequency within four months of the new fire protection water storage tanks and fire pumps being declared OPERABLE,  with the exception of unit outage required testing which would be completed before the end of the next scheduled unit outage.
COOK NUCLEAR PLANT    - UNIT  1                      3/4 7-43                  AMENDMENT NO.
 
BASES  (Continued) radiation levels and the expected time to perform a visual inspection  etc' in each snubber location as well as other factors associated with accessibility during plant operations (e.g., temperature, atmosphere, location,            ), and recommendations of Regulatory Guides 8.8 and 8.10. The addition or deletion of any snubber shall be made in accordance with Section 50.59 of 10 CFR Part 50.
3 4 7 9    FIRE SUPPRESSION SYSTEMS The OPERABILITY    of the fire suppression systems ensures that adequate fire suppression capability is available to confine and extinguish fires occurring in any portion of the facility where safety related equipment is located.
The fire suppression systems consist of the water system, spray and/or sprinklers,  C02, Halon and  fire hose  stations. The collective capability of the fire  suppression systems is adequate to minimize potential damage to safety-related equipment and is a major element in the facility fire protection program.
In the event that one or more C02 suppression systems requiring automatic actuation must be isolated for personal protection to permit entry for routine tours, maintenance, construction, or surveillance testing in the protected area, the fire detection system(s) required to be OPERABLE by Specification 3.3.3.7 shall be verified to be OPERABLE. Isolation of an automatic CO suppression system temporarily puts this system in a manual actuation mote.
Reliance on the fire detection syst: em, in conjunction with the ability to manually discharge the C02 suppression system will provide adequate fire protection for periods when personnel are required to work in these areas.
In the event that portions of the fire suppression systems are inoperable, alternate backup fire fighting equipment is required to be made available in the affected areas until the inoperable equipment is restored to service.
When  the inoperable fire fighting equipment is intended for use as a backup means  of fire suppression, a longer period of time is allowed to provide an alternate means of fire fighting than      if  the inoperable equipment is the primary means of fire suppression.      Backup fire protection equipment will normally take the form of permanently mounted fire extinguishers and/or fire hose stations in or near the area, or fire hoses routed to the affected area.
In the event that the fire water tanks become inoperable, Lake Michigan may serve as their backup. Two manual, diesel-engine driven, vertical-turbine fire pumps rated at 2000 gpm, which take suction off of Lake Michigan and provide water to the fire suppression header, are administratively controlled. One of these pumps may serve as a backup to one of the fire suppression pumps that take suction off of the tanks. However,      it is not our intent to rely  on backup systems or other compensatory measures for an extended period of time and action will be taken to restore the inoperable portions of the fire suppression system to      OPERABLE status within a reasonable period.
COOK NUCLEAR PLANT    - UNIT 1        B  3/4 7-7        AMENDMENT NO. 68,
 
BASES 3  4 4.7  9  Continued The  surveillance requirements provide assurance that the minimum OPERABILITY requirements of the fire suppression systems are met. While performing the surveillances specified in 4.7.9.1 the fire suppression water system is        still capable of performing its intended function. Consequently,      it  is not necessary to enter the ACTION STATEMENT specified in 3.7.9.1      while  the SURVEILLANCES specified in 4.7.9.1.1 are being performed,      unless  the  tested equipment fails the SURVEILLANCE. In addition, an allowance is        made  for ensuring a sufficient volume of Halon and CO> in the Halon and COz storage tanks by verifying either the weight, level, or pressure of the tanks.
The  fire  suppression water system has three fire pumps common to both units which discharge into underground ring headers.        There is one motor-driven horizontal centrifugal fire pump rated at 2500 gpm that takes suction from the fire water storage tanks; and two diesel-engine-driven horizontal centrifugal fire pumps rated at 2500 gpm that take suction from the fire water storage tanks. Having a combination of diesel-driven and electric motor-driven pumps in the system design is consistent with NRC Branch Technical Position APSCB 9.5-1.
The  flow paths capable of taking suction from Lake Michigan are normally isolated to preclude zebra mussel infestation of the system.
The purpose    of the charcoal filter fire suppr'ession T/S is to account for detection and suppression of fires in the charcoal filters. Manual operation of these systems is allowed because two-point heat detection with control room and local annunciation of trouble conditions is provided for the charcoal filters. The OPERABILITY of the fire suppression system protecting the charcoal filters is only required when there is charcoal in the filters.
Actuation of spray water onto the charcoal filters requires both the manual opening of the system isolation valve and reaching the high temperature alarm setpoint for the automatic opening of the system deluge valve.
Because  of the inaccessibility of the lower containment to personnel during operation due to ALARA radiation exposure concerns, the use of one or more CCTVs in the lower containment, to monitor for fire and smoke, is an acceptable substitute to an hourly fire watch, becomes inoperable.
if  the fire suppression system
'All hourly fire watch patrols are performed at intervals of sixty minutes with a margin of fifteen minutes.
II A  continuous fire watch requires that a trained individual be in the specified area at all times and that each fire zone within the specified area be patrolled at least once every fifteen minutes with a margin of five minutes.
COOK NUCLEAR PLANT      - UNIT 1      B 3/4 7-8        AMENDMENT NO.
 
INDEX BASES SECTION                                                                                                          PAGE 3 4.4  REACTOR COOLANT SYSTE          (Continued) 3/4.4.9 3/4.4.10 i'
PRESSURE/TEMPERATURE STRUCTURAL ZNTEGRZTY LIMITS
                                        ..........
                                                        ................o.o..o...
                                                              ..  ~  ......'... ........    ~
B B
3/4 3/4 4-6 4-10 3.4.4.11  RELIEF VALVES  ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~      ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~  B  3/4 4-11 3/4.4.12  REACTOR COOLANT VENT SYSTEM                .......o.......iso.o......                              B  3/4 4-11 3 4.5    EMERGENCY CORE COOLING SYSTEMS                      ECCS 3/4 '.1  ACCUMULATORS      .. oi ~ oo.ohio      ~  ..o.o.        ~ ~  ...o    ~  ...........          B  3/4 5-1 3/4.5.2  and 3/4.5.3  ECCS SUBSYSTEMS                                                                        B  3/4 5-1 3/4 5.4  BORON INJECTION SYSTEM            ........ o.........                        ~ ~                    B  3/4 5-2 3/4 5.5  REFUELING WATER STORAGE TANK (RWST)                            .    .  .... ......              . B  3/4 5-3 3 4.6    CONTAINMENT SYSTEMS 3/4.6.1  PRIMARY CONTAINMENT        .............oo                ~ ~    ...o..i.o........                  B  3/4 6-1 3/4 6.2  DEPRESSURZZATZON AND COOLING SYSTEMS                              ...............o.                  B  3/4 6-3 3/4.6.3  CONTAINMENT ISOLATION VALVES                  .o.....            ~ ..o.o.      ~ ........          B  3/4 6-3 3/4.6 4  COMBUSTIBLE GAS CONTROL                                                                              B  3/4 6-3 3/4.6.5  ICE CONDENSER                                                                  ~  ~ ~ ~ ~ ~ ~ ~ ~ ~ B  3/4 6 4 3 4.7    PLANT SYSTEMS 3/4.7.1  TURBINE CYCLE                                                                                        B  3/4 7-1 3/4.7.2  STEAM GENERATOR PRESSURE/TEMPERATURE LIMITATZON                                          ... ..      B  3/4 7-4 3/4.7.3  COMPONENT COOLING WATER SYSTEM                    ......................                            B  3/4 7-4 3/4.7.4  ESSENTIAL SERVICE WATER SYSTEM                                                                      B  3/4 7-4 3/4.7.5  CONTROL ROOM EMERGENCY VENTILATION SYSTEM                                                            B  3/4 7-4a 3/4 7.6  ESF VENTILATION SYSTEM                                                                              B  3/4 7-5 3/4 7.7  HYDRAULIC SNUBBERS                                                            ~  ~ ~ ~ ~ ~ ~ ~ ~ ~ B  3/4 7 5 COOK NUCLEAR PLANT  UNIT 2                          XIII                                                AMENDMENT NO.    ~
 
