IR 05000321/2014403

From kanterella
Jump to navigation Jump to search
IR 05000321-14-403, 05000366-14-406, 04/10/2014, Edwin I. Hatch Nuclaer Plant - NRC Security
ML14132A026
Person / Time
Site: Hatch  
Issue date: 05/09/2014
From: Binoy Desai
NRC/RGN-II/DRS/PSB2
To: Vineyard D
Southern Nuclear Operating Co
Linda K. Gruhler 404-997-4633
References
IR-14-403
Download: ML14132A026 (4)


Text

May 9, 2014

SUBJECT:

EDWIN I. HATCH NUCLEAR PLANT - NRC SECURITY INSPECTION REPORT 05000321/2014403 AND 05000366/2014403

Dear Mr. Vineyard:

On April 10, 2014, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Plant Hatch. The inspection covered one or more of the key attributes of the security cornerstone of the NRCs Reactor Oversight Process. Portions of the inspection associated with Access Authorization, Protection of Safeguards Information, and Fitness for Duty were completed at the Southern Nuclear Companys (SNC) Corporate Office on March 21, 2014. The enclosed inspection report documents the inspection results that were discussed on April 10, 2014, with Mr. Greg Johnson and other members of your staff.

The inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations, and with the conditions of your license. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.

There were no findings identified during this inspection

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public inspections, exemptions, requests for withholdings, of the NRC's Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room, or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, the material enclosed herein contains Security-Related Information in accordance with 10 CFR 2.390(d)(1), and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the Enclosure will not be made available electronically for public inspection in the NRC Public Document Room, or from the PARS component of NRCs ADAMS. If you choose to provide a response and Security-Related Information is necessary to provide an acceptable response, please mark your entire response Security-Related Information - Withhold from public disclosure under 10 CFR 2.390, in accordance with 10 CFR 2.390(d)(1), and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.

Sincerely,

/RA/

Binoy B. Desai, Chief Plant Support Branch 2 Division of Reactor Safety

Docket Nos. 50-321 and 50-366 License Nos. NPF-5 and DPR-57

Enclosure:

IR 05000321/2014403 and 05000366/2014403 w/Attachment: Supplementary Information (OUO)

cc: (See page 3)

ML14132A026

SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRS/PSB2 RII:DRS/PSB2 RII:DRS/PSB2 RII:DRS/PSB2 RII:DRP/BR2 RII:DRS/PSB2

SIGNATURE RLP5 RLP5 for JOB2 ICH JHW2 AXA1 for FJE BBD

NAME R. Patterson J. Brown I. Hall J. Wallo F. Ehrhardt B. Desai

DATE 5/ 9 /2014 5/ 9 /2014 5/ 7 /2014 5/ 7 /2014 5/ 9 /2014 5/ 9 /2014

E-MAIL COPY YES NO YES NO YES NO YES NO YES NO YES NO cc:

Jonathan M. Merritt Security Manager - Nuclear Southern Nuclear Operating Company, Inc.

Edwin I. Hatch Nuclear Plant 11028 Hatch Parkway North Baxley, GA 31513

Stephen P. McGavin Southern Nuclear Operating Co., Inc.

40 Inverness Center Parkway Bin B-042 Birmingham, AL 35242

David P. Burford Fleet Cyber Security Manager Southern Nuclear Operating Co., Inc.

40 Inverness Center Parkway Bin B-042 Birmingham, AL 35242

Ms. Lisa B. Hogg Southern Nuclear Operating Co., Inc.

40 Inverness Center Parkway Birmingham, AL 35242