Category:Code Relief or Alternative
MONTHYEARML22245A0012022-09-12012 September 2022 Relief from the Requirements of the ASME Code ML20227A3852020-09-0303 September 2020 Nonproprietary - Proposed Alternative RR-ENG-3-24 to ASME Code Requirements for the Repair of Essential Cooling Water System Class 3 Buried Piping NOC-AE-20003702, Proposed Alternatives to ASME OM Code 2012 Edition for the Fourth Inservice Test Interval (Relief Request PRR-03)2020-01-22022 January 2020 Proposed Alternatives to ASME OM Code 2012 Edition for the Fourth Inservice Test Interval (Relief Request PRR-03) ML19142A3072019-08-13013 August 2019 Request for Relief Request RR-ENG-3-23 to Extend Volumetric Examination Interval for Reactor Vessel Closure Head Nozzles NOC-AE-19003620, Proposed Alternative for Extension of Volumetric Examination Interval for Reactor Vessel Closure Head with Alloy 690 Nozzles in Accordance with 10 CFR 50.55a(z)(1) (Relief Request RR-ENG-3-23)2019-02-28028 February 2019 Proposed Alternative for Extension of Volumetric Examination Interval for Reactor Vessel Closure Head with Alloy 690 Nozzles in Accordance with 10 CFR 50.55a(z)(1) (Relief Request RR-ENG-3-23) ML18303A2062018-11-0707 November 2018 Request for Relief from ASME Code to Extend the Inservice Inspection Interval for Category B-N-2 and B-N-3 Examinations NOC-AE-18003598, Response to Request for Additional Information Request for Relief from the Third 10-Year Interval ISI Program ASME Section Xl Code Requirements for Category B-N-2 and B-N-3 Welds (Relief Request RR-ENG-3-16)2018-09-26026 September 2018 Response to Request for Additional Information Request for Relief from the Third 10-Year Interval ISI Program ASME Section Xl Code Requirements for Category B-N-2 and B-N-3 Welds (Relief Request RR-ENG-3-16) ML18177A4252018-07-24024 July 2018 Relief from the Requirements of the Asme Code Regarding the Third 10-Year Inservice Inspection Interval ML18187A1492018-07-24024 July 2018 Relief Request RR-ENG-3-22 for the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography NOC-AE-18003578, Request for Relief from the Third 10-Year Interval ISI Program ASME Section Xl Code Requirements for Category B-N-2 and B-N-3 Welds (Relief Request RR-ENG-3-16)2018-06-25025 June 2018 Request for Relief from the Third 10-Year Interval ISI Program ASME Section Xl Code Requirements for Category B-N-2 and B-N-3 Welds (Relief Request RR-ENG-3-16) NOC-AE-18003547, Proposed Alternative to Reactor Vessel Inservice Inspection Intervals (Relief Request RR-ENG-3-14)2018-02-15015 February 2018 Proposed Alternative to Reactor Vessel Inservice Inspection Intervals (Relief Request RR-ENG-3-14) ML16174A0912016-06-30030 June 2016 Relief Request RR-ENG-3-20, Use of ASME Code Case N-770-1, Reactor Vessel Cold Leg Nozzle to Safe-End Welds with Flaw Analysis, for the Third 10-Year Inservice Inspection Interval ML15218A3672015-08-21021 August 2015 Relief Request RR-ENG-17, Relief from Code Case N-770-1, Subsection 2400 and Table 1 Inspection Frequency of Reactor Vessel Cold Leg Nozzle to Safe-End Welds with Flaw Analysis, Third 10-Year ISI Interval ML13102A1262013-04-23023 April 2013 Withdrawal of Relief Request RR-ENG-3-12 from ASME Code Requirements for Periodic Inspection of Reactor Coolant Pressure Boundary Check Valve with Seal Cap, Third 10-year Inservice Inspection Interval ML13087A5172013-04-12012 April 2013 Relief Request RR-ENG-3-09, Request for Relief from ASME Code Requirements; Deferral of Code Repair of Essential Cooling Water System Piping Until April 2013 Refueling Outage ML13004A3392013-03-12012 March 2013 Relief Request RR-ENG-3-10, Reactor Pressure Vessel Head Flange O-Ring Leakoff Lines Non-Destructive Examination, for the Third 10-Year Inservice Inspection Interval NOC-AE-12002939, Request for Relief from ASME Section XI Code Requirements for Periodic Inspection of Reactor Coolant Pressure Boundary Check Valves with Seal Cap Enclosures (Relief Request RR-ENG-3-12)2013-02-0707 February 2013 Request