INDEX BASES SECTION                                                                                        PAGE 3 4.7    PLANT SYSTEMS  (Continued) 3/4 7.8  SEALED SOURCE CONTAMINATION          ... .. ~ . . ~ ~ ~ ~ i.  ~ . o..o..      ~ B 3/4  7-6 3/4.7.9  FIRE SUPPRESSION SYSTEMS      ...... .... ....                  ~ ~ ~    ..        B 3/4  7-6 3/4.7.10 FIRE-RATED ASSEMBLIES    ...    .  ~ o.....                                        B 3/4  7-9 3 4.8    ELECTRICAL POWER SYSTEMS      ~ ~ ~  .......  .  ..  ~ ~ . ~ ~ ~    ~ ~  ... ~ ~ B 3/4  8-1 3 4.9    REFUELING OPERATIONS 3/4.9.1  BORON CONCENTRATION    ~ .... ~  .  ~ .......                                        B 3/4  9-1 3/4.9.2  INSTRUMENTATION                                                                      B 3/4  9-1 3/4.9.3  DECAY TIME                                                                          B 3/4  9-1 3/4.9.4  CONTAINMENT BUZLDING PENETRATIONS            .. .. .....o.....                      B 3/4  9-1 3/4.9.5  COMMUNICATIONS  ...i..o.i...oiooo..... ...o.o o.+oooo        ~ o                  B 3/4  9-1 3/4.9.6  MANIPULATOR CRANE OPERABILITY                                                        B 3/4  9-2 3/4.9.7  CRANE TRAVEL  SPENT FUEL STORAGE            BUILDING                                B 3/4  9-2 3/4.9.8  RESIDUAL HEAT REMOVAL AND COOLANT CIRCULATION                                        B 3/4  9-2 3/4.9.9  CONTAINMENT PURGE AND EXHAUST ISOLATION SYSTEM                        ii ....      B 3/4  9-3 3/4.9.10 and  3/4.9.11  WATER LEVEL    -    REACTOR VESSEL AND STORAGE POOL                                                                    B 3/4  9-3 3/4.9 12 STORAGE POOL VENTILATION SYSTEM            .......    .~.  ~ .........            B 3/4  9-3 3/4.9.13 SPENT FUEL CASK MOVEMENT                                                            B 3/4  9-3 3/4.9.14 SPENT FUEL CASK DROP PROTECTION SYSTEM                                              B 3/4  9-3 3 4.10  SPECIAL TEST EXCEPTIONS 3/4.10.1 SHUTDOWN MARGIN                                                                      B 3/4 10-1 3/4.10.2 GROUP HEIGHTg  INSERTION AND POWER DISTRZBUTION LIMITS.                            B 3/4 10-1 COOK NUCLEAR PLANT "-  UNIT 2                  XIV                                      AMENDMENT  NO.~
 
~ ~
PLANT SYSTEMS 3 4    9  FIRE SUPPRESSION SYSTEMS FIRE SUPPRESSION WATER SYSTEM LIMITING CONDITION    FOR OPERATION 3.7.9.1      The fire suppression      water system shall be considered to be      OPERABLE with:
: a. Three    fire  suppression system pumps,
* each with    a capacity of  2500    gpm,  with their discharge        aligned to the fire suppression header,
: b. Two  fire water    tanks,
* each with  a minimum usable volume    of 565,000 gallons (34.0        feet level indication)
C. An OPERABLE    flow path capable of taking suction from either one of the      fire water tanks an'd transferring the water through distribution piping (with OPERABLE sectionalizing valves) up to the yard hydrant curb control valves, to the hose    station valve(s) and water suppression system controlling valve(s). The hose station valve(s) and the water suppression system controlling valve(s) that are required to be in the flow path are given in Specifications 3.7.9.5 and 3.7.9.2, respectively.
APPLICABILITY:    At  all  times.
ACTION:
: a. With one      pump inoperable, restore the inoperable pump to OPERABLE    status within 7 days or provide an alternate backup pump.
: b. With one fire water tank inoperable, restore the inoperable tank to OPERABLE status within 30 days or establish a backup water system supply.
c ~  With the    fire  suppression water system otherwise inoperable:
Restore the    fire suppression water distribution system to  OPERABLE    status within  24 hours, or
: 2.      Establish a backup    fire suppression    water system within 24  hours.
: d. The  provisions of Specifications 3.0.3            and  3.0.4 are not applicable.
* These  pumps and  tanks are shared between Units        1 and  2.
COOK NUCLEAR PLANT    - UNIT 2            3/4 7-27          AMENDMENT NO. 4k,  ~,  454
 
PLANT SYSTEMS SURVEILLANCE RE UIREMENTS 4.7.9.1.1    The  fire  suppression water system shall be demonstrated        OPERABLE:
: a. At least once per 7 days by verifying the water supply contained in the fire water tanks.
: b. At least once per 31 days on a STAGGERED TEST BASIS by starting each pump and operating flow.
it  for at least 15 minutes on recirculation C. At least once per 31 days by verifying that each valve (manual, power operated, or automatic) in the flow path that is not locked, sealed, or otherwise secured in position, is in its correct position.
: d. At least once per        6  months by performance    of  a system  flush of above ground    internal distribution headers      and fire  hydrants.
: e. At least once per 12 months by cycling each testable valve in the flow path through at least one complete cycle of full travel.
At least once per 18 months by performing a system functional test which includes simulated automatic actuation of the system throughout its operating sequence, and:
Verifying that each automatic valve in the flow path actuates to its correct position, Verifying that each pump develops a flow of at least 2500 gpm at a system head of at least 300 feet of water by observing three  points      (minimum,    rated  and  peak)  on  the  pump's performance curve,      .
: 3.      Cycling each valve in the flow path that is not, testable during plant operation through at least one complete cycle of full travel,    and Verifying that        each high pressure      pump starts    in its preplanned sequence to maintain the, fire suppression water system pressure greater than or equal to 100 psig.
g ~  At least once per      3  years by performing a series of flow tests so that every fire main      segment (excluding individual system supplies) has been    verified to    be clear of obstructions by a    full  flow test.
COOK NUCLEAR PLANT    - UNIT 2            3/4 7-28          EEEEEEEEE EO. EE, EEE,    ~
 
LANT SYSTEMS SURVEILLANCE RE UIREMENTS      Continued 4.7.9.1.2  The  fire pump  diesel engines shall be demonstrated        OPERABLE:
a ~  At least once per    31 days by  verifying:
The  fuel storage tanks contain at least      160  gallons of fuel, and
: 2. The  diesels start from ambient conditions and operate for at least  30  minutes.
: b. At least once per    92 days by  verifying that a sample of diesel fuel from the fuel storage tanks obtained in accordance with ASTM-D4057-81 is within the acceptable limits specified in Table 1 of ASTM-D975-81 when checked for viscosity, water and sediment.
C. At least once per 18 months by subjecting the diesels to an inspection in accordance with procedures prepared in conjunction with its manufacturer's recommendations for this class of standby service.                                    '
4.7.9.1.3    The  fire  pump  diesel starting battery banks      and chargers  shall  be demonstrated  OPERABLE:
: a. At least once per    7 days by  verifying that:
The  electrolyte level of    each  battery is    above the  plates, and
: 2. The  output battery voltage of each bank is greater than          24 volts.
: b. At least once per 92 days by verifying that the specific gravity is appropriate for continued service of each battery.
C. At least once per    18 months by  verifying, that:
The"batteries, cell plates and battery packs show no visual indication of physical damage or abnormal deterioration, and
: 2. The  battery-to-battery    and  terminal connections are clean, tight, free of corrosion,        and coated with anti-corrosion material.
COOK NUCLEAR PLANT -    UNIT 2          3/4 7-29            AMENDMENT NO. 44, khan, 454
 
PLANT SYSTEMS SURVEILLANCE RE UIREMENTS      Continued 4.7.9.2      Each of the  above required water spray and/or    sprinkler systems shall be demonstrated to    be OPERABLE:
a ~  At least once per 12 months by cycling each testable valve in the flow path through at least one complete cycle of full travel as provided by Technical Specification 4.7.9.1.1.e.
: b. At least once per    18 months:
By  performing a system functional test which includes simulated automatic actuation of the system, and:
a)  Verifying that the automatic valves in the flow path actuate to their correct positions on a test signal, and*
b) Cycling each valve    in the flow path that is not testable during plant operation through at least one complete cycle of full travel.
: 2. By  visual inspection of deluge and preaction system piping (this is not required for systems supervised by air) to verify their integrity.
By  visual inspection of      each open head  deluge nozzle          to verify that there is    no blockage.
At least once per 3 years by performing an air flow test through the piping of each open head deluge system and verifying each deluge nozzle is unobstructed.
open'ead
*The  fire protection water flow surveillance testing may be suspended until the completion of the  fire protection water storage tank and fiie pump installations (May 31, 1993).      The surveillance testing suspended as a result of this amendment will be initiated at its normal frequency within four months of the new fire protection water storage tanks and fire pumps being declared OPERABLE, with the exception of unit outage required testing which would be completed before the end of the next scheduled unit outage.
COOK NUCLEAR PLANT  - UNIT  2        3/  7 31    AMENDMENT NO'''34'40                454 I
 
PLANT SYSTEMS FIRE HOSE STATIONS LIMITING CONDITION    FOR OPERATION 3.7.9.5      The  fire  hose  stations  shown    in Table 3.7-7 shall    be OPERABLE:
APPLICABILITY:    Whenever equipment      in the areas protected by the fire          hose stations is required to    be OPERABLE.
ACTION a  ~  With one or more of the fire hose stations shown in Table 3.7-7 inoperable:    1) For those areas where the inoperable fire hose station is the primary means of fire suppression (areas where no fixed systems are provided or areas where the fixed systems are inoperable), within 1 hour, route an additional equivalent capacity fire hose to the affected area(s) from an OPERABLE hose station(s) per Specification 4.7.9.5, or 2) within 1 hour, verify that the fixed fire suppression system(s) that also protects the affected area(s) serviced by the fire hose station(s) is OPERABLE.
: b. The    provisions    of Specifications        3.0.3  and    3.0.4  are    not applicable.
SURVEILLANCE RE UIREMENTS 4.7.9.5      Each    of the fire    hose  stations    shown  in Table 3.7-7 shall        be demonstrated  OPERABLE:
: a. At least once per      31 days by a    visual inspection of 'the fire hose stations to assure      all  required equipment is at the station.
: b. At least once per      18 months    by:
Removing the hose    for visual inspection    and  re-racking,  and 2 ~    Replacement  of all    degraded gaskets    in couplings.
: c. At least once per    3  years by:
Partially    opening      each  hose  station    valve    to verify OPERABILITY and no      flow blockage.*
: 2.      Conducting a hose hydrostatic        test at a pressure of 150 psig or at least 50 psi greater than the maximum pressure available at that hose station, whichever is greater.*
*The  fire protection water flow surveillance testing may be suspended until the completion of the    fire protection water storage tank and fire pump installations (May 31, 1993).        The surveillance testing suspended as a result of this amendment will be initiated at its normal frequency within four months of the new fire protection water storage tanks and fire pumps being declared OPERABLE, with the exception of unit outage required testing which would be completed before the end of the next scheduled unit outage.
COOK NUCLEAR PLANT    - UNIT 2          3/4 7-37            AMENDMENT NO. 44,  ki4,  450


