{{#Wiki_filter:DAIRYLAND POWERCOOPERATIVE AIR'C19ockelAlo.
{{#Wiki_filter:DAIRYLAND POWER COOPERATIVE AIR'C 1 9ockelAlo.
50-4409TO: NRC-DOCUMENT CONTROL DESK CONTROLLED DISTRIBUTION NO. 53FROM:LACBWR Plant Manager9/30/2013
50-4409 TO: NRC-DOCUMENT CONTROL DESK CONTROLLED DISTRIBUTION NO. 53 FROM: LACBWR Plant Manager 9/30/2013  


==SUBJECT:==
==SUBJECT:==
 
Changes to LACBWR Controlling Documents I. The following documents have been revised or issued new.TECHNICAL SPECIFICATIONS Amendment No. 72 to Possession-Only License No. DPR-45 for the La Crosse Boiling Water Reactor dated January 25, 2011, in response to DPC's application of December 13, 2005.This amendment revises the LACBWR Technical Specification (TS), in support of the dry cask storage project at LACBWR.Instructions Remove and replace all applicable pages in your Technical Specification binder with the enclosed revised Amendment No. 72 pages. New pages include: REMOVE 3 4 Title Page Table of Contents 1-1 2-1 3-1 4/5-1 6-1 INSERT 3 4 Title Page Table of Contents 1-1 2-1 3-1 4/5-1 6-1 o The material listed above is transmitted herewith.
Changes to LACBWR Controlling Documents I. The following documents have been revised or issued new.TECHNICAL SPECIFICATIONS Amendment No. 72 to Possession-Only License No. DPR-45 for the La Crosse BoilingWater Reactor dated January 25, 2011, in response to DPC's application of December 13,2005.This amendment revises the LACBWR Technical Specification (TS), in support of thedry cask storage project at LACBWR.Instructions Remove and replace all applicable pages in your Technical Specification binder with theenclosed revised Amendment No. 72 pages. New pages include:REMOVE34Title PageTable of Contents1-12-13-14/5-16-1INSERT34Title PageTable of Contents1-12-13-14/5-16-1o The material listed above is transmitted herewith.
Please verify receipt of all listed material, destroy superseded material, and sign below to acknowledge receipt.11 The material listed above has been placed in your binder.o Please review listed material, notify your personnel of changes, and sign below to acknowledge your review and notification of personnel.  
Please verify receipt of all listedmaterial, destroy superseded  
[To be checked for supervisors for department specific procedures and LACBWR Technical Specifications.]
: material, and sign below to acknowledge receipt.11 The material listed above has been placed in your binder.o Please review listed material, notify your personnel of changes, and sign below toacknowledge your review and notification of personnel.  
[To be checked forsupervisors for department specific procedures and LACBWR Technical Specifications.]
H 2,...... .........  
H 2,...... .........  
.. -1.o4,SM5A Touchstone Energy Cooperative La Crosse Boiling Water Reactor (LACBWR)  
.. -1.o 4,SM5 A Touchstone Energy Cooperative La Crosse Boiling Water Reactor (LACBWR) .S4601 State Highway 35
.S4601 State Highway 35
* Genoa, WI 54632-8846
* Genoa, WI 54632-8846
* 608-689-2331
* 608-689-2331
* 608-689-4200 fax o The material listed above has been changed.  
* 608-689-4200 fax o The material listed above has been changed. [To be checked for supervisors when materials applicable to other departments are issued to them.]/S/ DATE Please return this notification to the LACBWR Secretary within ten (10) working days.
[To be checked for supervisors whenmaterials applicable to other departments are issued to them.]/S/ DATEPlease return this notification to the LACBWR Secretary within ten (10) working days.
ATTACHMENT TO LICENSE AMENDMENT NO. 71 POSSESSION ONLY LICENSE NO. DPR-45 DOCKET NO. 50-409 Replace the current pages of License No. DPR-45, with the enclosed revised Amendment No.72 pages. The revised pages are identified by the amendment number and contain marginal lines indicating the area of change.REMOVE INSERT 3 4 3 4 Replace the current pages of the Appendix A, Technical Specifications, with the enclosed revised Amendment No. 72 pages. The revised pages are identified by the amendment number and contain marginal lines indicating the area of change.REMOVE INSERT Title Page Table of Contents 1-1.2-1 3-1 4/5-1 6-1 Title Page Table of Contents 1-1 2-1 3-1 4/5-1 6-1 Attachment (3) Pursuant to the Act and 10 CFR Parts 30 and 70, to possess, but not separate, such byproduct and special nuclear materials as were produced by the prior operation of the facility.A. This license shall be deemed to contain and is subject to the conditions specified in the following Commission regulations in 10 CFR Chapter I; Part 20, Section 30.34 of Part 30, Section 40.41 of Part 40, Sections 50.54 and 50. 59 of Part 50, and Section 70.32 of Part 70; and is subject to all applicable provisions of the Act and to the rules, regulations and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below: (1) Maximum Power Level The licensee is not authorized to operate the reactor. Fuel may not be placed in the reactor vessel.(2) Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 72, are hereby incorporated in the license. The licensee shall possess and maintain the facility in accordance with the Technical Specifications.
