ML13330A584: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:MN No. 13-026 U.S. NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF PUBLIC MEETING Licensee:
{{#Wiki_filter:MN No. 1 3-026 U.S. NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF PUBLIC MEETING Licensee: NextEra Energy, Seabrook, LLC Facilities:
NextEra Energy, Seabrook, LLC Facilities:
Seabrook Station Docket Nos:
Seabrook Station Docket Nos:
50-443  Date/ Time: December 18, 2013  Open House 5:00 p.m. to 5:45 p.m. Public Meeting 6:00 p.m. to 9:00 p.m. Location:
50-443  Date/ Time: December 18, 2013  Open House 5:00 p.m. to 5: 45 p.m. Public Meeting 6: 00 p.m. to 9:00 p.m. Location: Best Western Plus, The Inn at Hampton 815 Lafayette Road Hampton, New Hampshire 03842  (603) 926-6771 Purpose:  The U. S. Nuclear Regulatory Commission (NRC) will host an open house and public meeting with NextEra. The NRC plans to discuss NextEra's   testing program and their schedule regarding concrete degradation caused by Alkali
Best Western Plus, The Inn at Hampton 815 Lafayette Road Hampton, New Hampshire 03842  (603) 926
-6771 Purpose:  The U. S. Nuclear Regulatory Commission (
NRC) will host an open house and public meeting with NextEra. The NRC plans to discuss NextEra's testing program and their schedule regarding concrete degradation caused by Alkali
-Silica Reaction (ASR) at Seabrook Station.
-Silica Reaction (ASR) at Seabrook Station.
Participants
Participants
:  NRC  David Lew
:  NRC  David Lew , Deputy Regional Administrator, Region I (RI)
, Deputy Regional Administrator, Region I (RI)
James Trapp , Deputy Director, Division of Reactor Safety (DRS), RI Mel Gray, Chief, Engineering Branch I, DRS, RI William Cook, Senior Reactor Analyst (Team Leader), RI Michael Marshall, Division of License Renewal,    Office of Nuclear Reactor Regulation NextEra  Kevin Walsh, Vice President, Seabrook Station Rick Noble, ASR Project Manager, Seabrook Station Dr. Oguzhan Bayrak , Director, Ferguson Structural Engineering Laboratory , University of Texas at Austin Public Participation:
James Trapp
, Deputy Director, Division of Reactor Safety (DRS), RI Mel Gray, Chief, Engineering Branch I, DRS, RI William Cook, Senior Reactor Analyst (Team Leader), RI Michael Marshall, Division of License Renewal,    Office of Nuclear Reactor Regulation NextEra  Kevin Walsh, Vice President, Seabrook Station Rick Noble, ASR Project Manager, Seabrook Station Dr. Oguzhan Bayrak, Director, Ferguson Structural Engineering Laboratory
, University of Texas at Austin Public Participation:
This is a Category 1 Meeting. During the open house, NRC staff will be available to answer questions from the public and discuss issues or concerns related to the Seabrook Station.
This is a Category 1 Meeting. During the open house, NRC staff will be available to answer questions from the public and discuss issues or concerns related to the Seabrook Station.
Following the open house, the NRC will ho ld a meeting with NextEra
Following the open house, the NRC will ho ld a meeting with NextEra. The public is invited to observe this meeting and will have the opportunity to communicate with the NRC during a question and answer period directly following the business portion of the meeting, but before the meeting is adjourned
. The public is invited to observe this meeting and will have the opportunity to communicate with the NRC during a question and answer period directly following the business portion of the meeting, but before the meeting is adjourned
. Meeting Contact:
. Meeting Contact:
Mel Gray, Region I 610-337-5209 E-mail:  Mel.Gray@nrc.gov 2 AGENDA:  5:00 - 5:45 p.m. Poster Session (NRC staff, NextEra staff, Other Organizat ions)  6:00 - 6:15 p.m. Opening Remarks by NRC staff 6:15 - 7:15 p.m. Presentation by NextEra on Testing Program and Schedule
Mel Gray, Region I 610-337-5 209 E-mail:  Mel.Gray@nrc.gov 2 AGENDA:  5: 0 0 - 5: 45 p.m. Poster Session (NRC staff, NextEra staff, Other Organizat i ons)  6: 00 - 6:15 p.m. Opening Remarks by NRC staff 6: 15 - 7: 15 p.m. Presentation by NextEra on Testing Program and Schedule


7:15 - 9:00 p.m. Question and Answer Period
7: 15 - 9: 00 p.m. Question and Answer Period


Additional information relative to the NRC's oversight of the ASR conditions at Seabrook Station can be found on the NRC's website at:
Additional information relative to the NRC's oversight of the ASR conditions at Seabrook Station can be found on the NRC's website at:
Line 41: Line 33:
-finder/reactor/seabrook/concrete
-finder/reactor/seabrook/concrete
-degradation.html The NRC's Policy Statement, "Enhancing Public Participation in NRC Meetings," effective May 28, 2002, applies to this meeting. The policy statement may be found on the NRC
-degradation.html The NRC's Policy Statement, "Enhancing Public Participation in NRC Meetings," effective May 28, 2002, applies to this meeting. The policy statement may be found on the NRC
's website, http://www.nrc.gov/reading-rm/doc-collections/commission/policy/67fr36920.html
's website, http://www.nrc.gov/reading-rm/doc-collections/commission/policy/67fr36920.html , and contains information regarding visitors and security.
, and contains information regarding visitors and security.
The NRC provides reasonable accommodation to individuals with disabilities where appropriate. If you need a reasonable accommodation to participate in this meeting, or need the meeting notice or other information from the meeting in another format (e.g., Braille, large print), please notify the NRC's meeting contact. Determinations on requests for reasonable accommodation will be made on a case-by-case basis. Persons requiring assistance to attend the meeting shall make their requests known to the NRC meeting contact no later than two business days prior to the meeting.
The NRC provides reasonable accommodation to individuals with disabilities where appropriate. If you need a reasonable accommodation to participate in this meeting, or need the meeting notice or other information from the meeting in another format (e.g., Braille, large print), please notify the NRC's meeting contact. Determinations on requests for reasonable accommodation will be made on a case-by-case basis. Persons requiring assistance to attend the meeting shall make their requests known to the NRC meeting contact no later than two business days prior to the meeting.