PLANT SYSTEMS SURVEILLANCE RE UIREMENTS Continued 4,7.9.1.2 The fire pump diesel engines shall be demonstrated OPERABLE: a.At least once per 31 days by verifying:
ATTACHMENT 2 TO AEP:NRC:1143A OATH OF AFFIRMATION STATEMENT FOR AEP:NRCt0659V
1.The fuel storage tanks contain at least 160 gallons of fuel, and 2.The diesels start from ambient conditions and operate for at least 30 minutes.b.-At least once per 92 days by verifying that a sample of diesel fuel from the fuel storage tanks obtained in accordance with ASTM-D4057-81 is within the acceptable limits specified in Table 1 of ASTM-D975-81 when checked for viscosity, water and sediment.c~At least once per 18 months by subjecting the diesels to an inspection in accordance with procedures prepared in conjunction with the manufacturer's recommendations for this class of standby service 4.7.9.1.3 The fire pump diesel starting battery banks and chargers shall be demonstrated OPERABLE: a.At least once per 7 days by verifying that: 1.The electrolyte level of each battery is above the plates, and 2.The output battery voltage of each bank is greater than 24 volts.b.At least once per 92 days by verifying that the specific gravity is appropriate for continued service of each battery.c~At least once per 18 months by verifying that: 1.The batteries, cell plates and battery packs show no visual indication of physical damage or abnormal deterioration, and 2.The battery-to-battery and terminal connections are clean, tight, free of corrosion, and coated with anti-corrosion material, COOK NUCLEAR PLANT-UNIT 1 3/4 7-35 AMENDMENT NO.M, 480,~f PLANT SYSTEMS SURVEILLANCE RE UIREMENTS Continued 4.7.9.2 Each of the above required water spray and/or sprinkler systems shall be demonstrated to be OPERABLE: a.At least once per 12 months by cycling each testable valve in the flow path through at least one complete cycle of full travel as provided by Technical Specification 4,7,9.1,1,e.
b.At least once per 18 months: 1.By performing a system functional test which includes simulated automatic actuation of the syst: em, and: a)Verifying that the automatic valves in the flow path actuate to their correct positions on a test signal, and'.b)Cycling each valve in the flow, path that is not testable during plant operation through at least one complete cycle of full travel.By visual inspection of deluge and preaction system piping (this is not required for systems supervised by air)to verify their integrity.
3.By visual inspection of each open head deluge nozzle'to verify that there is no blockage, c~At least once per 3 years by performing an air flow test through the piping of each open head deluge system and verifying each open head deluge nozzle is unobstructed.
The fire protection water flow surveillance testing may be suspended until the completion of the fire protection water storage tank and fire pump installations (May 31, 1993).The surveillance testing suspended as a lt resu of t o t s amendment will be initiated at its normal frequency within four mo th our mon s 0 E o he new fire protection water storage tanks and fire pumps being decl d ec are P RABLE, with the exception of unit outage required testing which would be completed before the end of the next scheduled unit outage.COOK NUCLEAR PLANT-UNIT 1 3/4 7-37 AMENDMENT NO.400, 430, 444, PLANT SYSTEMS FIRE HOSE STATIONS LIMITING CONDITION FOR OPERATION 3,7.9.5 The fire hose stations shown in Table 3.7-7 shall be OPERABLE: APPLICABILITY:
Whenever equipment in the areas protected by the fire hose stations.is required to be OPERABLE.ACTION: a.With one or more of the fire hose stations shown in Table 3.7-7 inoperable:
1)For those areas where the inoperable fire hose station is the primary means of fire suppression (areas where no fixed systems aze provided or areas where the fixed systems aze inoperable), within 1 hour, route an additional equivalent capacity fire hose to the affected area(s), from an OPERABLE hose station(s) per Specification 4.7.9.5, or 2)within 1 hour, verify that the fixed fire suppression system(s)that also protects the affected area(s)serviced by the fire hose station(s) is OPERABLE.b, The provisions of Specifications 3.0.3 and 3.0.4 are not applicable.
SURVEILLANCE RE UIREMENTS 4'.9.5 Each of the fire hose stations shown in Table 3.7-7 shall be demonstrated OPERABLE: a.At least once per 31 days by a visual inspection of the.fire hose stations to assure all required equipment is at the station.b.$t least once per 18 months by: 1.Removing the hose for visual inspection and re-racking, and 2.Replacement of all degraded gaskets in couplings.
c.At least once per 3 years by: 1.Partially opening each hose station valve to verify OPERABILITY and no flow blockage.'.
Conducting a hose hydrostatic test at a pressure of 150 psig or at least 50 psi greater than the maximum pressure available at that hose station, whichever is greater.'he fire protection water flow surveillance testing may be suspended until the completion of the fire protection water storage tank and fire pump installations (May 31, 1993).The surveillance testing suspended as a result of this amendment will be initiated at its normal frequency within four months of the new fire protection water storage tanks and fire pumps being declared OPERABLE, with the exception of unit outage required testing which would be completed before the end of the next scheduled unit outage.COOK NUCLEAR PLANT-UNIT 1 3/4 7-43 AMENDMENT NO.