for Relief from ASME Section XI Code Requirements for Periodic Inspection of Reactor Coolant Pressure Boundary Check Valves with Seal Cap Enclosures (Relief Request RR-ENG-3-12) NOC-AE-12002956, Response to Request for Additional Information Regarding Relief Request RR-ENG-3-09 for the Essential Cooling Water System2013-01-31031 January 2013 Response to Request for Additional Information Regarding Relief Request RR-ENG-3-09 for the Essential Cooling Water System ML12243A3432012-09-10010 September 2012 RR RE-ENG-3-04 to Apply Alternative to the American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI Requirements for Examination of Class 1 and 2 Piping Welds ML12235A3472012-08-28028 August 2012 Relief Request RR-ENG-3-06 from ASME Code Requirements for Leak Testing Boundaries of Class 1 Pressure-Retaining Components, Third 10-Year Inservice Inspection Interval (TAC ME7053-ME7054) ML12201A2562012-08-16016 August 2012 Relief Request RR-ENG-3-08, Deferral of Code Repair of Flaws in U2 Essential Cooling Water Class 3 Piping Until Restart from Current Refueling Outage Scheduled for Mid-April 2012 NOC-AE-12002837, Response to Request for Additional Information: Application of an Alternative to Requirements for Examination of Class 1 and Class 2 Piping Welds (Relief Request RR-ENG-3-04)2012-05-0909 May 2012 Response to Request for Additional Information: Application of an Alternative to Requirements for Examination of Class 1 and Class 2 Piping Welds (Relief Request RR-ENG-3-04) NOC-AE-12002807, Request for Relief from ASME Boiler and Pressure Vessel Code, Section XI Requirements for the Essential Cooling Water System (Relief Request RR-ENG-3-08)2012-03-12012 March 2012 Request for Relief from ASME Boiler and Pressure Vessel Code, Section XI Requirements for the Essential Cooling Water System (Relief Request RR-ENG-3-08) ML1118605352011-07-29029 July 2011 Relief Request RR-ENG-2-55 from ASME Code Requirements for Weld Examinations, Second 10-Year Inservice Inspection Interval ML1109803472011-04-20020 April 2011 Relief Request RR-ENG-3-01, from ASME Code Requirements for Steam Generator Main Steam Nozzle Non-Destructive Examination, Third 10-Year Inservice Inspection Interval ML1108109482011-04-0707 April 2011 Request for Relief RR-ENG-3-03 from ASME Code Requirements for Pump Casing Inservice Inspection Examination, Third 10-Year Inservice Inspection Interval ML1108400762011-04-0505 April 2011 Request for Relief RR-ENG-3-02 from ASME Code Requirements for Reactor Pressure Vessel Flange Insert Non-Destructive Examination, Third 10-Year Inservice Inspection Interval NOC-AE-10002600, Request for Relief from ASME Section XI Requirements for Ultrasonic Examination of Reactor Pressure Vessel Shell-to-Flange Welds (RR-ENG-3-05)2010-10-18018 October 2010 Request for Relief from ASME Section XI Requirements for Ultrasonic Examination of Reactor Pressure Vessel Shell-to-Flange Welds (RR-ENG-3-05) NOC-AE-10002594, Request for Relief from ASME Section XI Code Requirements for Pump Casing Inservice Inspection Examination (Relief Request RR-ENG-3-03)2010-09-20020 September 2010 Request for Relief from ASME Section XI Code Requirements for Pump Casing Inservice Inspection Examination (Relief Request RR-ENG-3-03) ML1021500772010-09-0202 September 2010 Relief Request Nos. VRR-01, PRR-03, PRR-02, and PRR-01 for Third 10-year Interval Inservice Testing Program for Pumps and Valves (TAC Nos. ME3515 Through ME3522) ML1006208692010-03-24024 March 2010 Authorization of Relief Request RR-ENG-2-53, Alternative to Inservice Inspection Requirements for Ultrasonic Exam of Reactor Pressure Vessel Shell-to-Flange Weld ML1005395882010-03-12012 March 2010 Relief Request RR-ENG-2-52 from ASME Code, Section XI Requirements for Essential Cooling Water System Code Repair NOC-AE-09002399, Request for Relief from ASME Boiler and Pressure Vessel Code Section XI Requirements for the Essential Cooling Water System (Relief Request RR-ENG-2-52)2009-03-12012 March 2009 Request