ML17263A225: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:ACCEI.EEDDOCUMENTDISOBVTIONSYSTEMREGULAORYINFORMATION DISTRIBUT 8SYSTEM(RIDS)ACCESSION NBR:9304160043 DOC.DATE:
{{#Wiki_filter:ACCEI.E ED DOCUMENT DIS OBVTION SYSTEM REGULA ORY INFORMATION DISTRIBUT 8 SYSTEM (RIDS)ACCESSION NBR:9304160043 DOC.DATE: 93/04/12 NOTARIZED:
93/04/12NOTARIZED:
NO FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G AUTH.NAME AUTHOR AFFILIATION BACKUSgW HE Rochester Gas&Electric Corp.MECREDY,R.C.
NOFACIL:50-244 RobertEmmetGinnaNuclearPlant,Unit1,Rochester GAUTH.NAMEAUTHORAFFILIATION BACKUSgWHERochester Gas&ElectricCorp.MECREDY,R.C.
Rochester Gas&Electric Corp.RECIP.NAME RECIPIENT AFFILIATION DOCKET 05000244 S UBJECT: LER 93-001-00:on 930312,both source range detectors found inoperable during energization.Caused by center electrode degradation due to gamma corrosion.
Rochester Gas&ElectricCorp.RECIP.NAME RECIPIENT AFFILIATION DOCKET05000244
Failed detectors replaced w/qualified spares.W/930412 ltr.DISTRIBUTION CODE: IE22T COPIES RECEIVED:LTR ENCL SIZE: TITLE: 50.73/50.9 Licensee Event Report (LER), ncident Rpt, etc.NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72).
05000244 RECIPIENT ID CODE/NAME PD1-3 LA JOHNSONiA INTERNAL: ACNW AEOD/DSP/TPAB NRR/DE/EELB NRR/DORS/OEAB NRR/DRCH/HICB NRR/DRIL/RPEB RR7'DSSA/PLB G FILE 02 RGN E 01 EXTERNAL'G&G BRYCE g J~H NRC PDR NSIC POOREiW.COPIES LTTR ENCL 1 1 1 1 2 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 2 2 1 1 1 1 RECIPIENT ID CODE/NAME PD1-3 PD AEOD/DOA AEOD/ROAB/DSP NRR/DE/EMEB NRR/DRCH/HHFB NRR/DRCH/HOLB NRR/DRSS/PRPB NRR/DSSA/SRXB RES/DSIR/EIB L ST LOBBY WARD NS IC MURPHY, G.A NUDOCS FULL TXT COPIES LTTR ENCL 1 1 1 1 2 2 1 1 1 1 1 1 2 2 1 1 1 1 1 1 1 1 1 1 f'23 7 4 pQg c 5 NOTE TO ALL"RIDS" RECIPIENTS:
$0-t PLEASE HELP US TO REDUCE WASTE!CONTACT THE DOCUMENT CONTROL DESK, ROOM PI-37 (EXT.504-2065)TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!FULL TEXT CONVERSION REQUIRED TOTAL NUMBER OF COPIES REQUIRED: LTTR 30 ENCL 30


==SUBJECT:==
J Jr ROCHESTER GAS AND ELECTRIC CORPORATION
LER93-001-00:on 930312,both sourcerangedetectors foundinoperable duringenergization.Caused bycenterelectrode degradation duetogammacorrosion.
, r'~".'rOarr tE t~j St Jlf 4 89 EAST AVENUE, ROCHESTER N.K 14649-0001 ROBERT C.h1ECREDY Vice President CrnnJ NucteJr Production TELEPHONE AREA CODE 7 i 6 546 2700 April 12, 1993 U.S.Nuclear Regulatory Commission Document Control Desk Nashington, DC 20555
Faileddetectors replacedw/qualified spares.W/930412 ltr.DISTRIBUTION CODE:IE22TCOPIESRECEIVED:LTR ENCLSIZE:TITLE:50.73/50.9 LicenseeEventReport(LER),ncidentRpt,etc.NOTES:License Expdateinaccordance with10CFR2,2.109(9/19/72).
05000244RECIPIENT IDCODE/NAME PD1-3LAJOHNSONiA INTERNAL:
ACNWAEOD/DSP/TPAB NRR/DE/EELB NRR/DORS/OEAB NRR/DRCH/HICB NRR/DRIL/RPEB RR7'DSSA/
PLBGFILE02RGNE01EXTERNAL'G&GBRYCEgJ~HNRCPDRNSICPOOREiW.COPIESLTTRENCL1111221111111111111111221111RECIPIENT IDCODE/NAME PD1-3PDAEOD/DOAAEOD/ROAB/DSP NRR/DE/EMEB NRR/DRCH/HHFB NRR/DRCH/HOLB NRR/DRSS/PRPB NRR/DSSA/SRXB RES/DSIR/EIB LSTLOBBYWARDNSICMURPHY,G.ANUDOCSFULLTXTCOPIESLTTRENCL111122111111221111111111f'2374pQgc5NOTETOALL"RIDS"RECIPIENTS:
$0-tPLEASEHELPUSTOREDUCEWASTE!CONTACTTHEDOCUMENTCONTROLDESK,ROOMPI-37(EXT.504-2065)
TOELIMINATE YOURNAMEFROMDISTRIBUTION LISTSFORDOCUMENTS YOUDON'TNEED!FULLTEXTCONVERSION REQUIREDTOTALNUMBEROFCOPIESREQUIRED:
LTTR30ENCL30
 
JJrROCHESTER GASANDELECTRICCORPORATION
,r'~".'rOarrtEt~jStJlf489EASTAVENUE,ROCHESTER N.K14649-0001 ROBERTC.h1ECREDYVicePresident CrnnJNucteJrProduction TELEPHONE AREACODE7i65462700April12,1993U.S.NuclearRegulatory Commission DocumentControlDeskNashington, DC20555


==Subject:==
==Subject:==
LER93-001,LossofSourceRangeDetectorIndication DuringEnergization, DuetoFaultyDetectors, CausesaCondition Prohibited byPlantTechnical Specifica-tions.R.E.GinnaNuclearPowerPlantDocketNo.50-244Inaccordance with10CFR50.73,LicenseeEventReportSystem,item(a)(2)(i)(B),
LER 93-001, Loss of Source Range Detector Indication During Energization, Due to Faulty Detectors, Causes a Condition Prohibited by Plant Technical Specifica-tions.R.E.Ginna Nuclear Power Plant Docket No.50-244 In accordance with 10 CFR 50.73, Licensee Event Report System, item (a)(2)(i)(B), which requires a report of,"any operation prohibited by the plant's Technical Specifications", the attached Licensee Event Report LER 93-001 is hereby submitted.
whichrequiresareportof,"anyoperation prohibited bytheplant'sTechnical Specifications",
This event has in no way affected the public's health and safety.Very truly yours, XCJ Robert C.Me redy U.S.Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406 Ginna USNRC Senior Resident Inspector IGG030'9304160043 930412 PDR ADOCK 05000244 S'PDR~'I>]gd If
theattachedLicenseeEventReportLER93-001isherebysubmitted.
Thiseventhasinnowayaffectedthepublic'shealthandsafety.Verytrulyyours,XCJRobertC.MeredyU.S.NuclearRegulatory Commission RegionI475Allendale RoadKingofPrussia,PA19406GinnaUSNRCSeniorResidentInspector IGG030'9304160043 930412PDRADOCK05000244S'PDR~'I>]gdIf


NACFORM300(Se)9)US.NUCLEARREGULATORY COMMISSIAPPAOVEDOMBNO.3)500(OCEXPIRF5:C/30/92ESTIMATED BURDENPERRFSPONSETOCOMPLYWTHTHISINFORMATIOAI COLLKCTION AEOUESTI50.0HAS.FORWARDCOMMENTSREGARDING BUADENESTIMATETOTHERECORDSANDRFPORTSMANAGEMENT BRANCH(F030).U.S.NUCLEARREGULATORY COMMISSION, WASHINGTON.
NAC FORM 300 (Se)9)US.NUCLEAR REGULATORY COMMISSI APPAOVED OMB NO.3)500(OC EXP IRF5: C/30/92 ESTIMATED BURDEN PER RFSPONSE TO COMPLY WTH THIS INFORMATIOAI COLLKCTION AEOUESTI 50.0 HAS.FORWARD COMMENTS REGARDING BUADEN ESTIMATE TO THE RECORDS AND RFPORTS MANAGEMENT BRANCH (F030).U.S.NUCLEAR REGULATORY COMMISSION, WASHINGTON.
DC20555,ANDTOTHEPAPEAWORK ABDUCTION PROiECT(31500'IOe).
DC 20555, AND TO THE PAPEAWORK ABDUCTION PROiECT (31500'IOe).
OFFICEOFMANAGEMENT ANDBUDGET.WASHINGTON, DC20503.LICENSEEEVENTREPORT(LER)DOCKETNUMBER(2)PA'FACILITYNAME(1)R.E.GinnaNuclearPowerPlanto5ooo244ioFllTITLE(e)LossofSourceRangeDetectorIndication DuringEnergization, DuetoFaultyDetectors CausesaCondition Prohibited vTechnical Snecifica io~yCC~'VENTDATE(SlLEANUMBER(0)REPORTDATE(7OTHERFACILITIES INVOLVED(0)MONTHOAYYEARYEARIg@SEQUENTIAL NUMSERREVISIONMONTHOAYYEARFACILITYNAMESDOCKETNUMBFRISI 050000312939300100041293~~05000OPERATING MODE(0)NPOWERLEVELppp20.I02(0) 20.e00(~)IIIIII20A05(el(1)(9)20.005(e) ll1(ill)20A054)ll)Grl20.405(~Ill)4)20.e05(~)BOM(c)(I)50.30(cl(2) 50.73(eI(2IIII50.73(e)(2)IIII50.734)(2)(III)
OFFICE OF MANAGEMENT AND BUDGET.WASHINGTON, DC 20503.LICENSEE EVENT REPORT (LER)DOCKET NUMBER (2)PA'FACILITY NAME (1)R.E.Ginna Nuclear Power Plant o 5 o o o 24 4ioFll TITLE (e)Loss of Source Range Detector Indication During Energization, Due to Faulty Detectors Causes a Condition Prohibited v Technical Snecifica io~y CC~'VENT DATE (Sl LEA NUMBER (0)REPORT DATE (7 OTHER FACILITIES INVOLVED (0)MONTH OAY YEAR YEAR Ig@SEQUENTIAL NUMSER REVISION MONTH OAY YEAR FACILITY NAMES DOCKET NUMBFRISI 0 5 0 0 0 0 312 93 93 001 0 0 0 4 1 2 9 3~~0 5 0 0 0 OPERATING MODE (0)N POWER LEVEL p p p 20.I02(0)20.e00(~)II IIII 20A05(e l(1)(9)20.005(e)ll 1(ill)20A05 4)ll)Grl 20.405(~Ill)4)20.e05(~)BOM(c)(I)50.30(cl(2) 50.73(e I (2 I I II 50.73(e)(2)IIII 50.734)(2)(III)
LICENSFECONTACTFOATHISLER(12)50,73leI(2)IIr)50.73(el(2) 4l50.73(e)(2) lrQ)50.73(e)(2)(rljj)
LICENSFE CONTACT FOA THIS LER (12)50,7 3 le I (2)I Ir)50.73(el(2) 4l 50.73(e)(2) lrQ)50.73(e)(2)(rljj)(A)50.73(el(2)(r(QI(~)50.73(e)(2)(el 0 THE REDUIREMENTS OF 10 CFR (): (Check onr or more of the fo//owindi (11)THIS REPORT IS SUBMITTED PURSUANT T 73.71(III 73.71(c)OTHER ISptcify cn Atjttrect Orrow rot/ln yrrt,/j/RC Form 300AI NAME Wes1ey H.Backus Technical Assistant to the Ooerations Mana er TELEPHONE NUMBER AREA CODE 31 552 4-4 44 6 COMPLETE ONE LINE FOR EACH COMPONENT FAILURE OKSCRIBED IN THIS REPORT ll3)C CAUSE SYSTEM COMPONENT MANUFAC.TURER REPORTABLE TO NPADS j~jPN~QQ cAUsE SYSTEM COMPONENT MANUFAC.TURKR EPOATABLE (c TO NPRDS Qt M Y.'NU wY, I G D T W 1 2 p SUPPLEMKNTAL REPORl'XPECTED (IC)EXPECTED SUBMISSION DATK (15)kklk)MI.QjtKi PyX~(MONTH OAY YEAR YES III yrt, complrtt EXPECTED St/der/SSION DATEI NO ABSTRACT ILlmlt to Irdd tpecrt, I,r., rppror/mrtrfy Iiftten rindle.eptcr typrwrittrn
(A)50.73(el(2)(r(QI(
/inrd I10)On March 12, 1993, at 1425 EST, vith the reactor subcritical during a planned shutdown, both source range detectors vere found inoperable with the reactor trip breakers closed.The Control Room operators immediately entered and performed the applicable actions of equipment restoration procedure ER-NZSe1 (SR Malfunction).
~)50.73(e)(2)(el0THEREDUIREMENTS OF10CFR():(Checkonrormoreofthefo//owindi (11)THISREPORTISSUBMITTED PURSUANTT73.71(III 73.71(c)OTHERISptcifycnAtjttrect Orrowrot/lnyrrt,/j/RCForm300AINAMEWes1eyH.BackusTechnical Assistant totheOoerations ManaerTELEPHONE NUMBERAREACODE315524-4446COMPLETEONELINEFOREACHCOMPONENT FAILUREOKSCRIBED INTHISREPORTll3)CCAUSESYSTEMCOMPONENT MANUFAC.TURERREPORTABLE TONPADSj~jPN~QQcAUsESYSTEMCOMPONENT MANUFAC.TURKREPOATABLE (cTONPRDSQtMY.'NUwY,IGDTW12pSUPPLEMKNTAL REPORl'XPECTED (IC)EXPECTEDSUBMISSION DATK(15)kklk)MI.QjtKiPyX~(MONTHOAYYEARYESIIIyrt,complrttEXPECTEDSt/der/SSION DATEINOABSTRACTILlmlttoIrddtpecrt,I,r.,rppror/mrtrfy Iifttenrindle.eptcr typrwrittrn
The reactor trip breakers vere opened vithin five (5)minutes of the event.The most likely cause of the source range detector failures was center electrode degradation due to gamma corrosion of the bare tungsten center~e"trode (center wire).(This event is NUREG--1022 (B)cause code).Corrective action was to replace the failed detectors vith qualified spares.Corrective action to prevent recurrence is outlined in section V(B).NRC Form 300 (509)  
/inrdI10)OnMarch12,1993,at1425EST,viththereactorsubcritical duringaplannedshutdown, bothsourcerangedetectors verefoundinoperable withthereactortripbreakersclosed.TheControlRoomoperators immediately enteredandperformed theapplicable actionsofequipment restoration procedure ER-NZSe1(SRMalfunction).
Thereactortripbreakersvereopenedvithinfive(5)minutesoftheevent.Themostlikelycauseofthesourcerangedetectorfailureswascenterelectrode degradation duetogammacorrosion ofthebaretungstencenter~e"trode(centerwire).(ThiseventisNUREG--1022(B)causecode).Corrective actionwastoreplacethefaileddetectors vithqualified spares.Corrective actiontopreventrecurrence isoutlinedinsectionV(B).NRCForm300(509)  


