|
|
Line 17: |
Line 17: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:ATTACHMENT 1TOAEP:NRC:1182A MARKED-UP TECHNICAL SPECIFICATION PAGES9502150154 S'50210PDRADOCK05000315PDR CO0OVCoh0'LINGCONDONFOROP.ON~ME'4)~l;rJlwd'(i4~+~roP'Pg;~~c.lto~Qredm~scJ:r~iam~4 3.1.3.1Allfulllength(shutdown andcontrol)rodsshallbeOPERABLEaad-oftheirgroupstepcounterdemandposition~ | | {{#Wiki_filter:ATTACHMENT 1 TO AEP:NRC:1182A MARKED-UP TECHNICAL SPECIFICATION PAGES 9502150154 S'50210 PDR ADOCK 05000315 PDR CO 0 OV Coh 0'LI NG COND ON FOR OP.ON~M E'4)~l;rJl wd'(i4~+~ro P'Pg;~~c.lto~Q red m~scJ:r~iam~4 3.1.3.1 All full length (shutdown and control)rods shall be OPERABLE aad-of their group step counter demand position~O.s%0olls~GL&ctc kc'+*~CTEOR: a~With~one or more full length rods inoperable due to being immovable as a result of excessive friction or mechanical interference or known to be untrippable, determine that the SHUTDOWN MARGIN requi.re-ment of Specification 3.1.1.1 is sati.sfied within 1 hour and, be in HOT STANDBY'ithin 6 hours.b.C~With more than one full length rod inoperable or misaligned from the+I I be in HOT STANDBY wi.thin 6 hours.~4u Q red mimosa.iiJenync~t~ |
| O.s%0olls~GL&ctckc'+*~CTEOR:a~With~oneormorefulllengthrodsinoperable duetobeingimmovable asaresultofexcessive frictionormechanical interference orknowntobeuntrippable, determine thattheSHUTDOWNMARGINrequi.re-mentofSpecification 3.1.1.1issati.sfied within1hourand,beinHOTSTANDBY'ithin 6hours.b.C~Withmorethanonefulllengthrodinoperable ormisaligned fromthe+IIbeinHOTSTANDBYwi.thin6hours.~4uQredmimosa.iiJenync~t~ | | With one.full length rod inoperable due to causes other than addressed by ACTION a, above, or misaligned from its group step counter demand position by more than+hour either: 2.The affected rod is restored to OPERABLE status within the above alignment requirements,.or 7ff@nrdh PyaER/encl rj~ed~red c r qua(W g5'/,'A7N,puf'gg)SlL |
| Withone.fulllengthrodinoperable duetocausesotherthanaddressed byACTIONa,above,ormisaligned fromitsgroupstepcounterdemandpositionbymorethan+houreither:2.TheaffectedrodisrestoredtoOPERABLEstatuswithintheabovealignment requirements,
| | /o>Pg 7jy'Z wilalIn~<<>+ |
| .or7ff@nrdhPyaER/enclrj~ed~redcrqua(Wg5'/,'A7N,puf'gg)SlL | | The affected rod i.s declared inoperable and th'e SHUTDOWN MARGIN requirement of Specification 3.1.1.1 is satisfied. |
| /o>Pg7jy'ZwilalIn~<<>+ | | POWER OPERATION may then continue provided that: a)A reevaluation of each accident analysis of Table 3.1-1 is performed within 5 days;this reevaluation shall confirm that the previously analyzed results of these accidents remain valid for the duration of operation under these conditions, and b)The SHUTDOWN MARGIN requirement of Specification 3.1.1.1 is determined at least once per 12 hours, and-"See Special D.C.COOK-UNIT 1 3/4 1-18 r Test Exceptions 3.10.2 and 3.10.4 piers.+o p~g4'-t'7 AMENDMENT NO.g$gg, 12' o for THERMAL POWER less than or equal to 85X of RATED THERMAL POWER, the allowed rod misalignment is~lS steps, and o for THERMAL POWER greater than 85X of RATED THERMAL POWER, the allowed rod misalignment is~12 steps or as determined from Figure 3.1-4.Figure 3.1-4 permits~an allowed rod misalignment from 413 steps (for APL equal to 101X)to~18 steps (for APL greater or equal to 106X)provided the value of R (defined in Figure 3.1-4)is greater than or equal to 1.04. |
| Theaffectedrodi.sdeclaredinoperable andth'eSHUTDOWNMARGINrequirement ofSpecification 3.1.1.1issatisfied.
| | REACTIVITY CO OL SYSTEMS 3N.1 3 MOVABLE CO OL ASSEMBLIES. |
| POWEROPERATION maythencontinueprovidedthat:a)Areevaluation ofeachaccidentanalysisofTable3.1-1isperformed within5days;thisreevaluation shallconfirmthatthepreviously analyzedresultsoftheseaccidents remainvalidforthedurationofoperation undertheseconditions, andb)TheSHUTDOWNMARGINrequirement ofSpecification 3.1.1.1isdetermined atleastonceper12hours,and-"SeeSpecialD.C.COOK-UNIT13/41-18rTestExceptions 3.10.2and3.10.4piers.+op~g4'-t'7AMENDMENT NO.g$gg,12' oforTHERMALPOWERlessthanorequalto85XofRATEDTHERMALPOWER,theallowedrodmisalignment is~lSsteps,andoforTHERMALPOWERgreaterthan85XofRATEDTHERMALPOWER,theallowedrodmisalignment is~12stepsorasdetermined fromFigure3.1-4.Figure3.1-4permits~anallowedrodmisalignment from413steps(forAPLequalto101X)to~18steps(forAPLgreaterorequalto106X)providedthevalueofR(definedinFigure3.1-4)isgreaterthanorequalto1.04.
