{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303
[[Issue date::March 4, 2015]]
-1257 March 4, 2015 Mr. David R. Vineyard Vice President Southern Nuclear Operating Company, In Edwin I. Hatch Nuclear Plant 11028 Hatch Parkway North Baxley, GA 31513


Mr. David Vice President Southern Nuclear Operating Company, Inc. Edwin I. Hatch Nuclear Plant 11028 Hatch Parkway North Baxley, GA 31513
SUBJECT: ANNUAL ASSESSMENT LETTER FOR EDWIN I. HATCH NUCLEAR PLANT UNIT 1 AND UNIT 2 (NRC INSPECTION REPORT 05000321/201 4001 AND 05000366/2014001) Dear Mr. Vineyard
: On February 1 2, 2015, the NRC completed its end
-of-cycle performance review of Edwin I. Hatch Nuclear Plant Units 1 and The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from January 1, 201 4 through December 31, 201 This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections at your facilit The NRC determined that overall, Hatch Units 1 and 2 operated in a manner that preserved public health and safety and met all cornerstone objective The NRC determined the performance at Hatch Unit 1 and Unit 2 during the most recent quarter was within the Licensee Response Column of the NRC's Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low safety significance (i.e., Green), and all PIs indicated that your performance was within the nominal, expected range (i.e.,
Green). Therefore, the NRC plans to conduct ROP baseline inspections at your facilit The enclosed inspection plan lists the inspections scheduled through June 30, 201 Routine inspections performed by resident inspectors are not included in the inspection pla In addition to baseline inspections, the NRC will conduct reactor operator initial licensing examination The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the mid
-cycle performance revie The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issue The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any change This inspection plan does not include security related inspections which will be sent via separate, non
-publicly available correspondenc Additionally, an NRC audit of licensee efforts towards compliance with Order EA
-12-049, "Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond
-Design-Basis External Events," and Order EA
-12-051, "Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation" is ongoing for various site The audit includes an onsite visit for the NRC staff to evaluate mitigating strategies as described in the licensee D. Vineyard 2 submittals and to receive and review information relative to associated open item This onsite audit will occur prior to the first unit at the site achieving compliance with the Orders and the audit will aid NRC staff in developing a final Safety Evaluation for the sit The audit at your site will occur in the Fall of 2015
. A site-specific audit plan for the visit will be provided in advance to allow sufficient time for preparation In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading
-rm/adams.html (the Public Electronic Reading Room).


SUBJECT: ANNUAL ASSESSMENT LETTER FOR EDWIN I. HATCH NUCLEAR PLANT UNIT 1 AND UNIT 2 (NRC INSPECTION REPORT 05000321/2014001 AND 05000366/2014001)
Please contact me at 404
-997-4482 with any questions you have regarding this lette


==Dear Mr. Vineyard:==
Sincerely,/RA/ Joseph Austin
On February 12, 2015, the NRC completed its end-of-cycle performance review of Edwin I. Hatch Nuclear Plant Units 1 and 2. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from January 1, 2014 through December 31, 2014. This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections at your facility. The NRC determined that overall, Hatch Units 1 and 2 operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at Hatch Unit 1 and Unit 2 during the most recent quarter was within the Licensee Response Column of the NRC's Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low safety significance (i.e., Green), and all PIs indicated that your performance was within the nominal, expected range (i.e., Green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility. The enclosed inspection plan lists the inspections scheduled through June 30, 2016. Routine inspections performed by resident inspectors are not included in the inspection plan. In addition to baseline inspections, the NRC will conduct reactor operator initial licensing examinations. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the mid-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections which will be sent via separate, non-publicly available correspondence.
, Acting Chief Reactor Projects Branch 2 Division of Reactor Projects Docket Nos.:
 
50-321, 50-366 License Nos.: NPF
Additionally, an NRC audit of licensee efforts towards compliance with Order EA-12-049, "Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events," and Order EA-12-051, "Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation" is ongoing for various sites. The audit includes an onsite visit for the NRC staff to evaluate mitigating strategies as described in the licensee submittals and to receive and review information relative to associated open items. This onsite audit will occur prior to the first unit at the site achieving compliance with the Orders and the audit will aid NRC staff in developing a final Safety Evaluation for the site. The audit at your site will occur in the Fall of 2015. A site-specific audit plan for the visit will be provided in advance to allow sufficient time for preparations.
-57, NPF-5  
 
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
 
Please contact me at 404-997-4482 with any questions you have regarding this letter.
 
