MONTHYEARML22245A0012022-09-12012 September 2022 Relief from the Requirements of the ASME Code ML20227A3852020-09-0303 September 2020 Nonproprietary - Proposed Alternative RR-ENG-3-24 to ASME Code Requirements for the Repair of Essential Cooling Water System Class 3 Buried Piping NOC-AE-20003702, Proposed Alternatives to ASME OM Code 2012 Edition for the Fourth Inservice Test Interval (Relief Request PRR-03)2020-01-22022 January 2020 Proposed Alternatives to ASME OM Code 2012 Edition for the Fourth Inservice Test Interval (Relief Request PRR-03) ML19142A3072019-08-13013 August 2019 Request for Relief Request RR-ENG-3-23 to Extend Volumetric Examination Interval for Reactor Vessel Closure Head Nozzles NOC-AE-19003620, Proposed Alternative for Extension of Volumetric Examination Interval for Reactor Vessel Closure Head with Alloy 690 Nozzles in Accordance with 10 CFR 50.55a(z)(1) (Relief Request RR-ENG-3-23)2019-02-28028 February 2019 Proposed Alternative for Extension of Volumetric Examination Interval for Reactor Vessel Closure Head with Alloy 690 Nozzles in Accordance with 10 CFR 50.55a(z)(1) (Relief Request RR-ENG-3-23) ML18303A2062018-11-0707 November 2018 Request for Relief from ASME Code to Extend the Inservice Inspection Interval for Category B-N-2 and B-N-3 Examinations NOC-AE-18003598, Response to Request for Additional Information Request for Relief from the Third 10-Year Interval ISI Program ASME Section Xl Code Requirements for Category B-N-2 and B-N-3 Welds (Relief Request RR-ENG-3-16)2018-09-26026 September 2018 Response to Request for Additional Information Request for Relief from the Third 10-Year Interval ISI Program ASME Section Xl Code Requirements for Category B-N-2 and B-N-3 Welds (Relief Request RR-ENG-3-16) ML18177A4252018-07-24024 July 2018 Relief from the Requirements of the Asme Code Regarding the Third 10-Year Inservice Inspection Interval ML18187A1492018-07-24024 July 2018 Relief Request RR-ENG-3-22 for the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography NOC-AE-18003578, Request for Relief from the Third 10-Year Interval ISI Program ASME Section Xl Code Requirements for Category B-N-2 and B-N-3 Welds (Relief Request RR-ENG-3-16)2018-06-25025 June 2018 Request for Relief from the Third 10-Year Interval ISI Program ASME Section Xl Code Requirements for Category B-N-2 and B-N-3 Welds (Relief Request RR-ENG-3-16) NOC-AE-18003547, Proposed Alternative to Reactor Vessel Inservice Inspection Intervals (Relief Request RR-ENG-3-14)2018-02-15015 February 2018 Proposed Alternative to Reactor Vessel Inservice Inspection Intervals (Relief Request RR-ENG-3-14) ML16174A0912016-06-30030 June 2016 Relief Request RR-ENG-3-20, Use of ASME Code Case N-770-1, Reactor Vessel Cold Leg Nozzle to Safe-End Welds with Flaw Analysis, for the Third 10-Year Inservice Inspection Interval ML15218A3672015-08-21021 August 2015 Relief Request RR-ENG-17, Relief from Code Case N-770-1, Subsection 2400 and Table 1 Inspection Frequency of Reactor Vessel Cold Leg Nozzle to Safe-End Welds with Flaw Analysis, Third 10-Year ISI Interval ML13102A1262013-04-23023 April 2013 Withdrawal of Relief Request RR-ENG-3-12 from ASME Code Requirements for Periodic Inspection of Reactor Coolant Pressure Boundary Check Valve with Seal Cap, Third 10-year Inservice Inspection Interval ML13087A5172013-04-12012 April 2013 Relief Request RR-ENG-3-09, Request for Relief from ASME Code Requirements; Deferral of Code Repair of Essential Cooling Water System Piping Until April 2013 Refueling Outage ML13004A3392013-03-12012 March 2013 Relief Request RR-ENG-3-10, Reactor Pressure Vessel Head Flange O-Ring Leakoff Lines Non-Destructive Examination, for the Third 10-Year Inservice Inspection Interval NOC-AE-12002939, Request for Relief from ASME Section XI Code Requirements for Periodic Inspection of Reactor Coolant Pressure Boundary Check Valves with Seal Cap Enclosures (Relief Request RR-ENG-3-12)2013-02-0707 February 2013 Request for Relief from ASME Section XI Code Requirements for Periodic Inspection of Reactor Coolant Pressure Boundary Check Valves with Seal Cap Enclosures (Relief Request RR-ENG-3-12) NOC-AE-12002956, Response to Request for Additional Information Regarding Relief Request RR-ENG-3-09 for the Essential Cooling Water System2013-01-31031 January 2013 Response to Request for Additional Information Regarding Relief Request RR-ENG-3-09 for the Essential Cooling Water System ML12243A3432012-09-10010 September 2012 RR RE-ENG-3-04 to Apply Alternative to the American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI Requirements for Examination of Class 1 and 2 Piping Welds ML12235A3472012-08-28028 August 2012 Relief Request RR-ENG-3-06 from ASME Code Requirements for Leak Testing Boundaries of Class 1 Pressure-Retaining Components, Third 10-Year Inservice Inspection