ATTACHMENT TO LICENSE AMENDMENT NO. 71POSSESSION ONLY LICENSE NO. DPR-45DOCKET NO. 50-409Replace the current pages of License No. DPR-45, with the enclosed revised Amendment No.72 pages. The revised pages are identified by the amendment number and contain marginallines indicating the area of change.REMOVEINSERT3434Replace the current pages of the Appendix A, Technical Specifications, with the enclosedrevised Amendment No. 72 pages. The revised pages are identified by the amendment numberand contain marginal lines indicating the area of change.REMOVEINSERTTitle PageTable of Contents1-1.2-13-14/5-16-1Title PageTable of Contents1-12-13-14/5-16-1Attachment (3) Pursuant to the Act and 10 CFR Parts 30 and 70, to possess, but not separate, such byproduct and special nuclear materials as were produced by the prioroperation of the facility.
(3) Physical Protection The licensee shall fully implement and maintain in effect all provisions of the Commission-approved physical security, guard training and qualification, and safeguards contingency plans including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revision to 10 CFR 73 55 (51 FR 27817 and 27822) and to the authority of 10 CFR 50.90 and 10 CFR 50.54(p).
A. This license shall be deemed to contain and is subject to the conditions specified inthe following Commission regulations in 10 CFR Chapter I; Part 20, Section 30.34 ofPart 30, Section 40.41 of Part 40, Sections 50.54 and 50. 59 of Part 50, and Section70.32 of Part 70; and is subject to all applicable provisions of the Act and to therules, regulations and orders of the Commission now or hereafter in effect; and issubject to the additional conditions specified or incorporated below:(1) Maximum Power LevelThe licensee is not authorized to operate the reactor.
The plan, which contains Safeguards Information protected under 10 CFR 73.21, is entitled, "Physical Security Plan for La Crosse Boiling Water Reactor (LACBWR)," as revised and reflecting exemptions from 10 CFR 73.55 granted June 20, 2012).(4) Fire Protection The licensee shall implement and maintain in effect all provisions of the facility Fire Protection Program as described therein and as approved by the NRC.The licensee may make changes to the approved Fire Protection Program without prior NRC approval if these changes do not decrease the effectiveness of fire protection for facilities, systems, and equipment which could result in a radiological hazard, taking into account the decommissioning plant conditions and activities.
Fuel may not be placed in thereactor vessel.(2) Technical Specifications The Technical Specifications contained in Appendix A, as revised throughAmendment No. 72, are hereby incorporated in the license.
Amendment No. 72  B. This Possession only license supersedes and terminates in their entirety changes to the license issued in License Amendments:
The licensee shallpossess and maintain the facility in accordance with the Technical Specifications.
No. 17, July 27, 1979; No. 56, August 4, 1987; No. 61, May 18, 1988; No. 63, August 18, 1988; No. 66, August 7, 1991;and No. 69, April 11, 1997.C. This amended license is effective 30 days from the date of issuance and shall expire at midnight, March 29, 2031.FOR THE NUCLEAR REGULATORY COMMISSION Seymour H. Weiss, Director Non-Power Reactors and Decommissioning Project Directorate Division of Reactor Project Management Office of Nuclear Reactor Regulation
(3) Physical Protection The licensee shall fully implement and maintain in effect all provisions of theCommission-approved physical  
: security, guard training and qualification, andsafeguards contingency plans including amendments made pursuant to provisions ofthe Miscellaneous Amendments and Search Requirements revision to 10 CFR 73 55(51 FR 27817 and 27822) and to the authority of 10 CFR 50.90 and 10 CFR50.54(p).
The plan, which contains Safeguards Information protected under 10 CFR73.21, is entitled, "Physical Security Plan for La Crosse Boiling Water Reactor(LACBWR),"
as revised and reflecting exemptions from 10 CFR 73.55 granted June20, 2012).(4) Fire Protection The licensee shall implement and maintain in effect all provisions of the facility FireProtection Program as described therein and as approved by the NRC.The licensee may make changes to the approved Fire Protection Program withoutprior NRC approval if these changes do not decrease the effectiveness of fireprotection for facilities,  
: systems, and equipment which could result in a radiological hazard, taking into account the decommissioning plant conditions and activities.
Amendment No. 72  B. This Possession only license supersedes and terminates in their entirety changes tothe license issued in License Amendments:
No. 17, July 27, 1979; No. 56, August 4,1987; No. 61, May 18, 1988; No. 63, August 18, 1988; No. 66, August 7, 1991;and No. 69, April 11, 1997.C. This amended license is effective 30 days from the date of issuance and shall expireat midnight, March 29, 2031.FOR THE NUCLEAR REGULATORY COMMISSION Seymour H. Weiss, DirectorNon-Power Reactors and Decommissioning Project Directorate Division of Reactor Project Management Office of Nuclear Reactor Regulation


