{{#Wiki_filter:UNITED NUCLEAR REGULATORY WASHINGTON, D.C. 20555*0001 April 23, 2013 Mr. Dennis President and CEO/CNO STP Nuclear Operating Company South Texas Project P.O. Box 289 VVadsworth, TX 77483 SOUTH TEXAS PROJECT, UNIT 2 -VVITHDRAVVAL OF RELIEF REQUEST RR-ENG-3-12 (TAC NO. MF0644) | {{#Wiki_filter:UNITED NUCLEAR REGULATORY WASHINGTON, D.C. 20555*0001 April 23, 2013 Mr. Dennis L. Koehl President and CEO/CNO STP Nuclear Operating Company South Texas Project P.O. Box 289 VVadsworth, TX 77483 SOUTH TEXAS PROJECT, UNIT 2 -VVITHDRAVVAL OF RELIEF REQUEST RR-ENG-3-12 (TAC NO. MF0644) Dear Mr. Koehl: By letter dated February 7,2013 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML 13045A479), STP Nuclear Operating Company (STPNOC) applied for relief request RR-ENG-3-12 for South Texas Project (STP), Unit 2. STPNOC requested relief from American Society of Mechanical Engineers Boiler and Pressure Vessel Code requirements for periodic inspections of reactor coolant pressure boundary check valves with seal cap enclosures. Subsequently, by letter dated February 28, 2013 (ADAMS Accession No. ML 130720527), STPNOC withdrew the relief request. The purpose of this letter is to advise that the above-cited application is being treated as withdrawn. The U.S. Nuclear Regulatory Commission staff activities on the review have ceased and the associated Technical Control number has been closed. If you have any questions, please contact me at 301-415-3016 or via e-mail at Balwant. singa I@nrc.gov. Sincerely, Balwant K. Singal, Senior Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-499 cc: Distribution via Listserv April 23, 2013 Mr. Dennis L. Koehl President and CEO/CNO STP Nuclear Operating Company South Texas Project P.O. Box 289 VVadsworth, TX 77483 SOUTH TEXAS PROJECT, UNIT 2 -VVITHDRAVVAL OF RELIEF REQUEST RR-ENG-3-12 (TAC NO. MF0644) Dear Mr. Koehl: By letter dated February 7, 2013 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML13045A479), STP Nuclear Operating Company (STPNOC) applied for relief request RR-ENG-3-12 for South Texas Project (STP), Unit 2. STPNOC requested relief from American Society of Mechanical Engineers Boiler and Pressure Vessel Code requirements for periodic inspections of reactor coolant pressure boundary check valves with seal cap enclosures. Subsequently, by letter dated February 28,2013 (ADAMS Accession No. ML 130720527), STPNOC withdrew the relief request. The purpose of this letter is to advise that the above-cited application is being treated as withdrawn. The U.S. Nuclear Regulatory Commission staff activities on the review have ceased and the associated Technical Control number has been closed. If you have any questions, please contact me at 301-415-3016 or via e-mail at Balwant.singal@nrc.gov. Docket No. 50-499 cc: Distribution via Listserv DISTRIBUTION: PUBLIC LPLIV Reading RidsAcrsAcnw_MailCTR Resource RidsNrrDorlLpl4 Resource ADAMS Accession No. ML13102A126 Sincerely, IRA! Balwant K. Singal, Senior Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation RidsNrrLAJBurkhardt Resource RidsNrrPMSouth Texas Resource RidsRgn4MailCenter Resource DAiley, NRRlDE/EPNB OFFICE NRRlDORULPL4/PM NRRlDORULPL4/LA NRRlDORULPL4/BC NRRlDORULPL4/PM NAME BSingal JBurkhardt MMarkley BSingal DATE 4/12113 4/12/13 4/23/13 4/23/13 OFFICIAL RECORD | ||
}} | |||
By letter dated February 7,2013 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML 13045A479), STP Nuclear Operating Company (STPNOC) applied for relief request RR-ENG-3-12 for South Texas Project (STP), Unit 2. STPNOC requested relief from American Society of Mechanical Engineers Boiler and Pressure Vessel Code requirements for periodic inspections of reactor coolant pressure boundary check valves with seal cap enclosures. Subsequently, by letter dated February 28, 2013 (ADAMS Accession No. ML 130720527), STPNOC withdrew the relief request. The purpose of this letter is to advise that the above-cited application is being treated as withdrawn. The U.S. Nuclear Regulatory Commission staff activities on the review have ceased and the associated Technical Control number has been closed. If you have any questions, please contact me at 301-415-3016 or via e-mail at Balwant. singa I@nrc.gov. | |||
Sincerely,Balwant K. Singal, Senior Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-499 cc: Distribution via Listserv April 23, 2013 Mr. Dennis President and CEO/CNO STP Nuclear Operating Company South Texas Project P.O. Box 289 VVadsworth, TX 77483 SOUTH TEXAS PROJECT, UNIT 2 -VVITHDRAVVAL OF RELIEF REQUEST RR-ENG-3-12 (TAC NO. MF0644) | |||