Sincerely,/RA/ Joseph Austin, Acting Chief Reactor Projects Branch 2 Division of Reactor Projects Docket Nos.: 50-321, 50-366 License Nos.: NPF-57, NPF-5  


===Enclosure:===
===Enclosure:===
Hatch Inspection/Activity Plan (03/01/2015 - 06/30/2016) cc Distribution via ListServ  
Hatch Inspection/Activity Plan (03/01/2015  
 
- 06/30/2016)
_____________________ SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRP RII:DRP SIGNATURE /RA By CWR1/ /RA By JDA/ NAME C. Rapp J. Austin . DATE 3/4/2015 3/4/2015 E-MAIL COPY? YES NO YES NO Page 1 of 203/04/201509:40:34Report 22UnitNumberPlanned DatesStart EndInspection ActivityTitleNo. of Staffon SiteHatchInspection / Activity Plan03/01/2015-06/30/2016ASM EP-2015 EP ASM & RES BASELINE31,2 IPDrill Evaluation711140601/01/201512/31/2015OL EXAM-INITIAL LICENSE EXAM31 HATCH/MARCH 2015 INITIAL EXAM AT POWER FACILITIESV2342603/23/201504/03/2015CDBI-COMPONENT DESIGN BASES INSPECTION71,2 IPComponent Design Bases Inspection711112108/31/201509/04/20151,2 IPComponent Design Bases Inspection711112109/21/201509/25/20151,2 IPComponent Design Bases Inspection711112110/05/201510/09/20151,2 IPComponent Design Bases Inspection711112110/19/201510/23/2015PI&R-PROBLEM IDENTIFICATION AND RESOLUTION41,2 IPProblem Identification and Resolution71152B11/16/201511/20/20151,2 IPProblem Identification and Resolution71152B12/07/201512/11/2015EP-EP EXERCISE81,2 IPExercise Evaluation711140112/07/201512/11/20151,2 IPEmergency Action Level and Emergency Plan Changes711140412/07/201512/11/20151,2 IPPerformance Indicator Verification7115112/07/201512/11/2015ASM EP-2016 EP ASM & RES BASELINE31,2 IPDrill Evaluation711140601/01/201612/31/2016RP-RAD HAZARDS AND TRANSPORTATION21,2 IPRadiological Hazard Assessment and Exposure Controls71124.0102/08/201602/12/20161,2 IPRadioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation71124.0802/08/201602/12/2016ISI-UNIT 1 IN-SERVICE INSPECTION11 IPInservice Inspection Activities - BWR7111108G02/29/201603/04/2016TFPI-TRIENNIAL FIRE PROTECTION INSPECTION41,2 IPFire Protection [Triennial]7111105T04/04/201604/08/20161,2 IPFire Protection [Triennial]7111105T04/18/201604/22/2016HS-TRIENNIAL HEAT SINK PERFORMANCE11,2 IPHeat Sink Performance7111107T05/16/201605/20/2016RP-RP PUBLIC RAD SAFETY BASELINE21,2 IPRadioactive Gaseous and Liquid Effluent Treatment71124.0605/16/201605/20/20161,2 IPRadiological Environmental Monitoring Program71124.0705/16/201605/20/20161,2 IPPerformance Indicator Verification7115105/16/201605/20/2016This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.
cc Distribution via ListServ