| | GROUP HEIGHT LIMITING CONDITION FOR OPERATIO~~pl dt pnd'~~d*J i4~fcA M I'o'4"~s w 4'~~o le>4 3.1.3.1 All full length (shutdown and control)rods shall be OPERABLE and demand positiony a5+sto~~.'inc'~~+8~A+~+'PPLICABILITY: |
| REACTIVITY COOLSYSTEMS3N.13MOVABLECOOLASSEMBLIES. | | MODES 1+and 2*ACTION'L~With one or more full length rods inoperable due to being immovable as a result of excessive friction or mechanical interference or known to be untrippable, determine that the SHUTDOWN MARGIN require-ment of Specification 3.1.1.1 is satisfied within 1 hour and be in HOT STANDBY within 6 hours.b.c~With more than one full length rod inoperable or misaligned from the (be in HOT STANDBY within 6 hours.cJ(o~~~isa.lip~~ |
| GROUPHEIGHTLIMITINGCONDITION FOROPERATIO~~pldtpnd'~~d*J i4~fcAMI'o'4"~sw4'~~ole>43.1.3.1Allfulllength(shutdown andcontrol)rodsshallbeOPERABLEanddemandpositiony a5+sto~~.'inc'~~+8~A+~+'PPLICABILITY:
| | ~With one full length rod inoperable due to causes other than addressed by ACTION a, above, or.misaligned from its group step counter demand position by more than POWER OPERATION may continue provided that within one J hour either: 2.The affected rod is restore/to OPERABLE status within the above I alignment requirements, or fiVEIV~HL Po&ER k~e/sg Yeku48c(7S ASS 85'/Andes fffEambL~>~EH pw wd-mrs'n/gP~&r6/n5 Ws, The affected rodle.declared dnoperahle and the SHUTDO'drHARGIN o>+e/requirement of Specification 3.1.1.1 is satisfied. |
| MODES1+and2*ACTION'L~Withoneormorefulllengthrodsinoperable duetobeingimmovable asaresultofexcessive frictionormechanical interference orknowntobeuntrippable, determine thattheSHUTDOWNMARGINrequire-mentofSpecification 3.1.1.1issatisfied within1hourandbeinHOTSTANDBYwithin6hours.b.c~Withmorethanonefulllengthrodinoperable ormisaligned fromthe(beinHOTSTANDBYwithin6hours.cJ(o~~~isa.lip~~
| | POWER 7're s+, OPERATION may then continue provided that:OV a)A reevaluation of each accident analysis of Table 3.1-1 is performed within 5 days;this reevaluation shall confirm that the previously analyzed results of these accidents rhmain valid for the duration of operation under these conditions, and::See Special b)The SHUTDOWN MARGIN requirement of Specification'3.1.1.1 is determined at least once per 12 hours, and~@~m PACING 9/4-[-lg Test Exceptions 3.10.2 and 3.10.3 D.C.COOK'-UNIT 2 3/4 1-18 AMENDMENT NO.JSp 107 |
| ~Withonefulllengthrodinoperable duetocausesotherthanaddressed byACTIONa,above,or.misaligned fromitsgroupstepcounterdemandpositionbymorethanPOWEROPERATION maycontinueprovidedthatwithinoneJhoureither:2.Theaffectedrodisrestore/toOPERABLEstatuswithintheaboveIalignment requirements, orfiVEIV~HLPo&ERk~e/sgYeku48c(7SASS85'/AndesfffEambL~>~EHpwwd-mrs'n/gP~&r6/n5Ws,Theaffectedrodle.declared dnoperahle andtheSHUTDO'drHARGIN o>+e/requirement ofSpecification 3.1.1.1issatisfied. | | ,o for THERMAL POWEB.less than or equal to 85X of RATED THERMAL P04~, the allowed rod misalignment is~18 steps, and o for THERMAL POVER greater than 85X of RATED THERMAL POVER, the allowed rod misalignment is J12 steps or as determined from Figure 3.1-4.Figure 3.1-4 permits~an allowed rod misalignment from~13 steps (for APL equal to 101X)to~18 steps (for APL greater or equal to 106X)provided the value of R (defined in Figure 3.1-4)is greater than or equal to 1.04. |
| POWER7'res+,OPERATION maythencontinueprovidedthat:OVa)Areevaluation ofeachaccidentanalysisofTable3.1-1isperformed within5days;thisreevaluation shallconfirmthatthepreviously analyzedresultsoftheseaccidents rhmainvalidforthedurationofoperation undertheseconditions, and::SeeSpecialb)TheSHUTDOWNMARGINrequirement ofSpecification'3.1.1.1 isdetermined atleastonceper12hours,and~@~mPACING9/4-[-lgTestExceptions 3.10.2and3.10.3D.C.COOK'-UNIT23/41-18AMENDMENT NO.JSp107
| |
| ,oforTHERMALPOWEB.lessthanorequalto85XofRATEDTHERMALP04~,theallowedrodmisalignment is~18steps,andoforTHERMALPOVERgreaterthan85XofRATEDTHERMALPOVER,theallowedrodmisalignment isJ12stepsorasdetermined fromFigure3.1-4.Figure3.1-4permits~anallowedrodmisalignment from~13steps(forAPLequalto101X)to~18steps(forAPLgreaterorequalto106X)providedthevalueofR(definedinFigure3.1-4)isgreaterthanorequalto1.04. | |
|
| |
|
| ATTACHMENT 2TOAEP:NRC:1182A PROPOSEDTECHNICAL SPECIFICAITON PAGES REACTIVITY CONTROLSYSTEMSj34.13MOVABLECONTROLASSEMBLIES GROUPHEIGHTLIMITINGCONDITION FOROPERATION 3.1.3.1Allfulllength(shutdown andcontrol)rodsshallbeOPERABLEwithallindividual indicated rodpositions withintheallowedrodmisalignment oftheirgroupstepcounterdemandpositionasfollows:forTHERMALPOWERlessthanorequalto85XofRATEDTHERMALPOWER,theallowedrodmisalignment iszl8steps,andforTHERMALPOWERgreaterthan85XofRATEDTHERMALPOWER,theallowedrodmisalignment is~12stepsorasdetermined fromFigure3.1-4.Figure3.1-4permitsanallowedrodmisalignment fromF13steps(forAPLequalto101X)toz18steps(forAPLgreaterorequalto106X)providedthevalueofR(definedinFigure3.1-4)isgreaterthanorequalto1.04.