NRCFORM3SSA(649)US,NUCLEARREGULATORY COMMISSION LlCENSEEEVENTREPORT(LER)TEXTCONTINUATlON APPROVEDOMBNO,3150010S EXPIRES:4/30/92ESTIMATED BURDENPERRESPONSETOCOMPLYIYTHTHISINFORMATION COLLECTION REOUEST:500HRS.FORWARDCOMMENTSREGARDING BURDENESTIMATETOTHERECORDSANDREPORTSMANAGEMENT BRANCH(F430),U.S.NUCLEARREGULATORY COMMISSION, WASHINGTON, DC20555,ANDTOSHEPAPERWORK REDUCTION PROJECT(31500)04),
NRC FORM 3SSA (649)US, NUCLEAR REGULATORY COMMISSION LlCENSEE EVENT REPORT (LER)TEXT CONTINUATlON APPROVED OMB NO,3150010S EXPIRES: 4/30/92 ESTIMATED BURDEN PER RESPONSE TO COMPLY IYTH THIS INFORMATION COLLECTION REOUEST: 500 HRS.FORWARD COMMENTS REGARDING BURDEN ESTIMATE TO THE RECORDS AND REPORTS MANAGEMENT BRANCH (F430), U.S.NUCLEAR REGULATORY COMMISSION, WASHINGTON, DC 20555, AND TO SHE PAPERWORK REDUCTION PROJECT (31500)04), OFFICE OF MANAGEMENT AND BUDGET,WASHINGTON.
OFFICEOFMANAGEMENT ANDBUDGET,WASHINGTON.
DC 20503.FACILITY NAME (1)DOCKET NUMBER (2)YEAR LER NUMBER (8)??o SEOUCNTIAL
DC20503.FACILITYNAME(1)DOCKETNUMBER(2)YEARLERNUMBER(8)??oSEOUCNTIAL
>5~REVrdr0N?.'/1/NUMddA SP/r)NUM EA PAGE (3)R.E.Glnna Nuclear Power Plant TEXT///more d/rdee/d//r/rer/ude/(r)roe/ir//IC Form 3//S42/(12) o s o o o 24 493-0 0 1 0 0 02 oF l 1 PRE-PMNT CONDIT ONS A plant shutdown was in progress per operating procedure 0-2.1 (Normal Shutdown to Hot Shutdown)for the annual refueling and maintenance outage.The turbine generator had gust.been taken off the line and Control Room operators'were in the process of shutting the reactor down and inserting all control and shutdown rods.DESCRIPTION OF EVENT DATES AND APPROXIMATE TIMES OF MAZOR OCCURRENCES o March 12, 1993, 1425 EST: Event date and time o March 12, 1993, 1425, EST: Event discovery date and time o March 12, 1993, 1430 EST: Control Room operators complete inserting all control and shutdown rods and open the reactor trip breakers.o March 12, 1993, 1435 EST: Plant stabilized at hot shutdown.o March 12, 1993, 1501 EST: Source Range NIS N-31 and NIS N-32 declared inoperable.
>5~REVrdr0N?.'/1/NUMddASP/r)NUMEAPAGE(3)R.E.GlnnaNuclearPowerPlantTEXT///mored/rdee/d//r/rer/ude/(r)roe/ir//IC Form3//S42/(12) osooo24493-0010002oFl1PRE-PMNTCONDITONSAplantshutdownwasinprogressperoperating procedure 0-2.1(NormalShutdowntoHotShutdown) fortheannualrefueling andmaintenance outage.Theturbinegenerator hadgust.beentakenoffthelineandControlRoomoperators
o March 12, 1993, 1730 EST: Source Range NIS N-32 declared operable using the installed spare source range detector.o March 16, 1993, 1747 EST: Source Range NIS N-31 declared operable.o March 17, 1993, 2040 EST: Source Range NIS N-32 declared operable, using its normal source range detector.NRC Penn 388A (589)  
'wereintheprocessofshuttingthereactordownandinserting allcontrolandshutdownrods.DESCRIPTION OFEVENTDATESANDAPPROXIMATE TIMESOFMAZOROCCURRENCES oMarch12,1993,1425EST:EventdateandtimeoMarch12,1993,1425,EST:Eventdiscovery dateandtimeoMarch12,1993,1430EST:ControlRoomoperators completeinserting allcontrolandshutdownrodsandopenthereactortripbreakers.
oMarch12,1993,1435EST:Plantstabilized athotshutdown.
oMarch12,1993,1501EST:SourceRangeNISN-31andNISN-32declaredinoperable.
oMarch12,1993,1730EST:SourceRangeNISN-32declaredoperableusingtheinstalled sparesourcerangedetector.
oMarch16,1993,1747EST:SourceRangeNISN-31declaredoperable.
oMarch17,1993,2040EST:SourceRangeNISN-32declaredoperable, usingitsnormalsourcerangedetector.
NRCPenn388A(589)  


NRCFORM366A(689)U.S.NUCLEARREGULATORY COMMISSION LICENSEEEVENTREPORT(LER)TEXTCONTINUATION APPROVEDOM6NO.31500106EXPIRES:6/30/92ESTIMATED BURDENPERRESPONSETOCOMPLYWTHTHISLNFORMATION COLLECTION REGUEST:50.0HRS.FORWARDCOMMENTSREGARDING BURDENESTIMATEToTHERECORDSANDREPORTSMANAGEMENT SRANCH(PJ)30).U.S.NUCLEARREGULATORY COMMISSION, WASHINGTON, DC20555,ANDTO1HEPAPERWORK REDUCTION PROJECT(3)500106),
NRC FORM 366A (689)U.S.NUCLEAR REGULATORY COMMISSION LICENSEE EVENT REPORT (LER)TEXT CONTINUATION APPROVED OM 6 NO.31500106 EXPIRES: 6/30/92 ESTIMATED BURDEN PER RESPONSE TO COMPLY WTH THIS LNFORMATION COLLECTION REGUEST: 50.0 HRS.FORWARD COMMENTS REGARDING BURDEN ESTIMATE To THE RECORDS AND REPORTS MANAGEMENT SRANCH (PJ)30).U.S.NUCLEAR REGULATORY COMMISSION, WASHINGTON, DC 20555, AND TO 1HE PAPERWORK REDUCTION PROJECT (3)500106), OFFICE OF MANAGEMENT ANO BUDGET, WASHINGTON.
OFFICEOFMANAGEMENT ANOBUDGET,WASHINGTON.
DC 20503.FACILITY NAME (I)DOCKET NUMBER (2)LER NUMBER (6)YEAR O~>: SSOUSNTIAI v~4'EVISION NVM66R'&-NUMFSA I'AGE I3)R.E.Ginna Nuclear Paver Plant TEXT lllmoto tptcoitttquia/, utt At//oont/P/RC%%dmt36SA't/(IT) 0 s 0 0 02~~93 p 01 0 0 0 3 DF 1 1 B.EVENT-On March 12, 1993 at approximately 1425 EST with the reactor subcritical during a planned shutdown, source range (SR)Nuclear Instrumentation System (NIS)Channel N-31 and Channel N-32 automatically energized at the normal setpoint of</=5E-11 amps on the two intermediate range (IR)NIS channels.The Control.Room operators were closely monitoring the decay of the intermediate range currents, and were anticipating the'reset level for the.source ranges.At the time of automatic energization of the source range detec-tors, there was no count rate indication on Channel N-31 or Channel N-32.Seeing no indication of count rate, the Control Room operators, in accordance with plant procedures and training guidance, immediately attempted to manually.energize the source range detectors using the P-6 defeat pushbuttons.
DC20503.FACILITYNAME(I)DOCKETNUMBER(2)LERNUMBER(6)YEARO~>:SSOUSNTIAI v~4'EVISION NVM66R'&-NUMFSAI'AGEI3)R.E.GinnaNuclearPaverPlantTEXTlllmototptcoitttquia/,
The source range detectors still did not indicate counts.The Control Room operators continued to expeditiously insert control and shutdown rods per 0-2.1 and at approximately 1430 EST the reactor trip breakers were opened.The plant,was subsequently stabilized in hot shutdown at approximately 1435 EST.NRC Form 366A (649)  
uttAt//oont/P/RC%%dmt36SA't/(IT) 0s0002~~93p010003DF11B.EVENT-OnMarch12,1993atapproximately 1425ESTwiththereactorsubcritical duringaplannedshutdown, sourcerange(SR)NuclearInstrumentation System(NIS)ChannelN-31andChannelN-32automatically energized atthenormalsetpointof</=5E-11ampsonthetwointermediate range(IR)NISchannels.
TheControl.Roomoperators werecloselymonitoring thedecayoftheintermediate rangecurrents, andwereanticipating the'resetlevelforthe.sourceranges.Atthetimeofautomatic energization ofthesourcerangedetec-tors,therewasnocountrateindication onChannelN-31orChannelN-32.Seeingnoindication ofcountrate,theControlRoomoperators, inaccordance withplantprocedures andtrainingguidance, immediately attempted tomanually.energizethesourcerangedetectors usingtheP-6defeatpushbuttons.
Thesourcerangedetectors stilldidnotindicatecounts.TheControlRoomoperators continued toexpeditiously insertcontrolandshutdownrodsper0-2.1andatapproximately 1430ESTthereactortripbreakerswereopened.Theplant,was subsequently stabilized inhotshutdownatapproximately 1435EST.NRCForm366A(649)  