for Relief from ASME Boiler and Pressure Vessel Code Section XI Requirements for the Essential Cooling Water System (Relief Request RR-ENG-2-52) ML0827502202008-12-0909 December 2008 Relief Request RR-ENG-2-30, Request for Relief to Use ASME Code Case N-516-3, Underwater Welding, Section XI, Division 1 ML0827707852008-11-12012 November 2008 Authorization of Relief Request RR-ENG-2-51 from ASME Code Case N-498-4, on 10-Year System Hydrostatic Testing for Class 1, 2, and 3 Systems ML0824901602008-09-26026 September 2008 Relief Request RR-ENG-2-49, Second 10-Year Inservice Inspection Interval, Deferral of Code Repair in the Essential Cooling Water System Piping ML0735410722008-01-10010 January 2008 Request for Relief No. RR-ENG-2-48 from ASME Code Case N-638-1 Requirements Regarding Start Time for 48-Hour Hold Period Before Non-Destructive Examination of Weld Overlay Repair ML0731204462007-11-30030 November 2007 Relief Request RR-ENG-2-47 for Approval of Temporary Non-code Repair and Deferral of Code Repair Upgraded Essential Cooling Water System Piping NOC-AE-07002211, Relief Request (RR-ENG-2-50) for the Second 10 Year ISI Interval from 10 CFR 50.55a for the Purpose of Invoking Code Case N-698, Design Stress Intensities and Yield Strength Values For...2007-10-0202 October 2007 Relief Request (RR-ENG-2-50) for the Second 10 Year ISI Interval from 10 CFR 50.55a for the Purpose of Invoking Code Case N-698, Design Stress Intensities and Yield Strength Values For... ML0708510082007-04-30030 April 2007 Relief Request No. RR-ENG-2-44 on Deferral of Code Repair of Essential Cooling Water System Indication ML0708102642007-04-0202 April 2007 Relief, Request for Relief No. RR-ENG-2-43 for Remainder of Second 10-year Inservice Inspection Interval Application of Weld Overlays in Pressurizer Nozzle Safe End Welds (TAC Nos. MD1414 - MD1423) ML0706500752007-03-15015 March 2007 Request to Use 2001 Edition Through 2003 Addenda of ASME Code for Operations and Maintenance for Remainder of Second 10-Year Inservice Testing Program Interval ML0704400592007-03-0101 March 2007 Request for Relief No. RR-ENG-2-45 for Remainder of Second 10-year Inservice Inspection Interval Use of Penetrameters in Radiography Examination ML0622303092006-10-26026 October 2006 Response to Relief Request RR-ENG-2-42 for Approval Non-Code Repair and Deferral of Code Repair of Essential Cooling Water System Piping, TAC MC8804 NOC-AE-06002031, Request for Relief from ASME Boiler and Pressure Vessel Code, Section XI Requirements for Use of Penetrameters in Radiographic Examinations2006-06-14014 June 2006 Request for Relief from ASME Boiler and Pressure Vessel Code, Section XI Requirements for Use of Penetrameters in Radiographic Examinations ML0610907542006-05-25025 May 2006 Relief, Relief Request RR-ENG-2-39 and RR-ENG-2-40 for Approval of Temporary Non-code Repair and Deferral of Code Repair of Essential Cooling Water System Piping, Trains 1B and 1C ML0609702402006-05-12012 May 2006 Relief, RR-ENG-2-41 TAC No. MC8279 NOC-AE-05001899, Request for Relief from ASME Boiler and Pressure Vessel Code, Section Xl Requirements for the Essential Cooling Water System (Ecw Train 1 C) (Relief Request RR-ENG-2-40)2005-07-19019 July 2005 Request for Relief from ASME Boiler and Pressure Vessel Code, Section Xl Requirements for the Essential Cooling Water System (Ecw Train 1 C) (Relief Request RR-ENG-2-40) ML0506205052005-03-15015 March 2005 Request for Relief from Requirements of ASME and Pressure Vessel Code RR-ENG-IWE-07 NOC-AE-04001817, Revised Request for Authorization to Use an Alternative to the ASME Boiler and Pressure Vessel Code Section XI Requirements (Relief Request VRR-05)2004-11-0909 November 2004 Revised Request for Authorization to Use an Alternative to the ASME Boiler and Pressure Vessel Code Section XI Requirements (Relief Request VRR-05) 2022-09-12
[Table view] Category:Letter type:NOC