*ACTION:a.Withoneormorefulllengthrodsinoperable duetobeingimmovable asaresultofexcessive frictionormechanical interference orknowntobeuntrippable, determine thattheSHUTDOWNMARGINrequirement ofSpecification 3.1.1.1issatisfied within1hourandbeinHOTSTANDBYwithin6hours.b.Withmorethanonefulllengthrodinoperable ormisaligned fromthegroupstepcounterdemandpositionbymorethantheallowedrodmisalignment, beinHOTSTANDBYwithin6hours.c.Withonefulllengthrodinoperable duetocausesotherthanaddressed byACTIONa,above,ormisaligned fromitsgroupstepcounterdemandpositionbymorethantheallowedrodmisalignment, POWEROPERATION maycontinueprovidedthatwithinonehoureither:1.TheaffectedrodisrestoredtoOPERABLEstatuswithintheabovealignment requirements, orTHERMALPOWERlevelisreducedtolessthanorequalto85XofRATEDTHERMALPOWERforrodmisalignments lessthanorequaltoz18steps,or2.Theaffectedrodisdeclaredinoperable andtheSHUTDOWNMARGINrequirement ofSpecification 3.1.1.1issatisfied. | | ATTACHMENT 2 TO AEP:NRC:1182A PROPOSED TECHNICAL SPECIFICAITON PAGES REACTIVITY CONTROL SYSTEMS j 3 4.1 3 MOVABLE CONTROL ASSEMBLIES GROUP HEIGHT LIMITING CONDITION FOR OPERATION 3.1.3.1 All full length (shutdown and control)rods shall be OPERABLE with all individual indicated rod positions within the allowed rod misalignment of their group step counter demand position as follows: for THERMAL POWER less than or equal to 85X of RATED THERMAL POWER, the allowed rod misalignment is zl8 steps, and for THERMAL POWER greater than 85X of RATED THERMAL POWER, the allowed rod misalignment is~12 steps or as determined from Figure 3.1-4.Figure 3.1-4 permits an allowed rod misalignment from F13 steps (for APL equal to 101X)to z18 steps (for APL greater or equal to 106X)provided the value of R (defined in Figure 3.1-4)is greater than or equal to 1.04.*ACTION: a.With one or more full length rods inoperable due to being immovable as a result of excessive friction or mechanical interference or known to be untrippable, determine that the SHUTDOWN MARGIN requirement of Specification 3.1.1.1 is satisfied within 1 hour and be in HOT STANDBY within 6 hours.b.With more than one full length rod inoperable or misaligned from the group step counter demand position by more than the allowed rod misalignment, be in HOT STANDBY within 6 hours.c.With one full length rod inoperable due to causes other than addressed by ACTION a, above, or misaligned from its group step counter demand position by more than the allowed rod misalignment, POWER OPERATION may continue provided that within one hour either: 1.The affected rod is restored to OPERABLE status within the above alignment requirements, or THERMAL POWER level is reduced to less than or equal to 85X of RATED THERMAL POWER for rod misalignments less than or equal to z18 steps, or 2.The affected rod is declared inoperable and the SHUTDOWN MARGIN requirement of Specification 3.1.1.1 is satisfied. |
| POWEROPERATION maythencontinueprovidedthat:a)Areevaluation ofeachaccidentanalysisofTable3.1-1isperformed within5days;thisreevaluation shallconfirmthatthepreviously analyzedresultsoftheseaccidents remainvalidforthedurationofoperation undertheseconditions, and*SeeSpecialTestExceptions 3.10.2and3.10.4COOKNUCLEARPLANT-UNIT13/41-18AMENDMENT NO.k5,Q8,IRAN REACTIVITY CONTROLSYSTEMS34.13MOVABLECONTROLASSEMBLIES GROUPHEIGHTLIMITINGCONDITION FOROPERATION 3.1.3.1Allfulllength(shutdown andcontrol)rodsshallbeOPERABLEwithallindividual indicated rodpositions withintheallowedrodmisalignment oftheirgroupstepcounterdemandpositionasfollows:forTHERMALPOWERlessthanorequalto85XofRATEDTHERMALPOWER,theallowedrodmisalignment isz18steps,andforTHERMALPOWERgreaterthan85XofRATEDTHERMALPOWER,theallowedrodmisalignment is~12stepsorasdetermined fromFigure3.1-4.Figure3.1-4permitsanallowedrodmisalignment fromzl3steps(forAPLequalto101X)to~18steps(forAPLgreaterorequalto106%)providedthevalueofR(definedinFigure3.1-4)isgreaterthanorequalto1.04.APPLICABILITY:
| | POWER OPERATION may then continue provided that: a)A reevaluation of each accident analysis of Table 3.1-1 is performed within 5 days;this reevaluation shall confirm that the previously analyzed results of these accidents remain valid for the duration of operation under these conditions, and*See Special Test Exceptions 3.10.2 and 3.10.4 COOK NUCLEAR PLANT-UNIT 1 3/4 1-18 AMENDMENT NO.k5, Q8, IRAN REACTIVITY CONTROL SYSTEMS 3 4.1 3 MOVABLE CONTROL ASSEMBLIES GROUP HEIGHT LIMITING CONDITION FOR OPERATION 3.1.3.1 All full length (shutdown and control)rods shall be OPERABLE with all individual indicated rod positions within the allowed rod misalignment of their group step counter demand position as follows: for THERMAL POWER less than or equal to 85X of RATED THERMAL POWER, the allowed rod misalignment is z18 steps, and for THERMAL POWER greater than 85X of RATED THERMAL POWER, the allowed rod misalignment is~12 steps or as determined from Figure 3.1-4.Figure 3.1-4 permits an allowed rod misalignment from zl3 steps (for APL equal to 101X)to~18 steps (for APL greater or equal to 106%)provided the value of R (defined in Figure 3.1-4)is greater than or equal to 1.04.APPLICABILITY: |
| MODES1*and2*ACTION:a.Withoneormorefulllengthrodsinoperable duetobeingimmovable asaresultofexcessive frictionormechanical interference orknowntobeuntrippable, determine thattheSHUTDOWNMARGINrequirement ofSpecification 3.1.1.1issatisfied within1hourandbeinHOTSTANDBYwithin6hours.b.Withmorethanonefulllengthrodinoperable ormisaligned fromthegroupstepcounterdemandpositionbymorethantheallowedrodmisalignment, beinHOTSTANDBYwithin6hours.c.Withonefulllengthrodinoperable duetocausesotherthanaddressed byACTIONa,above,ormisaligned fromitsgroupstepcounterdemandpositionbymorethantheallowedrodmisalignment, POWEROPERATION maycontinueprovidedthatwithinonehoureither:1.TheaffectedrodisrestoredtoOPERABLEstatuswithintheabovealignment requirements, orTHERMALPOWERlevelisreducedtolessthanorequalto85XofRATEDTHERMALPOWERforrodmisalignments lessthanorequaltoz18steps,or2.Theaffectedrodisdeclaredinoperable andtheSHUTDOWNMARGINrequirement ofSpecification 3.1.1.1issatisfied.