Line 52: Line 43:
Mel Gray, Chief        Engineering Branch 1 Division of Reactor Safety  cc: via ListServ
Mel Gray, Chief        Engineering Branch 1 Division of Reactor Safety  cc: via ListServ


ML13330A584 SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RI/DRS RI/DRP RI/DRS  NAME WCook/NPF for GDentel/GD MGray/MG  DATE 11/25/2013 11/25/2013 11/25/2013}}
ML13330A584 SUNSI Review Non-Sensitive Sensitive   Publicly Available Non-Publicly Available OFFICE RI/DRS RI/DRP RI/DRS  NAME WCook/NPF for GDentel/GD MGray/MG  DATE 11/25/2013 11/25/2013 11/25/2013}}

Revision as of 19:15, 13 July 2018

12/18/2013 - Public Meeting Notice for (ASR) Seabrook Station
ML13330A584
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 11/26/2013
From: Gray M K
Engineering Region 1 Branch 1
To:
Gray M
References
Download: ML13330A584 (3)


Text

MN No. 1 3-026 U.S. NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF PUBLIC MEETING Licensee: NextEra Energy, Seabrook, LLC Facilities:

Seabrook Station Docket Nos:

50-443 Date/ Time: December 18, 2013 Open House 5:00 p.m. to 5: 45 p.m. Public Meeting 6: 00 p.m. to 9:00 p.m. Location: Best Western Plus, The Inn at Hampton 815 Lafayette Road Hampton, New Hampshire 03842 (603) 926-6771 Purpose: The U. S. Nuclear Regulatory Commission (NRC) will host an open house and public meeting with NextEra. The NRC plans to discuss NextEra's testing program and their schedule regarding concrete degradation caused by Alkali

-Silica Reaction (ASR) at Seabrook Station.

Participants

NRC David Lew , Deputy Regional Administrator, Region I (RI)

James Trapp , Deputy Director, Division of Reactor Safety (DRS), RI Mel Gray, Chief, Engineering Branch I, DRS, RI William Cook, Senior Reactor Analyst (Team Leader), RI Michael Marshall, Division of License Renewal, Office of Nuclear Reactor Regulation NextEra Kevin Walsh, Vice President, Seabrook Station Rick Noble, ASR Project Manager, Seabrook Station Dr. Oguzhan Bayrak , Director, Ferguson Structural Engineering Laboratory , University of Texas at Austin Public Participation:

This is a Category 1 Meeting. During the open house, NRC staff will be available to answer questions from the public and discuss issues or concerns related to the Seabrook Station.

Following the open house, the NRC will ho ld a meeting with NextEra. The public is invited to observe this meeting and will have the opportunity to communicate with the NRC during a question and answer period directly following the business portion of the meeting, but before the meeting is adjourned

. Meeting Contact:

Mel Gray, Region I 610-337-5 209 E-mail: Mel.Gray@nrc.gov 2 AGENDA: 5: 0 0 - 5: 45 p.m. Poster Session (NRC staff, NextEra staff, Other Organizat i ons) 6: 00 - 6:15 p.m. Opening Remarks by NRC staff 6: 15 - 7: 15 p.m. Presentation by NextEra on Testing Program and Schedule

7: 15 - 9: 00 p.m. Question and Answer Period

Additional information relative to the NRC's oversight of the ASR conditions at Seabrook Station can be found on the NRC's website at:

http://www.nrc.gov/info

-finder/reactor/seabrook/concrete

-degradation.html The NRC's Policy Statement, "Enhancing Public Participation in NRC Meetings," effective May 28, 2002, applies to this meeting. The policy statement may be found on the NRC

's website, http://www.nrc.gov/reading-rm/doc-collections/commission/policy/67fr36920.html , and contains information regarding visitors and security.

The NRC provides reasonable accommodation to individuals with disabilities where appropriate. If you need a reasonable accommodation to participate in this meeting, or need the meeting notice or other information from the meeting in another format (e.g., Braille, large print), please notify the NRC's meeting contact. Determinations on requests for reasonable accommodation will be made on a case-by-case basis. Persons requiring assistance to attend the meeting shall make their requests known to the NRC meeting contact no later than two business days prior to the meeting.

Meetings are sometimes canceled or rescheduled as a result of unforeseen circumstances.

Please confirm the meeting schedule on the NRC website under public meetings.

Approved by:

___/RA/______________

Mel Gray, Chief Engineering Branch 1 Division of Reactor Safety cc: via ListServ

ML13330A584 SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RI/DRS RI/DRP RI/DRS NAME WCook/NPF for GDentel/GD MGray/MG DATE 11/25/2013 11/25/2013 11/25/2013