NRCFORM366A(64)9)US.NUCLEARREGULATORY COMMISSION LICENSEEEVENTREPORT(LER)TEXTCONTINUATION APPROVEDOMBNO.3ISOOI04 EXPIRESI4/30/92ESTIMATED BURDENPERRESPONSETOCOMPLYWTHTHISINFORMATION COLLECTION REOUEST:50.0HRS.FORWARDCOMMENTSREGARDING BURDENESTIMATETOTHERECORDSANDREPORTSMANAGEMENT BRANCH(P4)30),U.S.NUCLEARREGULATORY COMMISSION, WASHINGTON, DC20555,ANDTOTHEPAPERWORK REDUCTION PROJECT(31504)104).
NRC FORM 366A (64)9)US.NUCLEAR REGULATORY COMMISSION LICENSEE EVENT REPORT (LER)TEXT CONTINUATION APPROVED OMB NO.3ISOOI04 EXPIRESI 4/30/92 ESTIMATED BURDEN PER RESPONSE TO COMPLY WTH THIS INFORMATION COLLECTION REOUEST: 50.0 HRS.FORWARD COMMENTS REGARDING BURDEN ESTIMATE TO THE RECORDS AND REPORTS MANAGEMENT BRANCH (P4)30), U.S.NUCLEAR REGULATORY COMMISSION, WASHINGTON, DC 20555, AND TO THE PAPERWORK REDUCTION PROJECT (31504)104).
OFFICEOFMANAGEMFNT ANDBUDGET,WASHINGTON,OC 20503.FACILITYNAME(1)DOCKETNUMBER(2)YEARLERNUMBER(6)SEOUENZIAL,Oi)i NUMB%4AEVISIONNUMO64PAGE(3)R.E.GlnnaNuclearPowerPlantTEXT///mom4/>>ooJF~os,uood/d/ooo/NRCFomI35549/()7)osooo24493-00100040F~Subsequently theControlRoomoperators notifiedhighersupervision andtheInstrument
OFFICE OF MANAGEMFNT AND BUDGET, WASHINGTON,OC 20503.FACILITY NAME (1)DOCKET NUMBER (2)YEAR LER NUMBER (6)SEOUENZIAL,Oi)i NUMB%4 AEVISION NUMO64 PAGE (3)R.E.Glnna Nuclear Power Plant TEXT///mom 4/>>oo JF~os, uoo d/d/ooo/NRC FomI 35549/()7)o s o o o 24 49 3-001 00 0 40F~Subsequently the Control Room operators notified higher supervision and the Instrument
&Control(I&C)Department oftheeventandatapproximately 1501ESTdeclaredsourcerangeNISN-31andN-32inoperable.
&Control (I&C)Department of the event and at approximately 1501 EST declared source range NIS N-31 and N-32 inoperable.
ThePlantOperation ReviewCommittee (PORC)wasconvenedtoreviewtheactionstaken,conformance toTechnical Specifications, eventclassification andreportability.
The Plant Operation Review Committee (PORC)was convened to review the actions taken, conformance to Technical Specifications, event classification and reportability.
PORCdirectedthataccesstotheContainment Building(CNMT)beprohibited untilonesourcerangechannelwasrestoredtooperablestatus.InadditionPORCconfirmed thatactionsweretakentoensureplantcooldownwouldnotoccur,andthatdilutionofboronconcentration wouldnotoccur.TheControlRoomoperators enteredandperformed theapplicable actionsofequipment, restoration procedure ER-NIS.1(SRMalfunction) including continued borationtogreaterthan54shutdownmargin.andsamplingtheReactorCoolantSystem(RCS).forboronconcentration onaperiodicbasisduringtheboration.
PORC directed that access to the Containment Building (CNMT)be prohibited until one source range channel was restored to operable status.In addition PORC confirmed that actions were taken to ensure plant cooldown would not occur, and that dilution of boron concentration would not occur.The Control Room operators entered and performed the applicable actions of equipment, restoration procedure ER-NIS.1 (SR Malfunction) including continued boration to greater than 54 shutdown margin.and sampling the Reactor Coolant System (RCS).for boron concentration on a periodic basis during the boration.C.INOPERABLE STRUCTUEUKSF COMPONENTS, OR SYSTEMS THAT CONTRIBUTED TO THE 15TENT: D.None.OTE&R SYSTEMS OR SECONDARY FUNCTIONS AFFECTED: None.E METHOD OP DISCOVERY The event was immediately apparent due to indications in the Control Room.NRC FoIm 366A (64)9)  
C.INOPERABLE STRUCTUEUKSF COMPONENTS, ORSYSTEMSTHATCONTRIBUTED TOTHE15TENT:D.None.OTE&RSYSTEMSORSECONDARY FUNCTIONS AFFECTED:
None.EMETHODOPDISCOVERY Theeventwasimmediately apparentduetoindications intheControlRoom.NRCFoIm366A(64)9)  


NRCFORM366A(689)US.NUCLEARREGULATORY COMMISSION LICENSEEEVENTREPORT(LER)TEXTCONTINUATION
NRC FORM 366A (689)US.NUCLEAR REGULATORY COMMISSION LICENSEE EVENT REPORT (LER)TEXT CONTINUATION
~APPROVEDOMBNO,315001065XPIRES:6/30/92ESTIMATED BURDENPERRESPONSETOCOMPLYWTHTHISINFOAMATION COLLECTION REQUEST:500HRS.FORWARDCOMMENTSREGARDING BUAOENESTIMATETOTHERECORDSANDREPORTSMANAGEMENT BRANCH(P430),U.S.NUCLEARREGULATORY COMMISSION, WASHINGTON.
~APPROVED OMB NO, 31500106 5 XP IR ES: 6/30/92 ESTIMATED BURDEN PER RESPONSE TO COMPLY WTH THIS INFOAMATION COLLECTION REQUEST: 500 HRS.FORWARD COMMENTS REGARDING BUAOEN ESTIMATE TO THE RECORDS AND REPORTS MANAGEMENT BRANCH (P430), U.S.NUCLEAR REGULATORY COMMISSION, WASHINGTON.
DC20555,ANDTOTHEPAPERWORK REDUCTION PROJECT(31500106).
DC 20555, AND TO THE PAPERWORK REDUCTION PROJECT (31500106).
OFFICEOFMANAGEMENT ANDBUDGET.WASHINGTON, OC20503.FACILITYNAMEn)DOCKETNUMBER(2)LERNUMBER(6)YEARLPNLSEQUENTIAI.
OFFICE OF MANAGEMENT AND BUDGET.WASHINGTON, OC 20503.FACILITY NAME n)DOCKET NUMBER (2)LER NUMBER (6)YEAR LPNL SEQUENTIAI.
+WC:REVISIONI+I:NUMEER4.'UMERPAGED))R.E.GinnaNuclearPoT6erPlantJEXT///6NKEEpecris>>6U9od.
+WC: REVISION I+I: NUMEER 4.'UM ER PAGE D))R.E.Ginna Nuclear PoT6er Plant JEXT///6NKE Epecr is>>6U9od.u>>>>M/6'one/N/IC Form 35569)nl)o s o o o 24 493-0 1 0 0 0 5 OF P OPERATOR ACTION The Control Room operators, after recognizing that there were no indicated count rates on either of the source range detectors, immediately attempted to manually energize the-source range detectors using the P-6 defeat pushbuttons.
u>>>>M/6'one/N/IC Form35569)nl)osooo24493-010005OFPOPERATORACTIONTheControlRoomoperators, afterrecognizing thattherewerenoindicated countratesoneitherofthesourcerangedetectors, immediately attempted tomanuallyenergizethe-sourcerangedetectors usingtheP-6defeatpushbuttons.
The operators entered ER-NIS.1 and performed the applicable actions, including pulling the fuses for Instrument Power, in another attempt to reinstate, the source'anges.
Theoperators enteredER-NIS.1andperformed theapplicable actions,including pullingthefusesforInstrument Power,inanotherattempttoreinstate, thesource'anges.
Subsequently, the Control Room operators notified higher supervision
Subsequently, theControlRoomoperators notifiedhighersupervision
'and the I&C Department and declared source range NIS N-31 and N-32 inoperable.
'andtheI&CDepartment anddeclaredsourcerangeNISN-31andN-32inoperable.
G.SAFETY SYSTEM RESPONSES None.III.CAUSE OF OSTENT A.IMMEDIATE CAUSE The cause of the failure of source range detectors N-31 and N-32 to indicate counts was detector failure due to center electrode degradation.
G.SAFETYSYSTEMRESPONSES None.III.CAUSEOFOSTENTA.IMMEDIATE CAUSEThecauseofthefailureofsourcerangedetectors N-31andN-32toindicatecountswasdetectorfailureduetocenterelectrode degradation.
Specific measurements indicate that the center electrode to shield had become short circuited on source range detector N-31, most, likely due to the electrode breaking at the bottom of the detector.Source range detector N-32 was found to be open circuited, possibly due to the electrode breaking at the top of the detector.NAC Form 366A (689)  
Specificmeasurements indicatethatthecenterelectrode toshieldhadbecomeshortcircuited onsourcerangedetectorN-31,most,likelyduetotheelectrode breakingatthebottomofthedetector.
SourcerangedetectorN-32wasfoundtobeopencircuited, possiblyduetotheelectrode breakingatthetopofthedetector.
NACForm366A(689)  