| | MODES 1*and 2*ACTION: a.With one or more full length rods inoperable due to being immovable as a result of excessive friction or mechanical interference or known to be untrippable, determine that the SHUTDOWN MARGIN requirement of Specification 3.1.1.1 is satisfied within 1 hour and be in HOT STANDBY within 6 hours.b.With more than one full length rod inoperable or misaligned from the group step counter demand position by more than the allowed rod misalignment, be in HOT STANDBY within 6 hours.c.With one full length rod inoperable due to causes other than addressed by ACTION a, above, or misaligned from its group step counter demand position by more than the allowed rod misalignment, POWER OPERATION may continue provided that within one hour either: 1.The affected rod is restored to OPERABLE status within the above alignment requirements, or THERMAL POWER level is reduced to less than or equal to 85X of RATED THERMAL POWER for rod misalignments less than or equal to z18 steps, or 2.The affected rod is declared inoperable and the SHUTDOWN MARGIN requirement of Specification 3.1.1.1 is satisfied. |
| POWEROPERATION maythencontinueprovidedthat:a)Areevaluation ofeachaccidentanalysisofTable3'-1isperformed within5days;thisreevaluation shallconfirmthatthepreviously analyzedresultsoftheseaccidents remainvalidforthedurationofoperation undertheseconditions, and*SeeSpecialTestExceptions 3.10.2and3.10.3COOKNUCLEARPLANT-UNIT23/41-18AMENDMENT NO.40,}}
| | POWER OPERATION may then continue provided that: a)A reevaluation of each accident analysis of Table 3'-1 is performed within 5 days;this reevaluation shall confirm that the previously analyzed results of these accidents remain valid for the duration of operation under these conditions, and*See Special Test Exceptions 3.10.2 and 3.10.3 COOK NUCLEAR PLANT-UNIT 2 3/4 1-18 AMENDMENT NO.40,}} |
Similar Documents at Cook |
---|
Category:TECHNICAL SPECIFICATIONS
MONTHYEARML17335A5581999-10-12012 October 1999 Proposed Tech Specs Surveilllance Requirement 4.6.2.2.d for Spray Additive Sys to Relocate Details Associated with Acceptance Criteria & Test Parameters to Associated TS Bases ML17335A5611999-10-11011 October 1999 Proposed Tech Specs Pages,Correcting TS Pages Inadvertently Submitted in 990923 Submittal ML17335A5431999-10-0101 October 1999 Proposed Tech Specs Re Containment Recirculation Sump Water Inventory ML17326A1591999-09-23023 September 1999 Proposed Tech Specs Re Movement of SG Sections in Auxiliary Bldg for SG Replacement Project ML17326A1461999-09-17017 September 1999 Proposed Tech Specs Pages for Credit of Rod Cluster Control Assemblies for Cold Leg LBLOCA Subcriticality ML17326A1181999-09-10010 September 1999 Proposed Tech Specs Pages,Revising TS Surveillance Requirement 4.4.7,TS Tables 4.4-3,3.4-1 & TS Surveillance Requirement 4.11.2.2 Re RCS & Gas Storage Tank Sampling ML17326A0941999-08-17017 August 1999 Proposed Tech Specs,Removing voltage-based Repair Criteria, F* Repair Criteria & Sleeving Methodologies from Unit 1 TS & Clarifying Bases Section ML17325B6061999-05-21021 May 1999 Proposed Tech Specs Revising Limitations on Positive Reactivity Additions ML17325B5551999-04-19019 April 1999 Proposed Tech Specs 3/4.8.1.2, Electrical Power Systems & Associated Bases,Providing one-time Extension of 18-month Surveillance Interval for Specific SRs ML17335A3681998-12-0303 December 1998 Proposed Tech Specs,Adding New TS Re Distributed Ignition Sys ML17335A3581998-12-0303 December 1998 Proposed Tech Specs 4.6.5.1, Ice Condenser,Ice Bed & Associated Bases,Reflecting Max Ice Condenser Flow Channel Blockage Assumed in Accident Analyses ML17335A3621998-12-0303 December 1998 Proposed Tech Specs Removing Obsolete Info to Provide Consistency Between Units 1 & 2 to Provide Consistency with Std Tech Specs,To Provide Clarification & to Correct Typos ML17335A3651998-12-0303 December 1998 Proposed Tech Specs 3/4.7.7, Sealed Source Contamination & Associated Bases Addressing Revised Testing Requirements for Fission Detectors ML17335A2651998-10-0808 October 1998 Proposed Tech Specs Changing Containment Sys TS Bases 3/4.6.1.4, Internal Pressure & 3/4.6.1.5, Air Temp. ML17335A2691998-10-0808 October 1998 Proposed Tech Specs 3.4.1.3 Re Reactor Coolant Loop Requirements in Modes 4 & 5 ML17335A2781998-10-0808 October 1998 Proposed Tech Specs Sections 3.3.3.8 & 3.3.3.6,placing Tighter Restrictions on Amount of Time RWST Water Level Instrumentation Can Be Out of Svc Before Compensatory Actions Are Required ML17335A2341998-09-14014 September 1998 Proposed Tech Specs Page 3/4 5-6,revising Runout Limits for SI Pump to 675 Gpm Unless Pump Is Specifically Tested to Higher Flow Rate Not Exceeding 700 Gpm ML17335A1931998-08-28028 August 1998 Proposed Tech Specs Requesting Extension of SG Surveillance TS 4.4.5.3,which TSs Require to Be Performed on 990408,until End of Current Fuel Cycle Currently Scheduled for Mar 2000 ML17334B7031998-03-0303 March 1998 Proposed Tech Specs Pages,Removing Word Immediately from Unit 1 Hydrogen Recombiner Surveillance Requirement 4.6.4.2.b.4 & Revising Unit 1 & 2 TS 3/4.6.4 