Interval (TAC ME7053-ME7054) ML12201A2562012-08-16016 August 2012 Relief Request RR-ENG-3-08, Deferral of Code Repair of Flaws in U2 Essential Cooling Water Class 3 Piping Until Restart from Current Refueling Outage Scheduled for Mid-April 2012 NOC-AE-12002837, Response to Request for Additional Information: Application of an Alternative to Requirements for Examination of Class 1 and Class 2 Piping Welds (Relief Request RR-ENG-3-04)2012-05-0909 May 2012 Response to Request for Additional Information: Application of an Alternative to Requirements for Examination of Class 1 and Class 2 Piping Welds (Relief Request RR-ENG-3-04) NOC-AE-12002807, Request for Relief from ASME Boiler and Pressure Vessel Code, Section XI Requirements for the Essential Cooling Water System (Relief Request RR-ENG-3-08)2012-03-12012 March 2012 Request for Relief from ASME Boiler and Pressure Vessel Code, Section XI Requirements for the Essential Cooling Water System (Relief Request RR-ENG-3-08) ML1118605352011-07-29029 July 2011 Relief Request RR-ENG-2-55 from ASME Code Requirements for Weld Examinations, Second 10-Year Inservice Inspection Interval ML1109803472011-04-20020 April 2011 Relief Request RR-ENG-3-01, from ASME Code Requirements for Steam Generator Main Steam Nozzle Non-Destructive Examination, Third 10-Year Inservice Inspection Interval ML1108109482011-04-0707 April 2011 Request for Relief RR-ENG-3-03 from ASME Code Requirements for Pump Casing Inservice Inspection Examination, Third 10-Year Inservice Inspection Interval ML1108400762011-04-0505 April 2011 Request for Relief RR-ENG-3-02 from ASME Code Requirements for Reactor Pressure Vessel Flange Insert Non-Destructive Examination, Third 10-Year Inservice Inspection Interval NOC-AE-10002600, Request for Relief from ASME Section XI Requirements for Ultrasonic Examination of Reactor Pressure Vessel Shell-to-Flange Welds (RR-ENG-3-05)2010-10-18018 October 2010 Request for Relief from ASME Section XI Requirements for Ultrasonic Examination of Reactor Pressure Vessel Shell-to-Flange Welds (RR-ENG-3-05) NOC-AE-10002594, Request for Relief from ASME Section XI Code Requirements for Pump Casing Inservice Inspection Examination (Relief Request RR-ENG-3-03)2010-09-20020 September 2010 Request for Relief from ASME Section XI Code Requirements for Pump Casing Inservice Inspection Examination (Relief Request RR-ENG-3-03) ML1021500772010-09-0202 September 2010 Relief Request Nos. VRR-01, PRR-03, PRR-02, and PRR-01 for Third 10-year Interval Inservice Testing Program for Pumps and Valves (TAC Nos. ME3515 Through ME3522) ML1006208692010-03-24024 March 2010 Authorization of Relief Request RR-ENG-2-53, Alternative to Inservice Inspection Requirements for Ultrasonic Exam of Reactor Pressure Vessel Shell-to-Flange Weld ML1005395882010-03-12012 March 2010 Relief Request RR-ENG-2-52 from ASME Code, Section XI Requirements for Essential Cooling Water System Code Repair NOC-AE-09002399, Request for Relief from ASME Boiler and Pressure Vessel Code Section XI Requirements for the Essential Cooling Water System (Relief Request RR-ENG-2-52)2009-03-12012 March 2009 Request for Relief from ASME Boiler and Pressure Vessel Code Section XI Requirements for the Essential Cooling Water System (Relief Request RR-ENG-2-52) ML0827502202008-12-0909 December 2008 Relief Request RR-ENG-2-30, Request for Relief to Use ASME Code Case N-516-3, Underwater Welding, Section XI, Division 1 ML0827707852008-11-12012 November 2008 Authorization of Relief Request RR-ENG-2-51 from ASME Code Case N-498-4, on 10-Year System Hydrostatic Testing for Class 1, 2, and 3 Systems ML0824901602008-09-26026 September 2008 Relief Request RR-ENG-2-49, Second 10-Year Inservice Inspection Interval, Deferral of Code Repair in the Essential Cooling Water System Piping ML0735410722008-01-10010 January 2008 Request for Relief No. RR-ENG-2-48 from ASME Code Case N-638-1 Requirements Regarding Start Time for 48-Hour Hold Period Before Non-Destructive Examination of Weld Overlay Repair ML0731204462007-11-30030 November 2007 Relief Request RR-ENG-2-47 for Approval of Temporary Non-code Repair and Deferral of Code Repair Upgraded Essential Cooling Water System Piping NOC-AE-07002211, Relief Request (RR-ENG-2-50) for the Second 10 Year ISI Interval from 10 CFR 50.55a for the Purpose of Invoking Code Case N-698, Design Stress Intensities and Yield Strength Values For...2007-10-0202 October 2007 Relief Request (RR-ENG-2-50) for the Second 10 Year ISI Interval from 10 CFR 50.55a for the Purpose of Invoking Code Case N-698, Design Stress Intensities and Yield Strength Values For... ML0708510082007-04-30030 April 2007 Relief Request No. RR-ENG-2-44 on Deferral of Code Repair of Essential Cooling Water System Indication ML0708102642007-04-0202 April 2007 Relief, Request for Relief No. RR-ENG-2-43 