MONTHYEARML0622303092006-10-26026 October 2006 Response to Relief Request RR-ENG-2-42 for Approval Non-Code Repair and Deferral of Code Repair of Essential Cooling Water System Piping, TAC MC8804 Project stage: Other 2006-10-26
[Table View] |
|
---|
Category:Code Relief or Alternative
MONTHYEARML22245A0012022-09-12012 September 2022 Relief from the Requirements of the ASME Code ML20227A3852020-09-0303 September 2020 Nonproprietary - Proposed Alternative RR-ENG-3-24 to ASME Code Requirements for the Repair of Essential Cooling Water System Class 3 Buried Piping NOC-AE-20003702, Proposed Alternatives to ASME OM Code 2012 Edition for the Fourth Inservice Test Interval (Relief Request PRR-03)2020-01-22022 January 2020 Proposed Alternatives to ASME OM Code 2012 Edition for the Fourth Inservice Test Interval (Relief Request PRR-03) ML19142A3072019-08-13013 August 2019 Request for Relief Request RR-ENG-3-23 to Extend Volumetric Examination Interval for Reactor Vessel Closure Head Nozzles NOC-AE-19003620, Proposed Alternative for Extension of Volumetric Examination Interval for Reactor Vessel Closure Head with Alloy 690 Nozzles in Accordance with 10 CFR 50.55a(z)(1) (Relief Request RR-ENG-3-23)2019-02-28028 February 2019 Proposed Alternative for Extension of Volumetric Examination Interval for Reactor Vessel Closure Head with Alloy 690 Nozzles in Accordance with 10 CFR 50.55a(z)(1) (Relief Request RR-ENG-3-23) ML18303A2062018-11-0707 November 2018 Request for Relief from ASME Code to Extend the Inservice Inspection Interval for Category B-N-2 and B-N-3 Examinations NOC-AE-18003598, Response to Request for Additional Information Request for Relief from the Third 10-Year Interval ISI Program ASME Section Xl Code Requirements for Category B-N-2 and B-N-3 Welds (Relief Request RR-ENG-3-16)2018-09-26026 September 2018 Response to Request for Additional Information Request for Relief from the Third 10-Year Interval ISI Program ASME Section Xl Code Requirements for Category B-N-2 and B-N-3 Welds (Relief Request RR-ENG-3-16) ML18177A4252018-07-24024 July 2018 Relief from the Requirements of the Asme Code Regarding the Third 10-Year Inservice Inspection Interval ML18187A1492018-07-24024 July 2018 Relief Request RR-ENG-3-22 for the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography NOC-AE-18003578, Request for Relief from the Third 10-Year Interval ISI Program ASME Section Xl Code Requirements for Category B-N-2 and B-N-3 Welds (Relief Request RR-ENG-3-16)2018-06-25025 June 2018 Request for Relief from the Third 10-Year Interval ISI Program ASME Section Xl Code Requirements for Category B-N-2 and B-N-3 Welds (Relief Request RR-ENG-3-16) NOC-AE-18003547, Proposed Alternative to Reactor Vessel Inservice Inspection Intervals (Relief Request RR-ENG-3-14)2018-02-15015 February 2018 Proposed Alternative to Reactor Vessel Inservice Inspection Intervals (Relief Request RR-ENG-3-14) ML16174A0912016-06-30030 June 2016 Relief Request RR-ENG-3-20, Use of ASME Code Case N-770-1, Reactor Vessel Cold Leg Nozzle to Safe-End Welds with Flaw Analysis, for the Third 10-Year Inservice Inspection Interval ML15218A3672015-08-21021 August 2015 Relief Request RR-ENG-17, Relief from Code Case N-770-1, Subsection 2400 and Table 1 Inspection Frequency of Reactor Vessel Cold Leg Nozzle to Safe-End Welds with Flaw Analysis, Third 10-Year ISI Interval ML13102A1262013-04-23023 April 2013 Withdrawal of Relief Request RR-ENG-3-12 from ASME Code Requirements for Periodic Inspection of Reactor Coolant Pressure Boundary Check Valve with Seal Cap, Third 10-year Inservice Inspection Interval ML13087A5172013-04-12012 April 2013 Relief Request RR-ENG-3-09, Request for Relief from ASME Code Requirements; Deferral of Code Repair of Essential Cooling Water System Piping Until April 2013 Refueling Outage ML13004A3392013-03-12012 March 2013 Relief Request RR-ENG-3-10, Reactor Pressure Vessel Head Flange O-Ring Leakoff Lines Non-Destructive Examination, for the Third 10-Year Inservice Inspection Interval NOC-AE-12002939, Request for Relief from ASME Section XI Code Requirements for Periodic Inspection of Reactor Coolant Pressure Boundary Check Valves with Seal Cap Enclosures (Relief Request RR-ENG-3-12)2013-02-0707 February 2013 Request for Relief from ASME Section XI Code Requirements for Periodic Inspection of Reactor Coolant Pressure Boundary Check Valves with Seal Cap Enclosures (Relief Request RR-ENG-3-12) NOC-AE-12002956, Response to Request for Additional Information Regarding Relief Request RR-ENG-3-09 for the Essential Cooling Water System2013-01-31031 January 2013 Response to Request for Additional Information Regarding Relief Request RR-ENG-3-09 for the Essential Cooling Water System ML12243A3432012-09-10010 September 2012 RR RE-ENG-3-04 to Apply Alternative to the American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI Requirements for Examination of Class 1 and 2 Piping Welds ML12235A3472012-08-28028 August 2012 Relief Request RR-ENG-3-06 from ASME Code Requirements for Leak Testing Boundaries of Class 1 Pressure-Retaining Components, Third 10-Year Inservice Inspection Interval (TAC ME7053-ME7054) ML12201A2562012-08-16016 August 2012 Relief Request RR-ENG-3-08, Deferral of Code Repair of Flaws in U2 Essential Cooling Water Class 3 Piping Until Restart from Current Refueling Outage Scheduled for Mid-April 2012 NOC-AE-12002837, Response to Request for Additional Information: Application of an Alternative to Requirements for Examination of Class 1 and Class 2 Piping Welds (Relief Request RR-ENG-3-04)2012-05-0909 May 2012 Response to Request for Additional Information: Application of an Alternative to Requirements for Examination of Class 1 and Class 2 Piping Welds (Relief Request