{{#Wiki_filter:ATTACHMENT | {{#Wiki_filter:ATTACHMENT 2 TO AEP:NRC:1243 CURRENT TECHNICAL SPECIFICATION PAGES WITH CHANGES MARKED 9602260308 960222 PDR ADOCK 05000315 P PDR TABLE 4.8"1 DIESEL GENERATOR TEST SCHEDULE Number of Failures in Last 20 Valid Tests"~TF Less than or equal to 1 Greater than or equal to 2 At least once per 31 days At least once per 7 days"""Cr>ter)q for determining number of fai1ures and numbpr of valid tests shall be in"accordance with Regulatory Position C.2&of Regulatory Guide'I+A,!IS;,R ii f,~h f dfif determined gn a per diesel generator basis.For the purposes of this test schedule, only valid tests conducted after the OL issuance date shall be included in the computation of the"last 20 valid tests.""*This test frequency shall be maintained until seven consecutive failure free demands have been performed and the number of failures in the last 20 valid demands has been reduced to one or less.D.C.COOK" UNIT 1 3/4 8-8 AMENDMENT NO.125 TASLE 4.8"1 DIESEL GENERATOR TEST SCHEDULE Number of Failures in Last 20 Yalid Tests" Test Fre uenc Less than or equal to 1 Greater than or equal to 2 At least once per 31 days At least once per 7 days"" Criteria for determining number of failures and number of valid t'ests shall be in.accordance with Regulatory Position C.2A of Regulatory Guide I'f.~Sf, R i i/,4WWA4%2 h 1 f d f ii determined an a per diesel generator basis.For the purposes of this test schedule, only valid tests conducted after the OL issuance date shhll'be included in the computation of the"last 20 valid tests."""This test frequency shall be maintained until seven consecdtive failure free demands have been performed and the number of failures in the last 20 valid demands has been reduced to one or less.D.C.COOK-UNIT 2 3/4 8-8 AMENDMENT NO.112 ATTACHMENT 3 TO AEP:NRC:1243 PROPOSED TECHNICAL SPECIFICATION PAGES 3/4 LIMITING CONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS 3)4 8 ELECTRICAL POWER SYSTEMS TABLE 4.8-1 DIESEL GENERATOR TEST SCHEDULE Number of Failures in Last 20 Valid Tests Less than or equal to 1 Greater than or equal to 2 Test Fre uenc At least once per 31 days At least once per 7 days Criteria for determining number of failures and valid tests shall be in accordance with Regulatory Position C.2.1 of Regulatory Guide 1.9, Revision 3, where the number of tests and failures is determined on a per diesel generator basis.For the purposes of this test schedule, only valid tests conducted after the OL issuance date shall be included in the computation of the"last 20 valid tests.This test frequency shall be maintained until seven consecutive failure free demands have been performed and the number of failures in the last 20 valid demands has been reduced to one or less.COOK NUCLEAR PLANT-UNIT 1 Page 3/4 8-8 AMENDMENT 43$, | ||
3/ | 3/4 LIMITING CONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS 314;8 ELECTRICAL POWER SYSTEMS TABLE 4.8-1 DIESEL GENERATOR TEST SCHEDULE Number of Failures in Last 20 Valid Tests Less than or equal to 1 Greater than or equal to 2 Test Fre uenc At least once per 31 days At least once per 7 days Criteria for determining number of failures and valid tests shall be in accordance with Regulatory Position C.2.1 of Regulatory Guide 1.9, Revision 3, where the number of tests and failures is determined on a per diesel generator basis.For the purposes of this test schedule, only valid tests conducted after the OL issuance date shall be included in the computation of the"last 20 valid tests." This test frequency shall be maintained until seven consecutive failure free demands have been performed and the number of failures in the last 20 valid demands has been reduced to one or less.COOK NUCLEAR PLANT-UNIT 2 Page 3/4 8-8 AMENDMENT~,}} | ||
~,}} |
Revision as of 06:59, 6 July 2018
ML17333A317 | |
Person / Time | |
---|---|
Site: | Cook |
Issue date: | 02/22/1996 |
From: | INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG |
To: | |
Shared Package | |
ML17333A316 | List: |
References | |
RTR-REGGD-01.009, RTR-REGGD-01.108, RTR-REGGD-1.009, RTR-REGGD-1.108 NUDOCS 9602260308 | |
Download: ML17333A317 (6) | |
Text
ATTACHMENT 2 TO AEP:NRC:1243 CURRENT TECHNICAL SPECIFICATION PAGES WITH CHANGES MARKED 9602260308 960222 PDR ADOCK 05000315 P PDR TABLE 4.8"1 DIESEL GENERATOR TEST SCHEDULE Number of Failures in Last 20 Valid Tests"~TF Less than or equal to 1 Greater than or equal to 2 At least once per 31 days At least once per 7 days"""Cr>ter)q for determining number of fai1ures and numbpr of valid tests shall be in"accordance with Regulatory Position C.2&of Regulatory Guide'I+A,!IS;,R ii f,~h f dfif determined gn a per diesel generator basis.For the purposes of this test schedule, only valid tests conducted after the OL issuance date shall be included in the computation of the"last 20 valid tests.""*This test frequency shall be maintained until seven consecutive failure free demands have been performed and the number of failures in the last 20 valid demands has been reduced to one or less.D.C.COOK" UNIT 1 3/4 8-8 AMENDMENT NO.125 TASLE 4.8"1 DIESEL GENERATOR TEST SCHEDULE Number of Failures in Last 20 Yalid Tests" Test Fre uenc Less than or equal to 1 Greater than or equal to 2 At least once per 31 days At least once per 7 days"" Criteria for determining number of failures and number of valid t'ests shall be in.accordance with Regulatory Position C.2A of Regulatory Guide I'f.~Sf, R i i/,4WWA4%2 h 1 f d f ii determined an a per diesel generator basis.For the purposes of this test schedule, only valid tests conducted after the OL issuance date shhll'be included in the computation of the"last 20 valid tests."""This test frequency shall be maintained until seven consecdtive failure free demands have been performed and the number of failures in the last 20 valid demands has been reduced to one or less.D.C.COOK-UNIT 2 3/4 8-8 AMENDMENT NO.112 ATTACHMENT 3 TO AEP:NRC:1243 PROPOSED TECHNICAL SPECIFICATION PAGES 3/4 LIMITING CONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS 3)4 8 ELECTRICAL POWER SYSTEMS TABLE 4.8-1 DIESEL GENERATOR TEST SCHEDULE Number of Failures in Last 20 Valid Tests Less than or equal to 1 Greater than or equal to 2 Test Fre uenc At least once per 31 days At least once per 7 days Criteria for determining number of failures and valid tests shall be in accordance with Regulatory Position C.2.1 of Regulatory Guide 1.9, Revision 3, where the number of tests and failures is determined on a per diesel generator basis.For the purposes of this test schedule, only valid tests conducted after the OL issuance date shall be included in the computation of the"last 20 valid tests.This test frequency shall be maintained until seven consecutive failure free demands have been performed and the number of failures in the last 20 valid demands has been reduced to one or less.COOK NUCLEAR PLANT-UNIT 1 Page 3/4 8-8 AMENDMENT 43$,
3/4 LIMITING CONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS 314;8 ELECTRICAL POWER SYSTEMS TABLE 4.8-1 DIESEL GENERATOR TEST SCHEDULE Number of Failures in Last 20 Valid Tests Less than or equal to 1 Greater than or equal to 2 Test Fre uenc At least once per 31 days At least once per 7 days Criteria for determining number of failures and valid tests shall be in accordance with Regulatory Position C.2.1 of Regulatory Guide 1.9, Revision 3, where the number of tests and failures is determined on a per diesel generator basis.For the purposes of this test schedule, only valid tests conducted after the OL issuance date shall be included in the computation of the"last 20 valid tests." This test frequency shall be maintained until seven consecutive failure free demands have been performed and the number of failures in the last 20 valid demands has been reduced to one or less.COOK NUCLEAR PLANT-UNIT 2 Page 3/4 8-8 AMENDMENT~,