for Remainder of Second 10-year Inservice Inspection Interval Application of Weld Overlays in Pressurizer Nozzle Safe End Welds (TAC Nos. MD1414 - MD1423) ML0706500752007-03-15015 March 2007 Request to Use 2001 Edition Through 2003 Addenda of ASME Code for Operations and Maintenance for Remainder of Second 10-Year Inservice Testing Program Interval ML0704400592007-03-0101 March 2007 Request for Relief No. RR-ENG-2-45 for Remainder of Second 10-year Inservice Inspection Interval Use of Penetrameters in Radiography Examination ML0622303092006-10-26026 October 2006 Response to Relief Request RR-ENG-2-42 for Approval Non-Code Repair and Deferral of Code Repair of Essential Cooling Water System Piping, TAC MC8804 NOC-AE-06002031, Request for Relief from ASME Boiler and Pressure Vessel Code, Section XI Requirements for Use of Penetrameters in Radiographic Examinations2006-06-14014 June 2006 Request for Relief from ASME Boiler and Pressure Vessel Code, Section XI Requirements for Use of Penetrameters in Radiographic Examinations ML0610907542006-05-25025 May 2006 Relief, Relief Request RR-ENG-2-39 and RR-ENG-2-40 for Approval of Temporary Non-code Repair and Deferral of Code Repair of Essential Cooling Water System Piping, Trains 1B and 1C ML0609702402006-05-12012 May 2006 Relief, RR-ENG-2-41 TAC No. MC8279 NOC-AE-05001899, Request for Relief from ASME Boiler and Pressure Vessel Code, Section Xl Requirements for the Essential Cooling Water System (Ecw Train 1 C) (Relief Request RR-ENG-2-40)2005-07-19019 July 2005 Request for Relief from ASME Boiler and Pressure Vessel Code, Section Xl Requirements for the Essential Cooling Water System (Ecw Train 1 C) (Relief Request RR-ENG-2-40) ML0506205052005-03-15015 March 2005 Request for Relief from Requirements of ASME and Pressure Vessel Code RR-ENG-IWE-07 NOC-AE-04001817, Revised Request for Authorization to Use an Alternative to the ASME Boiler and Pressure Vessel Code Section XI Requirements (Relief Request VRR-05)2004-11-0909 November 2004 Revised Request for Authorization to Use an Alternative to the ASME Boiler and Pressure Vessel Code Section XI Requirements (Relief Request VRR-05) 2022-09-12
[Table view] Category:Letter type:NOC
MONTHYEARNOC-AE-230040, Supplement to Proposed Alternate Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (Relief Request RR-ENG-4-06)2023-12-14014 December 2023 Supplement to Proposed Alternate Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (Relief Request RR-ENG-4-06) NOC-AE-230039, Docket Nos. Stn 50-498, Stn 50-499 - Reply to a Notice of Violation, NRC Inspection Report 05000498/2023003 and 05000499/20230032023-12-12012 December 2023 Docket Nos. Stn 50-498, Stn 50-499 - Reply to a Notice of Violation, NRC Inspection Report 05000498/2023003 and 05000499/2023003 NOC-AE-230039, Submittal of Update Foreign Ownership, Control or Influence (FOCI)2023-07-11011 July 2023 Submittal of Update Foreign Ownership, Control or Influence (FOCI) NOC-AE-220039, Physical Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program Revision 252023-02-0606 February 2023 Physical Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program Revision 25 NOC-AE-220038, Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Cask2022-06-23023 June 2022 Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Cask NOC-AE-210038, Submittal of Operations Quality Assurance Plan Changes QA-089, QA-091, and Revision 252022-01-0404 January 2022 Submittal of Operations Quality Assurance Plan Changes QA-089, QA-091, and Revision 25 NOC-AE-21003858, 10 CFR 50.46 Thirty-Day Report of Significant ECCS Model Changes2021-12-0606 December 2021 10 CFR 50.46 Thirty-Day Report of Significant ECCS Model Changes NOC-AE-21003853, Revised Response to End of Enforcement Discretion and Request for Approval of Alternate Disposal Procedures for Very Low-Level Radioactive Material2021-12-0303 December 2021 Revised Response to End of Enforcement Discretion and Request for Approval of Alternate Disposal Procedures for Very Low-Level Radioactive Material NOC-AE-21003848, Unit 1 Cycle 24 Core Operating Limits Report2021-11-18018 November 2021 Unit 1 Cycle 24 Core Operating Limits Report NOC-AE-21003846, Response to End of Enforcement Discretion and Request for Approval of Alternate Disposal Procedures for Very Low-Level Radioactive Material2021-11-0404 November 2021 Response to End of Enforcement Discretion and Request for Approval of Alternate Disposal Procedures for Very Low-Level Radioactive Material NOC-AE-21003842, 10 CFR 50.59 Summary Report2021-09-23023 September 2021 10 CFR 50.59 Summary Report NOC-AE-21003841, Request for Relief from ASME Section Xl Code Requirements for Weld Examinations (Relief Request RR-ENG-3-25)2021-09-23023 September 2021 Request for Relief from ASME Section Xl Code Requirements for Weld Examinations (Relief