RR-ENG-3-04) NOC-AE-12002807, Request for Relief from ASME Boiler and Pressure Vessel Code, Section XI Requirements for the Essential Cooling Water System (Relief Request RR-ENG-3-08)2012-03-12012 March 2012 Request for Relief from ASME Boiler and Pressure Vessel Code, Section XI Requirements for the Essential Cooling Water System (Relief Request RR-ENG-3-08) ML1118605352011-07-29029 July 2011 Relief Request RR-ENG-2-55 from ASME Code Requirements for Weld Examinations, Second 10-Year Inservice Inspection Interval ML1109803472011-04-20020 April 2011 Relief Request RR-ENG-3-01, from ASME Code Requirements for Steam Generator Main Steam Nozzle Non-Destructive Examination, Third 10-Year Inservice Inspection Interval ML1108109482011-04-0707 April 2011 Request for Relief RR-ENG-3-03 from ASME Code Requirements for Pump Casing Inservice Inspection Examination, Third 10-Year Inservice Inspection Interval ML1108400762011-04-0505 April 2011 Request for Relief RR-ENG-3-02 from ASME Code Requirements for Reactor Pressure Vessel Flange Insert Non-Destructive Examination, Third 10-Year Inservice Inspection Interval NOC-AE-10002600, Request for Relief from ASME Section XI Requirements for Ultrasonic Examination of Reactor Pressure Vessel Shell-to-Flange Welds (RR-ENG-3-05)2010-10-18018 October 2010 Request for Relief from ASME Section XI Requirements for Ultrasonic Examination of Reactor Pressure Vessel Shell-to-Flange Welds (RR-ENG-3-05) NOC-AE-10002594, Request for Relief from ASME Section XI Code Requirements for Pump Casing Inservice Inspection Examination (Relief Request RR-ENG-3-03)2010-09-20020 September 2010 Request for Relief from ASME Section XI Code Requirements for Pump Casing Inservice Inspection Examination (Relief Request RR-ENG-3-03) ML1021500772010-09-0202 September 2010 Relief Request Nos. VRR-01, PRR-03, PRR-02, and PRR-01 for Third 10-year Interval Inservice Testing Program for Pumps and Valves (TAC Nos. ME3515 Through ME3522) ML1006208692010-03-24024 March 2010 Authorization of Relief Request RR-ENG-2-53, Alternative to Inservice Inspection Requirements for Ultrasonic Exam of Reactor Pressure Vessel Shell-to-Flange Weld ML1005395882010-03-12012 March 2010 Relief Request RR-ENG-2-52 from ASME Code, Section XI Requirements for Essential Cooling Water System Code Repair NOC-AE-09002399, Request for Relief from ASME Boiler and Pressure Vessel Code Section XI Requirements for the Essential Cooling Water System (Relief Request RR-ENG-2-52)2009-03-12012 March 2009 Request for Relief from ASME Boiler and Pressure Vessel Code Section XI Requirements for the Essential Cooling Water System (Relief Request RR-ENG-2-52) ML0827502202008-12-0909 December 2008 Relief Request RR-ENG-2-30, Request for Relief to Use ASME Code Case N-516-3, Underwater Welding, Section XI, Division 1 ML0827707852008-11-12012 November 2008 Authorization of Relief Request RR-ENG-2-51 from ASME Code Case N-498-4, on 10-Year System Hydrostatic Testing for Class 1, 2, and 3 Systems ML0824901602008-09-26026 September 2008 Relief Request RR-ENG-2-49, Second 10-Year Inservice Inspection Interval, Deferral of Code Repair in the Essential Cooling Water System Piping ML0735410722008-01-10010 January 2008 Request for Relief No. RR-ENG-2-48 from ASME Code Case N-638-1 Requirements Regarding Start Time for 48-Hour Hold Period Before Non-Destructive Examination of Weld Overlay Repair ML0731204462007-11-30030 November 2007 Relief Request RR-ENG-2-47 for Approval of Temporary Non-code Repair and Deferral of Code Repair Upgraded Essential Cooling Water System Piping NOC-AE-07002211, Relief Request (RR-ENG-2-50) for the Second 10 Year ISI Interval from 10 CFR 50.55a for the Purpose of Invoking Code Case N-698, Design Stress Intensities and Yield Strength Values For...2007-10-0202 October 2007 Relief Request (RR-ENG-2-50) for the Second 10 Year ISI Interval from 10 CFR 50.55a for the Purpose of Invoking Code Case N-698, Design Stress Intensities and Yield Strength Values For... ML0708510082007-04-30030 April 2007 Relief Request No. RR-ENG-2-44 on Deferral of Code Repair of Essential Cooling Water System Indication ML0708102642007-04-0202 April 2007 Relief, Request for Relief No. RR-ENG-2-43 for Remainder of Second 10-year Inservice Inspection Interval Application of Weld Overlays in Pressurizer Nozzle Safe End Welds (TAC Nos. MD1414 - MD1423) ML0706500752007-03-15015 March 2007 Request to Use 2001 Edition Through 2003 Addenda of ASME Code for Operations and Maintenance for Remainder of Second 10-Year Inservice Testing Program Interval ML0704400592007-03-0101 March 2007 Request for Relief No. RR-ENG-2-45 for Remainder of Second 10-year Inservice Inspection Interval Use of Penetrameters in Radiography Examination ML0622303092006-10-26026 October 2006 Response to Relief Request RR-ENG-2-42 for Approval Non-Code Repair and Deferral of Code Repair of Essential Cooling Water System Piping, TAC MC8804 NOC-AE-06002031, Request for Relief from ASME Boiler and Pressure Vessel Code, Section XI Requirements for Use of Penetrameters in Radiographic Examinations2006-06-14014 June 2006 Request for Relief from ASME Boiler and Pressure Vessel Code, Section XI Requirements for Use of Penetrameters in Radiographic Examinations ML0610907542006-05-25025 May 2006 Relief, Relief Request RR-ENG-2-39 and RR-ENG-2-40 for Approval of Temporary Non-code Repair and Deferral of Code Repair of Essential Cooling Water System Piping, Trains 1B and 1C ML0609702402006-05-12012 May 2006 Relief, RR-ENG-2-41 TAC No. MC8279 NOC-AE-05001899, Request for Relief from ASME Boiler and Pressure Vessel Code, Section Xl Requirements for the Essential Cooling Water System (Ecw Train 1 C) (Relief Request RR-ENG-2-40)2005-07-19019 July 2005 Request for Relief from ASME Boiler and Pressure Vessel Code, Section Xl Requirements for the Essential Cooling Water System (Ecw Train 1 C) (Relief Request RR-ENG-2-40) ML0506205052005-03-15015 March 2005 Request for Relief from Requirements of ASME and Pressure Vessel Code RR-ENG-IWE-07 NOC-AE-04001817, Revised Request for Authorization to Use an Alternative to the ASME Boiler and Pressure Vessel Code Section XI Requirements (Relief Request VRR-05)2004-11-0909 November 2004 Revised Request for Authorization to Use an Alternative to the ASME Boiler and Pressure Vessel Code Section XI Requirements (Relief Request VRR-05) 2022-09-12