==Attachment:==
==Attachment:==


Appendix A -Technical Specifications Date of Issuance:
Appendix A -Technical Specifications Date of Issuance:
April 11, 1997Amendment No. 72 DAIRYLAND POWER COOPERATIVE DOCKET NO. 50-409LA CROSSE BOILING WATER REACTOR(LACBWR)POSSESSION ONLY LICENSEAPPENDIX ATECHNICAL SPECIFICATIONS License No. DPR-45Amendment No. 72 TABLE OF CONTENTS1.2.3.4/5.6.PAGED E F IN IT IO N S ..............................................................................................................
April 11, 1997 Amendment No. 72 DAIRYLAND POWER COOPERATIVE DOCKET NO. 50-409 LA CROSSE BOILING WATER REACTOR (LACBWR)POSSESSION ONLY LICENSE APPENDIX A TECHNICAL SPECIFICATIONS License No. DPR-45 Amendment No. 72 TABLE OF CONTENTS 1.2.3.4/5.6.PAGE D E F IN IT IO N S ..............................................................................................................
1-1DESIGN FEATURES  
1-1 DESIGN FEATURES ...................................................................................................
...................................................................................................
2-1 2 .1 S IT E .......................................................................................................................
2-12 .1 S IT E .......................................................................................................................
2 -1 2.2 FUEL STORAGE ...................................................................................................
2 -12.2 FUEL STORAGE ...................................................................................................
2-1 APPLICABILITY
2-1APPLICABILITY
...........................................................................................................
...........................................................................................................
3-1PERFORMANCE REQUIREM ENTS .........................................................................
3-1 PERFORMANCE REQUIREM ENTS .........................................................................
4/5-1ADM INISTRATIVE CONTROLS  
4/5-1 ADM INISTRATIVE CONTROLS ..................................................................................
..................................................................................
6-1 LACBWR TS Amendment 72  
6-1LACBWR TSAmendment 72  
: 1. DEFINITIONS THIS SECTION DELETED IN ITS ENTIRETY LACBWR TS 1-1 Amendment 72  
: 1. DEFINITIONS THIS SECTION DELETED IN ITS ENTIRETYLACBWR TS1-1Amendment 72  
: 2. DESIGN FEATURES 2.1 SITE The facility is located in Vernon County, Wisconsin, on the east bank of the Mississippi River, approximately one mile south of Genoa, Wisconsin, as described in License Condition 2.A.2.2 FUEL STORAGE A maximum of 333 spent fuel assemblies from the La Crosse Boiling Water Reactor are stored in 5 dry casks within an Independent Spent Fuel Storage Installation (ISFSI).Spent fuel assemblies shall not be placed in the spent fuel pool.LACBWR TS 2-1 Amendment 72  
: 2. DESIGN FEATURES2.1 SITEThe facility is located in Vernon County, Wisconsin, on the east bank of the Mississippi River, approximately one mile south of Genoa, Wisconsin, as described in LicenseCondition 2.A.2.2 FUEL STORAGEA maximum of 333 spent fuel assemblies from the La Crosse Boiling Water Reactor arestored in 5 dry casks within an Independent Spent Fuel Storage Installation (ISFSI).Spent fuel assemblies shall not be placed in the spent fuel pool.LACBWR TS2-1Amendment 72  
: 3. APPLICABILITY THIS SECTION DELETED IN ITS ENTIRETY LACBWR TS 3-1 Amendment 72 4/5. PERFORMANCE REQUIREMENTS THIS SECTION DELETED IN ITS ENTIRETY I LACBWR TS 4/5-1 Amendment 72  
: 3. APPLICABILITY THIS SECTION DELETED IN ITS ENTIRETYLACBWR TS3-1Amendment 72 4/5. PERFORMANCE REQUIREMENTS THIS SECTION DELETED IN ITS ENTIRETY ILACBWR TS4/5-1Amendment 72  
: 6. ADMINISTRATIVE CONTROLS THIS SECTION DELETED IN ITS ENTIRETY LACBWR TS 6-1 Amendment 72}}
: 6. ADMINISTRATIVE CONTROLSTHIS SECTION DELETED IN ITS ENTIRETYLACBWR TS6-1Amendment 72}}