Request RR-ENG-3-25) NOC-AE-21003832, Supplement to License Amendment Request to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections2021-09-0909 September 2021 Supplement to License Amendment Request to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections NOC-AE-21003812, Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections2021-08-10010 August 2021 Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections NOC-AE-21003825, Update of Foreign Ownership, Control, or Influence Information (FOCI)2021-08-0505 August 2021 Update of Foreign Ownership, Control, or Influence Information (FOCI) NOC-AE-21003824, Update Foreign Ownership, Control, or Influence (FOCI)2021-07-29029 July 2021 Update Foreign Ownership, Control, or Influence (FOCI) NOC-AE-21003823, Update Foreign Ownership Control or Influence (FOCI)2021-07-28028 July 2021 Update Foreign Ownership Control or Influence (FOCI) NOC-AE-21003820, Nuclear Insurance Protection2021-07-20020 July 2021 Nuclear Insurance Protection NOC-AE-21003819, Inservice Inspection Summary Report - 2RE212021-07-15015 July 2021 Inservice Inspection Summary Report - 2RE21 NOC-AE-21003816, Commitment Change Summary Report2021-06-30030 June 2021 Commitment Change Summary Report NOC-AE-21003814, Technical Specification Bases Control Program2021-06-24024 June 2021 Technical Specification Bases Control Program NOC-AE-21003810, Update Foreign Ownership, Control, or Influence (FOCI)- CPS Energy2021-06-17017 June 2021 Update Foreign Ownership, Control, or Influence (FOCI)- CPS Energy NOC-AE-21003811, Update Foreign Ownership, Control, or Influence (FOCI)- Nrg Energy2021-06-17017 June 2021 Update Foreign Ownership, Control, or Influence (FOCI)- Nrg Energy NOC-AE-21003806, Inservice Inspection Program Plan and Inservice Testing Program Snubber Inservice Test Plan for the Fourth Ten-Year Interval2021-05-20020 May 2021 Inservice Inspection Program Plan and Inservice Testing Program Snubber Inservice Test Plan for the Fourth Ten-Year Interval NOC-AE-21003801, Annual Dose Report for 20202021-04-26026 April 2021 Annual Dose Report for 2020 NOC-AE-21003802, 2020 South Texas Project Electric Generating Station Annual Environmental Operating Report2021-04-26026 April 2021 2020 South Texas Project Electric Generating Station Annual Environmental Operating Report NOC-AE-21003804, Operator Licensing Examination Schedule2021-04-21021 April 2021 Operator Licensing Examination Schedule NOC-AE-21003800, Radioactive Effluent Release Report2021-04-19019 April 2021 Radioactive Effluent Release Report NOC-AE-21003799, Changes to South Texas Project Electric Generating Station (STPEGS) Emergency Plan2021-04-15015 April 2021 Changes to South Texas Project Electric Generating Station (STPEGS) Emergency Plan NOC-AE-21003795, Cycle 22 Core Operating Limits Report2021-04-15015 April 2021 Cycle 22 Core Operating Limits Report NOC-AE-21003796, Update Foreign Ownership, Control, or Influence (FOCI)2021-04-15015 April 2021 Update Foreign Ownership, Control, or Influence (FOCI) NOC-AE-21003791, Financial Assurance for Decommissioning - 2021 Update2021-03-31031 March 2021 Financial Assurance for Decommissioning - 2021 Update NOC-AE-21003790, Response to Apparent Violations in NRC Inspection Report 05000498/2020401 and 05000499/2020401: (EA-20-122) (Letter)2021-03-31031 March 2021 Response to Apparent Violations in NRC Inspection Report 05000498/2020401 and 05000499/2020401: (EA-20-122) (Letter) NOC-AE-210037, STP Fire Hazards Analysis Report, Amendment 26 (Redacted)2021-03-30030 March 2021 STP Fire Hazards Analysis Report, Amendment 26 (Redacted) NOC-AE-21003792, STP Fire Hazards Analysis Report, Amendment 26 (Redacted)2021-03-30030 March 2021 STP Fire Hazards Analysis Report, Amendment 26 (Redacted) NOC-AE-200037, License Amendment Request to Revise Technical Specification 3.6.3 to Append a Note and Remove the Index from Technical Specifications2021-03-11011 March 2021 License Amendment Request to Revise Technical Specification 3.6.3 to Append a Note and Remove the Index from Technical Specifications NOC-AE-21003784, Response to Request for Additional Information Regarding 1RE22 Inspection Summary Report for Steam Generator Tubing2021-03-0808 March 2021 Response to Request for Additional Information Regarding 1RE22 Inspection Summary Report for Steam Generator Tubing NOC-AE-21003786, Annual Fitness for Duty Performance Report for 20202021-03-0101 March 2021 Annual Fitness for Duty Performance Report for 2020 NOC-AE-21003785, Evidence of Financial Protection2021-02-23023 February 2021 Evidence of Financial Protection NOC-AE-21003781, Notice Regarding Withdrawal of Funds from Nuclear Decommissioning Trust Subaccounts2021-01-27027 January 2021 Notice Regarding Withdrawal of Funds from Nuclear Decommissioning Trust Subaccounts NOC-AE-21003780, Submittal