[Table view] Category:Letter
MONTHYEARML24029A2752024-01-29029 January 2024 Request to Reschedule Evaluated Force-on-Force Drill IR 05000498/20230042024-01-29029 January 2024 Integrated Inspection Report 05000498/2023004 and 05000499/2023004 ML24024A1162024-01-24024 January 2024 STP Unit 2 Request for Information IR 05000498/20244042024-01-18018 January 2024 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000498/2024404; 05000499/2024404 IR 05000498/20230032023-12-28028 December 2023 Acknowledgment of Reply to a Notice of Violation (NRC Inspection Report 05000498/2023003 and 05000499/2023003) ML23360A1692023-12-26026 December 2023 FEMA, Submittal of Radiological Emergency Preparedness Final Report for the South Texas Project Medical Services Drill Evaluated on August 31, 2023 NOC-AE-230040, Supplement to Proposed Alternate Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (Relief Request RR-ENG-4-06)2023-12-14014 December 2023 Supplement to Proposed Alternate Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (Relief Request RR-ENG-4-06) NOC-AE-230039, Docket Nos. Stn 50-498, Stn 50-499 - Reply to a Notice of Violation, NRC Inspection Report 05000498/2023003 and 05000499/20230032023-12-12012 December 2023 Docket Nos. Stn 50-498, Stn 50-499 - Reply to a Notice of Violation, NRC Inspection Report 05000498/2023003 and 05000499/2023003 ML23326A2592023-12-0505 December 2023 Review of the Fall 2022 Steam Generator Tube Inspection Report ML23339A1902023-12-0505 December 2023 Update Foreign Ownership, Control, or Influence (FOCI) IR 05000498/20234012023-12-0404 December 2023 Security Baseline Inspection Report 05000498/2023401 and 05000499/2023401 ML23324A0102023-11-16016 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23310A2282023-11-13013 November 2023 Integrated Inspection Report 05000498/2023003 and 05000499/2023003, and Notice of Violation ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV ML23298A0002023-11-0101 November 2023 the Associated Independent Spent Fuel Storage Installation - Issuance of Amendment Nos. 226 and 211 Related to Order Approving Indirect Transfer of Licenses and Conforming License Amendments ML23303A0782023-10-30030 October 2023 Submittal of Supplemental Information in Response to Order Consenting to License Transfers and Approval of Draft Conforming License Amendments ML23279A0342023-10-30030 October 2023 Associated Independent Spent Fuel Storage Installation - Order Approving Indirect Transfer of Licenses and Draft Conforming License Amendments (EPID L-2023-LLM-0004) (Letter) IR 05000498/20234032023-10-26026 October 2023 Material Control and Accounting Program Inspection Report 05000498/2023403 and 05000499/2023403 (Cover Letter) ML23317A1262023-10-12012 October 2023 South. Texas Project Physical Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program Revision 26 ML23279A1382023-10-0505 October 2023 Responses to Requests for Additional Information Related to Application for Order Approving Indirect Transfer of Control of Licenses ML23271A1942023-10-0303 October 2023 Notification of Commercial Grade Dedication Inspection (05000498/2024013 and 05000499/2024013) and Request for Information ML23270B2592023-09-27027 September 2023 Update Foreign Ownership, Control, or Influence ML23263B1132023-09-20020 September 2023 Operator Licensing Examination Schedule Revision 1 IR 05000498/20243012023-09-0707 September 2023 Notification of NRC Initial Operator Licensing Examination 05000498/2024301; 05000499/2024301 IR 05000498/20233012023-09-0101 September 2023 NRC Examination Report 05000498/2023301 and 05000499/2023301 ML23243B0562023-08-31031 August 2023 Supplemental Information to Application for Order Approving Indirect Transfer of Control of Licenses ML23236A6042023-08-24024 August 2023 Annual Dose Report for 2022 IR 05000498/20230052023-08-22022 August 2023 Updated Inspection Plan for South Texas Project Electric Generating Station, Units 1 and 2 (Report 05000498/2023005 and 05000499/2023005) - Mid Cycle Letter ML23229A5262023-08-17017 August 2023 Inservice Inspection Summary Report - 1 RE24, ML23229A5892023-08-17017 August 2023 Voluntary Response to Regulatory Issue Summary (RIS) 2023-02, Scheduling Information for the Licensing of Accident Tolerant, Increased Enrichment, and Higher Burnup Fuels ML23229A4992023-08-17017 August 2023 Supplement to Proposed Alternate Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (Relief Request RR-ENG-4-06) ML23228A2102023-08-15015 August 2023 Closure of Investigation (OI 4-22-19) ML23222A0322023-08-10010 August 2023 Report of Changes Made to Quality Assurance Program for Radioactive Material Packages ML23221A3002023-08-0909 August 2023 RE22 Inspection Summary Report for Steam Generator Tubinq, Rev. 1 (Epld L-2023-LRO-0029) ML23222A2792023-08-0909 August 2023 Submittal of Update Foreign Ownership, Control, or Influence (FOCI) IR 05000498/20230022023-07-28028 July 2023 Integrated Inspection Report 05000498/2023002 and 05000499/2023002 ML23198A0532023-07-24024 July 2023 Request for Withholding Information from Public Disclosure ML23188A1612023-07-14014 July 2023 the Associated