NRCFORM366AISS9)US.NUCLEARREGULATORY COMMISSION LICENSEEEVENTREPORT(LER)TEXTCONTINUATION APPROVEDOMSNO.31600104EXPIRES:E/30/92ESTIMATED BURDENPERRESPONSETOCOMPLYWTHTHISINFORMATION COLLECTION REOUESTI603)HRS.FORWARDCOMMENTSREGARDING BURDENESTIMATETOTHERECORDSANDREPORTSMANAGEMENT BRANCHIF@30),U,S.NUCLEARREGULATORY COMMISSION, WASHINGTON, DC20655,ANDTO1HEPAPERWORK REDUCTION PROJECT131600)04),
NRC FORM 366A ISS9)US.NUCLEAR REGULATORY COMMISSION LICENSEE EVENT REPORT (LER)TEXT CONTINUATION APPROVED OMS NO.31600104 EXPIRES: E/30/92 ESTIMATED BURDEN PER RESPONSE TO COMPLY WTH THIS INFORMATION COLLECTION REOUESTI 603)HRS.FORWARD COMMENTS REGARDING BURDEN ESTIMATE TO THE RECORDS AND REPORTS MANAGEMENT BRANCH IF@30), U,S.NUCLEAR REGULATORY COMMISSION, WASHINGTON, DC 20655, AND TO 1HE PAPERWORK REDUCTION PROJECT 131600)04), OFFICE OF MANAGEMENT AND BUDGET, WASHINGTON, DC 20603.FACILITY NAME 11)DOCKET NUMBER 12)YEAR LER NUMBER IS)X6%SEOUENTIAI.
OFFICEOFMANAGEMENT ANDBUDGET,WASHINGTON, DC20603.FACILITYNAME11)DOCKETNUMBER12)YEARLERNUMBERIS)X6%SEOUENTIAI.
NUMBER REVISION NUMSER PAGE 13)R.E.Gonna Nuclear Power Plant TEXT ill moro EPoco lr rorlrr/rod, Irw oddldorM/ll/IC Forrrr 366AS/)17) o s o o o 24 493-0 0 1 00 06 OF B ROOT CAUSE: After consulting with Westinghouse Electric Corporation (the manufacturer and vendor for these detectors), it was concluded that the underlying cause of the center electrode degradation of source range detectors N-31 and N-32 is most likely due to gamma corrosion of the bare tungsten center electrode (center wire).This effect occurs whenever the source range detector is energized.
NUMBERREVISIONNUMSERPAGE13)R.E.GonnaNuclearPowerPlantTEXTillmoroEPocolrrorlrr/rod, IrwoddldorM/ll/IC Forrrr366AS/)17) osooo24493-0010006OFBROOTCAUSE:Afterconsulting withWestinghouse ElectricCorporation (themanufacturer andvendorforthesedetectors),
ANALYSIS Op EVENT The event is reportable in accordance with 10 CFR 50.73, Licensee Event Report System, item (a)(2)(i)(B), which requires a report of,"any operation prohibited by the plant's Technical Specification", in that the failure of source range detectors N-31 and N-32 to indicate counts at</=1E-10 amps on the two intermediate range NIS channels was an operation prohibited by the plant Technical Specifications as follows: o Specification 3.5.1.1 states,"The Protection System Instrumentation shown on Table 3.5-1 shall be operable whenever the conditions specified in Column 6 are exceeded".
itwasconcluded thattheunderlying causeofthecenterelectrode degradation ofsourcerangedetectors N-31andN-32ismostlikelyduetogammacorrosion ofthebaretungstencenterelectrode (centerwire).Thiseffectoccurswheneverthesourcerangedetectorisenergized.
For the source range instruments, column 6 refers to Note 2, which states,"Channels should be operable at all modes below the bypass condition with the reactor trip system breakers in the closed position and control rod drive system capable of rod withdrawal".
ANALYSISOpEVENTTheeventisreportable inaccordance with10CFR50.73,LicenseeEventReportSystem,item(a)(2)(i)(B),
Contrary to the above, source range channels N-31 and N-32 were inoperable below the bypass condition of</=1E-10 on both IR NIS channels with the reactor trip breakers closed and the control rod drive system capable of rod withdrawal.
whichrequiresareportof,"anyoperation prohibited bytheplant'sTechnical Specification",
This condition existed for approximately five (5)minutes until the reactor trip breakers were opened.While an Action Statement exists for one source detector inoperable, there is no stated action requirement for two, detectors inoperable with the Reactor Trip breakers closed.Therefore, a condition prohibited by the plant's Technical Specifications existed.NRC Form 366A)689)  
inthatthefailureofsourcerangedetectors N-31andN-32toindicatecountsat</=1E-10ampsonthetwointermediate rangeNISchannelswasanoperation prohibited bytheplantTechnical Specifications asfollows:oSpecification 3.5.1.1states,"TheProtection SystemInstrumentation shownonTable3.5-1shallbeoperablewhenevertheconditions specified inColumn6areexceeded".
Forthesourcerangeinstruments, column6referstoNote2,whichstates,"Channels shouldbeoperableatallmodesbelowthebypasscondition withthereactortripsystembreakersintheclosedpositionandcontrolroddrivesystemcapableofrodwithdrawal".
Contrarytotheabove,sourcerangechannelsN-31andN-32wereinoperable belowthebypasscondition of</=1E-10onbothIRNISchannelswiththereactortripbreakersclosedandthecontrolroddrivesystemcapableofrodwithdrawal.
Thiscondition existedforapproximately five(5)minutesuntilthereactortripbreakerswereopened.WhileanActionStatement existsforonesourcedetectorinoperable, thereisnostatedactionrequirement fortwo,detectors inoperable withtheReactorTripbreakersclosed.Therefore, acondition prohibited bytheplant'sTechnical Specifications existed.NRCForm366A)689)  


NRCFORM366A(669)U.S.NUCLEARREGULATORY COMMISSION 2~LICENSEEEVENTREPORT(LER)TEXTCONTINUATION APPROVEDOMBNO.3(600104EXPIRES:A/30/92ESTIMATED BURDENPERRESPONSETOCOMPLYWTHTHISINFORMATION COLLECTION REOUESTI500HRS.FORWARDCOMMENTSREGARDING BURDENESTIMATEToTHERECORDSANDREPORTSMANAGEMENT BRANCH(P430),U.S.NUCLEARREGULATORY COMMISSION, WASHINGTON, DC20555,ANDTo1HEPAPERWORK REDUCTION PROJECT(3150010I),
NRC FORM 366A (669)U.S.NUCLEAR REGULATORY COMMISSION 2~LICENSEE EVENT REPORT (LER)TEXT CONTINUATION APPROVED OMB NO.3(600104 EXPIRES: A/30/92 ESTIMATED BURDEN PER RESPONSE TO COMPLY WTH THIS INFORMATION COLLECTION REOUESTI 500 HRS.FORWARD COMMENTS REGARDING BURDEN ESTIMATE To THE RECORDS AND REPORTS MANAGEMENT BRANCH (P430), U.S.NUCLEAR REGULATORY COMMISSION, WASHINGTON, DC 20555, AND To 1HE PAPERWORK REDUCTION PROJECT (3150010I), OFFICE OF MANAGEMENT AND BUDGET, WASHINGTON, DC 20503.FACILITY NAME (11 DOCKET NUMBER (2)LER NUMBER (6)PAGE (3)R.E.Ginna Nuclear Power Plant TEXT/I/mom H>>ce/t>>I)r/irer/
OFFICEOFMANAGEMENT ANDBUDGET,WASHINGTON, DC20503.FACILITYNAME(11DOCKETNUMBER(2)LERNUMBER(6)PAGE(3)R.E.GinnaNuclearPowerPlantTEXT/I/momH>>ce/t>>I)r/irer/
Ir>>pr/r//I/orN/HRC Form 366AB/(17)YEAR~rA 0 s 0 0 0 244 93 SEOUENTIAL NUMSER 0 0 1<~~REVISION..IH: NUM ER 0 0 070F1 1 Once the trip breakers are open, the minimum operable channels required reduces to one(1)instead of two (2)and the action statement states in part as follows: With the number of operable channels one less than the minimum operable channels requirement, suspend all operations involving positive reactivity changes.An assessment was performed considering both the safety consequences and implications of this event with the following results and conclusions:
Ir>>pr/r//I/orN/HRC Form366AB/(17)YEAR~rA0s00024493SEOUENTIAL NUMSER001<~~REVISION..IH:NUMER00070F11Oncethetripbreakersareopen,theminimumoperablechannelsrequiredreducestoone(1)insteadoftwo(2)andtheactionstatement statesinpartasfollows:Withthenumberofoperablechannelsonelessthantheminimumoperablechannelsrequirement, suspendalloperations involving positivereactivity changes.Anassessment wasperformed considering boththesafetyconsequences andimplications ofthiseventwiththefollowing resultsandconclusions:
The safety significance of the failure of both source range channels is the loss of detection of subcritical neutron flux in the core and the function those channels provide for both automatic actuation of the reactor protection system and the prompting of operator action to protect shutdown margin.However, this significance is minimized in this instance for the following reasons: 0 The failure occurred completely within the sequence of shutting down the-reactor in accordance with plant procedure 0-2.1 in that the operators were closely monitoring the decay of the intermediate range currents and were anticipating the reset level for the source ranges.ln accordance with 0-2.1 the operators were ex-peditiously inserting the control and shutdown rods to five steps prior to manually opening the reactor trip breakers.This sequence, simultaneous with injecting boric acid to achieve the required RCS cold shutdown boron concentration insured that shutdown margin was maintained greater than the requirements of Technical Specifications, and that shutdown margin did not decrease during this event.NRC Form 366A (BJ)9)
Thesafetysignificance ofthefailureofbothsourcerangechannelsisthelossofdetection ofsubcritical neutronfluxinthecoreandthefunctionthosechannelsprovideforbothautomatic actuation ofthereactorprotection systemandtheprompting ofoperatoractiontoprotectshutdownmargin.However,thissignificance isminimized inthisinstanceforthefollowing reasons:0Thefailureoccurredcompletely withinthesequenceofshuttingdownthe-reactor inaccordance withplantprocedure 0-2.1inthattheoperators werecloselymonitoring thedecayoftheintermediate rangecurrentsandwereanticipating theresetlevelforthesourceranges.lnaccordance with0-2.1theoperators wereex-peditiously inserting thecontrolandshutdownrodstofivestepspriortomanuallyopeningthereactortripbreakers.
J NRC FORM 355A (689)U.S.NUCLEAR REGULATORY COMMISSION LICENSEE EYENT REPORT ILER)TEXT CONTINUATION APPROVED OMB NO.31600104 EXPIRES: 4/30JS2 ESTIMATED BURDEN PER RESPONSE TO COMPLY WTH THIS INFORMATION COLLECTION REQUESTI 50.0 HRS.FORWARD COMMENTS REGARDING BURDEN ESTIMATE TO THE RECORDS AND REPORTS MANAGEMENT BRANCH (P430), U.S.NUCLEAR REGULATORY COMMISSION, WASHINGTON, DC 20555, AND TO 1HE PAPERWORK REDUCTION PROJECT (31504104).
Thissequence, simultaneous withinjecting boricacidtoachievetherequiredRCScoldshutdownboronconcentration insuredthatshutdownmarginwasmaintained greaterthantherequirements ofTechnical Specifications, andthatshutdownmargindidnotdecreaseduringthisevent.NRCForm366A(BJ)9)
OFFICE OF MANAGEMENT AND BUDGET, WASHINGTON, OC 20503.FACILITY NAME (1)DOCKET NUMBER (21 LER NUMBER (5)YEAR(PSEQUENTIALS)I(REVISION M 3 NUMSEA'P..: NUMBER PAGE (3)R.E.Ginna Nuclear Power Plant TEXT FIT mo>>~JJ>>ookod, u>>aktJNeal HRC Ann 35543)(IT)o s o o o2 44 93-00 1 0 0 0 8Oi o After immediately recognizing that the source range channels did not indicate counts at the intermediate range reset point, the operators took appropriate actions in attempting-to reinstate-source range detectors.
J NRCFORM355A(689)U.S.NUCLEARREGULATORY COMMISSION LICENSEEEYENTREPORTILER)TEXTCONTINUATION APPROVEDOMBNO.31600104EXPIRES:4/30JS2ESTIMATED BURDENPERRESPONSETOCOMPLYWTHTHISINFORMATION COLLECTION REQUESTI50.0HRS.FORWARDCOMMENTSREGARDING BURDENESTIMATETOTHERECORDSANDREPORTSMANAGEMENT BRANCH(P430),U.S.NUCLEARREGULATORY COMMISSION, WASHINGTON, DC20555,ANDTO1HEPAPERWORK REDUCTION PROJECT(31504104).
They continued to expeditiously insert control and shutdown rods, and within five minutes, opened the reactor trip breakers.The operator continued boration to the cold shutdown, xenon free concentration required by procedure for RCS cooldown below 500 degrees.There was no decrease in shutdown margin, from the time'of failure of both source range channels until the time the spare source range detector was used to declare Channel N-32 operable.All operations involving positive reactivity changes were suspenders until after the spare source range detector was declared operable.Based on the above, it can be concluded that the public's health and safety was assured at all times.V CORRECTIVE ACTION A ACTION TAKEN TO RETURN AFFECTED SYST1963 TO PRE-EVENT NORMAL STATUS: 0, The detector installed in source range channel N-32 was disconnected and the previously installed spare source range detector was connected to source range channel N-32.NIS N-32 high voltage setting and the pulse height discriminator (PHD)bias setting were ad)usted to conform to the data for the spare detector.At approxi-mately 1730 EST on March 12, 1993, source range Channel N-32 was declared operable.NRC Form 365A (SSS)  
OFFICEOFMANAGEMENT ANDBUDGET,WASHINGTON, OC20503.FACILITYNAME(1)DOCKETNUMBER(21LERNUMBER(5)YEAR(PSEQUENTIALS)I(REVISION M3NUMSEA'P..:NUMBERPAGE(3)R.E.GinnaNuclearPowerPlantTEXTFITmo>>~JJ>>ookod, u>>aktJNealHRCAnn35543)(IT)osooo24493-0010008OioAfterimmediately recognizing thatthesourcerangechannelsdidnotindicatecountsattheintermediate rangeresetpoint,theoperators tookappropriate actionsinattempting-toreinstate
-sourcerangedetectors.
Theycontinued toexpeditiously insertcontrolandshutdownrods,andwithinfiveminutes,openedthereactortripbreakers.
Theoperatorcontinued borationtothecoldshutdown, xenonfreeconcentration requiredbyprocedure forRCScooldownbelow500degrees.Therewasnodecreaseinshutdownmargin,fromthetime'offailureofbothsourcerangechannelsuntilthetimethesparesourcerangedetectorwasusedtodeclareChannelN-32operable.
Alloperations involving positivereactivity changesweresuspenders untilafterthesparesourcerangedetectorwasdeclaredoperable.
Basedontheabove,itcanbeconcluded thatthepublic'shealthandsafetywasassuredatalltimes.VCORRECTIVE ACTIONAACTIONTAKENTORETURNAFFECTEDSYST1963TOPRE-EVENT NORMALSTATUS:0,Thedetectorinstalled insourcerangechannelN-32wasdisconnected andthepreviously installed sparesourcerangedetectorwasconnected tosourcerangechannelN-32.NISN-32highvoltagesettingandthepulseheightdiscriminator (PHD)biassettingweread)ustedtoconformtothedataforthesparedetector.
Atapproxi-mately1730ESTonMarch12,1993,sourcerangeChannelN-32wasdeclaredoperable.
NRCForm365A(SSS)  