Revision as of 22:22, 13 July 2018

Dairyland Power Cooperative, Changes to LACBWR Controlling Documents
ML13280A289
Person / Time
Site: La Crosse File:Dairyland Power Cooperative icon.png
Issue date: 09/30/2013
From:
Dairyland Power Cooperative
To:
Document Control Desk, NRC/FSME
References
Download: ML13280A289 (12)


Text

DAIRYLAND POWER COOPERATIVE AIR'C 1 9ockelAlo.

50-4409 TO: NRC-DOCUMENT CONTROL DESK CONTROLLED DISTRIBUTION NO. 53 FROM: LACBWR Plant Manager 9/30/2013

SUBJECT:

Changes to LACBWR Controlling Documents I. The following documents have been revised or issued new.TECHNICAL SPECIFICATIONS Amendment No. 72 to Possession-Only License No. DPR-45 for the La Crosse Boiling Water Reactor dated January 25, 2011, in response to DPC's application of December 13, 2005.This amendment revises the LACBWR Technical Specification (TS), in support of the dry cask storage project at LACBWR.Instructions Remove and replace all applicable pages in your Technical Specification binder with the enclosed revised Amendment No. 72 pages. New pages include: REMOVE 3 4 Title Page Table of Contents 1-1 2-1 3-1 4/5-1 6-1 INSERT 3 4 Title Page Table of Contents 1-1 2-1 3-1 4/5-1 6-1 o The material listed above is transmitted herewith.

Please verify receipt of all listed material, destroy superseded material, and sign below to acknowledge receipt.11 The material listed above has been placed in your binder.o Please review listed material, notify your personnel of changes, and sign below to acknowledge your review and notification of personnel.

[To be checked for supervisors for department specific procedures and LACBWR Technical Specifications.]

H 2,...... .........

.. -1.o 4,SM5 A Touchstone Energy Cooperative La Crosse Boiling Water Reactor (LACBWR) .S4601 State Highway 35

  • Genoa, WI 54632-8846
  • 608-689-2331
  • 608-689-4200 fax o The material listed above has been changed. [To be checked for supervisors when materials applicable to other departments are issued to them.]/S/ DATE Please return this notification to the LACBWR Secretary within ten (10) working days.

ATTACHMENT TO LICENSE AMENDMENT NO. 71 POSSESSION ONLY LICENSE NO. DPR-45 DOCKET NO. 50-409 Replace the current pages of License No. DPR-45, with the enclosed revised Amendment No.72 pages. The revised pages are identified by the amendment number and contain marginal lines indicating the area of change.REMOVE INSERT 3 4 3 4 Replace the current pages of the Appendix A, Technical Specifications, with the enclosed revised Amendment No. 72 pages. The revised pages are identified by the amendment number and contain marginal lines indicating the area of change.REMOVE INSERT Title Page Table of Contents 1-1.2-1 3-1 4/5-1 6-1 Title Page Table of Contents 1-1 2-1 3-1 4/5-1 6-1 Attachment (3) Pursuant to the Act and 10 CFR Parts 30 and 70, to possess, but not separate, such byproduct and special nuclear materials as were produced by the prior operation of the facility.A. This license shall be deemed to contain and is subject to the conditions specified in the following Commission regulations in 10 CFR Chapter I; Part 20, Section 30.34 of Part 30, Section 40.41 of Part 40, Sections 50.54 and 50. 59 of Part 50, and Section 70.32 of Part 70; and is subject to all applicable provisions of the Act and to the rules, regulations and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below: (1) Maximum Power Level The licensee is not authorized to operate the reactor. Fuel may not be placed in the reactor vessel.(2) Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 72, are hereby incorporated in the license. The licensee shall possess and maintain the facility in accordance with the Technical Specifications.