ISFSI - Notice of Consideration of Approval of Indirect Transfer of Licenses and Conforming Amendments and Opportunity to Request a Hearing (EPID L-2023-LLM-0004) - Letter ML23193A9932023-07-11011 July 2023 Submittal of Update Foreign Ownership, Control or Influence (FOCI) ML23192A0482023-07-11011 July 2023 NRC Initial Operator Licensing Examination Approval 05000498/2023301; 05000499/2023301 NOC-AE-230039, Submittal of Update Foreign Ownership, Control or Influence (FOCI)2023-07-11011 July 2023 Submittal of Update Foreign Ownership, Control or Influence (FOCI) ML23180A2822023-06-29029 June 2023 Operator Licensing Examination Schedule ML23177A2522023-06-26026 June 2023 Units 1, 2 & Independent Spent Fuel Storage Installation - Biennial Submittal of Technical Specification Bases Changes, Commitment Changes, 10 CFR 50.59 Evaluation Summary, and 10 CFR 72.48 Evaluation Summary ML23166B0802023-06-14014 June 2023 Update Foreign Ownership, Control, or Influence (FOCI) ML23163A1762023-06-12012 June 2023 Application for Order Approving Indirect Transfer of Control of Licenses 2024-01-29
[Table view] Category:Safety Evaluation
MONTHYEARML23279A0342023-10-30030 October 2023 Associated Independent Spent Fuel Storage Installation - Order Approving Indirect Transfer of Licenses and Draft Conforming License Amendments (EPID L-2023-LLM-0004) (Letter) ML23279A0482023-10-30030 October 2023 Associated Independent Spent Fuel Storage Installation - Enclosure 4 -Order Approving Indirect Transfer of Licenses and Draft Conforming License Amendments (EPID L-2023-LLM-0004) (Nonproprietary Safety Evaluation) ML23015A0012023-02-0606 February 2023 Issuance of Amendment Nos. 225 and 210 to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements ML22300A2492022-12-0606 December 2022 Approval for Alternate Disposal Procedures for Very Low-Level Radioactive Material (EPID: L?2021?LLL?0022) ML22245A0012022-09-12012 September 2022 Relief from the Requirements of the ASME Code ML21319A3552021-12-0909 December 2021 Issuance of Amendment Nos. 224 and 209 to Revise Technical Specifications to Adopt TSTF-577, Revision 1, Revised Frequencies for Steam Generator Tube Inspections ML21320A0022021-12-0808 December 2021 Issuance of Amendment Nos. 223 and 208 to Revise Technical Specification 3.6.3 and to Remove the Technical Specifications Index NUREG-0654, Correction to Amendment Nos. 221 and 206 to Authorize Revision of the Emergency Plan Based on NUREG-0654/FEMA-REP-1, Revision 22021-05-11011 May 2021 Correction to Amendment Nos. 221 and 206 to Authorize Revision of the Emergency Plan Based on NUREG-0654/FEMA-REP-1, Revision 2 ML21033A2392021-04-0808 April 2021 Issuance of Amendment Nos. 222 and 207 to Revise Technical Specifications to Adopt TSTF-374, Revision to TS 5.5.13 and Associated TS Bases for Diesel Fuel Oil ML20253A0462020-09-29029 September 2020 Issuance of Amendment Nos. 220 and 205 to Revise Technical Specifications to Adopt TSTF-490, Deletion of E-Bar Definition and Revision to RCS Specific Activity Tech Spec ML20227A3852020-09-0303 September 2020 Nonproprietary - Proposed Alternative RR-ENG-3-24 to ASME Code Requirements for the Repair of Essential Cooling Water System Class 3 Buried Piping ML20199M1622020-07-21021 July 2020 Proposed Alternatives PRR-01, PRR-02, PRR-03, and PRR-04 to the Requirements of the ASME OM Code (Epids L-2020-LLR-0007 to L-2020-LLR-0010) ML20141L6122020-05-28028 May 2020 Issuance of Amendment No. 219 to Revise Technical Specifications to Reduce Safety Injection Accumulators Minimum Pressures (Exigent Circumstances) ML19322A7192019-12-0909 December 2019 Issuance of Amendment Nos. 218 and 204 to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules ML19217A0602019-10-24024 October 2019 Issuance of Amendment Nos. 217 and 203 Revision to Technical Specification Tables to Change Terminology for the P-13 Permissive Interlock Description ML19213A1472019-08-20020 August 2019 Issuance of Amendment Nos. 216 and 202 Standby Diesel Generator Surveillance Requirements ML19142A3072019-08-13013 August 2019 Request for Relief Request RR-ENG-3-23 to Extend Volumetric Examination Interval for Reactor Vessel Closure Head Nozzles ML19067A2222019-06-0606 June 2019 Issuance of Amendment Nos. 215 and 201 Adoption of TSTF-522 Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month ML18303A2062018-11-0707 November 2018 Request for Relief from ASME Code to Extend the Inservice Inspection Interval for Category B-N-2 and B-N-3 Examinations ML18177A4252018-07-24024 July 2018 Relief from the Requirements of the Asme Code Regarding the Third 10-Year Inservice Inspection Interval ML18187A1492018-07-24024 July 2018 Relief Request RR-ENG-3-22 for the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography ML18159A2122018-07-19019 July 2018 Issuance of Amendment Nos. 214 and 200 Emergency Response Organization Time Augmentation and Staffing Chances to the Emergency Plan (CAC Nos. MG0024 and MG0025; EPID L-2017-LLA-0265) ML18128A3422018-06-0707 June 2018 Issuance of Amendment Nos. 213 and 199 to Revise TSs for Administrative Changes and to Relocate Fxy Exclusion Zones to the Colrs(Cac Nos. MG0253 and MG0254, EPID-L-2017-LLA-0300) ML17038A2232017-07-11011 July 2017 Issuance of Amendment Nos. 212 and 198 - Risk-Informed Approach to Resolve Generic Safety Issue 191 ML17019A0022017-07-11011 July 2017 Safety Evaluation, Enclosure 3 to Amendment Nos. 212 and 198 - Risk-Informed Approach to Resolve Generic Safety Issue 191 ML16319A0102016-12-21021 December 2016 Issuance of Amendment No. 211, Revise Technical Specification 5.3.2 to Allow Operation with 56 Full-Length Control Rod Assemblies ML16174A0912016-06-30030 June 2016 Relief Request RR-ENG-3-20, Use of ASME Code Case