MONTHYEARNOC-AE-230040, Supplement to Proposed Alternate Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (Relief Request RR-ENG-4-06)2023-12-14014 December 2023 Supplement to Proposed Alternate Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (Relief Request RR-ENG-4-06) NOC-AE-230039, Docket Nos. Stn 50-498, Stn 50-499 - Reply to a Notice of Violation, NRC Inspection Report 05000498/2023003 and 05000499/20230032023-12-12012 December 2023 Docket Nos. Stn 50-498, Stn 50-499 - Reply to a Notice of Violation, NRC Inspection Report 05000498/2023003 and 05000499/2023003 NOC-AE-230039, Submittal of Update Foreign Ownership, Control or Influence (FOCI)2023-07-11011 July 2023 Submittal of Update Foreign Ownership, Control or Influence (FOCI) NOC-AE-220039, Physical Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program Revision 252023-02-0606 February 2023 Physical Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program Revision 25 NOC-AE-220038, Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Cask2022-06-23023 June 2022 Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Cask NOC-AE-210038, Submittal of Operations Quality Assurance Plan Changes QA-089, QA-091, and Revision 252022-01-0404 January 2022 Submittal of Operations Quality Assurance Plan Changes QA-089, QA-091, and Revision 25 NOC-AE-21003858, 10 CFR 50.46 Thirty-Day Report of Significant ECCS Model Changes2021-12-0606 December 2021 10 CFR 50.46 Thirty-Day Report of Significant ECCS Model Changes NOC-AE-21003853, Revised Response to End of Enforcement Discretion and Request for Approval of Alternate Disposal Procedures for Very Low-Level Radioactive Material2021-12-0303 December 2021 Revised Response to End of Enforcement Discretion and Request for Approval of Alternate Disposal Procedures for Very Low-Level Radioactive Material NOC-AE-21003848, Unit 1 Cycle 24 Core Operating Limits Report2021-11-18018 November 2021 Unit 1 Cycle 24 Core Operating Limits Report NOC-AE-21003846, Response to End of Enforcement Discretion and Request for Approval of Alternate Disposal Procedures for Very Low-Level Radioactive Material2021-11-0404 November 2021 Response to End of Enforcement Discretion and Request for Approval of Alternate Disposal Procedures for Very Low-Level Radioactive Material NOC-AE-21003842, 10 CFR 50.59 Summary Report2021-09-23023 September 2021 10 CFR 50.59 Summary Report NOC-AE-21003841, Request for Relief from ASME Section Xl Code Requirements for Weld Examinations (Relief Request RR-ENG-3-25)2021-09-23023 September 2021 Request for Relief from ASME Section Xl Code Requirements for Weld Examinations (Relief Request RR-ENG-3-25) NOC-AE-21003832, Supplement to License Amendment Request to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections2021-09-0909 September 2021 Supplement to License Amendment Request to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections NOC-AE-21003812, Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections2021-08-10010 August 2021 Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections NOC-AE-21003825, Update of Foreign Ownership, Control, or Influence Information (FOCI)2021-08-0505 August 2021 Update of Foreign Ownership, Control, or Influence Information (FOCI) NOC-AE-21003824, Update Foreign Ownership, Control, or Influence (FOCI)2021-07-29029 July 2021 Update Foreign Ownership, Control, or Influence (FOCI) NOC-AE-21003823, Update Foreign Ownership Control or Influence (FOCI)2021-07-28028 July 2021 Update Foreign Ownership Control or Influence (FOCI) NOC-AE-21003820, Nuclear Insurance Protection2021-07-20020 July 2021 Nuclear Insurance Protection NOC-AE-21003819, Inservice Inspection Summary Report - 2RE212021-07-15015 July 2021 Inservice Inspection Summary Report - 2RE21 NOC-AE-21003816, Commitment Change Summary Report2021-06-30030 June 2021 Commitment Change Summary Report NOC-AE-21003814, Technical Specification Bases Control Program2021-06-24024 June 2021 Technical Specification Bases Control Program NOC-AE-21003810, Update Foreign Ownership, Control, or Influence (FOCI)- CPS Energy2021-06-17017 June 