Bases ML20212A7051997-10-21021 October 1997 Proposed Tech Specs 3/4.6.5 Re Ice Weight & Surveillance Requirement ML17333B0751997-10-0808 October 1997 Proposed Tech Specs 3/4.6.5 & 3/4.5.5 Re Ice Weight & SR ML17333B0451997-09-19019 September 1997 Proposed Tech Specs,Deleting Requirement for Automatic Valve Closure Feature on RHR Sys Suction from RCS ML17333A9851997-08-11011 August 1997 Proposed Tech Specs,Allowing Filling of ECCS Accumulators W/O Declaring ECCS Equipment Inoperable ML17333A9891997-08-11011 August 1997 Proposed Tech Specs,Reflecting Changes for Moderator Temp Coefficient Measurement in Response to RAI ML17335A2121997-08-0101 August 1997 Proposed Tech Specs 4.7.1.2.g Deleting Wording When Secondary Steam Supply Pressure Is Greater than 310 Psig. ML17333A8261997-03-26026 March 1997 Proposed Tech Specs Removing Administrative Controls Related to Quality Assurance Requirements IAW Guidance of Administrative Ltr 95-06 ML17333A8301997-03-26026 March 1997 Proposed Tech Specs Modifying TS 4.7.5.1.e.2 Which Describes Control Room Ventilation Sys Autostart Functions ML17333A8331997-03-26026 March 1997 Proposed Tech Specs Involving Grammatical Correction to Wording of Unit 2 TS 3.4.8,Action a for Modes 1,2 & 3 & Returning Frequency Requirement to TS 4.7.1.2.c & 4.7.1.2.d That Was Inadvertently Deleted in Prior Amend ML20135C3781997-02-24024 February 1997 Revised Proposed Tech Specs Page Re 3/4, Limiting Condition for Operation & Surveillance Requirements ML17333A7161996-12-20020 December 1996 Proposed Tech Specs Change to Allow for Repair of Hybrid Sleeved SG Tubes in Response to RAI ML17333A7151996-12-20020 December 1996 Proposed Tech Specs 3/4.4.10 Re Reactor Coolant Sys ML17333A5161996-07-22022 July 1996 Proposed Tech Specs,Informing Operations Superintendent Will Have to Hold SRO License,Have Held Senior Operator License or Been Certified to Have Senior Operator Knowledge ML17334B5951996-07-11011 July 1996 Proposed Tech Specs,Supporting Operation of Facility at Increased Core Rated Thermal Power of 3,588 Mwt ML17333A4771996-06-19019 June 1996 Proposed Tech Specs Re Voltage Based Repair Criteria for Repair of Westinghouse SG Tubes Affected by Outside Diameter Stress Corrosion Cracking,Per GL 95-05 ML17333A4651996-06-11011 June 1996 Proposed Tech Specs Re Administrative Controls Related to QA ML17333A4221996-04-0808 April 1996 Revised Proposed Ts,Moving TS 4.0.4 Exemption Statement for MSSVs Into Section 4.7.1.1 ML17333A3571996-03-12012 March 1996 Proposed Tech Specs,Removing TSs Re Shutdown & Control Rod Position Indication While in Modes 3,4 & 5 ML17333A3301996-02-29029 February 1996 Proposed Tech Specs Re Boric Acid Storage Sys Boron Concentration ML17333A3231996-02-26026 February 1996 Proposed TS 5.6.2 Re Increase in Max Nominal Fuel Assembly Enrichment Limit,Taking Credit for Use of Integral Fuel Burnable Absorber Matl ML17333A3221996-02-22022 February 1996 Proposed Tech Specs,Proposing to Remove Requirement That Operations Superintendent Must Hold or Have Held Sol at Plant or Similar Reactor ML17333A3171996-02-22022 February 1996 Proposed Tech Specs,Modifying Table 4.8-1,DG Test Schedule by Ref Rg 1.9,Rev 3 Rather than Rg 1.108,Rev 1 Criteria for Determination of Valid DG Test ML17333A3121996-02-16016 February 1996 Proposed Tech Specs Section 3.6.1.6,removing Words Structure & Steel Liner to Be Consistent W/Unit 2 Containment Sys Wording ML17333A2671996-01-12012 January 1996 Proposed Tech Specs,Modifying TS Section 4.4.11 to Eliminate SR Demonstrating Operability of Emergency Power Supply for Pressurizer PORVs & Block Valves ML17333A2411995-12-19019 December 1995 Proposed Tech Specs 3/4.6.1.2,3/4.6.1.3,3/4.6/1/6 & 3/4.6.1.7,replacing Option a Scheduling Requirements for Types A,B & C Tests (Overall Integrated & Local Containment Leakage Rate) W/Requirement Per 10CFR50 App J Option B ML17332B0131995-11-10010 November 1995 Proposed Tech Specs Modifying Surveillance Testing of EDG During Refueling & Normal Operations ML17332A9991995-10-20020 October 1995 Proposed Tech Specs Adding Exemption to TS 4.0.4 in SR for MSIV ML17332A9151995-08-0808 August 1995 Proposed Tech Specs Re Deletion of Component Cyclic or Transient Limit Table ML17332A8751995-08-0404 August 1995 Proposed Tech Specs for Repair of Hybrid Expansion Joint Sleeved SG Tubes ML17332A8291995-06-30030 June 1995 Proposed Tech Specs Re Fuel Reconstitution,Per GL 90-02 ML17332A8111995-06-20020 June 1995 Proposed Tech Specs Removing Fire Protection Systems from Licenses 1999-09-23