N-770-1, Reactor Vessel Cold Leg Nozzle to Safe-End Welds with Flaw Analysis, for the Third 10-Year Inservice Inspection Interval ML16116A0072016-04-29029 April 2016 Issuance of Amendment Nos. 210 and 197, Revise Technical Specification 6.8.3.j, Containment Leakage Rate Testing Program, to Extend Integrated Leak Rate Test Interval from 10 to 15 Years ML15342A0032015-12-28028 December 2015 Issuance of Amendment Nos. 209 and 196, Adopt Technical Specification Task Force (TSTF)-510-A, Revision 2, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection (CAC MF6178-MF6179) ML15343A1282015-12-11011 December 2015 Issuance of Amendment No. 208, Revise Technical Specification 5.3.2 to Allow Operation with 56 Full-Length Control Rod Assemblies for Unit 1 Cycle 20 (Emergency Circumstances) ML15209A6412015-09-22022 September 2015 Issuance of Amendment Nos. 207 and 195, Revise Updated Final Safety Analysis Report Table 15.6-17 to Correct Radiological Doses Resulting from Calculation Error Performed in Support of Amendments 182 and 169 ML15218A3672015-08-21021 August 2015 Relief Request RR-ENG-17, Relief from Code Case N-770-1, Subsection 2400 and Table 1 Inspection Frequency of Reactor Vessel Cold Leg Nozzle to Safe-End Welds with Flaw Analysis, Third 10-Year ISI Interval ML15201A1952015-08-20020 August 2015 Issuance of Amendment Nos. 206 and 194, Revise the Emergency Action Level Scheme to the NRC-endorsed Scheme Contained in NEI-99, Revision 6 ML15075A1462015-04-29029 April 2015 Issuance of Amendment Nos. 205 and 193, Request to Revise Technical Specification 3.3.1, Functional Unit 20, Reactor Trip Breakers, for Required Actions and Allowed Outage Times ML15049A1292015-02-27027 February 2015 Issuance of Amendment Nos. 204 and 192, Revise Technical Specification 6.9.1.6, Core Operating Limits Report, with Respect to Analytical Methods Used to Determine Core Operating Limits ML14339A1702015-02-13013 February 2015 Issuance of Amendment Nos. 203 and 191, Revise Fire Hazards Analysis Report and Fire Protection Program License Conditions Related to Alternate Shutdown Capability ML14281A0652015-01-29029 January 2015 Issuance of Amendment Nos. 202 and 190, Revise Operating License Conditions Related to Cyber Security Plan Milestone 8 Full Implementation Date ML13221A0042013-09-0909 September 2013 Issuance of Amendment Nos. 201 and 189, Revise TS 5.0, Design Features, to Reflect Removal of Visitor'S Center Building and References to Emergency Operations Facility ML13142A1602013-06-0606 June 2013 Safety Assessment in Response to Information Request Pursuant to 10 CFR 50.54(f) - Recommendation 9.3 Communications Assessment ML13008A5282013-04-25025 April 2013 Issuance of Amendment Nos. 200 and 188, Revise Technical Specification 3.3.3.6, Accident Monitoring Instrumentation ML13087A5172013-04-12012 April 2013 Relief Request RR-ENG-3-09, Request for Relief from ASME Code Requirements; Deferral of Code Repair of Essential Cooling Water System Piping Until April 2013 Refueling Outage ML13004A3392013-03-12012 March 2013 Relief Request RR-ENG-3-10, Reactor Pressure Vessel Head Flange O-Ring Leakoff Lines Non-Destructive Examination, for the Third 10-Year Inservice Inspection Interval ML13007A1362013-01-31031 January 2013 Review of Operations Quality Assurance Plan, Revision 20 ML12243A3432012-09-10010 September 2012 RR RE-ENG-3-04 to Apply Alternative to the American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI Requirements for Examination of Class 1 and 2 Piping Welds ML12235A3472012-08-28028 August 2012 Relief Request RR-ENG-3-06 from ASME Code Requirements for Leak Testing Boundaries of Class 1 Pressure-Retaining Components, Third 10-Year Inservice Inspection Interval (TAC ME7053-ME7054) ML12201A2562012-08-16016 August 2012 Relief Request RR-ENG-3-08, Deferral of Code Repair of Flaws in U2 Essential Cooling Water Class 3 Piping Until Restart from Current Refueling Outage Scheduled for Mid-April 2012 ML12152A2452012-08-14014 August 2012 Issuance of Amendment Nos. 199 and 187, Revise Applicability of Risk-Managed Technical Specifications (TS) to TS 3.7.7, Control Room Makeup and Cleanup Filtration System ML1124402222011-11-17017 November 2011 Issuance of Amendment Nos. 198 and 186, Revise Technical Specifications 5.3.1 and 6.9.1.6 to Allow Fuel Assemblies with Optimized Zirlo Cladding ML1126500712011-10-14014 October 2011 Relief Request RR-ENG-3-05, from Requirements for Ultrasonic Examination of Reactor Pressure Vessel Shell-to-Flange Welds for Third 10-Year Inservice Inspection ML1118605352011-07-29029 July 2011 Relief Request RR-ENG-2-55 from ASME Code Requirements for Weld Examinations, Second 10-Year Inservice Inspection Interval 2023-02-06
[Table view] |
Text
October 26, 2006 Mr. James J. Sheppard President and Chief Executive Officer STP Nuclear Operating Company South Texas Project Electric Generating Station P. O. Box 289 Wadsworth, TX 77483
SUBJECT:
SOUTH TEXAS PROJECT, UNIT 1 - RE: RELIEF REQUEST RR-ENG-2-42 FOR APPROVAL NON-CODE REPAIR AND DEFERRAL OF CODE REPAIR OF ESSENTIAL COOLING WATER SYSTEM PIPING (TAC NO. MC8804)
Dear Mr. Sheppard:
The Nuclear Regulatory Commission (NRC) staff has reviewed and evaluated the information provided by South Texas Project (STP) Nuclear Operating Company (the licensee) in its letter dated October 27, 2005. The licensee requested the approval of Relief Request RR-ENG-2-42 to allow a temporary non-Code repair on the Essential Cooling Water (ECW) system piping at STP Electric Generating Station, Unit 1. The ECW system piping is classified as an American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code (Code) Class 3 and the licensee is proposing to defer the permanent Code repair until the next scheduled refueling outage.