NRCFORM366A(669)U.S.NUCLEARREGULATORY COMMISSION LICENSEEEVENTREPORT(LER)TEXTCONTINUATION APPROVED0MBNO.31500)04EXPIRES:6/30)92ESTIMATED BURDENPERRESPONSETOCOMPLYWTHTHISINFORMATION COLLECTION REQUEST:500HRS.FORWARDCOMMENTSREGARDING BURDENESTIMATETOTHERECORDSANDREPORTSMANAGEMENT BRANCH(P630),U.S.NUCLEARREGULATORY COMMISSION, WASHINGTON, OC20555,ANDTO1'HEPAPERWORK REDUCTION PROJECT(31500106),
NRC FORM 366A (669)U.S.NUCLEAR REGULATORY COMMISSION LICENSEE EVENT REPORT (LER)TEXT CONTINUATION APPROVED 0MB NO.31500)04 EXPIRES: 6/30)92 ESTIMATED BURDEN PER RESPONSE TO COMPLY WTH THIS INFORMATION COLLECTION REQUEST: 500 HRS.FORWARD COMMENTS REGARDING BURDEN ESTIMATE TO THE RECORDS AND REPORTS MANAGEMENT BRANCH (P630), U.S.NUCLEAR REGULATORY COMMISSION, WASHINGTON, OC 20555, AND TO 1'HE PAPERWORK REDUCTION PROJECT (31500106), OFFICE OF MANAGEMENT AND BUDGET, WASHINGTON, DC 20503, FACILITY NAME (I)DOCKET NUMBER (2)LER NUMBER (6)YEAR S~y SEQVSNTIAL
OFFICEOFMANAGEMENT ANDBUDGET,WASHINGTON, DC20503,FACILITYNAME(I)DOCKETNUMBER(2)LERNUMBER(6)YEARS~ySEQVSNTIAL
:~2 NUMSSII REVISION NUM SA PAGE (3)R.E.Gonna Nuclear Power Plant TEXT Nmon JIMce ls~, VJP~HRC Form 35663)(IT)p p p p p 2 44 3 001 0 0 0 9 oF 11 The detector installed in source range channel N-31 was replaced with a detector withdrawn from stock.Subsequently, for source range channel N-31 the high voltage power supply was replaced.The detector anode voltage curve (also referred to as the plateau curve).was obtained, and the PHD bias setting was adjusted.At approximately 1747 EST on March 16, 1993, source range Channel N-31 was declared operable.o The detector installed in source range channel N-32 was replaced with a detector withdrawn from stock.For this newly installed detector, the plateau curve was obtained and the PHD bias setting was adjusted.The installed spare source range detector was then disconnected from source range channel N-32 and this newly installed source range detector was connected to source range channel N-32..The channel operability test was completed, and at approximately 2040 EST on March 17, 1993 source range Channel N-32 was declared operable, using its normal source range detector.B ACTION TAKEN OR PLANN19)TO NUGENT REC&tRENCE:
:~2NUMSSIIREVISIONNUMSAPAGE(3)R.E.GonnaNuclearPowerPlantTEXTNmonJIMcels~,VJP~HRCForm35663)(IT)ppppp24430010009oF11Thedetectorinstalled insourcerangechannelN-31wasreplacedwithadetectorwithdrawn fromstock.Subsequently, forsourcerangechannelN-31thehighvoltagepowersupplywasreplaced.
To minimize future source range detector failures, the following actions are being planned: 0 A periodic replacement interval for BF~filled source range detectors will be established, based upon time in service or number of ener-gizations of the detectors.
Thedetectoranodevoltagecurve(alsoreferredtoastheplateaucurve).wasobtained, andthePHDbiassettingwasadjusted.
NRC Form 366A (689)  
Atapproximately 1747ESTonMarch16,1993,sourcerangeChannelN-31wasdeclaredoperable.
oThedetectorinstalled insourcerangechannelN-32wasreplacedwithadetectorwithdrawn fromstock.Forthisnewlyinstalled
: detector, theplateaucurvewasobtainedandthePHDbiassettingwasadjusted.
Theinstalled sparesourcerangedetectorwasthendisconnected fromsourcerangechannelN-32andthisnewlyinstalled sourcerangedetectorwasconnected tosourcerangechannelN-32..Thechanneloperability testwascompleted, andatapproximately 2040ESTonMarch17,1993sourcerangeChannelN-32wasdeclaredoperable, usingitsnormalsourcerangedetector.
BACTIONTAKENORPLANN19)TONUGENTREC&tRENCE:
Tominimizefuturesourcerangedetectorfailures, thefollowing actionsarebeingplanned:0Aperiodicreplacement intervalforBF~filledsourcerangedetectors willbeestablished, basedupontimeinserviceornumberofener-gizations ofthedetectors.
NRCForm366A(689)  


NRCFORM366A(689)FACILITYNAME(1)UE.NUCLEARREGULATORY COMMISSION LICENSEEEVENTREPORTtLER)TEXTCONTINUATION DOCKETNUMBER(2)APPROVEDOM8NO.31600104EXPIRES:4/30/92ESTIMATED BURDENPERRESPONSETOCOMPLYWTHTHISINFORMATION COLLECTION REQUEST:50/)HRS.FORWARDCOMMENTSREGARDING BURDENESTIMATETOTHERECORDSANDREPORTSMANAGEMENT BRANCH(P830),U.S.NUCLEARREGULATORY COMMISSION, WASHINGTON, DC20555,ANDTOTHEPAPERWORK REDUCTION PROJECT(31500104).
NRC FORM 366A (689)FACILITY NAME (1)UE.NUCLEAR REGULATORY COMMISSION LICENSEE EVENT REPORT tLER)TEXT CONTINUATION DOCKET NUMBER (2)APPROVED OM 8 NO.31600104 E XP I R ES: 4/30/92 ESTIMATED BURDEN PER RESPONSE TO COMPLY WTH THIS INFORMATION COLLECTION REQUEST: 50/)HRS.FORWARD COMMENTS REGARDING BURDEN ESTIMATE TO THE RECORDS AND REPORTS MANAGEMENT BRANCH (P830), U.S.NUCLEAR REGULATORY COMMISSION, WASHINGTON, DC 20555, AND TO THE PAPERWORK REDUCTION PROJECT (31500104).
OFFICEOFMANAGEMENT ANDBUDGET,WASHINGTON, DC20503.PAGE(3)LERNUMBER(8)YEARP444SEQUENTIAL
OFFICE OF MANAGEMENT AND BUDGET, WASHINGTON, DC 20503.PAGE (3)LER NUMBER (8)YEAR P444 SEQUENTIAL.Ay NUMSER REVISION NUMSSR R.E.Gonna Nuclear Power Plane TEXT///mare S>>ce JI re/Ir/red, Iree edd/dar>>/N/IC
.AyNUMSERREVISIONNUMSSRR.E.GonnaNuclearPowerPlaneTEXT///mareS>>ceJIre/Ir/red, Ireeedd/dar>>/N/IC
%%drm 38642/((7)ps ppp24 493 0 0 1 00 10 OF o A new Westinghouse design for these BF3 filled source range detectors incorporates low voltage source range detectors with gold-plated tungsten center wire conductor material.Detectors of this new design will be procured.When detectors of this new design are installed, as part of a planned detector upgrade schedule, as replace-ments for existing detectors, the periodic replacement interval will be re-evaluated.
%%drm38642/((7)psppp244930010010OFoAnewWestinghouse designfortheseBF3filledsourcerangedetectors incorporates lowvoltagesourcerangedetectors withgold-plated tungstencenterwireconductor material.
0 Existing calibration procedures will be revised," or new procedures developed, to include steps to perform time domain reflectometry (TDR)measure-ments on N-31, N-32 and spare detector, prior to scheduled refueling outages.(TDR measurements can determine if the detector center electrode wire is broken, shorted out or if it has high or low resistance)
Detectors ofthisnewdesignwillbeprocured.
.0 A trending program to detect potential degradation of source range detectors will be established, for the following data: 1)Detector plateau curve data will be trended.As the BF3 gas in the detector dissociates over time, the high voltage will be adjusted higher each time until it can no longer be set on the plateau.2)PHD bias curves will be trended.RMAT ON A PAXLED COMPONENTS:
Whendetectors ofthisnewdesignareinstalled, aspartofaplanneddetectorupgradeschedule, asreplace-mentsforexistingdetectors, theperiodicreplacement intervalwillbere-evaluated.
The faulty detectors were BF3 filled, source range detector proportional counters, Part No.WL-24182 manufactured by Westinghouse Electric Corporation.
0Existingcalibration procedures willberevised,"ornewprocedures developed, toincludestepstoperformtimedomainreflectometry (TDR)measure-mentsonN-31,N-32andsparedetector, priortoscheduled refueling outages.(TDRmeasurements candetermine ifthedetectorcenterelectrode wireisbroken,shortedoutorifithashighorlowresistance)
NRC Form 388A (889)  
.0Atrendingprogramtodetectpotential degradation ofsourcerangedetectors willbeestablished, forthefollowing data:1)Detectorplateaucurvedatawillbetrended.AstheBF3gasinthedetectordissociates overtime,thehighvoltagewillbeadjustedhighereachtimeuntilitcannolongerbesetontheplateau.2)PHDbiascurveswillbetrended.RMATONAPAXLEDCOMPONENTS:
Thefaultydetectors wereBF3filled,sourcerangedetectorproportional
: counters, PartNo.WL-24182manufactured byWestinghouse ElectricCorporation.
NRCForm388A(889)  