Page 2 of 203/04/201509:40:34Report 22UnitNumberPlanned DatesStart EndInspection ActivityTitleNo. of Staffon SiteHatchInspection / Activity Plan03/01/2015-06/30/2016OL EXAM-INITIAL LICENSE EXAM PREP31 HATCH JUNE 2016 INITIAL EXAM AT POWER FACILITIESV2347305/23/201605/27/2016MODS-PLANT MODIFICATIONS INSPECTION31,2 IPEvaluations of Changes, Tests, and Experiments and Permanent Plant Modifications7111117T06/06/201606/10/20161,2 IPEvaluations of Changes, Tests, and Experiments and Permanent Plant Modifications7111117T06/20/201606/24/2016OL EXAM-INITIAL LICENSE EXAM31 HATCH JUNE 2016 INITIAL EXAM AT POWER FACILITIESV2347306/20/201607/01/2016This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.
_____________________
SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRP RII:DRP SIGNATURE
/RA By CWR1/
/RA By JDA/
NAME C. Rapp J. Austin . DATE 3/4/2015 3/4/2015 E-MAIL COPY?
YES NO YES NO Page 1 of 2 03/04/2015 09:40:34Report 22 UnitNumberPlanned Dates Start EndInspection ActivityTitleNo. of Staff on SiteHatchInspection / Activity Plan 03/01/2015
-06/30/2016ASM EP-2015 EP ASM & RES BASELINE 31,2 IPDrill Evaluation711140601/01/2015 12/31/2015OL EXAM-INITIAL LICENSE EXAM 31 HATCH/MARCH 2015 INITIAL EXAM AT POWER FACILITIES V2342603/23/2015 04/03/2015 CDBI-COMPONENT DESIGN BASES INSPECTION 71,2 IPComponent Design Bases Inspection711112108/31/2015 09/04/2015 1,2 IPComponent Design Bases Inspection711112109/21/2015 09/25/2015 1,2 IPComponent Design Bases Inspection711112110/05/2015 10/09/2015 1,2 IPComponent Design Bases Inspection711112110/19/2015 10/23/2015 PI&R-PROBLEM IDENTIFICATION AND RESOLUTION 41,2 IPProblem Identification and Resolution71152B11/16/201511/20/2015 1,2 IPProblem Identification and Resolution71152B12/07/201512/11/2015 EP-EP EXERCISE 81,2 IPExercise Evaluation711140112/07/201512/11/2015 1,2 IPEmergency Action Level and Emergency Plan Changes711140412/07/201512/11/2015 1,2 IPPerformance Indicator Verification7115112/07/201512/11/2015ASM EP-2016 EP ASM & RES BASELINE 31,2 IPDrill Evaluation711140601/01/2016 12/31/2016 RP-RAD HAZARDS AND TRANSPORTATION 21,2 IPRadiological Hazard Assessment and Exposure Controls71124.0102/08/2016 02/12/2016 1,2 IPRadioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation71124.0802/08/2016 02/12/2016 ISI-UNIT 1 IN-SERVICE INSPECTION 11 IPInservice Inspection Activities - BWR7111108G02/29/2016 03/04/2016 TFPI-TRIENNIAL FIRE PROTECTION INSPECTION 41,2 IPFire Protection [Triennial]7111105T04/04/2016 04/08/2016 1,2 IPFire Protection [Triennial]7111105T04/18/2016 04/22/2016 HS-TRIENNIAL HEAT SINK PERFORMANCE 11,2 IPHeat Sink Performance7111107T05/16/2016 05/20/2016 RP-RP PUBLIC RAD SAFETY BASELINE 21,2 IPRadioactive Gaseous and Liquid Effluent Treatment71124.0605/16/2016 05/20/2016 1,2 IPRadiological Environmental Monitoring Program71124.0705/16/2016 05/20/2016 1,2 IPPerformance Indicator Verification7115105/16/2016 05/20/2016 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedure Page 2 of 2 03/04/2015 09:40:34Report 22 UnitNumberPlanned Dates Start EndInspection ActivityTitleNo. of Staff on SiteHatchInspection / Activity Plan 03/01/2015
-06/30/2016OL EXAM-INITIAL LICENSE EXAM PREP 31 HATCH JUNE 2016 INITIAL EXAM AT POWER FACILITIES V2347305/23/2016 05/27/2016 MODS-PLANT MODIFICATIONS INSPECTION 31,2 IPEvaluations of Changes, Tests, and Experiments and Permanent Plant Modifications7111117T06/06/2016 06/10/2016 1,2 IPEvaluations of Changes, Tests, and Experiments and Permanent Plant Modifications7111117T06/20/2016 06/24/2016OL EXAM-INITIAL LICENSE EXAM 31 HATCH JUNE 2016 INITIAL EXAM AT POWER FACILITIES V2347306/20/2016 07/01/2016 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.
}}
}}