BASES (Continued) radiation levels and the expected time to perform a visual inspection in each snubber location as well as other factors associated with accessibility during plant operations (e.g., temperature, atmosphere, location, etc'~), and recommendations of Regulatory Guides 8.8 and 8.10.The addition or deletion of any snubber shall be made in accordance with Section 50.59 of 10 CFR Part 50.3 4 7 9 FIRE SUPPRESSION SYSTEMS The OPERABILITY of the fire suppression systems ensures that adequate fire suppression capability is available to confine and extinguish fires occurring in any portion of the facility where safety related equipment is located.The fire suppression systems consist of the water system, spray and/or sprinklers, C02, Halon and fire hose stations.The collective capability of the fire suppression systems is adequate to minimize potential damage to safety-related equipment and is a major element in the facility fire protection program.In the event that one or more C02 suppression systems requiring automatic actuation must be isolated for personal protection to permit entry for routine tours, maintenance, construction, or surveillance testing in the protected area, the fire detection system(s)required to be OPERABLE by Specification 3.3.3.7 shall be verified to be OPERABLE.Isolation of an automatic CO suppression system temporarily puts this system in a manual actuation mote.Reliance on the fire detection syst: em, in conjunction with the ability to manually discharge the C02 suppression system will provide adequate fire protection for periods when personnel are required to work in these areas.In the event that portions of the fire suppression systems are inoperable, alternate backup fire fighting equipment is required to be made available in the affected areas until the inoperable equipment is restored to service.When the inoperable fire fighting equipment is intended for use as a backup means of fire suppression, a longer period of time is allowed to provide an alternate means of fire fighting than if the inoperable equipment is the primary means of fire suppression.
STATE OF OHIO COUNTY OF FRANKLIN R. F. Hering, bei.ng duly sworn, deposes and says that he is the Vice President of licensee Indiana Michigan Power Company, that he has read the foregoing application for SECTION 6 TECHNICAL SPECIFICATION CHANGE REQUEST and he knows the contents thereof'nd that said contents are true to the best of his knowledge  and belief.
Backup fire protection equipment will normally take the form of permanently mounted fire extinguishers and/or fire hose stations in or near the area, or fire hoses routed to the affected area.In the event that the fire water tanks become inoperable, Lake Michigan may serve as their backup.Two manual, diesel-engine driven, vertical-turbine fire pumps rated at 2000 gpm, which take suction off of Lake Michigan and provide water to the fire suppression header, are administratively controlled.
Subscri.bed and sworn  to me before this day of NOTAR        PUBLIC BITA D. HILL NOTARY PUBLIC. STAT) OF OHIO
One of these pumps may serve as a backup to one of the fire suppression pumps that take suction off of the tanks.However, it is not our intent to rely on backup systems or other compensatory measures for an extended period of time and action will be taken to restore the inoperable portions of the fire suppression system to OPERABLE status within a reasonable period.COOK NUCLEAR PLANT-UNIT 1 B 3/4 7-7 AMENDMENT NO.68, BASES 3 4 4.7 9 Continued The surveillance requirements provide assurance that the minimum OPERABILITY requirements of the fire suppression systems are met.While performing the surveillances specified in 4.7.9.1 the fire suppression water system is still capable of performing its intended function.Consequently, it is not necessary to enter the ACTION STATEMENT specified in 3.7.9.1 while the SURVEILLANCES specified in 4.7.9.1.1 are being performed, unless the tested equipment fails the SURVEILLANCE.
In addition, an allowance is made for ensuring a sufficient volume of Halon and CO>in the Halon and COz storage tanks by verifying either the weight, level, or pressure of the tanks.The fire suppression water system has three fire pumps common to both units which discharge into underground ring headers.There is one motor-driven horizontal centrifugal fire pump rated at 2500 gpm that takes suction from the fire water storage tanks;and two diesel-engine-driven horizontal centrifugal fire pumps rated at 2500 gpm that take suction from the fire water storage tanks.Having a combination of diesel-driven and electric motor-driven pumps in the system design is consistent with NRC Branch Technical Position APSCB 9.5-1.The flow paths capable of taking suction from Lake Michigan are normally isolated to preclude zebra mussel infestation of the system.The purpose of the charcoal filter fire suppr'ession T/S is to account for detection and suppression of fires in the charcoal filters.Manual operation of these systems is allowed because two-point heat detection with control room and local annunciation of trouble conditions is provided for the charcoal filters.The OPERABILITY of the fire suppression system protecting the charcoal filters is only required when there is charcoal in the filters.Actuation of spray water onto the charcoal filters requires both the manual opening of the system isolation valve and reaching the high temperature alarm setpoint for the automatic opening of the system deluge valve.Because of the inaccessibility of the lower containment to personnel during operation due to ALARA radiation exposure concerns, the use of one or more CCTVs in the lower containment, to monitor for fire and smoke, is an acceptable substitute to an hourly fire watch, if the fire suppression system becomes inoperable.
'All hourly fire watch patrols are performed at intervals of sixty minutes with a margin of fifteen minutes.II A continuous fire watch requires that a trained individual be in the specified area at all times and that each fire zone within the specified area be patrolled at least once every fifteen minutes with a margin of five minutes.COOK NUCLEAR PLANT-UNIT 1 B 3/4 7-8 AMENDMENT NO.
BASES SECTION INDEX PAGE 3 4.4 REACTOR COOLANT SYSTE (Continued) 3/4.4.9 PRESSURE/TEMPERATURE LIMITS................o.o..o...
3.4.4.11 RELIEF VALVES~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~3/4.4.12 REACTOR COOLANT VENT SYSTEM.......o.......iso.o......
3/4.4.10 STRUCTURAL ZNTEGRZTY..........
..~......'...
~........B 3/4 4-6 B 3/4 4-10 B 3/4 4-11 B 3/4 4-11 3 4.5 EMERGENCY CORE COOLING SYSTEMS ECCS 3/4'.1 3/4.5.2 3/4 5.4 BORON INJECTION SYSTEM........o.........
~~ACCUMULATORS i'~..oi~oo.ohio~..o.o.~~...o~...........
and 3/4.5.3 ECCS SUBSYSTEMS B 3/4 5-1 B 3/4 5-1 B 3/4 5-2 3/4 5.5 REFUELING WATER STORAGE TANK (RWST).............B 3/4 5-3 3 4.6 CONTAINMENT SYSTEMS 3/4.6.1 PRIMARY CONTAINMENT
.............oo
~~...o..i.o........
B 3/4 6-1 3/4 6.2 DEPRESSURZZATZON AND COOLING SYSTEMS...............o.
B 3/4 6-3 3/4.6.3 CONTAINMENT ISOLATION VALVES.o.....~..o.o.~........3/4.6 4 COMBUSTIBLE GAS CONTROL B 3/4 6-3 B 3/4 6-3 3/4.6.5 3 4.7 ICE CONDENSER~~~~~~~~~~B 3/4 6 4 PLANT SYSTEMS 3/4.7.1 TURBINE CYCLE B 3/4 7-1 3/4.7.2 STEAM GENERATOR PRESSURE/TEMPERATURE LIMITATZON
.....B 3/4 7-4 3/4.7.3 COMPONENT COOLING WATER SYSTEM......................
B 3/4 7-4 3/4.7.4 ESSENTIAL SERVICE WATER SYSTEM 3/4.7.5 CONTROL ROOM EMERGENCY VENTILATION SYSTEM 3/4 7.6 ESF VENTILATION SYSTEM 3/4 7.7 HYDRAULIC SNUBBERS B 3/4 7-4 B 3/4 7-4a B 3/4 7-5~~~~~~~~~~B 3/4 7 5 COOK NUCLEAR PLANT-UNIT 2 XIII AMENDMENT NO.~
INDEX BASES SECTION 3 4.7 PLANT SYSTEMS (Continued)
PAGE 3 4.8 3 4.9 ELECTRICAL POWER SYSTEMS~~~..........~~.~~~~~...~~REFUELING OPERATIONS 3/4.9.1 BORON CONCENTRATION
~....~.~.......3/4.9.2 3/4.9.3 INSTRUMENTATION DECAY TIME 3/4.9.4 CONTAINMENT BUZLDING PENETRATIONS
.........o.....
3/4.9.5 COMMUNICATIONS
...i..o.i...oiooo.....
...o.o~o o.+oooo 3/4.9.6 MANIPULATOR CRANE OPERABILITY 3/4.9.7 3/4.9.8 CRANE TRAVEL-SPENT FUEL STORAGE BUILDING RESIDUAL HEAT REMOVAL AND COOLANT CIRCULATION 3/4 7.8 SEALED SOURCE CONTAMINATION
.....~..~~~~i.~.o..o..~3/4.7.9 FIRE SUPPRESSION SYSTEMS..............~~~..3/4.7.10 FIRE-RATED ASSEMBLIES
....~o.....B 3/4 7-6 B 3/4 7-6 B 3/4 7-9 B 3/4 8-1 B 3/4 9-1 B 3/4 9-1 B 3/4 9-1 B 3/4 9-1 B 3/4 9-1 B 3/4 9-2 B 3/4 9-2 B 3/4 9-2 3/4.9.9 CONTAINMENT PURGE AND EXHAUST ISOLATION SYSTEM ii....B 3/4 9-3 3/4.9.10 and 3/4.9.11 WATER LEVEL-REACTOR VESSEL 3/4.9.13 3/4.9.14 SPENT FUEL CASK MOVEMENT SPENT FUEL CASK DROP PROTECTION SYSTEM 3 4.10 SPECIAL TEST EXCEPTIONS AND STORAGE POOL 3/4.9 12 STORAGE POOL VENTILATION SYSTEM........~.~.........B 3/4 9-3 B 3/4 9-3 B 3/4 9-3 B 3/4 9-3 3/4.10.1 SHUTDOWN MARGIN B 3/4 10-1 3/4.10.2 GROUP HEIGHTg INSERTION AND POWER DISTRZBUTION LIMITS.B 3/4 10-1 COOK NUCLEAR PLANT"-UNIT 2 XIV AMENDMENT NO.~
~~PLANT SYSTEMS 3 4 9 FIRE SUPPRESSION SYSTEMS FIRE SUPPRESSION WATER SYSTEM LIMITING CONDITION FOR OPERATION 3.7.9.1 with: The fire suppression water system shall be considered to be OPERABLE a.Three fire suppression system pumps,*each with a capacity of 2500 gpm, with their discharge aligned to the fire suppression header, b.Two fire water tanks,*each with a minimum usable volume of 565,000 gallons (34.0 feet level indication)
C.An OPERABLE flow path capable of taking suction from either one of the fire water tanks an'd transferring the water through distribution piping (with OPERABLE sectionalizing valves)up to the yard hydrant curb control valves, to the hose station valve(s)and water suppression system controlling valve(s).The hose station valve(s)and the water suppression system controlling valve(s)that are required to be in the flow path are given in Specifications 3.7.9.5 and 3.7.9.2, respectively.
APPLICABILITY:
At all times.ACTION: a.With one pump inoperable, restore the inoperable pump to OPERABLE status within 7 days or provide an alternate backup pump.b.With one fire water tank inoperable, restore the inoperable tank to OPERABLE status within 30 days or establish a backup water system supply.c~With the fire suppression water system otherwise inoperable:
Restore the fire suppression water distribution system to OPERABLE status within 24 hours, or 2.Establish a backup fire suppression water system within 24 hours.d.The provisions of Specifications 3.0.3 and 3.0.4 are not applicable.
*These pumps and tanks are shared between Units 1 and 2.COOK NUCLEAR PLANT-UNIT 2 3/4 7-27 AMENDMENT NO.4k,~, 454