[Table view] Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML17335A5581999-10-12012 October 1999 Proposed Tech Specs Surveilllance Requirement 4.6.2.2.d for Spray Additive Sys to Relocate Details Associated with Acceptance Criteria & Test Parameters to Associated TS Bases ML17335A5611999-10-11011 October 1999 Proposed Tech Specs Pages,Correcting TS Pages Inadvertently Submitted in 990923 Submittal ML17335A5431999-10-0101 October 1999 Proposed Tech Specs Re Containment Recirculation Sump Water Inventory ML17326A1591999-09-23023 September 1999 Proposed Tech Specs Re Movement of SG Sections in Auxiliary Bldg for SG Replacement Project ML17326A1461999-09-17017 September 1999 Proposed Tech Specs Pages for Credit of Rod Cluster Control Assemblies for Cold Leg LBLOCA Subcriticality ML17326A1181999-09-10010 September 1999 Proposed Tech Specs Pages,Revising TS Surveillance Requirement 4.4.7,TS Tables 4.4-3,3.4-1 & TS Surveillance Requirement 4.11.2.2 Re RCS & Gas Storage Tank Sampling ML17326A0941999-08-17017 August 1999 Proposed Tech Specs,Removing voltage-based Repair Criteria, F* Repair Criteria & Sleeving Methodologies from Unit 1 TS & Clarifying Bases Section ML17326A1471999-05-28028 May 1999 Non-proprietary Version of Control Rod Insertion Following Cold Leg LBLOCA at DC Cook,Units 1 & 2. ML17325B6061999-05-21021 May 1999 Proposed Tech Specs Revising Limitations on Positive Reactivity Additions ML17325B5891999-05-0707 May 1999 Rev 5 to PMP 7200.RST.004, Expanded Sys Readiness Review Program. ML17325B5901999-05-0707 May 1999 Rev 1 to PMP 7200.RST.006, Expanded Sys Readiness Review Program for Level 2 Sys. ML17325B5551999-04-19019 April 1999 Proposed Tech Specs 3/4.8.1.2, Electrical Power Systems & Associated Bases,Providing one-time Extension of 18-month Surveillance Interval for Specific SRs ML17325B4671999-03-0303 March 1999 Rev 5 to Cook Nuclear Plant Restart Plan. ML17335A3581998-12-0303 December 1998 Proposed Tech Specs 4.6.5.1, Ice Condenser,Ice Bed & Associated Bases,Reflecting Max Ice Condenser Flow Channel Blockage Assumed in Accident Analyses ML17335A3681998-12-0303 December 1998 Proposed Tech Specs,Adding New TS Re Distributed Ignition Sys ML17335A3651998-12-0303 December 1998 Proposed Tech Specs 3/4.7.7, Sealed Source Contamination & Associated Bases Addressing Revised Testing Requirements for Fission Detectors ML17335A3621998-12-0303 December 1998 Proposed Tech Specs Removing Obsolete Info to Provide Consistency Between Units 1 & 2 to Provide Consistency with Std Tech Specs,To Provide Clarification & to Correct Typos ML17325B4431998-11-0202 November 1998 Rev 4 to Cook Nuclear Plant Restart Plan. with 981216 Ltr ML17335A4071998-11-0202 November 1998 Rev 4 to Cook Nuclear Plant Restart Plan. ML17335A2781998-10-0808 October 1998 Proposed Tech Specs Sections 3.3.3.8 & 3.3.3.6,placing Tighter Restrictions on Amount of Time RWST Water Level Instrumentation Can Be Out of Svc Before Compensatory Actions Are Required ML17335A2691998-10-0808 October 1998 Proposed Tech Specs 3.4.1.3 Re Reactor Coolant Loop Requirements in Modes 4 & 5 ML17335A2651998-10-0808 October 1998 Proposed Tech Specs Changing Containment Sys TS Bases 3/4.6.1.4, Internal Pressure & 3/4.6.1.5, Air Temp. ML17335A2341998-09-14014 September 1998 Proposed Tech Specs Page 3/4 5-6,revising Runout Limits for SI Pump to 675 Gpm Unless Pump Is Specifically Tested to Higher Flow Rate Not Exceeding 700 Gpm ML17335A2301998-09-12012 September 1998 Rev 3 to Cook Nuclear Plant Restart Plan. ML17335A2721998-09-0404 September 1998 Rev 0 to PL-CNSI-98-007, Transportation & Emergency Response Plan for DC Cook Unit 2 SG Project. ML17335A2751998-09-0202 September 1998 Rev 1 to ER-98-012, Evaluation of Dose Rate from U-Tube End of DC Cook SG Lower Assembly. ML17335A1931998-08-28028 August 1998 Proposed Tech Specs Requesting Extension of SG Surveillance TS 4.4.5.3,which TSs Require to Be Performed on 990408,until End of Current Fuel Cycle Currently Scheduled for Mar 2000 ML17335A2731998-08-21021 August 1998 Rev 0 to ST-307, Structural Evaluation of DC Cook Unit 2 Sgla Package. ML17334A7301998-05-0606 May 1998 Rev 2 of Cook Nuclear Plant Restart Plan. ML17325B5271998-04-0707 April 1998 Rev 1 to Cook Nuclear Plant Restart Plan. ML17334B8041998-04-0303 April 1998 Rev 1 to Valve IST Program for DCP Third 10-Yr Interval. ML17325B5261998-03-0707 March 1998 Rev 0 to Cook Nuclear Plant Restart Plan. ML17334B7031998-03-0303 March 1998 Proposed Tech Specs Pages,Removing Word Immediately from Unit 1 Hydrogen Recombiner Surveillance Requirement 4.6.4.2.b.4 & Revising Unit 1 & 2 TS 3/4.6.4 Bases ML20212A7051997-10-21021 October 1997 Proposed Tech Specs 3/4.6.5 Re Ice Weight & Surveillance Requirement ML17333B0751997-10-0808 October 1997 Proposed Tech Specs 3/4.6.5 & 3/4.5.5 Re Ice Weight & SR ML17333B0451997-09-19019 September 1997 Proposed Tech Specs,Deleting Requirement for Automatic Valve Closure Feature on RHR Sys Suction from RCS ML17333A9891997-08-11011 August 1997 Proposed Tech Specs,Reflecting Changes for Moderator Temp Coefficient Measurement in Response to RAI ML17333A9851997-08-11011 August 1997 Proposed Tech Specs,Allowing Filling of ECCS Accumulators W/O Declaring ECCS Equipment Inoperable ML17335A2121997-08-0101 August 1997 Proposed Tech Specs 4.7.1.2.g Deleting Wording When Secondary Steam Supply Pressure Is Greater than 310 Psig. ML17333A8301997-03-26026 March 1997 Proposed Tech Specs Modifying TS 4.7.5.1.e.2 Which Describes Control Room Ventilation Sys Autostart Functions ML17333A8331997-03-26026 March 1997 Proposed Tech Specs Involving Grammatical Correction to Wording of Unit 2 TS 3.4.8,Action a for Modes 1,2 & 3 & Returning