Revision as of 04:26, 1 July 2018

Annual Assessment Letter for Edwin I. Hatch Nuclear Plant Unit 1 and Unit 2 (NRC Inspection Report 05000321/2014001 and 05000366/2014001)
ML15063A573
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 03/04/2015
From: Austin J D
NRC/RGN-II/DRP/RPB4
To: Vineyard D R
Southern Nuclear Operating Co
References
IR 2014001
Download: ML15063A573 (5)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303

-1257 March 4, 2015 Mr. David R. Vineyard Vice President Southern Nuclear Operating Company, In Edwin I. Hatch Nuclear Plant 11028 Hatch Parkway North Baxley, GA 31513

SUBJECT: ANNUAL ASSESSMENT LETTER FOR EDWIN I. HATCH NUCLEAR PLANT UNIT 1 AND UNIT 2 (NRC INSPECTION REPORT 05000321/201 4001 AND 05000366/2014001) Dear Mr. Vineyard

On February 1 2, 2015, the NRC completed its end

-of-cycle performance review of Edwin I. Hatch Nuclear Plant Units 1 and The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from January 1, 201 4 through December 31, 201 This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections at your facilit The NRC determined that overall, Hatch Units 1 and 2 operated in a manner that preserved public health and safety and met all cornerstone objective The NRC determined the performance at Hatch Unit 1 and Unit 2 during the most recent quarter was within the Licensee Response Column of the NRC's Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low safety significance (i.e., Green), and all PIs indicated that your performance was within the nominal, expected range (i.e.,

Green). Therefore, the NRC plans to conduct ROP baseline inspections at your facilit The enclosed inspection plan lists the inspections scheduled through June 30, 201 Routine inspections performed by resident inspectors are not included in the inspection pla In addition to baseline inspections, the NRC will conduct reactor operator initial licensing examination The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the mid

-cycle performance revie The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issue The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any change This inspection plan does not include security related inspections which will be sent via separate, non

-publicly available correspondenc Additionally, an NRC audit of licensee efforts towards compliance with Order EA

-12-049, "Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond

-Design-Basis External Events," and Order EA

-12-051, "Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation" is ongoing for various site The audit includes an onsite visit for the NRC staff to evaluate mitigating strategies as described in the licensee D. Vineyard 2 submittals and to receive and review information relative to associated open item This onsite audit will occur prior to the first unit at the site achieving compliance with the Orders and the audit will aid NRC staff in developing a final Safety Evaluation for the sit The audit at your site will occur in the Fall of 2015

. A site-specific audit plan for the visit will be provided in advance to allow sufficient time for preparation In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading

-rm/adams.html (the Public Electronic Reading Room).

Please contact me at 404

-997-4482 with any questions you have regarding this lette

Sincerely,/RA/ Joseph Austin

, Acting Chief Reactor Projects Branch 2 Division of Reactor Projects Docket Nos.:

50-321, 50-366 License Nos.: NPF

-57, NPF-5

Enclosure:

Hatch Inspection/Activity Plan (03/01/2015

- 06/30/2016)

cc Distribution via ListServ

_____________________

SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRP RII:DRP SIGNATURE

/RA By CWR1/

/RA By JDA/

NAME C. Rapp J. Austin . DATE 3/4/2015 3/4/2015 E-MAIL COPY?