Based on the information provided in the licensees submittal, the NRC staff concludes that the licensee has provided an acceptable alternative to the requirements of ASME Code,Section XI, IWA-4310. Performing the required ASME Code repair immediately would require plant shutdown, creating a hardship for the licensee without a compensating increase in the level of quality or safety relative to the licensees proposed alternative. Furthermore, the NRC staff concludes that the proposed alternative provides a reasonable assurance of structural integrity during the interim period prior to next refueling outage.
Therefore, pursuant to 10 CFR 50.55a(a)(3)(ii) the alternative is authorized for the STP Electric Generating Station, Unit 1, until the next scheduled refueling outage.
J. Sheppard At that time, an ASME Code repair will be performed. All other ASME Code,Section XI, requirements for which relief was not specifically requested and authorized herein by the NRC staff remain applicable, including third party review by the Authorized Nuclear Inservice Inspector. The NRC staffs safety evaluation is enclosed.
Sincerely,
/RA/
David Terao, Chief Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-498
Enclosure:
Safety Evaluation cc: See next page
J. Sheppard At that time, an ASME Code repair will be performed. All other ASME Code,Section XI, requirements for which relief was not specifically requested and authorized herein by the NRC staff remain applicable, including third party review by the Authorized Nuclear Inservice Inspector. The NRC staffs safety evaluation is enclosed.
Sincerely,
/RA/
David Terao, Chief Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-498
Enclosure:
Safety Evaluation cc: See next page DISTRIBUTION PUBLIC LPLIV Reading RidsOgcRp RidsAcrsAcnwMailCenter RidsNrrDorlLpl4 RidsNrrPMMThadani RidsNrrLALFeizollahi RidsRgn4MailCenter JLamb, Region IV EDO GGeorgiev, DCI ACCESSION NO: ML062230309 *No significant change to SE input OFFICE NRR/LPL4/PM NRR/LPL4/LA CNPB/BC OGC NRR/LPL4/BC NAME MThadani LFeizollahi TChan* MBarkman DTerao DATE 8/14/06 8/11/06 6/8/2006 10/24/06 10/26/06 OFFICIAL RECORD COPY
SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION TEMPORARY NON-CODE REPAIRS OF ESSENTIAL COOLING WATER SYSTEM PIPING STP NUCLEAR OPERATING COMPANY SOUTH TEXAS PROJECT, UNIT 1 DOCKET NO. 50-498
1.0 INTRODUCTION
By letter dated October 27, 2005, STP Nuclear Operating Company (the licensee) requested pursuant to 10 CFR 50.55a(g)(5)(iii) approval to allow a temporary non-Code repair (RR-ENG-2-42) on the Essential Cooling Water (ECW) system piping at its STP Electric Generating Station (STPEGS), Unit 1. The ECW System is designed to supply cooling water to various safety-related systems for normal plant operation, normal shutdown, and during and after postulated design-basis accidents. The ECW system is classified as an American Society for Mechanical Engineers (ASME) Boiler and Pressure Vessel Code Class 3 system. The licensee is proposing to defer the permanent ASME Code repair of the identified flaws until the next unscheduled outage exceeding 30 days, but no later than the next scheduled refueling outage. The relief request was made because the proposed temporary non-Code repair deviates from the requirements of ASME Code,Section XI, Article IWA-4310.
The licensee has stated that it has identified through-wall indications measuring 1-inch by 1/4-inch on a 6-inch flange of the ECW return line downstream from 150-ton Essential Chiller 11B. A residue buildup near the flange weld suggests seepage through the flaw is active. The flawed area includes a potential linear indication 9/16-inch long. This indication appears to be a tight crack and any leakage is not readily measurable.
ASME Code,Section XI, 1989 Edition, is used for the Repair and Replacement Program activities at the STPEGS, Unit 1, second 10-year inservice inspection (ISI) interval.
2.0 REGULATORY EVALUATION
Paragraph 50.55a(g) of Title 10 of the Code of Federal Regulations (10 CFR) specifies that the ISI of nuclear power plant components shall be performed in accordance with the requirements of the ASME Code,Section XI, except where specific written relief has been granted by the Commission pursuant to 10 CFR 50.55a(g)(6)(i). The regulations in 10 CFR 50.55a(a)(3) state that alternatives to the requirements of paragraph (g) may be used, when authorized by the Nuclear Regulatory Commission (NRC), if (i) the proposed alternatives would provide an acceptable level of quality and safety or (ii) compliance with the specified requirements would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety. In 10 CFR 50.55a(g)(5)(iii), the regulations state that if the licensee has determined that conformance with certain code requirements is impractical for its facility, the licensee shall
notify the Commission and submit, as specified in §50.4, information to support the determinations.