PLANT SYSTEMS SURVEILLANCE RE UIREMENTS 4.7.9.1.1 The fire suppression water system shall be demonstrated OPERABLE: a.At least once per 7 days by verifying the water supply contained in the fire water tanks.b.At least once per 31 days on a STAGGERED TEST BASIS by starting each pump and operating it for at least 15 minutes on recirculation flow.C.At least once per 31 days by verifying that each valve (manual, power operated, or automatic) in the flow path that is not locked, sealed, or otherwise secured in position, is in its correct position.d.At least once per 6 months by performance of a system flush of above ground internal distribution headers and fire hydrants.e.At least once per 12 months by cycling each testable valve in the flow path through at least one complete cycle of full travel.At least once per 18 months by performing a system functional test which includes simulated automatic actuation of the system throughout its operating sequence, and: Verifying that each automatic valve in the flow path actuates to its correct position, Verifying that each pump develops a flow of at least 2500 gpm at a system head of at least 300 feet of water by observing three points (minimum, rated and peak)on the pump's performance curve,.3.Cycling each valve in the flow path that is not, testable during plant operation through at least one complete cycle of full travel, and Verifying that each high pressure pump starts in its preplanned sequence to maintain the, fire suppression water system pressure greater than or equal to 100 psig.g~At least once per 3 years by performing a series of flow tests so that every fire main segment (excluding individual system supplies)has been verified to be clear of obstructions by a full flow test.COOK NUCLEAR PLANT-UNIT 2 3/4 7-28 EEEEEEEEE EO.EE, EEE,~
        ~   II ~
LANT SYSTEMS SURVEILLANCE RE UIREMENTS Continued 4.7.9.1.2 The fire pump diesel engines shall be demonstrated OPERABLE: a~At least once per 31 days by verifying:
I
The fuel storage tanks contain at least 160 gallons of fuel, and 2.The diesels start from ambient conditions and operate for at least 30 minutes.b.At least once per 92 days by verifying that a sample of diesel fuel from the fuel storage tanks obtained in accordance with ASTM-D4057-81 is within the acceptable limits specified in Table 1 of ASTM-D975-81 when checked for viscosity, water and sediment.C.At least once per 18 months by subjecting the diesels to an inspection in accordance with procedures prepared in conjunction with its manufacturer's recommendations for this class of standby service.'4.7.9.1.3 The fire pump diesel starting battery banks and chargers shall be demonstrated OPERABLE: a.At least once per 7 days by verifying that: The electrolyte level of each battery is above the plates, and 2.The output battery voltage of each bank is greater than 24 volts.b.At least once per 92 days by verifying that the specific gravity is appropriate for continued service of each battery.C.At least once per 18 months by verifying, that: The"batteries, cell plates and battery packs show no visual indication of physical damage or abnormal deterioration, and 2.The battery-to-battery and terminal connections are clean, tight, free of corrosion, and coated with anti-corrosion material.COOK NUCLEAR PLANT-UNIT 2 3/4 7-29 AMENDMENT NO.44, khan, 454 PLANT SYSTEMS SURVEILLANCE RE UIREMENTS Continued 4.7.9.2 Each of the above required water spray and/or sprinkler systems shall be demonstrated to be OPERABLE: a~At least once per 12 months by cycling each testable valve in the flow path through at least one complete cycle of full travel as provided by Technical Specification 4.7.9.1.1.e.
~~
b.At least once per 18 months: By performing a system functional test which includes simulated automatic actuation of the system, and: a)Verifying that the automatic valves in the flow path actuate to their correct positions on a test signal, and*b)Cycling each valve in the flow path that is not testable during plant operation through at least one complete cycle of full travel.2.By visual inspection of deluge and preaction system piping (this is not required for systems supervised by air)to verify their integrity.
~I 1
By visual inspection of each open head deluge nozzle to verify that there is no blockage.At least once per 3 years by performing an air flow test through the piping of each open head deluge system and verifying each open'ead deluge nozzle is unobstructed.
II g}}
*The fire protection water flow surveillance testing may be suspended until the completion of the fire protection water storage tank and fiie pump installations (May 31, 1993).The surveillance testing suspended as a result of this amendment will be initiated at its normal frequency within four months of the new fire protection water storage tanks and fire pumps being declared OPERABLE, with the exception of unit outage required testing which would be completed before the end of the next scheduled unit outage.COOK NUCLEAR PLANT-UNIT 2 3/7 31 AMENDMENT NO'''34'40 I 454 PLANT SYSTEMS FIRE HOSE STATIONS LIMITING CONDITION FOR OPERATION 3.7.9.5 The fire hose stations shown in Table 3.7-7 shall be OPERABLE: APPLICABILITY:
Whenever equipment in the areas protected by the fire hose stations is required to be OPERABLE.ACTION a~With one or more of the fire hose stations shown in Table 3.7-7 inoperable:
1)For those areas where the inoperable fire hose station is the primary means of fire suppression (areas where no fixed systems are provided or areas where the fixed systems are inoperable), within 1 hour, route an additional equivalent capacity fire hose to the affected area(s)from an OPERABLE hose station(s) per Specification 4.7.9.5, or 2)within 1 hour, verify that the fixed fire suppression system(s)that also protects the affected area(s)serviced by the fire hose station(s) is OPERABLE.b.The provisions of Specifications 3.0.3 and 3.0.4 are not applicable.
SURVEILLANCE RE UIREMENTS 4.7.9.5 Each of the fire hose stations shown in Table 3.7-7 shall be demonstrated OPERABLE: a.At least once per 31 days by a visual inspection of'the fire hose stations to assure all required equipment is at the station.b.At least once per 18 months by: Removing the hose for visual inspection and re-racking, and 2~Replacement of all degraded gaskets in couplings.
c.At least once per 3 years by: 2.Partially opening each hose station valve to verify OPERABILITY and no flow blockage.*
Conducting a hose hydrostatic test at a pressure of 150 psig or at least 50 psi greater than the maximum pressure available at that hose station, whichever is greater.**The fire protection water flow surveillance testing may be suspended until the completion of the fire protection water storage tank and fire pump installations (May 31, 1993).The surveillance testing suspended as a result of this amendment will be initiated at its normal frequency within four months of the new fire protection water storage tanks and fire pumps being declared OPERABLE, with the exception of unit outage required testing which would be completed before the end of the next scheduled unit outage.COOK NUCLEAR PLANT-UNIT 2 3/4 7-37 AMENDMENT NO.44, ki4, 450 ATTACHMENT 2 TO AEP:NRC:1143A OATH OF AFFIRMATION STATEMENT FOR AEP:NRCt0659V STATE OF OHIO COUNTY OF FRANKLIN R.F.Hering, bei.ng duly sworn, deposes and says that he is the Vice President of licensee Indiana Michigan Power Company, that he has read the foregoing application for SECTION 6 TECHNICAL SPECIFICATION CHANGE REQUEST and he knows the contents thereof'nd that said contents are true to the best of his knowledge and belief.Subscri.bed and sworn to me before this day of NOTAR PUBLIC BITA D.HILL NOTARY PUBLIC.STAT)OF OHIO
~II~I~~~I 1 II g}}

Revision as of 14:24, 22 October 2019

Corrected Index Pages & TS Pages,Table 3.7-4 Re Snubber Visual Insp Interval
ML17331A887
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 06/18/1993
From:
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
Shared Package
ML17331A886 List:
References
NUDOCS 9306290073
Download: ML17331A887 (26)


Text

ATTACHMENT 1 TO AEP:NRC!1143A SNUBBER T/S CHANGE UPDATE

'DR 9306290073 930618

',.P, ADOCK 05000315

'I PDR

p INDEX BASES SECTION PAGE 3 4.7 PLANT SYSTEMS (Continued) 3/4.7.8 ....... ............. . .9..9 .. 3 3/4 7-9 3/4.7.9 HYDRAULIC SNUBBERS.

FIRE SUPPRESSION SYSTEMS .......................9 '.~

8 3/4 7-7 B 3/4 7 9 3/4 7.10 FIRE RATED ASSEMBLIES.

3 4.8 ELECTRICAL POWER SYSTEMIC ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ . ~ ~ ~ ~ ~ ~ ~ .... B 3/4 8-1 3 4.9 REFUELING OPERATIONS 3/4.9.1 BORON CONCENTRATION...... ~ ..........................- B 3/4 9-1 3/4.9.2 INSTRUMENTATZON...................................... B 3/4 9-1 3/4.9.3 DECAY TIME. B 3/4 9-1 3/4.9.4 CONTAINMENT BUILDING PENETRATZONS.................... B 3/4 9-1 3/4.9:5 COMMUNICATIONS. B 3/4 9-1 3/4 9.6 MANIPULATOR CRANE OPERABILITY....................... B 3/4 9-2 3/4.9.7 CRANE TRAVEL SPENT FUEL STORAGE BUILDING... ....... B 3/4 9-2 3/4 9 ' RESIDUAL HEAT REMOVAL AND COOLANT CIRCULATZON........ B 3/4 9-2 3/4.9.9 CONTAINMENT PURGE AND EXHAUST ISOLATION SYSTEM..B . . B 3/4 9-2 3/4.9 10 AND 3/4.9.11 WATER LEVEL-REACTOR VESSEL AND STORAGE POOL B ~ ~ e ~ ~ ~ ~ ~ ~ ~ ~ ~ o ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ B 3/4 9-3 3/4.9.12 STORAGE POOL VENTILATION SYSTEM...................... B 3/4 9-3 3/4.9.13 SPENT FUEL CASK MOVEMENT. ~ ................... ....... ~ B 3/4 9-3 3/4.9.14 SPENT FUEL CASK DROP PROTECTION SYSTEM............... B 3/4 9-3 3 4.10 SPECIAL TEST EXCEPTIONS 3/4 '0Bl SHUTDOWN MARGINe ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ B ~ ~ ~ B 3/4 10-1 3/4.10.'2 GROUP HEIGHT, INSERTION AND POWER DISTRIBUTION LIMITS~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ B 3/4 10-1 COOK NUCLEAR PLANT - UNZT 1 XIV AMENDMENT NO. QQ,~%

t 0

)

,I

TABLE 3 '-4 SNUBBER VISUAL INSPECTION INTERVAL NUMBER OF UNACCEPTABLE SNUBBERS Population Column A Column B Column C or Category Extend Interval Repeat Interval Reduce Interval Notes 1 and 2 Notes 3 and 6 Notes 4 and 6 Notes 5 and 6 80 100 150 200 13 300 ~ 12 25 400 18 36 500 12 24 48 750 20 40 78

. 1000 or greater 29 56 109 Note 1: The next visual inspection interval for a snubber population or category size shall be determined based upon the previous inspection interval and the number of unacceptable snubbers found during that interval. Snubbers may be categorized, based upon their accessibility during power operation,, as accessible or inaccessible. These categories may be examined separately or jointly. However, the licensee must make and document that decision before any inspection and shall use that decision as the basis upon which to determine the next inspection interval for that category.