NRCFORM366A(SJ)9)tUS.NUCLEARREGULATORY COMMISSION LICENSEEEVENTREPORT(LER)TEXTCONTINUATION APPROVEOOMBNO,31500104EXPIRES:EI30(92ESTIMATED BURDENPERRESPONSETOCOMPLYWTHTHISINFORMATION COLLECTION REQUEST:500HRS.FORWARDCOMMENTSREGARDING BURDENESTIMATETOTHERECORDSANDREPORTSMANAGEMENT BRANCH(F430).U.S.NUCLEARREGULATORY COMMISSION, WASHINGTON.
NRC FORM 366A (SJ)9)t US.NUCLEAR REGULATORY COMMISSION LICENSEE EVENT REPORT (LER)TEXT CONTINUATION APPROVEO OMB NO, 31500104 EXPIRES: EI30(92 ESTIMATED BURDEN PER RESPONSE TO COMPLY WTH THIS INFORMATION COLLECTION REQUEST: 500 HRS.FORWARD COMMENTS REGARDING BURDEN ESTIMATE TO THE RECORDS AND REPORTS MANAGEMENT BRANCH (F430).U.S.NUCLEAR REGULATORY COMMISSION, WASHINGTON.
OC20555,ANDTO1HEPAPERWORK REDUCTION PROJECT(31500104).
OC 20555, AND TO 1HE PAPERWORK REDUCTION PROJECT (31500104).
OFFICEOFMANAGEMENT ANDBUDGET,WASHINGTON, DC20503.FACILITYNAME(1IDOCKETNUMBER(2)YEARLERNUMBER(SISEQUENTIAL NVMSERREVISIONNVMSERI'AGE(3)R.E.GinnaNuclearPowerPlantRJOOOOPooo (ssoSs(INL goooddlooIMI HRC%%dmI36643)(17)osooo244930010011OFB.PREVXOUSLERsONSIMILARKGFNTS.AsimilarLEReventhistorical searchwasconducted withthefollowing results:LER90-003(HigherThanNormalCountRateonSourceRangeNIS,DuetoaFaultyDetector, CausesaReactorTripDuringSourceRangeRe-energization) wasasimilareventwiththesamerootcause.Thecorrective actiontopreventrecur-rence,oftheeventdescribed inLER90-003,wastoinitiateaevaluation whichwillultimately resultinprocurement andinstallation ofdetectors, ofanewWestinghouse design.Itshouldbenotedthateveniftheevaluation hadbeencompleted, anddetectors ofanewdesignhadbeenprocuredandwereinstock,thesedetectors wouldnothavebeeninstalled priortothe1993outage.CSPECIALCOMMENTSNone.NRCFoIm366A(SJ)9)}}
OFFICE OF MANAGEMENT AND BUDGET, WASHINGTON, DC 20503.FACILITY NAME (1I DOCKET NUMBER (2)YEAR LER NUMBER (SI SEQUENTIAL NVMSER REVISION NVMSER I'AGE (3)R.E.Ginna Nuclear Power Plant RJOOOOPooo (ssoSs(INL goo oddlooIMI HRC%%dmI 36643)(17)o s o o o 2 449 3 001 0 0 1 1 OF B.PREVXOUS LERs ON SIMILAR KGFNTS.A similar LER event historical search was conducted with the following results: LER 90-003 (Higher Than Normal Count Rate on Source Range NIS, Due to a Faulty Detector, Causes a Reactor Trip During Source Range Re-energization) was a similar event with the same root cause.The corrective action to prevent recur-rence, of the event described in LER 90-003, was to initiate a evaluation which will ultimately result in procurement and installation of detectors, of a new Westinghouse design.It should be noted that even if the evaluation had been completed, and detectors of a new design had been procured and were in stock, these detectors would not have been installed prior to the 1993 outage.C SPECIAL COMMENTS None.NRC FoIm 366A (SJ)9)}}

Revision as of 14:09, 7 July 2018

LER 93-001-00:on 930312,both Source Range Detectors Found Inoperable During Energization.Caused by Center Electrode Degradation Due to Gamma Corrosion.Failed Detectors Replaced W/Qualified spares.W/930412 Ltr
ML17263A225
Person / Time
Site: Ginna Constellation icon.png
Issue date: 04/12/1993
From: BACKUS W H, MECREDY R C
ROCHESTER GAS & ELECTRIC CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
LER-93-001, LER-93-1, NUDOCS 9304160043
Download: ML17263A225 (26)


Text

ACCEI.E ED DOCUMENT DIS OBVTION SYSTEM REGULA ORY INFORMATION DISTRIBUT 8 SYSTEM (RIDS)ACCESSION NBR:9304160043 DOC.DATE: 93/04/12 NOTARIZED:

NO FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G AUTH.NAME AUTHOR AFFILIATION BACKUSgW HE Rochester Gas&Electric Corp.MECREDY,R.C.

Rochester Gas&Electric Corp.RECIP.NAME RECIPIENT AFFILIATION DOCKET 05000244 S UBJECT: LER 93-001-00:on 930312,both source range detectors found inoperable during energization.Caused by center electrode degradation due to gamma corrosion.

Failed detectors replaced w/qualified spares.W/930412 ltr.DISTRIBUTION CODE: IE22T COPIES RECEIVED:LTR ENCL SIZE: TITLE: 50.73/50.9 Licensee Event Report (LER), ncident Rpt, etc.NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72).

05000244 RECIPIENT ID CODE/NAME PD1-3 LA JOHNSONiA INTERNAL: ACNW AEOD/DSP/TPAB NRR/DE/EELB NRR/DORS/OEAB NRR/DRCH/HICB NRR/DRIL/RPEB RR7'DSSA/PLB G FILE 02 RGN E 01 EXTERNAL'G&G BRYCE g J~H NRC PDR NSIC POOREiW.COPIES LTTR ENCL 1 1 1 1 2 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 2 2 1 1 1 1 RECIPIENT ID CODE/NAME PD1-3 PD AEOD/DOA AEOD/ROAB/DSP NRR/DE/EMEB NRR/DRCH/HHFB NRR/DRCH/HOLB NRR/DRSS/PRPB NRR/DSSA/SRXB RES/DSIR/EIB L ST LOBBY WARD NS IC MURPHY, G.A NUDOCS FULL TXT COPIES LTTR ENCL 1 1 1 1 2 2 1 1 1 1 1 1 2 2 1 1 1 1 1 1 1 1 1 1 f'23 7 4 pQg c 5 NOTE TO ALL"RIDS" RECIPIENTS:

$0-t PLEASE HELP US TO REDUCE WASTE!CONTACT THE DOCUMENT CONTROL DESK, ROOM PI-37 (EXT.504-2065)TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!FULL TEXT CONVERSION REQUIRED TOTAL NUMBER OF COPIES REQUIRED: LTTR 30 ENCL 30

J Jr ROCHESTER GAS AND ELECTRIC CORPORATION

, r'~".'rOarr tE t~j St Jlf 4 89 EAST AVENUE, ROCHESTER N.K 14649-0001 ROBERT C.h1ECREDY Vice President CrnnJ NucteJr Production TELEPHONE AREA CODE 7 i 6 546 2700 April 12, 1993 U.S.Nuclear Regulatory Commission Document Control Desk Nashington, DC 20555

Subject:

LER 93-001, Loss of Source Range Detector Indication During Energization, Due to Faulty Detectors, Causes a Condition Prohibited by Plant Technical Specifica-tions.R.E.Ginna Nuclear Power Plant Docket No.50-244 In accordance with 10 CFR 50.73, Licensee Event Report System, item (a)(2)(i)(B), which requires a report of,"any operation prohibited by the plant's Technical Specifications", the attached Licensee Event Report LER 93-001 is hereby submitted.

This event has in no way affected the public's health and safety.Very truly yours, XCJ Robert C.Me redy U.S.Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406 Ginna USNRC Senior Resident Inspector IGG030'9304160043 930412 PDR ADOCK 05000244 S'PDR~'I>]gd If

NAC FORM 300 (Se)9)US.NUCLEAR REGULATORY COMMISSI APPAOVED OMB NO.3)500(OC EXP IRF5: C/30/92 ESTIMATED BURDEN PER RFSPONSE TO COMPLY WTH THIS INFORMATIOAI COLLKCTION AEOUESTI 50.0 HAS.FORWARD COMMENTS REGARDING BUADEN ESTIMATE TO THE RECORDS AND RFPORTS MANAGEMENT BRANCH (F030).U.S.NUCLEAR REGULATORY COMMISSION, WASHINGTON.

DC 20555, AND TO THE PAPEAWORK ABDUCTION PROiECT (31500'IOe).

OFFICE OF MANAGEMENT AND BUDGET.WASHINGTON, DC 20503.LICENSEE EVENT REPORT (LER)DOCKET NUMBER (2)PA'FACILITY NAME (1)R.E.Ginna Nuclear Power Plant o 5 o o o 24 4ioFll TITLE (e)Loss of Source Range Detector Indication During Energization, Due to Faulty Detectors Causes a Condition Prohibited v Technical Snecifica io~y CC~'VENT DATE (Sl LEA NUMBER (0)REPORT DATE (7 OTHER FACILITIES INVOLVED (0)MONTH OAY YEAR YEAR Ig@SEQUENTIAL NUMSER REVISION MONTH OAY YEAR FACILITY NAMES DOCKET NUMBFRISI 0 5 0 0 0 0 312 93 93 001 0 0 0 4 1 2 9 3~~0 5 0 0 0 OPERATING MODE (0)N POWER LEVEL p p p 20.I02(0)20.e00(~)II IIII 20A05(e l(1)(9)20.005(e)ll 1(ill)20A05 4)ll)Grl 20.405(~Ill)4)20.e05(~)BOM(c)(I)50.30(cl(2) 50.73(e I (2 I I II 50.73(e)(2)IIII 50.734)(2)(III)

LICENSFE CONTACT FOA THIS LER (12)50,7 3 le I (2)I Ir)50.73(el(2) 4l 50.73(e)(2) lrQ)50.73(e)(2)(rljj)(A)50.73(el(2)(r(QI(~)50.73(e)(2)(el 0 THE REDUIREMENTS OF 10 CFR (): (Check onr or more of the fo//owindi (11)THIS REPORT IS SUBMITTED PURSUANT T 73.71(III 73.71(c)OTHER ISptcify cn Atjttrect Orrow rot/ln yrrt,/j/RC Form 300AI NAME Wes1ey H.Backus Technical Assistant to the Ooerations Mana er TELEPHONE NUMBER AREA CODE 31 552 4-4 44 6 COMPLETE ONE LINE FOR EACH COMPONENT FAILURE OKSCRIBED IN THIS REPORT ll3)C CAUSE SYSTEM COMPONENT MANUFAC.TURER REPORTABLE TO NPADS j~jPN~QQ cAUsE SYSTEM COMPONENT MANUFAC.TURKR EPOATABLE (c TO NPRDS Qt M Y.'NU wY, I G D T W 1 2 p SUPPLEMKNTAL REPORl'XPECTED (IC)EXPECTED SUBMISSION DATK (15)kklk)MI.QjtKi PyX~(MONTH OAY YEAR YES III yrt, complrtt EXPECTED St/der/SSION DATEI NO ABSTRACT ILlmlt to Irdd tpecrt, I,r., rppror/mrtrfy Iiftten rindle.eptcr typrwrittrn

/inrd I10)On March 12, 1993, at 1425 EST, vith the reactor subcritical during a planned shutdown, both source range detectors vere found inoperable with the reactor trip breakers closed.The Control Room operators immediately entered and performed the applicable actions of equipment restoration procedure ER-NZSe1 (SR Malfunction).