2021 Update Foreign Ownership, Control, or Influence (FOCI)- CPS Energy NOC-AE-21003811, Update Foreign Ownership, Control, or Influence (FOCI)- Nrg Energy2021-06-17017 June 2021 Update Foreign Ownership, Control, or Influence (FOCI)- Nrg Energy NOC-AE-21003806, Inservice Inspection Program Plan and Inservice Testing Program Snubber Inservice Test Plan for the Fourth Ten-Year Interval2021-05-20020 May 2021 Inservice Inspection Program Plan and Inservice Testing Program Snubber Inservice Test Plan for the Fourth Ten-Year Interval NOC-AE-21003801, Annual Dose Report for 20202021-04-26026 April 2021 Annual Dose Report for 2020 NOC-AE-21003802, 2020 South Texas Project Electric Generating Station Annual Environmental Operating Report2021-04-26026 April 2021 2020 South Texas Project Electric Generating Station Annual Environmental Operating Report NOC-AE-21003804, Operator Licensing Examination Schedule2021-04-21021 April 2021 Operator Licensing Examination Schedule NOC-AE-21003800, Radioactive Effluent Release Report2021-04-19019 April 2021 Radioactive Effluent Release Report NOC-AE-21003799, Changes to South Texas Project Electric Generating Station (STPEGS) Emergency Plan2021-04-15015 April 2021 Changes to South Texas Project Electric Generating Station (STPEGS) Emergency Plan NOC-AE-21003795, Cycle 22 Core Operating Limits Report2021-04-15015 April 2021 Cycle 22 Core Operating Limits Report NOC-AE-21003796, Update Foreign Ownership, Control, or Influence (FOCI)2021-04-15015 April 2021 Update Foreign Ownership, Control, or Influence (FOCI) NOC-AE-21003791, Financial Assurance for Decommissioning - 2021 Update2021-03-31031 March 2021 Financial Assurance for Decommissioning - 2021 Update NOC-AE-21003790, Response to Apparent Violations in NRC Inspection Report 05000498/2020401 and 05000499/2020401: (EA-20-122) (Letter)2021-03-31031 March 2021 Response to Apparent Violations in NRC Inspection Report 05000498/2020401 and 05000499/2020401: (EA-20-122) (Letter) NOC-AE-210037, STP Fire Hazards Analysis Report, Amendment 26 (Redacted)2021-03-30030 March 2021 STP Fire Hazards Analysis Report, Amendment 26 (Redacted) NOC-AE-21003792, STP Fire Hazards Analysis Report, Amendment 26 (Redacted)2021-03-30030 March 2021 STP Fire Hazards Analysis Report, Amendment 26 (Redacted) NOC-AE-200037, License Amendment Request to Revise Technical Specification 3.6.3 to Append a Note and Remove the Index from Technical Specifications2021-03-11011 March 2021 License Amendment Request to Revise Technical Specification 3.6.3 to Append a Note and Remove the Index from Technical Specifications NOC-AE-21003784, Response to Request for Additional Information Regarding 1RE22 Inspection Summary Report for Steam Generator Tubing2021-03-0808 March 2021 Response to Request for Additional Information Regarding 1RE22 Inspection Summary Report for Steam Generator Tubing NOC-AE-21003786, Annual Fitness for Duty Performance Report for 20202021-03-0101 March 2021 Annual Fitness for Duty Performance Report for 2020 NOC-AE-21003785, Evidence of Financial Protection2021-02-23023 February 2021 Evidence of Financial Protection NOC-AE-21003781, Notice Regarding Withdrawal of Funds from Nuclear Decommissioning Trust Subaccounts2021-01-27027 January 2021 Notice Regarding Withdrawal of Funds from Nuclear Decommissioning Trust Subaccounts NOC-AE-21003780, Submittal of Update Foreign Ownership, Control, or Influence (FOCI)2021-01-0707 January 2021 Submittal of Update Foreign Ownership, Control, or Influence (FOCI) NOC-AE-20003778, Changes to South Texas Project Electric Generating Station Emergency Plan2020-12-17017 December 2020 Changes to South Texas Project Electric Generating Station Emergency Plan NOC-AE-20003777, STPNOC Concerns Regarding the Proposed Change to the Evaluated Force-on-Force Inspection Guidance During the COVID-19 Public Health Emergency2020-12-10010 December 2020 STPNOC Concerns Regarding the Proposed Change to the Evaluated Force-on-Force Inspection Guidance During the COVID-19 Public Health Emergency NOC-AE-20003766, Supplement to Change Implementation Date for License Amendment Request to Revise the STPEGS Emergency Plan2020-12-0202 December 2020 Supplement to Change Implementation Date for License Amendment Request to Revise the STPEGS Emergency Plan NOC-AE-20003767, Request for a One-Time Exemption from 10 CFR 73, Appendix 8, Section VI, Subsection C.3.