YES NO YES NO Page 1 of 2 03/04/2015 09:40:34Report 22 UnitNumberPlanned Dates Start EndInspection ActivityTitleNo. of Staff on SiteHatchInspection / Activity Plan 03/01/2015

-06/30/2016ASM EP-2015 EP ASM & RES BASELINE 31,2 IPDrill Evaluation711140601/01/2015 12/31/2015OL EXAM-INITIAL LICENSE EXAM 31 HATCH/MARCH 2015 INITIAL EXAM AT POWER FACILITIES V2342603/23/2015 04/03/2015 CDBI-COMPONENT DESIGN BASES INSPECTION 71,2 IPComponent Design Bases Inspection711112108/31/2015 09/04/2015 1,2 IPComponent Design Bases Inspection711112109/21/2015 09/25/2015 1,2 IPComponent Design Bases Inspection711112110/05/2015 10/09/2015 1,2 IPComponent Design Bases Inspection711112110/19/2015 10/23/2015 PI&R-PROBLEM IDENTIFICATION AND RESOLUTION 41,2 IPProblem Identification and Resolution71152B11/16/201511/20/2015 1,2 IPProblem Identification and Resolution71152B12/07/201512/11/2015 EP-EP EXERCISE 81,2 IPExercise Evaluation711140112/07/201512/11/2015 1,2 IPEmergency Action Level and Emergency Plan Changes711140412/07/201512/11/2015 1,2 IPPerformance Indicator Verification7115112/07/201512/11/2015ASM EP-2016 EP ASM & RES BASELINE 31,2 IPDrill Evaluation711140601/01/2016 12/31/2016 RP-RAD HAZARDS AND TRANSPORTATION 21,2 IPRadiological Hazard Assessment and Exposure Controls71124.0102/08/2016 02/12/2016 1,2 IPRadioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation71124.0802/08/2016 02/12/2016 ISI-UNIT 1 IN-SERVICE INSPECTION 11 IPInservice Inspection Activities - BWR7111108G02/29/2016 03/04/2016 TFPI-TRIENNIAL FIRE PROTECTION INSPECTION 41,2 IPFire Protection [Triennial]7111105T04/04/2016 04/08/2016 1,2 IPFire Protection [Triennial]7111105T04/18/2016 04/22/2016 HS-TRIENNIAL HEAT SINK PERFORMANCE 11,2 IPHeat Sink Performance7111107T05/16/2016 05/20/2016 RP-RP PUBLIC RAD SAFETY BASELINE 21,2 IPRadioactive Gaseous and Liquid Effluent Treatment71124.0605/16/2016 05/20/2016 1,2 IPRadiological Environmental Monitoring Program71124.0705/16/2016 05/20/2016 1,2 IPPerformance Indicator Verification7115105/16/2016 05/20/2016 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedure Page 2 of 2 03/04/2015 09:40:34Report 22 UnitNumberPlanned Dates Start EndInspection ActivityTitleNo. of Staff on SiteHatchInspection / Activity Plan 03/01/2015

-06/30/2016OL EXAM-INITIAL LICENSE EXAM PREP 31 HATCH JUNE 2016 INITIAL EXAM AT POWER FACILITIES V2347305/23/2016 05/27/2016 MODS-PLANT MODIFICATIONS INSPECTION 31,2 IPEvaluations of Changes, Tests, and Experiments and Permanent Plant Modifications7111117T06/06/2016 06/10/2016 1,2 IPEvaluations of Changes, Tests, and Experiments and Permanent Plant Modifications7111117T06/20/2016 06/24/2016OL EXAM-INITIAL LICENSE EXAM 31 HATCH JUNE 2016 INITIAL EXAM AT POWER FACILITIES V2347306/20/2016 07/01/2016 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.