(3) Physical Protection The licensee shall fully implement and maintain in effect all provisions of the Commission-approved physical security, guard training and qualification, and safeguards contingency plans including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revision to 10 CFR 73 55 (51 FR 27817 and 27822) and to the authority of 10 CFR 50.90 and 10 CFR 50.54(p).

The plan, which contains Safeguards Information protected under 10 CFR 73.21, is entitled, "Physical Security Plan for La Crosse Boiling Water Reactor (LACBWR)," as revised and reflecting exemptions from 10 CFR 73.55 granted June 20, 2012).(4) Fire Protection The licensee shall implement and maintain in effect all provisions of the facility Fire Protection Program as described therein and as approved by the NRC.The licensee may make changes to the approved Fire Protection Program without prior NRC approval if these changes do not decrease the effectiveness of fire protection for facilities, systems, and equipment which could result in a radiological hazard, taking into account the decommissioning plant conditions and activities.

Amendment No. 72 B. This Possession only license supersedes and terminates in their entirety changes to the license issued in License Amendments:

No. 17, July 27, 1979; No. 56, August 4, 1987; No. 61, May 18, 1988; No. 63, August 18, 1988; No. 66, August 7, 1991;and No. 69, April 11, 1997.C. This amended license is effective 30 days from the date of issuance and shall expire at midnight, March 29, 2031.FOR THE NUCLEAR REGULATORY COMMISSION Seymour H. Weiss, Director Non-Power Reactors and Decommissioning Project Directorate Division of Reactor Project Management Office of Nuclear Reactor Regulation

Attachment:

Appendix A -Technical Specifications Date of Issuance:

April 11, 1997 Amendment No. 72 DAIRYLAND POWER COOPERATIVE DOCKET NO. 50-409 LA CROSSE BOILING WATER REACTOR (LACBWR)POSSESSION ONLY LICENSE APPENDIX A TECHNICAL SPECIFICATIONS License No. DPR-45 Amendment No. 72 TABLE OF CONTENTS 1.2.3.4/5.6.PAGE D E F IN IT IO N S ..............................................................................................................

1-1 DESIGN FEATURES ...................................................................................................

2-1 2 .1 S IT E .......................................................................................................................

2 -1 2.2 FUEL STORAGE ...................................................................................................

2-1 APPLICABILITY

...........................................................................................................

3-1 PERFORMANCE REQUIREM ENTS .........................................................................

4/5-1 ADM INISTRATIVE CONTROLS ..................................................................................

6-1 LACBWR TS Amendment 72

1. DEFINITIONS THIS SECTION DELETED IN ITS ENTIRETY LACBWR TS 1-1 Amendment 72
2. DESIGN FEATURES 2.1 SITE The facility is located in Vernon County, Wisconsin, on the east bank of the Mississippi River, approximately one mile south of Genoa, Wisconsin, as described in License Condition 2.A.2.2 FUEL STORAGE A maximum of 333 spent fuel assemblies from the La Crosse Boiling Water Reactor are stored in 5 dry casks within an Independent Spent Fuel Storage Installation (ISFSI).Spent fuel assemblies shall not be placed in the spent fuel pool.LACBWR TS 2-1 Amendment 72
3. APPLICABILITY THIS SECTION DELETED IN ITS ENTIRETY LACBWR TS 3-1 Amendment 72 4/5. PERFORMANCE REQUIREMENTS THIS SECTION DELETED IN ITS ENTIRETY I LACBWR TS 4/5-1 Amendment 72
6. ADMINISTRATIVE CONTROLS THIS SECTION DELETED IN ITS ENTIRETY LACBWR TS 6-1 Amendment 72