(1)(1) Regarding Annual Force-on-Force (FOF) Exercises, Due to Covid 19 Pandemic2020-11-16016 November 2020 Request for a One-Time Exemption from 10 CFR 73, Appendix 8, Section VI, Subsection C.3.(1)(1) Regarding Annual Force-on-Force (FOF) Exercises, Due to Covid 19 Pandemic NOC-AE-20003765, Inservice Testing Program Description for the Fourth Ten-Year Interval2020-10-28028 October 2020 Inservice Testing Program Description for the Fourth Ten-Year Interval NOC-AE-20003764, 1 RE22 Inspection Summary Report for Steam Generator Tubing2020-10-0707 October 2020 1 RE22 Inspection Summary Report for Steam Generator Tubing NOC-AE-20003762, Supplement to License Amendment Request to Revise Technical Specifications to Adopt TSTF-374, Revision 0, Revision to TS 5.5.13 and Associated TS Bases for Diesel Fuel Oil Using the Consolidated Line Item Improvemen2020-09-22022 September 2020 Supplement to License Amendment Request to Revise Technical Specifications to Adopt TSTF-374, Revision 0, Revision to TS 5.5.13 and Associated TS Bases for Diesel Fuel Oil Using the Consolidated Line Item Improvemen NOC-AE-20003761, Supplement to Exemption Request from 10 CFR 50 Appendix E Due to COVID-19 Pandemic2020-09-10010 September 2020 Supplement to Exemption Request from 10 CFR 50 Appendix E Due to COVID-19 Pandemic NOC-AE-20003760, Update Foreign Ownership. Control. or Influence(FOCI)- Transmittal2020-09-0808 September 2020 Update Foreign Ownership. Control. or Influence(FOCI)- Transmittal 2023-07-11
[Table view] |
Text
Nuclear Operating Company South Texas Pro/ectElectric Generating Station PO Box 289 Wadsworth, Texas 77483 ,
September 20, 2010 NOC-AE-10002594 File No.: G25 10 CFR 50.55a U. S. Nuclear Regulatory Commission Attention: Document Control Desk One White Flint North 11555 Rockville Pike Rockville, MD 20852-2746 South Texas Project Units 1 and 2 Docket Nos. STN 50-498, 50-499 Request for Relief from ASME Section XI Code Requirements for Pump Casing Inservice Inspection Examination (Relief Request RR-ENG-3-03)
In accordance with the provisions of 10 CFR 50.55a(a)(3)(i), the STP Nuclear Operating Company (STPNOC) requests relief from ASME Section XI Code Table IWC-2500-1. This table includes a requirement that a surface examination be performed on essentially 100% of the length of each weld of one pump casing among each group of multiple Class 2 pumps.
However, some welds (or portions of welds) in the pump casings of the Containment Spray, Low Head Safety Injection, and High Head Safety Injection pumps are located in a pump pit and are not accessible for surface examination. Boroscopic VT-1 visual examination meets the criteria for an alternate examination specified in 10 CFR 50.55a(a)(3)(i). Consequently, STPNOC requests approval to use boroscopic VT-1 visual examination as an alternative examination method during the third inservice inspection interval.
Commitments are provided as an attachment.
STPNOC requests NRC review and approval of this relief request by March 1, 2011, to support implementation of the Unit 1 and Unit 2 Ten Year Inservice Inspection Plan for the third interval.
If there are any questions, please contact either Mr. Philip L. Walker at (361) 972-8392 or me at (361) 972-7904.
arco Ruv caba Manager, Testing and Programs Engineering PLW/
Attachment:
- 1) Request for Relief from ASME Section XI Code Requirements for Pump Casing Inservice Inspection Examination (Relief Request RR-ENG-3-03)
- 2) List of Commitments STI: 32733141
NOC-AE-10002594 Page 2 of 2
.cc: (paper copy) (electronic copy)
Regional Administrator, Region IV A. H. Gutterman, Esq.