By letter dated February 7, 2013 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML13045A479), STP Nuclear Operating Company (STPNOC) applied for relief request RR-ENG-3-12 for South Texas Project (STP), Unit 2. STPNOC requested relief from American Society of Mechanical Engineers Boiler and Pressure Vessel Code requirements for periodic inspections of reactor coolant pressure boundary check valves with seal cap enclosures. Subsequently, by letter dated February 28,2013 (ADAMS Accession No. ML 130720527), STPNOC withdrew the relief request. The purpose of this letter is to advise that the above-cited application is being treated as withdrawn. The U.S. Nuclear Regulatory Commission staff activities on the review have ceased and the associated Technical Control number has been closed. If you have any questions, please contact me at 301-415-3016 or via e-mail at Balwant.singal@nrc.gov. Docket No. 50-499 cc: Distribution via Listserv DISTRIBUTION: PUBLIC LPLIV Reading RidsAcrsAcnw_MailCTR Resource RidsNrrDorlLpl4 Resource ADAMS Accession No. ML13102A126 | |||
Sincerely,IRA! Balwant K. Singal, Senior Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation RidsNrrLAJBurkhardt Resource RidsNrrPMSouth Texas Resource RidsRgn4MailCenter Resource DAiley, NRRlDE/EPNB OFFICE NRRlDORULPL4/PM NRRlDORULPL4/LA NRRlDORULPL4/BC NRRlDORULPL4/PM NAME BSingal JBurkhardt MMarkley BSingal DATE 4/12113 4/12/13 4/23/13 4/23/13 OFFICIAL RECORD}} |
Revision as of 18:58, 22 March 2018
ML13102A126 | |
Person / Time | |
---|---|
Site: | South Texas ![]() |
Issue date: | 04/23/2013 |
From: | Singal B K Plant Licensing Branch IV |
To: | Koehl D L South Texas |
Singal B K | |
References | |
TAC MF0644 | |
Download: ML13102A126 (2) | |
Text
UNITED NUCLEAR REGULATORY WASHINGTON, D.C. 20555*0001 April 23, 2013 Mr. Dennis L. Koehl President and CEO/CNO STP Nuclear Operating Company South Texas Project P.O. Box 289 VVadsworth, TX 77483 SOUTH TEXAS PROJECT, UNIT 2 -VVITHDRAVVAL OF RELIEF REQUEST RR-ENG-3-12 (TAC NO. MF0644) Dear Mr. Koehl: By letter dated February 7,2013 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML 13045A479), STP Nuclear Operating Company (STPNOC) applied for relief request RR-ENG-3-12 for South Texas Project (STP), Unit 2. STPNOC requested relief from American Society of Mechanical Engineers Boiler and Pressure Vessel Code requirements for periodic inspections of reactor coolant pressure boundary check valves with seal cap enclosures. Subsequently, by letter dated February 28, 2013 (ADAMS Accession No. ML 130720527), STPNOC withdrew the relief request. The purpose of this letter is to advise that the above-cited application is being treated as withdrawn. The U.S. Nuclear Regulatory Commission staff activities on the review have ceased and the associated Technical Control number has been closed. If you have any questions, please contact me at 301-415-3016 or via e-mail at Balwant. singa I@nrc.gov. Sincerely, Balwant K. Singal, Senior Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-499 cc: Distribution via Listserv April 23, 2013 Mr. Dennis L. Koehl President and CEO/CNO STP Nuclear Operating Company South Texas Project P.O. Box 289 VVadsworth, TX 77483 SOUTH TEXAS PROJECT, UNIT 2 -VVITHDRAVVAL OF RELIEF REQUEST RR-ENG-3-12 (TAC NO. MF0644) Dear Mr. Koehl: By letter dated February 7, 2013 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML13045A479), STP Nuclear Operating Company (STPNOC) applied for relief request RR-ENG-3-12 for South Texas Project (STP), Unit 2. STPNOC requested relief from American Society of Mechanical Engineers Boiler and Pressure Vessel Code requirements for periodic inspections of reactor coolant pressure boundary check valves with seal cap enclosures. Subsequently, by letter dated February 28,2013 (ADAMS Accession No. ML 130720527), STPNOC withdrew the relief request. The purpose of this letter is to advise that the above-cited application is being treated as withdrawn. The U.S. Nuclear Regulatory Commission staff activities on the review have ceased and the associated Technical Control number has been closed. If you have any questions, please contact me at 301-415-3016 or via e-mail at Balwant.singal@nrc.gov. Docket No. 50-499 cc: Distribution via Listserv DISTRIBUTION: PUBLIC LPLIV Reading RidsAcrsAcnw_MailCTR Resource RidsNrrDorlLpl4 Resource ADAMS Accession No. ML13102A126 Sincerely, IRA! Balwant K. Singal, Senior Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation RidsNrrLAJBurkhardt Resource RidsNrrPMSouth Texas Resource RidsRgn4MailCenter Resource DAiley, NRRlDE/EPNB OFFICE NRRlDORULPL4/PM NRRlDORULPL4/LA NRRlDORULPL4/BC NRRlDORULPL4/PM NAME BSingal JBurkhardt MMarkley BSingal DATE 4/12113 4/12/13 4/23/13 4/23/13 OFFICIAL RECORD