The reactor trip breakers vere opened vithin five (5)minutes of the event.The most likely cause of the source range detector failures was center electrode degradation due to gamma corrosion of the bare tungsten center~e"trode (center wire).(This event is NUREG--1022 (B)cause code).Corrective action was to replace the failed detectors vith qualified spares.Corrective action to prevent recurrence is outlined in section V(B).NRC Form 300 (509)

NRC FORM 3SSA (649)US, NUCLEAR REGULATORY COMMISSION LlCENSEE EVENT REPORT (LER)TEXT CONTINUATlON APPROVED OMB NO,3150010S EXPIRES: 4/30/92 ESTIMATED BURDEN PER RESPONSE TO COMPLY IYTH THIS INFORMATION COLLECTION REOUEST: 500 HRS.FORWARD COMMENTS REGARDING BURDEN ESTIMATE TO THE RECORDS AND REPORTS MANAGEMENT BRANCH (F430), U.S.NUCLEAR REGULATORY COMMISSION, WASHINGTON, DC 20555, AND TO SHE PAPERWORK REDUCTION PROJECT (31500)04), OFFICE OF MANAGEMENT AND BUDGET,WASHINGTON.

DC 20503.FACILITY NAME (1)DOCKET NUMBER (2)YEAR LER NUMBER (8)??o SEOUCNTIAL

>5~REVrdr0N?.'/1/NUMddA SP/r)NUM EA PAGE (3)R.E.Glnna Nuclear Power Plant TEXT///more d/rdee/d//r/rer/ude/(r)roe/ir//IC Form 3//S42/(12) o s o o o 24 493-0 0 1 0 0 02 oF l 1 PRE-PMNT CONDIT ONS A plant shutdown was in progress per operating procedure 0-2.1 (Normal Shutdown to Hot Shutdown)for the annual refueling and maintenance outage.The turbine generator had gust.been taken off the line and Control Room operators'were in the process of shutting the reactor down and inserting all control and shutdown rods.DESCRIPTION OF EVENT DATES AND APPROXIMATE TIMES OF MAZOR OCCURRENCES o March 12, 1993, 1425 EST: Event date and time o March 12, 1993, 1425, EST: Event discovery date and time o March 12, 1993, 1430 EST: Control Room operators complete inserting all control and shutdown rods and open the reactor trip breakers.o March 12, 1993, 1435 EST: Plant stabilized at hot shutdown.o March 12, 1993, 1501 EST: Source Range NIS N-31 and NIS N-32 declared inoperable.

o March 12, 1993, 1730 EST: Source Range NIS N-32 declared operable using the installed spare source range detector.o March 16, 1993, 1747 EST: Source Range NIS N-31 declared operable.o March 17, 1993, 2040 EST: Source Range NIS N-32 declared operable, using its normal source range detector.NRC Penn 388A (589)

NRC FORM 366A (689)U.S.NUCLEAR REGULATORY COMMISSION LICENSEE EVENT REPORT (LER)TEXT CONTINUATION APPROVED OM 6 NO.31500106 EXPIRES: 6/30/92 ESTIMATED BURDEN PER RESPONSE TO COMPLY WTH THIS LNFORMATION COLLECTION REGUEST: 50.0 HRS.FORWARD COMMENTS REGARDING BURDEN ESTIMATE To THE RECORDS AND REPORTS MANAGEMENT SRANCH (PJ)30).U.S.NUCLEAR REGULATORY COMMISSION, WASHINGTON, DC 20555, AND TO 1HE PAPERWORK REDUCTION PROJECT (3)500106), OFFICE OF MANAGEMENT ANO BUDGET, WASHINGTON.

DC 20503.FACILITY NAME (I)DOCKET NUMBER (2)LER NUMBER (6)YEAR O~>: SSOUSNTIAI v~4'EVISION NVM66R'&-NUMFSA I'AGE I3)R.E.Ginna Nuclear Paver Plant TEXT lllmoto tptcoitttquia/, utt At//oont/P/RC%%dmt36SA't/(IT) 0 s 0 0 02~~93 p 01 0 0 0 3 DF 1 1 B.EVENT-On March 12, 1993 at approximately 1425 EST with the reactor subcritical during a planned shutdown, source range (SR)Nuclear Instrumentation System (NIS)Channel N-31 and Channel N-32 automatically energized at the normal setpoint of</=5E-11 amps on the two intermediate range (IR)NIS channels.The Control.Room operators were closely monitoring the decay of the intermediate range currents, and were anticipating the'reset level for the.source ranges.At the time of automatic energization of the source range detec-tors, there was no count rate indication on Channel N-31 or Channel N-32.Seeing no indication of count rate, the Control Room operators, in accordance with plant procedures and training guidance, immediately attempted to manually.energize the source range detectors using the P-6 defeat pushbuttons.

The source range detectors still did not indicate counts.The Control Room operators continued to expeditiously insert control and shutdown rods per 0-2.1 and at approximately 1430 EST the reactor trip breakers were opened.The plant,was subsequently stabilized in hot shutdown at approximately 1435 EST.NRC Form 366A (649)

NRC FORM 366A (64)9)US.NUCLEAR REGULATORY COMMISSION LICENSEE EVENT REPORT (LER)TEXT CONTINUATION APPROVED OMB NO.3ISOOI04 EXPIRESI 4/30/92 ESTIMATED BURDEN PER RESPONSE TO COMPLY WTH THIS INFORMATION COLLECTION REOUEST: 50.0 HRS.FORWARD COMMENTS REGARDING BURDEN ESTIMATE TO THE RECORDS AND REPORTS MANAGEMENT BRANCH (P4)30), U.S.NUCLEAR REGULATORY COMMISSION, WASHINGTON, DC 20555, AND TO THE PAPERWORK REDUCTION PROJECT (31504)104).

OFFICE OF MANAGEMFNT AND BUDGET, WASHINGTON,OC 20503.FACILITY NAME (1)DOCKET NUMBER (2)YEAR LER NUMBER (6)SEOUENZIAL,Oi)i NUMB%4 AEVISION NUMO64 PAGE (3)R.E.Glnna Nuclear Power Plant TEXT///mom 4/>>oo JF~os, uoo d/d/ooo/NRC FomI 35549/()7)o s o o o 24 49 3-001 00 0 40F~Subsequently the Control Room operators notified higher supervision and the Instrument

&Control (I&C)Department of the event and at approximately 1501 EST declared source range NIS N-31 and N-32 inoperable.

The Plant Operation Review Committee (PORC)was convened to review the actions taken, conformance to Technical Specifications, event classification and reportability.

PORC directed that access to the Containment Building (CNMT)be prohibited until one source range channel was restored to operable status.In addition PORC confirmed that actions were taken to ensure plant cooldown would not occur, and that dilution of boron concentration would not occur.The Control Room operators entered and performed the applicable actions of equipment, restoration procedure ER-NIS.1 (SR Malfunction) including continued boration to greater than 54 shutdown margin.and sampling the Reactor Coolant System (RCS).for boron concentration on a periodic basis during the boration.C.INOPERABLE STRUCTUEUKSF COMPONENTS, OR SYSTEMS THAT CONTRIBUTED TO THE 15TENT: D.None.OTE&R SYSTEMS OR SECONDARY FUNCTIONS AFFECTED: None.E METHOD OP DISCOVERY The event was immediately apparent due to indications in the Control Room.NRC FoIm 366A (64)9)

NRC FORM 366A (689)US.NUCLEAR REGULATORY COMMISSION LICENSEE EVENT REPORT (LER)TEXT CONTINUATION

~APPROVED OMB NO, 31500106 5 XP IR ES: 6/30/92 ESTIMATED BURDEN PER RESPONSE TO COMPLY WTH THIS INFOAMATION COLLECTION REQUEST: 500 HRS.FORWARD COMMENTS REGARDING BUAOEN ESTIMATE TO THE RECORDS AND REPORTS MANAGEMENT BRANCH (P430), U.S.NUCLEAR REGULATORY COMMISSION, WASHINGTON.

DC 20555, AND TO THE PAPERWORK REDUCTION PROJECT (31500106).

OFFICE OF MANAGEMENT AND BUDGET.WASHINGTON, OC 20503.FACILITY NAME n)DOCKET NUMBER (2)LER NUMBER (6)YEAR LPNL SEQUENTIAI.

+WC: REVISION I+I: NUMEER 4.'UM ER PAGE D))R.E.Ginna Nuclear PoT6er Plant JEXT///6NKE Epecr is>>6U9od.u>>>>M/6'one/N/IC Form 35569)nl)o s o o o 24 493-0 1 0 0 0 5 OF P OPERATOR ACTION The Control Room operators, after recognizing that there were no indicated count rates on either of the source range detectors, immediately attempted to manually energize the-source range detectors using the P-6 defeat pushbuttons.

The operators entered ER-NIS.1 and performed the applicable actions, including pulling the fuses for Instrument Power, in another attempt to reinstate, the source'anges.

Subsequently, the Control Room operators notified higher supervision

'and the I&C Department and declared source range NIS N-31 and N-32 inoperable.

G.SAFETY SYSTEM RESPONSES None.III.CAUSE OF OSTENT A.IMMEDIATE CAUSE The cause of the failure of source range detectors N-31 and N-32 to indicate counts was detector failure due to center electrode degradation.

Specific measurements indicate that the center electrode to shield had become short circuited on source range detector N-31, most, likely due to the electrode breaking at the bottom of the detector.Source range detector N-32 was found to be open circuited, possibly due to the electrode breaking at the top of the detector.NAC Form 366A (689)

NRC FORM 366A ISS9)US.NUCLEAR REGULATORY COMMISSION LICENSEE EVENT REPORT (LER)TEXT CONTINUATION APPROVED OMS NO.31600104 EXPIRES: E/30/92 ESTIMATED BURDEN PER RESPONSE TO COMPLY WTH THIS INFORMATION COLLECTION REOUESTI 603)HRS.FORWARD COMMENTS REGARDING BURDEN ESTIMATE TO THE RECORDS AND REPORTS MANAGEMENT BRANCH IF@30), U,S.NUCLEAR REGULATORY COMMISSION, WASHINGTON, DC 20655, AND TO 1HE PAPERWORK REDUCTION PROJECT 131600)04), OFFICE OF MANAGEMENT AND BUDGET, WASHINGTON, DC 20603.FACILITY NAME 11)DOCKET NUMBER 12)YEAR LER NUMBER IS)X6%SEOUENTIAI.

NUMBER REVISION NUMSER PAGE 13)R.E.Gonna Nuclear Power Plant TEXT ill moro EPoco lr rorlrr/rod, Irw oddldorM/ll/IC Forrrr 366AS/)17) o s o o o 24 493-0 0 1 00 06 OF B ROOT CAUSE: After consulting with Westinghouse Electric Corporation (the manufacturer and vendor for these detectors), it was concluded that the underlying cause of the center electrode degradation of source range detectors N-31 and N-32 is most likely due to gamma corrosion of the bare tungsten center electrode (center wire).This effect occurs whenever the source range detector is energized.

ANALYSIS Op EVENT The event is reportable in accordance with 10 CFR 50.73, Licensee Event Report System, item (a)(2)(i)(B), which requires a report of,"any operation prohibited by the plant's Technical Specification", in that the failure of source range detectors N-31 and N-32 to indicate counts at</=1E-10 amps on the two intermediate range NIS channels was an operation prohibited by the plant Technical Specifications as follows: o Specification 3.5.1.1 states,"The Protection System Instrumentation shown on Table 3.5-1 shall be operable whenever the conditions specified in Column 6 are exceeded".