The information provided by the licensee in support of the request has been evaluated by the NRC staff and the bases for disposition are documented below.
2.1 Licensees Evaluation 2.1.1 Components for which Relief is Requested Unit 1 Train B ECW system 6-inch flange downstream from 150-ton Essential Chiller 11B.
The flawed area includes a potential linear indication 9/16-inch long. The indication appears to be a tight crack and any leakage is not readily measurable.
2.1.2 Applicable Code Edition and Addenda ASME Boiler and Pressure Vessel Code,Section XI, 1989 Edition 2.1.3 Applicable Code Requirement Relief from the requirements of ASME Code,Section XI, IWA-5250(a)(3) is requested so that a code repair of the through-wall flaw at this location may be deferred until the next outage, of sufficient duration, but not later than the next refueling outage provided the conditions of Generic Letter 90-05, Guidance for Performing Temporary Non-Code Repair of ASME Code Class 1, 2 and 3 Piping," are met.
2.1.4 Flaw Detection During Plant Operation The flaw was discovered on July 27, 2005, during periodic examination of ECW system large bore piping. Unit 1 was in Mode 1 at full 100 percent power.
2.1.5 Impracticality Determination As stated in Generic Letter 90-05, an ASME Code repair is required for Code Class 1, 2, and 3 piping unless specific written relief is granted by the NRC. Relief is appropriate when performing the repair at the time of discovery is determined to be impractical. A repair is considered to be impractical if:
- The flaw detected during plant operation is in a section of Class 3 piping that cannot be isolated to complete a code repair within the time period permitted by the limiting condition for operation of the affected system as specified in the plant Technical Specifications, and
- Performance of code repair necessitates a plant shutdown.
Performance of code repairs within the allowed outage time for the ECW System at the STPEGS, as permitted by the limiting condition for operation, is not practical due to the amount of time required to implement the repair, and the potential for fit-up problems during repair. A
plant shutdown may be necessary to complete the repair. Therefore, the licensee requests this relief on the basis of impracticality.
2.1.6 Proposed Alternative and Basis for Use Proposed Alternative Repair of the defect will be deferred until adequate time is available for the repair, but no later than the next Unit 1 refueling outage, provided the condition continues to meet the acceptance criteria of Generic Letter 90-05. The next Unit 1 refueling outage is currently scheduled to begin in spring 2007. Compensatory action has been implemented to detect changes in the condition of the flaw.
Basis for Use The 150-ton Essential Chiller unit has been abandoned in place, but the flaw location is exposed to normal ECW system operating pressure. The ECW system is a low-pressure system with normal operating pressures of approximately 50 pounds per square inch gauge (psig) and a design pressure of 120 psig. Therefore, the consequences associated with failure of high-energy lines are not applicable to this relief request.
The structural integrity is monitored by the following methods:
- Monthly monitoring for qualitative assessment of leakage (quantitative if measurable leaks are observed). Currently there is no measurable leakage.
- Continuation of Essential Cooling Water System large bore piping periodic walkdowns.
These walkdowns are regularly scheduled VT-2 examinations. The inspection technique has proven to be an effective means of identifying dealloyed/cracked components prior to deterioration of structural integrity margins below ASME Code,Section XI requirements.
Structural integrity and the monitoring frequency will be re-evaluated if significant changes in the condition of the dealloyed area are found during this monitoring.
Root Cause Determination The root cause of dealloying is a combination of corrosion and stress. The dealloying process normally initiates from a crevice such as the area behind a backing ring, a fabrication-induced flaw, or a casting flaw. Dealloying in this case is believed to be similar to dealloying seen in other susceptible aluminum-bronze components.
Flaw Evaluation In assessing the structural integrity of partially dealloyed aluminum-bronze piping components, a conservative evaluation has been performed to assure that adequate margins remain. This was accomplished by evaluating the condition where the dealloyed region is assumed to have
lost its load carrying capacity and will behave like a crack-like flaw. Under these conditions, flaw evaluation procedures similar to Section XI of the ASME Code have been applied.
Unlike some carbon steels and low-alloy steels, aluminum-bronze is inherently ductile and tough. This stems from its crystal structure which is like that of Type 304 stainless steel. Thus, the fracture resistance of aluminum bronze is expected to be high and the affected fittings will be relatively insensitive to material flaws such as cracks.
Aluminum-bronze is not expected to behave in a non-ductile manner; however, linear elastic fracture mechanics techniques (LEFM) have established the load carrying capacity of partially dealloyed fittings when treating the dealloyed region as a crack-like flaw. When LEFM principles are applied, flaw tolerance can be quantified in terms of applied stress, flaw size and shape, and the material fracture toughness. Selection of conservative values for fracture toughness, and a conservative representation of the size and extent of dealloying as a flaw, gives a conservative determination of the structural capacity.
The structural integrity of the flanged piping was assessed using the "through-wall flaw" evaluation approach provided in Section C.3.a of Enclosure 1 to NRC Generic Letter 90-05.
This approach evaluates the flaw stability by LEFM methodology.
To summarize the results:
s = predicted bending stress at the flaw location s = 10.1 ksi K = stress intensity factor K = 24 ksi-in1/2 For flaw stability, this methodology specifies "K" should be less than the critical stress intensity factor which represents the fracture toughness of the material. The fracture toughness of the aluminum-bronze ranges from 63.5 to 95.1 ksi-in1/2.
Stresses Pressure + Dead Faulted Thermal Weight Stress (psi) 942 3286 5349 Allowable Stress (psi) 18000 43200 27000 Safety Margin 19.1 13.14 5.04 The licensee states that the calculated safety margins are adequate for the various loading conditions.
Augmented Inspection Augmented monthly inspections have been implemented to detect changes in the size of the discolored area or leakage. Structural integrity and the monitoring frequency will be
reevaluated if significant changes in the condition of the dealloyed area are found during this monitoring.