of Update Foreign Ownership, Control, or Influence (FOCI)2021-01-0707 January 2021 Submittal of Update Foreign Ownership, Control, or Influence (FOCI) NOC-AE-20003778, Changes to South Texas Project Electric Generating Station Emergency Plan2020-12-17017 December 2020 Changes to South Texas Project Electric Generating Station Emergency Plan NOC-AE-20003777, STPNOC Concerns Regarding the Proposed Change to the Evaluated Force-on-Force Inspection Guidance During the COVID-19 Public Health Emergency2020-12-10010 December 2020 STPNOC Concerns Regarding the Proposed Change to the Evaluated Force-on-Force Inspection Guidance During the COVID-19 Public Health Emergency NOC-AE-20003766, Supplement to Change Implementation Date for License Amendment Request to Revise the STPEGS Emergency Plan2020-12-0202 December 2020 Supplement to Change Implementation Date for License Amendment Request to Revise the STPEGS Emergency Plan NOC-AE-20003767, Request for a One-Time Exemption from 10 CFR 73, Appendix 8, Section VI, Subsection C.3.(1)(1) Regarding Annual Force-on-Force (FOF) Exercises, Due to Covid 19 Pandemic2020-11-16016 November 2020 Request for a One-Time Exemption from 10 CFR 73, Appendix 8, Section VI, Subsection C.3.(1)(1) Regarding Annual Force-on-Force (FOF) Exercises, Due to Covid 19 Pandemic NOC-AE-20003765, Inservice Testing Program Description for the Fourth Ten-Year Interval2020-10-28028 October 2020 Inservice Testing Program Description for the Fourth Ten-Year Interval NOC-AE-20003764, 1 RE22 Inspection Summary Report for Steam Generator Tubing2020-10-0707 October 2020 1 RE22 Inspection Summary Report for Steam Generator Tubing NOC-AE-20003762, Supplement to License Amendment Request to Revise Technical Specifications to Adopt TSTF-374, Revision 0, Revision to TS 5.5.13 and Associated TS Bases for Diesel Fuel Oil Using the Consolidated Line Item Improvemen2020-09-22022 September 2020 Supplement to License Amendment Request to Revise Technical Specifications to Adopt TSTF-374, Revision 0, Revision to TS 5.5.13 and Associated TS Bases for Diesel Fuel Oil Using the Consolidated Line Item Improvemen NOC-AE-20003761, Supplement to Exemption Request from 10 CFR 50 Appendix E Due to COVID-19 Pandemic2020-09-10010 September 2020 Supplement to Exemption Request from 10 CFR 50 Appendix E Due to COVID-19 Pandemic NOC-AE-20003760, Update Foreign Ownership. Control. or Influence(FOCI)- Transmittal2020-09-0808 September 2020 Update Foreign Ownership. Control. or Influence(FOCI)- Transmittal 2023-07-11
[Table view] |
Text
Nuclear Operating Company South Texas Pro/ect Electric Generatin, Station 7.0 Box 289 Wadsvorth, Texas 77483 _ __/__- -
February 7, 2013 NOC-AE-12002939 10 CFR 50.55a U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555-0001 South Texas Project Unit 2 Docket No. STN 50-499 Request for Relief from ASME Section Xl Code Requirements for Periodic Inspection of Reactor Coolant Pressure Boundary Check Valves with Seal Cap Enclosures (Relief Request RR-ENG-3-12)
References:
- 1. Letter, W. C. Walker to D. Koehl, "South Texas Project Electric Generating Station - NRC Integrated Inspection Report 05000498/2012004 and 05000499/2012004," dated November 8, 2012 (ML12313A345)
- 2. NRC Information Notice 2012-15, "Use of Seal Cap Enclosures to Mitigate Leakage from Joints That Use A-286 Bolts," dated August 9, 2012 (ML121740012)
In accordance with the provisions of 10 CFR 50.55a(a)(3)(ii), the STP Nuclear Operating Company (STPNOC) requests relief for South Texas Project (STP) Unit 2, for the third inspection interval, from the ASME Section XI Code requirements for periodic inspection of reactor coolant pressure boundary (RCPB) check valves with installed seal cap enclosures.
Seal cap enclosures restrict access to the pressure boundary at the bolted joint of the body to bonnet as discussed in References 1 and 2. STPNOC has determined that compliance with the code inspection requirements for the affected RCPB check valves, for the interim period until the remaining seal caps are removed, would result in unnecessary hardship without a compensating increase in the level of quality and safety. As an alternative to the code requirements, STPNOC proposes to perform inspections at the seal cap enclosures. The details of the relief request are provided in the attachment to this letter.
STPNOC requests NRC review and approval by May 31, 2013, to support use of the! proposed alternative when authorized, as required by 10 CFR 50.55a(a)(3), until removal of the remaining seal caps. These activities are planned to be completed during the next scheduled STP Unit 2 refueling outage in 2013.
There are no commitments in this letter.
STI: 33635004
NOC-AE-12002939 Page 2 of 3 If there are any questions, please contact Coley Chappell at 361-972-4745, or me at 361-972-7867.