Frequency Requirement to TS 4.7.1.2.c & 4.7.1.2.d That Was Inadvertently Deleted in Prior Amend ML17333A8261997-03-26026 March 1997 Proposed Tech Specs Removing Administrative Controls Related to Quality Assurance Requirements IAW Guidance of Administrative Ltr 95-06 ML20135C3781997-02-24024 February 1997 Revised Proposed Tech Specs Page Re 3/4, Limiting Condition for Operation & Surveillance Requirements ML17333A7161996-12-20020 December 1996 Proposed Tech Specs Change to Allow for Repair of Hybrid Sleeved SG Tubes in Response to RAI ML17333A7151996-12-20020 December 1996 Proposed Tech Specs 3/4.4.10 Re Reactor Coolant Sys ML17333A5161996-07-22022 July 1996 Proposed Tech Specs,Informing Operations Superintendent Will Have to Hold SRO License,Have Held Senior Operator License or Been Certified to Have Senior Operator Knowledge ML17334B5951996-07-11011 July 1996 Proposed Tech Specs,Supporting Operation of Facility at Increased Core Rated Thermal Power of 3,588 Mwt ML17333A4771996-06-19019 June 1996 Proposed Tech Specs Re Voltage Based Repair Criteria for Repair of Westinghouse SG Tubes Affected by Outside Diameter Stress Corrosion Cracking,Per GL 95-05 ML17333A4841996-06-11011 June 1996 ISI & Testing. ML17333A4651996-06-11011 June 1996 Proposed Tech Specs Re Administrative Controls Related to QA 1999-09-23
[Table view] |
Text
ATTACHMENT 1 TO AEP:NRC:1182A MARKED-UP TECHNICAL SPECIFICATION PAGES 9502150154 S'50210 PDR ADOCK 05000315 PDR CO 0 OV Coh 0'LI NG COND ON FOR OP.ON~M E'4)~l;rJl wd'(i4~+~ro P'Pg;~~c.lto~Q red m~scJ:r~iam~4 3.1.3.1 All full length (shutdown and control)rods shall be OPERABLE aad-of their group step counter demand position~O.s%0olls~GL&ctc kc'+*~CTEOR: a~With~one or more full length rods inoperable due to being immovable as a result of excessive friction or mechanical interference or known to be untrippable, determine that the SHUTDOWN MARGIN requi.re-ment of Specification 3.1.1.1 is sati.sfied within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and, be in HOT STANDBY'ithin 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.b.C~With more than one full length rod inoperable or misaligned from the+I I be in HOT STANDBY wi.thin 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.~4u Q red mimosa.iiJenync~t~
With one.full length rod inoperable due to causes other than addressed by ACTION a, above, or misaligned from its group step counter demand position by more than+hour either: 2.The affected rod is restored to OPERABLE status within the above alignment requirements,.or 7ff@nrdh PyaER/encl rj~ed~red c r qua(W g5'/,'A7N,puf'gg)SlL
/o>Pg 7jy'Z wilalIn~<<>+
The affected rod i.s declared inoperable and th'e SHUTDOWN MARGIN requirement of Specification 3.1.1.1 is satisfied.
POWER OPERATION may then continue provided that: a)A reevaluation of each accident analysis of Table 3.1-1 is performed within 5 days;this reevaluation shall confirm that the previously analyzed results of these accidents remain valid for the duration of operation under these conditions, and b)The SHUTDOWN MARGIN requirement of Specification 3.1.1.1 is determined at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />, and-"See Special D.C.COOK-UNIT 1 3/4 1-18 r Test Exceptions 3.10.2 and 3.10.4 piers.+o p~g4'-t'7 AMENDMENT NO.g$gg, 12' o for THERMAL POWER less than or equal to 85X of RATED THERMAL POWER, the allowed rod misalignment is~lS steps, and o for THERMAL POWER greater than 85X of RATED THERMAL POWER, the allowed rod misalignment is~12 steps or as determined from Figure 3.1-4.Figure 3.1-4 permits~an allowed rod misalignment from 413 steps (for APL equal to 101X)to~18 steps (for APL greater or equal to 106X)provided the value of R (defined in Figure 3.1-4)is greater than or equal to 1.04.
REACTIVITY CO OL SYSTEMS 3N.1 3 MOVABLE CO OL ASSEMBLIES.
GROUP HEIGHT LIMITING CONDITION FOR OPERATIO~~pl dt pnd'~~d*J i4~fcA M I'o'4"~s w 4'~~o le>4 3.1.3.1 All full length (shutdown and control)rods shall be OPERABLE and demand positiony a5+sto~~.'inc'~~+8~A+~+'PPLICABILITY:
MODES 1+and 2*ACTION'L~With one or more full length rods inoperable due to being immovable as a result of excessive friction or mechanical interference or known to be untrippable, determine that the SHUTDOWN MARGIN require-ment of Specification 3.1.1.1 is satisfied within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and be in HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.b.c~With more than one full length rod inoperable or misaligned from the (be in HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.cJ(o~~~isa.lip~~
~With one full length rod inoperable due to causes other than addressed by ACTION a, above, or.misaligned from its group step counter demand position by more than POWER OPERATION may continue provided that within one J hour either: 2.The affected rod is restore/to OPERABLE status within the above I alignment requirements, or fiVEIV~HL Po&ER k~e/sg Yeku48c(7S ASS 85'/Andes fffEambL~>~EH pw wd-mrs'n/gP~&r6/n5 Ws, The affected rodle.declared dnoperahle and the SHUTDO'drHARGIN o>+e/requirement of Specification 3.1.1.1 is satisfied.