U. S. Nuclear Regulatory Commission Morgan, Lewis & Bockius LLP 612 East Lamar Blvd., Suite 4004 Arlington, TX 76011-4125 Mohan C. Thadani U. S. Nuclear Regulatory Commission Mohan C. Thadani Peter Nemeth Senior Project Manager Crain Caton & James, P.C.
U.S. Nuclear Regulatory Commission One White Flint North (MS 8 G14) 11555 Rockville Pike C. Mele Rockville, MD 20852 City of Austin Senior Resident Inspector E. Alarcon U. S. Nuclear Regulatory Commission K. Polio P. 0. Box 289, Mail Code: MN116 Richard Pena Wadsworth, TX 77483 City Public Service C. M. Canady John Ragan City of Austin C. Callaway Electric Utility Department J. von Suskil 721 Barton Springs Road NRG South Texas LP Austin, TX 78704 Richard A. Ratliff Alice Rogers Texas Department of State Health Services
Attachment 1 NOC-AE-1 0002594 Page 1 of 4 SOUTH TEXAS PROJECT UNITS I AND 2 REQUEST FOR RELIEF FROM ASME SECTION XI CODE REQUIREMENTS FOR PUMP CASING INSERVICE INSPECTION EXAMINATION (RELIEF REQUEST RR-ENG-3-03)
- 1. Reference Code: ASME Code Section Xl, 2004 Edition, No Addenda
- 2. Components Affected:
(a) Component:
- Containment Spray (CS) Pumps 1A (Unit 1) and 2A (Unit 2): longitudinal seam weld PCW5 and circumferential weld PCW3
- Low Head Safety Injection (LHSI) Pumps 1A (Unit 1) and 2A (Unit 2): longitudinal seam weld PCW5 and circumferential weld PCW3 0 High Head Safety Injection Pumps (HHSI) 1A (Unit 1) and 2A (Unit 2): longitudinal seam weld PCW5 and circumferential weld PCW3 (b)
Description:
" Refer to UFSAR Section 6.2.2.2.2 for Containment Spray pumps
" Refer to UFSAR Section 6.3.2 for Low and High Head Safety Injection pumps (c) Class: ASME Code Class 2
3. Applicable Code Requirement
Table IWC-2500-1, Examination Category C-G, Item C6.10 of ASME Code Section Xl, 2004 Edition, no addenda, requires surface examination of 100% of the welds in all pumps in each piping run examined under Examination Category C-F. As stated in footnotes:
(1) In case of multiple pumps or valves of similar design, size, function, and service in a system, required weld examinations may be limited to all the welds in one pump or one valve in the same group or distributed among any of the pumps or valves of that same group.
(2) The examination may be performed from either the inside or outside surface of the component.
(3) The pumps and valves originally selected for examination shall be reexamined in the same sequence over the service lifetime of the component, to the extent practical.
Attachment 1 NOC-AE-1 0002594 Page 2 of 4
- 4. Basis for Relief from Code Requirements The subject outer barrel (pump casing) welds of the affected pumps are located in pump pits. In order to perform a surface examination on the subject casing welds, either the pump would have to be pulled from the associated pit, or the pump motor and pump internals would have to be removed to allow access to the interior of the pump casing.
The CS, LHSI, and HHSI pumps are of a similar centrifugal multiple stage vertical design, and are manufactured by Pacific Pumps. There are five pressure-retaining casing welds associated with each of the subject pump casings: three circumferential casing welds; one suction nozzle weld; and one longitudinal casing weld. Of these welds, only the lower circumferential weld and the lower portion of the longitudinal casing weld are inaccessible for surface examination while a pump is in its pit. The remaining welds are accessible for the required Section XI surface examination.
The CS and LHSI pump casings are 24 inches in diameter with approximately a three-inch annular clearance between the casing and the pit wall. The HHSI pump casing is 18 inches in diameter with approximately a 6-inch annular clearance. A debris seal covers the annular opening between each pump casing and the edge of the pit. The lower circumferential weld in each pump casing, located approximately 10 feet down in the pump pit, is inaccessible for surface examination. The 10-foot length of each longitudinal casing weld located inside the pump pit is also inaccessible for surface examination. The upper portion of each longitudinal casing weld is accessible for Section XI surface examination for approximately 50 to 55 inches of its overall length. A sketch depicting the typical pump casing and pump pit configuration is attached.