D. W. Rencurrel Senior Vice President ccc
Attachment:
Request for Relief from ASME Section XI Code Requirements for Periodic Inspection of Reactor Coolant Pressure Boundary Check Valves with Seal Cap Enclosures (Relief Request RR-ENG-3-12)
NOC-AE-12002939 Page 3 of 3 cc: (paper copy) (electronic copy)
Regional Administrator, Region IV A. H. Gutterman, Esquire U. S. Nuclear Regulatory Commission Morgan, Lewis & Bockius LLP 1600 East Lamar Boulevard Arlington, TX 76011-4511 Balwant K. Singal U. S. Nuclear Regulatory Commission Balwant K. Singal John Ragan Senior Project Manager Chris O'Hara U.S. Nuclear Regulatory Commission Jim von Suskil One White Flint North (MS 8 B1) NRG South Texas LP 11555 Rockville Pike Rockville, MD 20852 NRC Resident Inspector Kevin Polio U. S. Nuclear Regulatory Commission Richard Peha P.O. Box 289, Mail Code: MN116 City Public Service Wadsworth, TX 77483 C. M. Canady Peter Nemeth City of Austin Crain Caton & James, P.C.
Electric Utility Department 721 Barton Springs Road C. Mele Austin, TX 78704 City of Austin Richard A. Ratliff Alice Rogers Texas Department of State Health Services
Attachment NOC-AE-12002939 Page 1 of 7 SOUTH TEXAS PROJECT UNIT 2 REQUEST FOR RELIEF FROM ASME SECTION XI CODE REQUIREMENTS FOR PERIODIC INSPECTION OF REACTOR COOLANT PRESSURE BOUNDARY CHECK VALVES WITH SEAL CAP ENCLOSURES (RELIEF REQUEST RR-ENG-3-12)
In accordance with the provisions of 10 CFR 50.55a(a)(3)(ii), the STP Nuclear Operating Company (STPNOC) requests relief for South Texas Project (STP) Unit 2, for the third inspection interval, from the ASME Section XI Code requirements for periodic inspection of reactor coolant pressure boundary (RCPB) check valves with installed seal cap enclosures.
The enclosures restrict access to the pressure retaining boundary (at the bolted joint of the body to bonnet) for required code inspections. STPNOC has determined that compliance with the code inspection requirements, for the interim period until the remaining seal caps are removed, would result in unnecessary hardship without a compensating increase in the level of quality and safety. As an alternative to the code requirements, STPNOC proposes to perform inspections at the seal cap enclosures. The details of the relief request are provided below.
- 1. Components for Which Relief is Requested The components affected are STP Unit 2 chemical and volume control system (CVCS) and safety injection system (SIS) check valves with seal cap enclosures installed:
The components are ASME Section III Class 1 and act as part of the RCPB. The CVCS check valves, Sl-0010A, and connections from CVCS and SIS to the reactor coolant system (RCS) are shown on the following figures (from Reference 1):
- Figure 9.3.4-1, "Piping & Instrumentation Diagram Chemical and Volume Control System," Drawing 5R179F05005#2, Revision 27
- Figure 6.3-1, "Piping and Instrument Diagram Safety Injection System," Drawing 5N129F05013#2, Revision 32 Figure 5.1-1, "Piping and Instrumentation Diagram RCS Primary Coolant Loop,"
Drawing 5R149F05001#2, Revision 33 CV-0001, CV-0002, CV-0004 and CV-0005 are 4-inch swing check valves located in 4-inch nominal diameter CVCS piping. CV-0001 and CV-0002 are located in series in the normal charging line to the cold leg of RCS Loop 1. CV-0004 and CV-0005 are located in series in the alternate charging line to the cold leg of RCS Loop 3. There are no isolation valves between these valves and the RCS. Although the two sets of valves are located in different parts of the CVCS (normal and alternate charging lines), their safety functions are the same and include:
Attachment NOC-AE-12002939 Page 2 of 7
- Prevent backflow from the RCS into their respective CVCS lines
- Act as part of the pressure boundary of the RCS for isolation of the Class 1 RCS pressure boundary from the upstream Class 2 portion of the CVCS charging line (refer to Reference 1, Section 5.2.4.1, "System Boundary Subject to Inspection")
Support the overall design functions of the CVCS during normal and postulated plant accident conditions (refer to Reference 1, Section 9.3.4.1, "Chemical and Volume Control System")
The CVCS check valves are part of the flowpaths used to provide safety grade boration and makeup capabilities for cold shutdown. The valves support the normal function of the charging flowpaths, required to pass flow during all normal plant operating conditions which use the charging lines (normal charging line alternated with the alternate charging line).
The CVCS check valves are constructed from austenitic stainless steel body (SA1 82, Type 316) and bonnet (SA240, Type 316 or alternate material SA 82 Type F316) joined using type SA453 Grade 660 studs and SA 94 Grade 6 nuts. The design code for these valves is the ASME Boiler and Pressure Vessel (B&PV) Code,Section III, 1974 Edition through the Winter of 1975 Addenda.
Sl-0010A is an 8-inch swing check valve located in the 8-inch nominal diameter SIS piping.