Note 2: Interpolation between population or category sizes and the number of unacceptable- snubbers is permissible. Use next lower integer for the value of the limit for Columns A, B, or C if that integer includes a fractional value of unacceptable snubbers as determined by interpolation.

COOK NUCLEAR PLANT - UNIT 1 3/4 7-31 AMENDMENT NO ~

PLANT SYSTEMS 3 4.7.9 FIRE SUPPRESSION SYSTEMS FIRE SUPPRESSION WATER SYSTEM LIMITING CONDITION FOR OPERATION 3.7 '.1 The fire suppression water system shall be considered to be OPERABLE with:

a. Three fire suppression system pumps, 'ach with a capacity of 2500 gpm, with their discharge aligned to the fire suppression header,
b. Two fire water tanks, 'ach with a minimum usable volume of 565,000 gallons (34,0 feet level indication).

co An OPERABLE flow path capable of taking suction from either one of the fire water tanks and transferring the water through distribution piping (with OPERABLE sectionalizing valves) up to the yard hydrant curb control valves, to the hose station valve(s) and water suppression system controlling valve(s). The hose station valve(s) and the water suppression system controlling valve(s) that aze required to be in the flow path are given in Specifications 3.7.9.5 and 3,7.9.2, respectively.

APPLICABILITY: At all times.

ACTION:

a ~ With one pump inoperable, restore the inoperable pump to OPERABLE status within 7 days or provide an alternate backup pump.

b. With one fire water tank inoperable, restore the inoperable tank to OPERABLE status within 30 days or establish a backup water system supply.

c ~ With the fire suppression water system otherwise inoperable:

1. Restore the fire suppression water distribution system to OPERABLE status within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, or
2. Establish a backup fire suppression water system within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
d. The provisions of Specifications 3.0.3 and 3.0,4 are not applicable.

+ These pumps and tanks are shazed between Units 1 and 2.

COOK NUCLEAR PLANT - UNIT 1 3/4 7-33 AMENDMENT NO. M, 430,

'

PLANT SYSTEMS SURVEILLANCE RE UIREMENTS 4.7.9.1.1 The fire suppression water system shall be demonstrated OPERABLE:

a. At least once per 7 days by verifying the water supply contained in the fire water tanks.
b. At least once per 31 days on a STAGGERED TEST BASIS by starting each pump and operating it for at least 15 minutes on recirculation flow.

C ~ At least once per 31 days by verifying that each valve (manual, power operated, or automatic) in the flow path that is not locked, sealed, or otherwise secured in position, is in its correct'osition.

d. At least once per 6 months by performance of a system flush of above ground internal distribution headers and fire hydrants.
e. At least once per 12 months by cycling each testable valve in the flow path through at least one complete cycle of full travel.

At least once per 18 months by performing a system functional test which includes simulated automatic actuation of the system throughout its operating sequence, and:

1. Verifying that each automatic valve in the flow path actuates to its correct position,
2. Verifying that each pump develops a flow of at least 2500 gpm at a system head of at least 300 feet of water by observing three points (minimum, rated, and peak) on the pump's performance curve,
3. Cycling each valve in the flow path that is not testable during plant operation through at least one complete cycle of full travel, and
4. Verifying that each pump starts in its preplanned sequence to maintain the fire suppression water system pressure greater than or equal to 100 psig.

ge At least once per 3 years by performing a series of flow tests so that every fire main segment (excluding individual system supplies) has been verified to be clear of obstruction by a full flow test.

COOK NUCLEAR PLANT - UNIT 1 3/4 7-34 AMENDMENT NO. M, 480,

PLANT SYSTEMS SURVEILLANCE RE UIREMENTS Continued 4,7.9.1.2 The fire pump diesel engines shall be demonstrated OPERABLE:

a. At least once per 31 days by verifying:
1. The fuel storage tanks contain at least 160 gallons of fuel, and
2. The diesels start from ambient conditions and operate for at least 30 minutes.

b.- At least once per 92 days by verifying that a sample of diesel fuel from the fuel storage tanks obtained in accordance with ASTM-D4057-81 is within the acceptable limits specified in Table 1 of ASTM-D975-81 when checked for viscosity, water and sediment.

c ~ At least once per 18 months by subjecting the diesels to an inspection in accordance with procedures prepared in conjunction with the manufacturer's recommendations for this class of standby service 4.7.9.1.3 The fire pump diesel starting battery banks and chargers shall be demonstrated OPERABLE:

a. At least once per 7 days by verifying that:
1. The electrolyte level of each battery is above the plates, and
2. The output battery voltage of each bank is greater than 24 volts.
b. At least once per 92 days by verifying that the specific gravity is appropriate for continued service of each battery.

c ~ At least once per 18 months by verifying that:

1. The batteries, cell plates and battery packs show no visual indication of physical damage or abnormal deterioration, and
2. The battery-to-battery and terminal connections are clean, tight, free of corrosion, and coated with anti-corrosion material, COOK NUCLEAR PLANT - UNIT 1 3/4 7-35 AMENDMENT NO. M, 480, ~ f

PLANT SYSTEMS SURVEILLANCE RE UIREMENTS Continued 4.7.9.2 Each of the above required water spray and/or sprinkler systems shall be demonstrated to be OPERABLE:

a. At least once per 12 months by cycling each testable valve in the flow path through at least one complete cycle of full travel as provided by Technical Specification 4,7,9.1,1,e.
b. At least once per 18 months:
1. By performing a system functional test which includes simulated automatic actuation of the syst: em, and:

a) Verifying that the automatic valves in the flow path actuate to their correct positions on a test signal, and'.

b) Cycling each valve in the flow, path that is not testable during plant operation through at least one complete cycle of full travel.

By visual inspection of deluge and preaction system piping (this is not required for systems supervised by air) to verify their integrity.

3. By visual inspection of each open head deluge nozzle 'to verify that there is no blockage, c ~ At least once per 3 years by performing an air flow test through the piping of each open head deluge system and verifying each open head deluge nozzle is unobstructed.

The fire protection water flow surveillance testing may be suspended until the completion of the fire protection water storage tank and fire pump installations (May 31, 1993). The surveillance testing suspended as a resu lt o t s amendment will be initiated at its normal frequency within four mo th s our mon oof the new fire protection water storage tanks and fire pumps being decl ec are d 0 P E RABLE, with the exception of unit outage required testing which would be completed before the end of the next scheduled unit outage.

COOK NUCLEAR PLANT - UNIT 1 3/4 7-37 AMENDMENT NO. 400, 430, 444,

PLANT SYSTEMS FIRE HOSE STATIONS LIMITING CONDITION FOR OPERATION 3,7.9.5 The fire hose stations shown in Table 3.7-7 shall be OPERABLE:

APPLICABILITY: Whenever equipment in the areas protected by the fire hose stations. is required to be OPERABLE.

ACTION:

a. With one or more of the fire hose stations shown in Table 3.7-7 inoperable: 1) For those areas where the inoperable fire hose station is the primary means of fire suppression (areas where no fixed systems aze provided or areas where the fixed systems aze inoperable), within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />, route an additional equivalent capacity fire hose to the affected area(s), from an OPERABLE hose station(s) per Specification 4.7.9.5, or 2) within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />, verify that the fixed fire suppression system(s) that also protects the affected area(s) serviced by the fire hose station(s) is OPERABLE.

b, The provisions of Specifications 3.0.3 and 3.0.4 are not applicable.

SURVEILLANCE RE UIREMENTS 4 '.9.5 Each of the fire hose stations shown in Table 3.7-7 shall be demonstrated OPERABLE:

a. At least once per 31 days by a visual inspection of the. fire hose stations to assure all required equipment is at the station.
b. $ t least once per 18 months by:
1. Removing the hose for visual inspection and re-racking, and
2. Replacement of all degraded gaskets in couplings.
c. At least once per 3 years by:
1. Partially opening each hose station valve to verify OPERABILITY and no flow blockage.'.

Conducting a hose hydrostatic test at a pressure of 150 psig or at least 50 psi greater than the maximum pressure available at that hose station, whichever is greater.'he fire protection water flow surveillance testing may be suspended until the completion of the fire protection water storage tank and fire pump installations (May 31, 1993). The surveillance testing suspended as a result of this amendment will be initiated at its normal frequency within four months of the new fire protection water storage tanks and fire pumps being declared OPERABLE, with the exception of unit outage required testing which would be completed before the end of the next scheduled unit outage.

COOK NUCLEAR PLANT - UNIT 1 3/4 7-43 AMENDMENT NO.