For the source range instruments, column 6 refers to Note 2, which states,"Channels should be operable at all modes below the bypass condition with the reactor trip system breakers in the closed position and control rod drive system capable of rod withdrawal".

Contrary to the above, source range channels N-31 and N-32 were inoperable below the bypass condition of</=1E-10 on both IR NIS channels with the reactor trip breakers closed and the control rod drive system capable of rod withdrawal.

This condition existed for approximately five (5)minutes until the reactor trip breakers were opened.While an Action Statement exists for one source detector inoperable, there is no stated action requirement for two, detectors inoperable with the Reactor Trip breakers closed.Therefore, a condition prohibited by the plant's Technical Specifications existed.NRC Form 366A)689)

NRC FORM 366A (669)U.S.NUCLEAR REGULATORY COMMISSION 2~LICENSEE EVENT REPORT (LER)TEXT CONTINUATION APPROVED OMB NO.3(600104 EXPIRES: A/30/92 ESTIMATED BURDEN PER RESPONSE TO COMPLY WTH THIS INFORMATION COLLECTION REOUESTI 500 HRS.FORWARD COMMENTS REGARDING BURDEN ESTIMATE To THE RECORDS AND REPORTS MANAGEMENT BRANCH (P430), U.S.NUCLEAR REGULATORY COMMISSION, WASHINGTON, DC 20555, AND To 1HE PAPERWORK REDUCTION PROJECT (3150010I), OFFICE OF MANAGEMENT AND BUDGET, WASHINGTON, DC 20503.FACILITY NAME (11 DOCKET NUMBER (2)LER NUMBER (6)PAGE (3)R.E.Ginna Nuclear Power Plant TEXT/I/mom H>>ce/t>>I)r/irer/

Ir>>pr/r//I/orN/HRC Form 366AB/(17)YEAR~rA 0 s 0 0 0 244 93 SEOUENTIAL NUMSER 0 0 1<~~REVISION..IH: NUM ER 0 0 070F1 1 Once the trip breakers are open, the minimum operable channels required reduces to one(1)instead of two (2)and the action statement states in part as follows: With the number of operable channels one less than the minimum operable channels requirement, suspend all operations involving positive reactivity changes.An assessment was performed considering both the safety consequences and implications of this event with the following results and conclusions:

The safety significance of the failure of both source range channels is the loss of detection of subcritical neutron flux in the core and the function those channels provide for both automatic actuation of the reactor protection system and the prompting of operator action to protect shutdown margin.However, this significance is minimized in this instance for the following reasons: 0 The failure occurred completely within the sequence of shutting down the-reactor in accordance with plant procedure 0-2.1 in that the operators were closely monitoring the decay of the intermediate range currents and were anticipating the reset level for the source ranges.ln accordance with 0-2.1 the operators were ex-peditiously inserting the control and shutdown rods to five steps prior to manually opening the reactor trip breakers.This sequence, simultaneous with injecting boric acid to achieve the required RCS cold shutdown boron concentration insured that shutdown margin was maintained greater than the requirements of Technical Specifications, and that shutdown margin did not decrease during this event.NRC Form 366A (BJ)9)

J NRC FORM 355A (689)U.S.NUCLEAR REGULATORY COMMISSION LICENSEE EYENT REPORT ILER)TEXT CONTINUATION APPROVED OMB NO.31600104 EXPIRES: 4/30JS2 ESTIMATED BURDEN PER RESPONSE TO COMPLY WTH THIS INFORMATION COLLECTION REQUESTI 50.0 HRS.FORWARD COMMENTS REGARDING BURDEN ESTIMATE TO THE RECORDS AND REPORTS MANAGEMENT BRANCH (P430), U.S.NUCLEAR REGULATORY COMMISSION, WASHINGTON, DC 20555, AND TO 1HE PAPERWORK REDUCTION PROJECT (31504104).

OFFICE OF MANAGEMENT AND BUDGET, WASHINGTON, OC 20503.FACILITY NAME (1)DOCKET NUMBER (21 LER NUMBER (5)YEAR(PSEQUENTIALS)I(REVISION M 3 NUMSEA'P..: NUMBER PAGE (3)R.E.Ginna Nuclear Power Plant TEXT FIT mo>>~JJ>>ookod, u>>aktJNeal HRC Ann 35543)(IT)o s o o o2 44 93-00 1 0 0 0 8Oi o After immediately recognizing that the source range channels did not indicate counts at the intermediate range reset point, the operators took appropriate actions in attempting-to reinstate-source range detectors.

They continued to expeditiously insert control and shutdown rods, and within five minutes, opened the reactor trip breakers.The operator continued boration to the cold shutdown, xenon free concentration required by procedure for RCS cooldown below 500 degrees.There was no decrease in shutdown margin, from the time'of failure of both source range channels until the time the spare source range detector was used to declare Channel N-32 operable.All operations involving positive reactivity changes were suspenders until after the spare source range detector was declared operable.Based on the above, it can be concluded that the public's health and safety was assured at all times.V CORRECTIVE ACTION A ACTION TAKEN TO RETURN AFFECTED SYST1963 TO PRE-EVENT NORMAL STATUS: 0, The detector installed in source range channel N-32 was disconnected and the previously installed spare source range detector was connected to source range channel N-32.NIS N-32 high voltage setting and the pulse height discriminator (PHD)bias setting were ad)usted to conform to the data for the spare detector.At approxi-mately 1730 EST on March 12, 1993, source range Channel N-32 was declared operable.NRC Form 365A (SSS)

NRC FORM 366A (669)U.S.NUCLEAR REGULATORY COMMISSION LICENSEE EVENT REPORT (LER)TEXT CONTINUATION APPROVED 0MB NO.31500)04 EXPIRES: 6/30)92 ESTIMATED BURDEN PER RESPONSE TO COMPLY WTH THIS INFORMATION COLLECTION REQUEST: 500 HRS.FORWARD COMMENTS REGARDING BURDEN ESTIMATE TO THE RECORDS AND REPORTS MANAGEMENT BRANCH (P630), U.S.NUCLEAR REGULATORY COMMISSION, WASHINGTON, OC 20555, AND TO 1'HE PAPERWORK REDUCTION PROJECT (31500106), OFFICE OF MANAGEMENT AND BUDGET, WASHINGTON, DC 20503, FACILITY NAME (I)DOCKET NUMBER (2)LER NUMBER (6)YEAR S~y SEQVSNTIAL

~2 NUMSSII REVISION NUM SA PAGE (3)R.E.Gonna Nuclear Power Plant TEXT Nmon JIMce ls~, VJP~HRC Form 35663)(IT)p p p p p 2 44 3 001 0 0 0 9 oF 11 The detector installed in source range channel N-31 was replaced with a detector withdrawn from stock.Subsequently, for source range channel N-31 the high voltage power supply was replaced.The detector anode voltage curve (also referred to as the plateau curve).was obtained, and the PHD bias setting was adjusted.At approximately 1747 EST on March 16, 1993, source range Channel N-31 was declared operable.o The detector installed in source range channel N-32 was replaced with a detector withdrawn from stock.For this newly installed detector, the plateau curve was obtained and the PHD bias setting was adjusted.The installed spare source range detector was then disconnected from source range channel N-32 and this newly installed source range detector was connected to source range channel N-32..The channel operability test was completed, and at approximately 2040 EST on March 17, 1993 source range Channel N-32 was declared operable, using its normal source range detector.B ACTION TAKEN OR PLANN19)TO NUGENT REC&tRENCE:

To minimize future source range detector failures, the following actions are being planned: 0 A periodic replacement interval for BF~filled source range detectors will be established, based upon time in service or number of ener-gizations of the detectors.

NRC Form 366A (689)

NRC FORM 366A (689)FACILITY NAME (1)UE.NUCLEAR REGULATORY COMMISSION LICENSEE EVENT REPORT tLER)TEXT CONTINUATION DOCKET NUMBER (2)APPROVED OM 8 NO.31600104 E XP I R ES: 4/30/92 ESTIMATED BURDEN PER RESPONSE TO COMPLY WTH THIS INFORMATION COLLECTION REQUEST: 50/)HRS.FORWARD COMMENTS REGARDING BURDEN ESTIMATE TO THE RECORDS AND REPORTS MANAGEMENT BRANCH (P830), U.S.NUCLEAR REGULATORY COMMISSION, WASHINGTON, DC 20555, AND TO THE PAPERWORK REDUCTION PROJECT (31500104).

OFFICE OF MANAGEMENT AND BUDGET, WASHINGTON, DC 20503.PAGE (3)LER NUMBER (8)YEAR P444 SEQUENTIAL.Ay NUMSER REVISION NUMSSR R.E.Gonna Nuclear Power Plane TEXT///mare S>>ce JI re/Ir/red, Iree edd/dar>>/N/IC

%%drm 38642/((7)ps ppp24 493 0 0 1 00 10 OF o A new Westinghouse design for these BF3 filled source range detectors incorporates low voltage source range detectors with gold-plated tungsten center wire conductor material.Detectors of this new design will be procured.When detectors of this new design are installed, as part of a planned detector upgrade schedule, as replace-ments for existing detectors, the periodic replacement interval will be re-evaluated.

0 Existing calibration procedures will be revised," or new procedures developed, to include steps to perform time domain reflectometry (TDR)measure-ments on N-31, N-32 and spare detector, prior to scheduled refueling outages.(TDR measurements can determine if the detector center electrode wire is broken, shorted out or if it has high or low resistance)

.0 A trending program to detect potential degradation of source range detectors will be established, for the following data: 1)Detector plateau curve data will be trended.As the BF3 gas in the detector dissociates over time, the high voltage will be adjusted higher each time until it can no longer be set on the plateau.2)PHD bias curves will be trended.RMAT ON A PAXLED COMPONENTS:

The faulty detectors were BF3 filled, source range detector proportional counters, Part No.WL-24182 manufactured by Westinghouse Electric Corporation.

NRC Form 388A (889)

NRC FORM 366A (SJ)9)t US.NUCLEAR REGULATORY COMMISSION LICENSEE EVENT REPORT (LER)TEXT CONTINUATION APPROVEO OMB NO, 31500104 EXPIRES: EI30(92 ESTIMATED BURDEN PER RESPONSE TO COMPLY WTH THIS INFORMATION COLLECTION REQUEST: 500 HRS.FORWARD COMMENTS REGARDING BURDEN ESTIMATE TO THE RECORDS AND REPORTS MANAGEMENT BRANCH (F430).U.S.NUCLEAR REGULATORY COMMISSION, WASHINGTON.

OC 20555, AND TO 1HE PAPERWORK REDUCTION PROJECT (31500104).

OFFICE OF MANAGEMENT AND BUDGET, WASHINGTON, DC 20503.FACILITY NAME (1I DOCKET NUMBER (2)YEAR LER NUMBER (SI SEQUENTIAL NVMSER REVISION NVMSER I'AGE (3)R.E.Ginna Nuclear Power Plant RJOOOOPooo (ssoSs(INL goo oddlooIMI HRC%%dmI 36643)(17)o s o o o 2 449 3 001 0 0 1 1 OF B.PREVXOUS LERs ON SIMILAR KGFNTS.A similar LER event historical search was conducted with the following results: LER 90-003 (Higher Than Normal Count Rate on Source Range NIS, Due to a Faulty Detector, Causes a Reactor Trip During Source Range Re-energization) was a similar event with the same root cause.The corrective action to prevent recur-rence, of the event described in LER 90-003, was to initiate a evaluation which will ultimately result in procurement and installation of detectors, of a new Westinghouse design.It should be noted that even if the evaluation had been completed, and detectors of a new design had been procured and were in stock, these detectors would not have been installed prior to the 1993 outage.C SPECIAL COMMENTS None.NRC FoIm 366A (SJ)9)