POWER 7're s+, OPERATION may then continue provided that:OV a)A reevaluation of each accident analysis of Table 3.1-1 is performed within 5 days;this reevaluation shall confirm that the previously analyzed results of these accidents rhmain valid for the duration of operation under these conditions, and::See Special b)The SHUTDOWN MARGIN requirement of Specification'3.1.1.1 is determined at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />, and~@~m PACING 9/4-[-lg Test Exceptions 3.10.2 and 3.10.3 D.C.COOK'-UNIT 2 3/4 1-18 AMENDMENT NO.JSp 107
,o for THERMAL POWEB.less than or equal to 85X of RATED THERMAL P04~, the allowed rod misalignment is~18 steps, and o for THERMAL POVER greater than 85X of RATED THERMAL POVER, the allowed rod misalignment is J12 steps or as determined from Figure 3.1-4.Figure 3.1-4 permits~an allowed rod misalignment from~13 steps (for APL equal to 101X)to~18 steps (for APL greater or equal to 106X)provided the value of R (defined in Figure 3.1-4)is greater than or equal to 1.04.
ATTACHMENT 2 TO AEP:NRC:1182A PROPOSED TECHNICAL SPECIFICAITON PAGES REACTIVITY CONTROL SYSTEMS j 3 4.1 3 MOVABLE CONTROL ASSEMBLIES GROUP HEIGHT LIMITING CONDITION FOR OPERATION 3.1.3.1 All full length (shutdown and control)rods shall be OPERABLE with all individual indicated rod positions within the allowed rod misalignment of their group step counter demand position as follows: for THERMAL POWER less than or equal to 85X of RATED THERMAL POWER, the allowed rod misalignment is zl8 steps, and for THERMAL POWER greater than 85X of RATED THERMAL POWER, the allowed rod misalignment is~12 steps or as determined from Figure 3.1-4.Figure 3.1-4 permits an allowed rod misalignment from F13 steps (for APL equal to 101X)to z18 steps (for APL greater or equal to 106X)provided the value of R (defined in Figure 3.1-4)is greater than or equal to 1.04.*ACTION: a.With one or more full length rods inoperable due to being immovable as a result of excessive friction or mechanical interference or known to be untrippable, determine that the SHUTDOWN MARGIN requirement of Specification 3.1.1.1 is satisfied within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and be in HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.b.With more than one full length rod inoperable or misaligned from the group step counter demand position by more than the allowed rod misalignment, be in HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.c.With one full length rod inoperable due to causes other than addressed by ACTION a, above, or misaligned from its group step counter demand position by more than the allowed rod misalignment, POWER OPERATION may continue provided that within one hour either: 1.The affected rod is restored to OPERABLE status within the above alignment requirements, or THERMAL POWER level is reduced to less than or equal to 85X of RATED THERMAL POWER for rod misalignments less than or equal to z18 steps, or 2.The affected rod is declared inoperable and the SHUTDOWN MARGIN requirement of Specification 3.1.1.1 is satisfied.
POWER OPERATION may then continue provided that: a)A reevaluation of each accident analysis of Table 3.1-1 is performed within 5 days;this reevaluation shall confirm that the previously analyzed results of these accidents remain valid for the duration of operation under these conditions, and*See Special Test Exceptions 3.10.2 and 3.10.4 COOK NUCLEAR PLANT-UNIT 1 3/4 1-18 AMENDMENT NO.k5, Q8, IRAN REACTIVITY CONTROL SYSTEMS 3 4.1 3 MOVABLE CONTROL ASSEMBLIES GROUP HEIGHT LIMITING CONDITION FOR OPERATION 3.1.3.1 All full length (shutdown and control)rods shall be OPERABLE with all individual indicated rod positions within the allowed rod misalignment of their group step counter demand position as follows: for THERMAL POWER less than or equal to 85X of RATED THERMAL POWER, the allowed rod misalignment is z18 steps, and for THERMAL POWER greater than 85X of RATED THERMAL POWER, the allowed rod misalignment is~12 steps or as determined from Figure 3.1-4.Figure 3.1-4 permits an allowed rod misalignment from zl3 steps (for APL equal to 101X)to~18 steps (for APL greater or equal to 106%)provided the value of R (defined in Figure 3.1-4)is greater than or equal to 1.04.APPLICABILITY:
MODES 1*and 2*ACTION: a.With one or more full length rods inoperable due to being immovable as a result of excessive friction or mechanical interference or known to be untrippable, determine that the SHUTDOWN MARGIN requirement of Specification 3.1.1.1 is satisfied within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and be in HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.b.With more than one full length rod inoperable or misaligned from the group step counter demand position by more than the allowed rod misalignment, be in HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.c.With one full length rod inoperable due to causes other than addressed by ACTION a, above, or misaligned from its group step counter demand position by more than the allowed rod misalignment, POWER OPERATION may continue provided that within one hour either: 1.The affected rod is restored to OPERABLE status within the above alignment requirements, or THERMAL POWER level is reduced to less than or equal to 85X of RATED THERMAL POWER for rod misalignments less than or equal to z18 steps, or 2.The affected rod is declared inoperable and the SHUTDOWN MARGIN requirement of Specification 3.1.1.1 is satisfied.
POWER OPERATION may then continue provided that: a)A reevaluation of each accident analysis of Table 3'-1 is performed within 5 days;this reevaluation shall confirm that the previously analyzed results of these accidents remain valid for the duration of operation under these conditions, and*See Special Test Exceptions 3.10.2 and 3.10.3 COOK NUCLEAR PLANT-UNIT 2 3/4 1-18 AMENDMENT NO.40,