BASES (Continued) radiation levels and the expected time to perform a visual inspection etc' in each snubber location as well as other factors associated with accessibility during plant operations (e.g., temperature, atmosphere, location, ), and recommendations of Regulatory Guides 8.8 and 8.10. The addition or deletion of any snubber shall be made in accordance with Section 50.59 of 10 CFR Part 50.

3 4 7 9 FIRE SUPPRESSION SYSTEMS The OPERABILITY of the fire suppression systems ensures that adequate fire suppression capability is available to confine and extinguish fires occurring in any portion of the facility where safety related equipment is located.

The fire suppression systems consist of the water system, spray and/or sprinklers, C02, Halon and fire hose stations. The collective capability of the fire suppression systems is adequate to minimize potential damage to safety-related equipment and is a major element in the facility fire protection program.

In the event that one or more C02 suppression systems requiring automatic actuation must be isolated for personal protection to permit entry for routine tours, maintenance, construction, or surveillance testing in the protected area, the fire detection system(s) required to be OPERABLE by Specification 3.3.3.7 shall be verified to be OPERABLE. Isolation of an automatic CO suppression system temporarily puts this system in a manual actuation mote.

Reliance on the fire detection syst: em, in conjunction with the ability to manually discharge the C02 suppression system will provide adequate fire protection for periods when personnel are required to work in these areas.

In the event that portions of the fire suppression systems are inoperable, alternate backup fire fighting equipment is required to be made available in the affected areas until the inoperable equipment is restored to service.

When the inoperable fire fighting equipment is intended for use as a backup means of fire suppression, a longer period of time is allowed to provide an alternate means of fire fighting than if the inoperable equipment is the primary means of fire suppression. Backup fire protection equipment will normally take the form of permanently mounted fire extinguishers and/or fire hose stations in or near the area, or fire hoses routed to the affected area.

In the event that the fire water tanks become inoperable, Lake Michigan may serve as their backup. Two manual, diesel-engine driven, vertical-turbine fire pumps rated at 2000 gpm, which take suction off of Lake Michigan and provide water to the fire suppression header, are administratively controlled. One of these pumps may serve as a backup to one of the fire suppression pumps that take suction off of the tanks. However, it is not our intent to rely on backup systems or other compensatory measures for an extended period of time and action will be taken to restore the inoperable portions of the fire suppression system to OPERABLE status within a reasonable period.

COOK NUCLEAR PLANT - UNIT 1 B 3/4 7-7 AMENDMENT NO. 68,

BASES 3 4 4.7 9 Continued The surveillance requirements provide assurance that the minimum OPERABILITY requirements of the fire suppression systems are met. While performing the surveillances specified in 4.7.9.1 the fire suppression water system is still capable of performing its intended function. Consequently, it is not necessary to enter the ACTION STATEMENT specified in 3.7.9.1 while the SURVEILLANCES specified in 4.7.9.1.1 are being performed, unless the tested equipment fails the SURVEILLANCE. In addition, an allowance is made for ensuring a sufficient volume of Halon and CO> in the Halon and COz storage tanks by verifying either the weight, level, or pressure of the tanks.

The fire suppression water system has three fire pumps common to both units which discharge into underground ring headers. There is one motor-driven horizontal centrifugal fire pump rated at 2500 gpm that takes suction from the fire water storage tanks; and two diesel-engine-driven horizontal centrifugal fire pumps rated at 2500 gpm that take suction from the fire water storage tanks. Having a combination of diesel-driven and electric motor-driven pumps in the system design is consistent with NRC Branch Technical Position APSCB 9.5-1.

The flow paths capable of taking suction from Lake Michigan are normally isolated to preclude zebra mussel infestation of the system.

The purpose of the charcoal filter fire suppr'ession T/S is to account for detection and suppression of fires in the charcoal filters. Manual operation of these systems is allowed because two-point heat detection with control room and local annunciation of trouble conditions is provided for the charcoal filters. The OPERABILITY of the fire suppression system protecting the charcoal filters is only required when there is charcoal in the filters.

Actuation of spray water onto the charcoal filters requires both the manual opening of the system isolation valve and reaching the high temperature alarm setpoint for the automatic opening of the system deluge valve.

Because of the inaccessibility of the lower containment to personnel during operation due to ALARA radiation exposure concerns, the use of one or more CCTVs in the lower containment, to monitor for fire and smoke, is an acceptable substitute to an hourly fire watch, becomes inoperable.

if the fire suppression system

'All hourly fire watch patrols are performed at intervals of sixty minutes with a margin of fifteen minutes.

II A continuous fire watch requires that a trained individual be in the specified area at all times and that each fire zone within the specified area be patrolled at least once every fifteen minutes with a margin of five minutes.

COOK NUCLEAR PLANT - UNIT 1 B 3/4 7-8 AMENDMENT NO.

INDEX BASES SECTION PAGE 3 4.4 REACTOR COOLANT SYSTE (Continued) 3/4.4.9 3/4.4.10 i'

PRESSURE/TEMPERATURE STRUCTURAL ZNTEGRZTY LIMITS

..........

................o.o..o...

.. ~ ......'... ........ ~

B B

3/4 3/4 4-6 4-10 3.4.4.11 RELIEF VALVES ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ B 3/4 4-11 3/4.4.12 REACTOR COOLANT VENT SYSTEM .......o.......iso.o...... B 3/4 4-11 3 4.5 EMERGENCY CORE COOLING SYSTEMS ECCS 3/4 '.1 ACCUMULATORS .. oi ~ oo.ohio ~ ..o.o. ~ ~ ...o ~ ........... B 3/4 5-1 3/4.5.2 and 3/4.5.3 ECCS SUBSYSTEMS B 3/4 5-1 3/4 5.4 BORON INJECTION SYSTEM ........ o......... ~ ~ B 3/4 5-2 3/4 5.5 REFUELING WATER STORAGE TANK (RWST) . . .... ...... . B 3/4 5-3 3 4.6 CONTAINMENT SYSTEMS 3/4.6.1 PRIMARY CONTAINMENT .............oo ~ ~ ...o..i.o........ B 3/4 6-1 3/4 6.2 DEPRESSURZZATZON AND COOLING SYSTEMS ...............o. B 3/4 6-3 3/4.6.3 CONTAINMENT ISOLATION VALVES .o..... ~ ..o.o. ~ ........ B 3/4 6-3 3/4.6 4 COMBUSTIBLE GAS CONTROL B 3/4 6-3 3/4.6.5 ICE CONDENSER ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ B 3/4 6 4 3 4.7 PLANT SYSTEMS 3/4.7.1 TURBINE CYCLE B 3/4 7-1 3/4.7.2 STEAM GENERATOR PRESSURE/TEMPERATURE LIMITATZON ... .. B 3/4 7-4 3/4.7.3 COMPONENT COOLING WATER SYSTEM ...................... B 3/4 7-4 3/4.7.4 ESSENTIAL SERVICE WATER SYSTEM B 3/4 7-4 3/4.7.5 CONTROL ROOM EMERGENCY VENTILATION SYSTEM B 3/4 7-4a 3/4 7.6 ESF VENTILATION SYSTEM B 3/4 7-5 3/4 7.7 HYDRAULIC SNUBBERS ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ B 3/4 7 5 COOK NUCLEAR PLANT UNIT 2 XIII AMENDMENT NO. ~

INDEX BASES SECTION PAGE 3 4.7 PLANT SYSTEMS (Continued) 3/4 7.8 SEALED SOURCE CONTAMINATION ... .. ~ . . ~ ~ ~ ~ i. ~ . o..o.. ~ B 3/4 7-6 3/4.7.9 FIRE SUPPRESSION SYSTEMS ...... .... .... ~ ~ ~ .. B 3/4 7-6 3/4.7.10 FIRE-RATED ASSEMBLIES ... . ~ o..... B 3/4 7-9 3 4.8 ELECTRICAL POWER SYSTEMS ~ ~ ~ ....... . .. ~ ~ . ~ ~ ~ ~ ~ ... ~ ~ B 3/4 8-1 3 4.9 REFUELING OPERATIONS 3/4.9.1 BORON CONCENTRATION ~ .... ~ . ~ ....... B 3/4 9-1 3/4.9.2 INSTRUMENTATION B 3/4 9-1 3/4.9.3 DECAY TIME B 3/4 9-1 3/4.9.4 CONTAINMENT BUZLDING PENETRATIONS .. .. .....o..... B 3/4 9-1 3/4.9.5 COMMUNICATIONS ...i..o.i...oiooo..... ...o.o o.+oooo ~ o B 3/4 9-1 3/4.9.6 MANIPULATOR CRANE OPERABILITY B 3/4 9-2 3/4.9.7 CRANE TRAVEL SPENT FUEL STORAGE BUILDING B 3/4 9-2 3/4.9.8 RESIDUAL HEAT REMOVAL AND COOLANT CIRCULATION B 3/4 9-2 3/4.9.9 CONTAINMENT PURGE AND EXHAUST ISOLATION SYSTEM ii .... B 3/4 9-3 3/4.9.10 and 3/4.9.11 WATER LEVEL - REACTOR VESSEL AND STORAGE POOL B 3/4 9-3 3/4.9 12 STORAGE POOL VENTILATION SYSTEM ....... .~. ~ ......... B 3/4 9-3 3/4.9.13 SPENT FUEL CASK MOVEMENT B 3/4 9-3 3/4.9.14 SPENT FUEL CASK DROP PROTECTION SYSTEM B 3/4 9-3 3 4.10 SPECIAL TEST EXCEPTIONS 3/4.10.1 SHUTDOWN MARGIN B 3/4 10-1 3/4.10.2 GROUP HEIGHTg INSERTION AND POWER DISTRZBUTION LIMITS. B 3/4 10-1 COOK NUCLEAR PLANT "- UNIT 2 XIV AMENDMENT NO.~

~ ~

PLANT SYSTEMS 3 4 9 FIRE SUPPRESSION SYSTEMS FIRE SUPPRESSION WATER SYSTEM LIMITING CONDITION FOR OPERATION 3.7.9.1 The fire suppression water system shall be considered to be OPERABLE with:

a. Three fire suppression system pumps,
  • each with a capacity of 2500 gpm, with their discharge aligned to the fire suppression header,
b. Two fire water tanks,
  • each with a minimum usable volume of 565,000 gallons (34.0 feet level indication)

C. An OPERABLE flow path capable of taking suction from either one of the fire water tanks an'd transferring the water through distribution piping (with OPERABLE sectionalizing valves) up to the yard hydrant curb control valves, to the hose station valve(s) and water suppression system controlling valve(s). The hose station valve(s) and the water suppression system controlling valve(s) that are required to be in the flow path are given in Specifications 3.7.9.5 and 3.7.9.2, respectively.