2.2 Staff Evaluation The licensee stated that a through-wall flaw was discovered during the performance of routine maintenance activities on the ECW system at its STPEGS, Unit 1. Specifically, the ECW Train B flaw was discovered on July 27, 2005, during periodic examination of ECW system large bore piping. The flaw was identified as an indication of through-wall dealloying measuring 1-inch by 1/4-inch. A residue buildup at a spot near the flange suggests that seepage through the flaw is active. The root cause for the linear indications in the pipe was determined to be a combination of corrosion and stress. The dealloying most likely initiated from a crevice such as the area behind a backing ring, a fabrication-induced flaw, or a casting flaw. Dealloying in this case is believed to be similar to dealloying seen in other susceptible aluminum-bronze components. The licensee has implemented augmented monthly inspections to detect changes in the size of the discolored area or leakage. Structural integrity and the monitoring frequency will be re-evaluated if significant changes in the condition of the dealloyed area are found during this monitoring. The staff finds the licensees temporary non-Code repair acceptable because the leakage is not readily measurable and because the licensee has implemented monthly inspections to detect changes in the size of the flaw.
To assess the structural integrity of the flawed piping the licensee evaluated the piping using the "through-wall flaw" evaluation approach included in the NRC Generic Letter 90-05.
The evaluation results determined that calculated safety margins are adequate for the various loading conditions. As it can be seen from the table in Section 2.1.6 above, safety margins of 5.04 to 19.1 exist for the various loading conditions. Therefore, the flaw is not expected to grow to sizes large enough to cause a failure. Further, cracks are expected to be detected well before they reach a size sufficient to result in failure. The staff finds the evaluation approach employed by the licensee acceptable because the structural integrity analysis employs the methods specified in NRC Generic Letter 90-05 and because the results showed that the calculated safety margins are adequate for the various loading conditions.
The licensee also stated that the performance of a permanent ASME Code repair may necessitate a plant shutdown because the allowed outage time specified by the limiting condition for operation for the ECW system may not be sufficient to complete the ASME Code repair. This time limitation is projected to arise from the fact that the amount of time that is needed to implement the repair would delay the restart, there is a potential for fit-up problems during repair, and other delays may be encountered during the completion of the task.
Therefore, the NRC staff finds that requiring the licensee to perform a permanent ASME Code repair would result in a hardship because the affected piping cannot be repaired within the time specified by the limiting condition for operation for the ECW system and, therefore, the plant would need to be shut down in order to perform the permanent ASME Code repair. Requiring the plant to be shut down for repair, in this case, is not warranted taking into consideration the alternative that the licensee has proposed because the shutdown and subsequent restart would unnecessarily cycle plant systems and components.
3.0 CONCLUSION
Based on the information provided in the licensees submittal, the NRC staff concludes that the licensee has provided an acceptable alternative to the requirements of Appendix IX of ASME Code,Section XI, IWA-4310. Performing ASME Code repair immediately would result in plant shutdown, creating a hardship for the licensee, without a compensating increase in the level of quality or safety. Furthermore, the NRC staff concludes that the proposed alternative provides a reasonable assurance of structural integrity during the interim period. Therefore, pursuant to 10 CFR 50.55a(a)(3)(ii) the alternative is authorized for the STPEGS, Unit 1, until the next scheduled outage exceeding 30 days, but not beyond the next refueling outage.
At that time, an ASME Code repair will be performed. All other ASME Code,Section XI, requirements for which relief was not specifically requested and authorized herein by the NRC staff remain applicable, including third party review by the Authorized Nuclear Inservice Inspector.
Principal Contributor: G. Georgiev Date: October 26, 2006
South Texas Project, Units 1 & 2 cc:
Senior Resident Inspector E. D. Halpin U.S. Nuclear Regulatory Commission Site Vice President/
P. O. Box 330 Plant General Manager Wadsworth, TX 77483 STP Nuclear Operating Company P.O. Box 289 C. Kirksey/C. M. Canady Wadsworth, TX 77483 City of Austin Electric Utility Department S. M. Head, Manager, Licensing 721 Barton Springs Road STP Nuclear Operating Company Austin, TX 78704 P. O. Box 289, Mail Code: N5014 Wadsworth, TX 77483 Mr. J. J. Nesrsta Mr. R. K. Temple Environmental and Natural Resources City Public Service Board Policy Director P. O. Box 1771 P. O. Box 12428 San Antonio, TX 78296 Austin, TX 78711-3189 INPO Jon C. Wood Records Center Cox, Smith, & Matthews 700 Galleria Parkway 112 East Pecan, Suite 1800 Atlanta, GA 30339-3064 San Antonio, TX 78205 Regional Administrator, Region IV Director U.S. Nuclear Regulatory Commission Division of Compliance & Inspection 611 Ryan Plaza Drive, Suite 400 Bureau of Radiation Control Arlington, TX 76011 Texas Department of State Health Services 1100 West 49th Street Steve Winn Austin, TX 78756 Texas Genco, LP 12301 Kurland Drive Brian Almon Houston, TX 77034 Public Utility Commission William B. Travis Building Judge, Matagorda County P. O. Box 13326 Matagorda County Courthouse 1701 North Congress Avenue 1700 Seventh Street Austin, TX 78701-3326 Bay City, TX 77414 A. H. Gutterman, Esq.
Morgan, Lewis & Bockius 1111 Pennsylvania Avenue, NW Washington, DC 20004 June 2006
South Texas Project, Units 1 & 2 Susan M. Jablonski Mr. Glenn Adler Office of Permitting, Remediation Senior Research Analyst and Registration Service Employees International Union Texas Commission on 1313 L Street NW.
Environmental Quality Washington, DC 20005 MC-122 P.O. Box 13087 Austin, TX 78711-3087 Mr. Terry Parks, Chief Inspector Texas Department of Licensing and Regulation Boiler Division P. O. Box 12157 Austin, TX 78711 Mr. Ted Enos 4200 South Hulen Suite 630 Ft. Worth, Texas 76109