The subject pumps are approximately 30 feet long with the driver mounted. Alignment of the shaft along the multiple vertical stages to the driver coupling is critical to proper operation.
Improper rigging or alignment can result in a bent pump shaft or vibration and subsequent impaired operation and pump damage. Therefore, removal of the pump casing from the pit or removal of the pump internals to gain access to the specified welds to perform a surface examination would present an undue hardship without a compensating increase in quality and safety. Removal could also have a negative impact on quality and safety if the precise alignment required for these vertical pumps is not achieved when they are returned to their positions.
- 5. Alternative Examination:
Pursuant to 10 CFR 50.55a(a)(3)(i), STPNOC proposes an alternative to the examination method required under ASME Section XI, Table IWC-2500-1. Due to the small annular space between the pump casing and the pit wall and the distance of the welds from the access opening at the top of the pit (i.e., up to ten feet), performing a complete surface examination of these welds in the installed condition is not practical. However, this configuration is compatible with a boroscopic visual examination of these welds. Boroscopic VT-1 visual examination will verify welds and adjacent base material are free of significant service-induced degradation.
The accessible welds (or accessible portions of welds) in these pump casings will be examined with a surface examination technique as required by Section Xl code requirements. If a CS, LHSI, or HHSI pump is disassembled during the third inspection
Attachment 1 NOC-AE-1 0002594 Page 3 of 4 interval, STPNOC will perform the Code-required surface examination of the pump casing welds within the pump pit.
- 6. Justification for Granting Relief:
The referenced ASME Section XI Code requires a surface examination of 100% of the pump casing welds of each pump required to be inspected. However, a boroscopic VT-I visual examination of the pump casing. welds within the pump pits is expected to provide an acceptable level of quality and safety by verifying the weld and adjacent base material surfaces are free of significant service-induced degradation. Consequently, the boroscopic VT-1 visual examination meets the criteria of 10 CFR 50.55a(a)(3)(i) as an acceptable alternative.
In addition, the following design considerations apply:
" The outer barrel (pump casing) is exposed to relatively low system suction pressure.
- Detection of excessive leakage from the Safety Injection System and Containment Spray System and rooms in the Fuel Handling Building is provided by level instrumentation in the appropriate sump. Each train of the Safety Injection System and Containment Spray System is located in a separate room with its own sump and duplex sump pumps. The sump pumps and associated piping from the Safety Injection System and Containment Spray System equipment rooms are designated as non-seismic equipment. The leak detection level instrumentation is seismic Category I and Class 1 E.
" Failure of the non-seismic pumps or piping would not affect the functional integrity of the equipment in the room because the equipment is located such that sufficient time is available for operator action.
- Leakage and flooding into Safety Injection System and Containment Spray System pump compartments are alarmed on the Qualified Display Processing System by switches on the level instrumentation for the collection sumps in these compartments. Two independent Class 1 E high level alarms are provided. Only one alarm must remain functional to provide the minimum leak detection capability.
Consequently, the likelihood of a service-related weld failure is unlikely. In addition, if a leak from one of the subject welds should occur, it can be detected quickly.
- 7. Implementation Schedule:
STPNOC requests relief from ASME Section Xl nondestructive examination requirements for the inaccessible pump casing welds described above for the third ten-year inservice inspection interval beginning September 25, 2010 (Unit 1) and October 19, 2010 (Unit 2).
The NRC is requested to review and approve this relief request by March 1, 2011, to support implementation of the Unit 1 and Unit 2 Ten Year Inservice Inspection Plan for the third interval.
Attachment 1 NOC-AE-10002594 Page 4 of 4
- 8. Precedent A similar request for the South Texas Project for the second inspection interval was approved by the NRC by safety evaluation dated February 7, 2000 (ML003680853).
SDý Wrge:N ozdt NVe6rW (PCWV5),
Wr~jd, (PCW3)
Reference Drawing 6F-18-9-N-5062, Rev. 9 (Typical for Containment Spray, Low Head Safety Injection, and High Head Safety Injection Pumps)
Attachment 2 NOC-AE-1 0002594 Page 1 of 1 Commitment:
If a CS, LHSI, or HHSI pump is disassembled during the third inspection interval, STPNOC will perform the Code-required surface examination of the pump casing welds within the pump pit.
Condition Report: 08-9676 Expected Completion Date: December 12, 2010 (incorporation into procedure)