APPLICABILITY: At all times.

ACTION:

a. With one pump inoperable, restore the inoperable pump to OPERABLE status within 7 days or provide an alternate backup pump.
b. With one fire water tank inoperable, restore the inoperable tank to OPERABLE status within 30 days or establish a backup water system supply.

c ~ With the fire suppression water system otherwise inoperable:

Restore the fire suppression water distribution system to OPERABLE status within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, or

2. Establish a backup fire suppression water system within 24 hours.
d. The provisions of Specifications 3.0.3 and 3.0.4 are not applicable.
  • These pumps and tanks are shared between Units 1 and 2.

COOK NUCLEAR PLANT - UNIT 2 3/4 7-27 AMENDMENT NO. 4k, ~, 454

PLANT SYSTEMS SURVEILLANCE RE UIREMENTS 4.7.9.1.1 The fire suppression water system shall be demonstrated OPERABLE:

a. At least once per 7 days by verifying the water supply contained in the fire water tanks.
b. At least once per 31 days on a STAGGERED TEST BASIS by starting each pump and operating flow.

it for at least 15 minutes on recirculation C. At least once per 31 days by verifying that each valve (manual, power operated, or automatic) in the flow path that is not locked, sealed, or otherwise secured in position, is in its correct position.

d. At least once per 6 months by performance of a system flush of above ground internal distribution headers and fire hydrants.
e. At least once per 12 months by cycling each testable valve in the flow path through at least one complete cycle of full travel.

At least once per 18 months by performing a system functional test which includes simulated automatic actuation of the system throughout its operating sequence, and:

Verifying that each automatic valve in the flow path actuates to its correct position, Verifying that each pump develops a flow of at least 2500 gpm at a system head of at least 300 feet of water by observing three points (minimum, rated and peak) on the pump's performance curve, .

3. Cycling each valve in the flow path that is not, testable during plant operation through at least one complete cycle of full travel, and Verifying that each high pressure pump starts in its preplanned sequence to maintain the, fire suppression water system pressure greater than or equal to 100 psig.

g ~ At least once per 3 years by performing a series of flow tests so that every fire main segment (excluding individual system supplies) has been verified to be clear of obstructions by a full flow test.

COOK NUCLEAR PLANT - UNIT 2 3/4 7-28 EEEEEEEEE EO. EE, EEE, ~

LANT SYSTEMS SURVEILLANCE RE UIREMENTS Continued 4.7.9.1.2 The fire pump diesel engines shall be demonstrated OPERABLE:

a ~ At least once per 31 days by verifying:

The fuel storage tanks contain at least 160 gallons of fuel, and

2. The diesels start from ambient conditions and operate for at least 30 minutes.
b. At least once per 92 days by verifying that a sample of diesel fuel from the fuel storage tanks obtained in accordance with ASTM-D4057-81 is within the acceptable limits specified in Table 1 of ASTM-D975-81 when checked for viscosity, water and sediment.

C. At least once per 18 months by subjecting the diesels to an inspection in accordance with procedures prepared in conjunction with its manufacturer's recommendations for this class of standby service. '

4.7.9.1.3 The fire pump diesel starting battery banks and chargers shall be demonstrated OPERABLE:

a. At least once per 7 days by verifying that:

The electrolyte level of each battery is above the plates, and

2. The output battery voltage of each bank is greater than 24 volts.
b. At least once per 92 days by verifying that the specific gravity is appropriate for continued service of each battery.

C. At least once per 18 months by verifying, that:

The"batteries, cell plates and battery packs show no visual indication of physical damage or abnormal deterioration, and

2. The battery-to-battery and terminal connections are clean, tight, free of corrosion, and coated with anti-corrosion material.

COOK NUCLEAR PLANT - UNIT 2 3/4 7-29 AMENDMENT NO. 44, khan, 454

PLANT SYSTEMS SURVEILLANCE RE UIREMENTS Continued 4.7.9.2 Each of the above required water spray and/or sprinkler systems shall be demonstrated to be OPERABLE:

a ~ At least once per 12 months by cycling each testable valve in the flow path through at least one complete cycle of full travel as provided by Technical Specification 4.7.9.1.1.e.

b. At least once per 18 months:

By performing a system functional test which includes simulated automatic actuation of the system, and:

a) Verifying that the automatic valves in the flow path actuate to their correct positions on a test signal, and*

b) Cycling each valve in the flow path that is not testable during plant operation through at least one complete cycle of full travel.

2. By visual inspection of deluge and preaction system piping (this is not required for systems supervised by air) to verify their integrity.

By visual inspection of each open head deluge nozzle to verify that there is no blockage.

At least once per 3 years by performing an air flow test through the piping of each open head deluge system and verifying each deluge nozzle is unobstructed.

open'ead

  • The fire protection water flow surveillance testing may be suspended until the completion of the fire protection water storage tank and fiie pump installations (May 31, 1993). The surveillance testing suspended as a result of this amendment will be initiated at its normal frequency within four months of the new fire protection water storage tanks and fire pumps being declared OPERABLE, with the exception of unit outage required testing which would be completed before the end of the next scheduled unit outage.

COOK NUCLEAR PLANT - UNIT 2 3/ 7 31 AMENDMENT NO34'40 454 I

PLANT SYSTEMS FIRE HOSE STATIONS LIMITING CONDITION FOR OPERATION 3.7.9.5 The fire hose stations shown in Table 3.7-7 shall be OPERABLE:

APPLICABILITY: Whenever equipment in the areas protected by the fire hose stations is required to be OPERABLE.

ACTION a ~ With one or more of the fire hose stations shown in Table 3.7-7 inoperable: 1) For those areas where the inoperable fire hose station is the primary means of fire suppression (areas where no fixed systems are provided or areas where the fixed systems are inoperable), within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />, route an additional equivalent capacity fire hose to the affected area(s) from an OPERABLE hose station(s) per Specification 4.7.9.5, or 2) within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />, verify that the fixed fire suppression system(s) that also protects the affected area(s) serviced by the fire hose station(s) is OPERABLE.

b. The provisions of Specifications 3.0.3 and 3.0.4 are not applicable.

SURVEILLANCE RE UIREMENTS 4.7.9.5 Each of the fire hose stations shown in Table 3.7-7 shall be demonstrated OPERABLE:

a. At least once per 31 days by a visual inspection of 'the fire hose stations to assure all required equipment is at the station.
b. At least once per 18 months by:

Removing the hose for visual inspection and re-racking, and 2 ~ Replacement of all degraded gaskets in couplings.

c. At least once per 3 years by:

Partially opening each hose station valve to verify OPERABILITY and no flow blockage.*

2. Conducting a hose hydrostatic test at a pressure of 150 psig or at least 50 psi greater than the maximum pressure available at that hose station, whichever is greater.*
  • The fire protection water flow surveillance testing may be suspended until the completion of the fire protection water storage tank and fire pump installations (May 31, 1993). The surveillance testing suspended as a result of this amendment will be initiated at its normal frequency within four months of the new fire protection water storage tanks and fire pumps being declared OPERABLE, with the exception of unit outage required testing which would be completed before the end of the next scheduled unit outage.

COOK NUCLEAR PLANT - UNIT 2 3/4 7-37 AMENDMENT NO. 44, ki4, 450

ATTACHMENT 2 TO AEP:NRC:1143A OATH OF AFFIRMATION STATEMENT FOR AEP:NRCt0659V

STATE OF OHIO COUNTY OF FRANKLIN R. F. Hering, bei.ng duly sworn, deposes and says that he is the Vice President of licensee Indiana Michigan Power Company, that he has read the foregoing application for SECTION 6 TECHNICAL SPECIFICATION CHANGE REQUEST and he knows the contents thereof'nd that said contents are true to the best of his knowledge and belief.

Subscri.bed and sworn to me before this day of NOTAR PUBLIC BITA D. HILL NOTARY PUBLIC. STAT) OF OHIO

~ II ~

I

~~

~I 1

II g