The valve is located in the SIS discharge to the hot leg of RCS Loop 1 from the high head safety injection (HHSI) pump 2A and the low head safety injection (LHSI) pump 2A. The valve is the first check valve from the RCS hot leg that separates RCS from HHSI and LHSI pumping systems. The safety functions are to provide pressure isolation and prevent RCS back leakage into the HHSI and LHSI pumping systems.
SI-0010A is constructed from an austenitic stainless steel body (SA1 82, Type 316) and bonnet (SA240, Type 316, or alternate material SA1 82 Type F316) joined using SA453 Grade 660 studs and nuts. The design code for this valve is ASME B&PV Code,Section III, 1974 Edition through the Winter of 1975 Addenda.
2. Applicable Code Edition and Addenda
ASME Boiler and Pressure Vessel (B&PV) Code Section XI, 2004 Edition (no addenda).
- 3. Applicable Code Requirements IWA-1400 OWNER'S RESPONSIBILITY states that the responsibilities of the Owner of the nuclear power plant shall include the design and arrangement of system components to include allowances for adequate access and clearances for conduct of the examination and tests.
IWA-1 500 ACCESSIBILITY states that provisions for accessibility shall include considerations for access for the Inspector, examination personnel, and equipment necessary to conduct the examinations.
Attachment NQC-AE-12002939 Page 3 of 7 IWA-5240 VISUAL EXAMINATION, IWA-5241 Insulated and Non-insulated Components, requires:
(a) The VT-2 visual examination shall be conducted by examining the accessible external exposed surfaces of pressure retaining components for evidence of leakage.
(b) For components whose external surfaces are inaccessible for direct VT-2 visual examination, only the examination of the surrounding area (including floor areas or equipment surfaces located underneath the components) for evidence of leakage shall be required.
- Table IWB-2500-1, Category B-P (all Class 1 pressure retaining components) requires a system leakage test frequency of every refueling outage.
IWB-5220 SYSTEM LEAKAGE TEST, IWB-5221 Pressure, requires:
(a) The system leakage test shall be conducted at a pressure not less than the pressure corresponding to 100% rated reactor power.
(b) The system test pressure and temperature shall be attained at a rate in accordance with the heat-up limitations specified for the system.
Additional discussion regarding the requirements for ASME Section III Class 1 components is provided in Reference 1, Section 5.2.4.2, "Access Provisions," and Section 5.2.4.2.6, "Valve Pressure Boundaries."
4. Reason for Request
In accordance with the provisions of 10 CFR 50.55a(a)(3)(ii), STPNOC requests relief from the code requirement to periodically inspect the pressure retaining boundary (at the bolted joint of the body to bonnet of each affected RCPB check valve), for the interim period until the remaining seal cap enclosures are removed.
STPNOC has determined that removal of the installed seal cap enclosures in order to comply with the code requirement, prior to the permanent removal of the seal caps, would result in unusual difficulty without a compensating increase in the level of quality and safety.
The affected RCPB check valves are located in the reactor containment building bio-shield area and are not normally accessible for inspection except during outage conditions. No inspection techniques have been identified to permit detection of stud bolt failure without first removing the enclosure. In order to perform the code required inspections, the unit would be required to be shutdown and the seal cap enclosures removed to inspect the stud bolts. To perform these inspections would require the removal of insulation, removal of seal cap enclosures, inspections of the check valve pressure retaining boundary at the bolted joint of the body to bonnet, and reinstallation of the seal cap enclosures and insulation that would result in additional dose to personnel. Recent inspections on a majority of the studs on the affected valves have identified no structural degradation and provide reasonable assurance of structural integrity for the interim period until the seal cap enclosures are permanently removed. Activities to remove all the seal cap enclosures on the affected RCPB check valves are planned to be completed during the next scheduled STP Unit 2 refueling outage in 2013 (2RE16).
Attachment NOC-AE-12002939 Page 4 of 7
- 5. Proposed Alternative and Basis for Use As an alternative to the code examination requirements, STPNOC proposes to inspect the RCPB check valves with the seal cap enclosures installed, at normal operating temperature and pressure. The inspections will be performed at the valve seal cap enclosures, rather than at the pressure retaining boundary at the bolted joint of the body to bonnet, and will follow the ASME Section Xl code requirements for accessibility to allow for inspections to be performed without removal of insulation. Inspections will be performed at the Unit 2 refueling outage frequency. Use of the alternate examination method will continue until the seal cap enclosures are removed.
Detection of failures of the welds joining the valve to enclosure may be possible by detection of leaks. In previous examples (see References 2 and 3), failures were detected by insulation removal and identification of boric acid deposits (see Figure 2). Any significant leakage in this condition would be expected to clearly exhibit boric acid accumulation that would be discernible during the required VT-2 visual examinations. RCS leakage would be evident on the insulation on the valves, as indicated by water and boric acid crystals.
- 6. Technical Justification
Background
Seal cap enclosures had been previously welded over the bonnets and studs to address external valve leakage at the body to bonnet flange such as a gasket leak. Modifications to the CVCS valves were completed in the late 1980's. The seal cap enclosure was originally installed on SI-001 OA in 1997 due to identified leakage from the body-to-bonnet gasket.
Figure 1 shows a typical seal cap enclosure. As discussed in References 2 and 3, a concern with the installation of seal cap enclosures as mitigation for non-pressure boundary leakage is the potential for unmanaged degradation, since direct inspection of the pressure-retaining bolted joint enclosed by the valve seal cap is prevented.
During the STP Unit 2 refueling outage in 2011 (2RE1 5), leakage from the SI-001 OA seal cap was discovered on October 30, 2011. The weld attaching the cap to the bonnet had several defects which were removed and re-welded during the outage. The NRC raised a question regarding the structural integrity of the studs encapsulated by the seal cap, stemming from the potential for corrosion of the studs due to the environment inside the seal cap and the fact that inspection of the studs was not possible with the cap installed.
To address regulatory concerns regarding stress corrosion cracking, STPNOC has removed the seal caps from the STP Unit 1 CVCS check valves and is planning to remove the seal caps from all of the affected valves on STP Unit 2 at the next scheduled refueling outage in 2013.
Reasonable Assurance of Structural Integrity Inspections performed during recent Unit 1 and Unit 2 outages have been performed of nearly two-thirds (63%, or 60 of 96) of the studs on the affected STP Unit 1 and Unit 2
Attachment NOC-AE-12002939 Page 5 of 7 CVCS check valves and 100% (16/16) of the Unit 2 SIS check valve studs. Inspections have identified no damage to the bolted joint (studs and nuts) or degradation on the studs.
" During the STP Unit 1 planned refueling outage October-November 2012 (1 RE17),
seal caps on CV-0001, CV-0002, CV-0004 and CV-0005 were removed and replaced with a modified bonnet design from the Original Equipment Manufacturer (Westinghouse) which incorporates a seal weld provision (Reference 4). The original CVCS check valves were of a vintage of Westinghouse check valves which are not configured to accept a seal weld of the main flange joint. The intent of seal welding this joint is to prevent external leakage in the event of gasket degradation and to allow access to perform inspection of the bolting material (studs and nuts). Prior to the actual bonnet replacement the original stud bolts and nuts (twelve per valve) were individually removed, cleaned, visually inspected, and reinstalled applying the full operational torque value. No damage was observed on the original stud bolts or nuts during the visual inspection, and any damage would have resulted in a failure during the torquing process. Subsequently as part of the bonnet replacement, the original stud bolts and nuts were replaced with new longer studs and new nuts. This process was performed with the reactor head removed and refueling cavity flooded.
- In April 2012, during the STP Unit 2 forced outage that commenced in late 2011 (2F1 102), the top portions of the seal caps on check valves CV-0005 and SI-0010A were removed. All the stud bolts were ultrasonically inspected for stress corrosion cracking with no indications of any degradation. The seal caps were then welded back in place prior to Unit 2 restart.
These inspection results, with no findings of any degradation of the check valve studs and nuts supporting the pressure retaining function, provide reasonable assurance that the remaining studs on the affected Unit 2 check valves are acceptable for continued use and that the pressure boundary will continue to perform its intended safety function.
Planned Repairs All of the stud bolts and nuts for the affected STP Unit 2 check valves are scheduled to be replaced as part of the permanent valve repairs and removal of seal cap enclosures planned for the next scheduled refueling outage in 2013 (2RE16). Similar to the repairs previously completed on Unit 1 CVCS check valves, the work planned to be completed includes:
- For each affected CVCS check valve, replacing the existing studs and bonnets with new studs and new bonnet designed to apply a body to bonnet seal weld within the bolting circle of the joint; and
- For the SI-001 OA valve, replacing the existing studs and reusing the existing bonnet which already allows a seal weld of the body to bonnet joint within the bolting circle of the joint.
With permanent removal of the existing seal cap enclosures and the installation of seal welds within the bolting circle of the joint, inspection of the valve body to bonnet joints may then be performed with no accessibility restrictions if leakage is identified during system pressure test, in accordance with the code requirements.
Attachment NOC-AE-12002939 Page 6 of 7 6., Duration of Proposed Alternative STPNOC requests NRC review and approval of this relief request by May 31, 2013, to support use of the proposed alternative when authorized, as required by § 50.55a(a)(3).
Relief is requested during the third ten-year inservice inspection interval for STP Unit 2 for the interim period until all seal cap enclosures are removed from the affected RCPB check valves. These activities are planned to be completed during the scheduled refueling outage in 2013 (2RE16). The third interval for STP Unit 2 began October 19, 2010, and ends October 18, 2020.
- 7. References (1) South Texas Project Electric Generating Station (STPEGS) Updated Final Safety Analysis Report (UFSAR)
(2) Letter, W. C. Walker to D. Koehl, "South Texas Project Electric Generating Station -
NRC Integrated Inspection Report," dated November 8, 2012 (ML12313A345)
(3) NRC Information Notice 2012-15, "Use of Seal Cap Enclosures to Mitigate Leakage from Joints That Use A-286 Bolts," dated August 9, 2012 (ML121740012)
(4) STPNOC Design Change Package (DCP) Number 12-2110-2, "Remove the Seal Caps from XCV0001, XCV0002, XCV0004, and XCV0005"
Attachment NOC-AE-1 2002939 Page 7 of 7 CHAMFER EDGES TYR 8 1141 Figure 1. Diagram of seal cap enclosure for SI-0010A, typical for affected RCPB check valves Figure 2. Seal cap enclosure for SI-0010A exhibiting boric acid deposits as a result of seal weld leakage (not pressure boundary leakage)