 Issue dateTitleTopic
ML22245A00112 September 2022Relief from the Requirements of the ASME CodeProbabilistic Risk Assessment
Nondestructive Examination
VT-2
Incorporated by reference
Large early release frequency
Liquid penetrant
Pressure Boundary Leakage
Dissimilar Metal Weld
ML20227A3853 September 2020Nonproprietary - Proposed Alternative RR-ENG-3-24 to ASME Code Requirements for the Repair of Essential Cooling Water System Class 3 Buried PipingFinite Element Analysis
Biofouling
NOC-AE-20003702, Proposed Alternatives to ASME OM Code 2012 Edition for the Fourth Inservice Test Interval (Relief Request PRR-03)22 January 2020Proposed Alternatives to ASME OM Code 2012 Edition for the Fourth Inservice Test Interval (Relief Request PRR-03)
ML19142A30713 August 2019Request for Relief Request RR-ENG-3-23 to Extend Volumetric Examination Interval for Reactor Vessel Closure Head NozzlesBoric Acid
Incorporated by reference
NOC-AE-19003620, Proposed Alternative for Extension of Volumetric Examination Interval for Reactor Vessel Closure Head with Alloy 690 Nozzles in Accordance with 10 CFR 50.55a(z)(1) (Relief Request RR-ENG-3-23)28 February 2019Proposed Alternative for Extension of Volumetric Examination Interval for Reactor Vessel Closure Head with Alloy 690 Nozzles in Accordance with 10 CFR 50.55a(z)(1) (Relief Request RR-ENG-3-23)Boric Acid
Reactor Vessel Water Level
VT-2
ML18303A2067 November 2018Request for Relief from ASME Code to Extend the Inservice Inspection Interval for Category B-N-2 and B-N-3 ExaminationsIncorporated by reference
NOC-AE-18003598, Response to Request for Additional Information Request for Relief from the Third 10-Year Interval ISI Program ASME Section Xl Code Requirements for Category B-N-2 and B-N-3 Welds (Relief Request RR-ENG-3-16)26 September 2018Response to Request for Additional Information Request for Relief from the Third 10-Year Interval ISI Program ASME Section Xl Code Requirements for Category B-N-2 and B-N-3 Welds (Relief Request RR-ENG-3-16)
ML18177A42524 July 2018Relief from the Requirements of the Asme Code Regarding the Third 10-Year Inservice Inspection IntervalProbabilistic Risk Assessment
ML18187A14924 July 2018Relief Request RR-ENG-3-22 for the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of RadiographyDissimilar Metal Weld
NOC-AE-18003578, Request for Relief from the Third 10-Year Interval ISI Program ASME Section Xl Code Requirements for Category B-N-2 and B-N-3 Welds (Relief Request RR-ENG-3-16)25 June 2018Request for Relief from the Third 10-Year Interval ISI Program ASME Section Xl Code Requirements for Category B-N-2 and B-N-3 Welds (Relief Request RR-ENG-3-16)
NOC-AE-18003547, Proposed Alternative to Reactor Vessel Inservice Inspection Intervals (Relief Request RR-ENG-3-14)15 February 2018Proposed Alternative to Reactor Vessel Inservice Inspection Intervals (Relief Request RR-ENG-3-14)Probabilistic Risk Assessment
ML16174A09130 June 2016Relief Request RR-ENG-3-20, Use of ASME Code Case N-770-1, Reactor Vessel Cold Leg Nozzle to Safe-End Welds with Flaw Analysis, for the Third 10-Year Inservice Inspection IntervalIncorporated by reference
Finite Element Analysis
Dissimilar Metal Weld
DM weld
ML15218A36721 August 2015Relief Request RR-ENG-17, Relief from Code Case N-770-1, Subsection 2400 and Table 1 Inspection Frequency of Reactor Vessel Cold Leg Nozzle to Safe-End Welds with Flaw Analysis, Third 10-Year ISI IntervalFinite Element Analysis
Dissimilar Metal Weld
ML13102A12623 April 2013Withdrawal of Relief Request RR-ENG-3-12 from ASME Code Requirements for Periodic Inspection of Reactor Coolant Pressure Boundary Check Valve with Seal Cap, Third 10-year Inservice Inspection Interval
ML13087A51712 April 2013Relief Request RR-ENG-3-09, Request for Relief from ASME Code Requirements; Deferral of Code Repair of Essential Cooling Water System Piping Until April 2013 Refueling OutageTime of Discovery
Mission time
Probabilistic Risk Assessment
VT-2
Through-Wall Leak
ML13004A33912 March 2013Relief Request RR-ENG-3-10, Reactor Pressure Vessel Head Flange O-Ring Leakoff Lines Non-Destructive Examination, for the Third 10-Year Inservice Inspection IntervalBoric Acid
Hydrostatic
Nondestructive Examination
VT-2
Pressure Boundary Leakage
Through-Wall Leak
NOC-AE-12002939, Request for Relief from ASME Section XI Code Requirements for Periodic Inspection of Reactor Coolant Pressure Boundary Check Valves with Seal Cap Enclosures (Relief Request RR-ENG-3-12)7 February 2013Request for Relief from ASME Section XI Code Requirements for Periodic Inspection of Reactor Coolant Pressure Boundary Check Valves with Seal Cap Enclosures (Relief Request RR-ENG-3-12)Boric Acid
VT-2
Pressure Boundary Leakage
NOC-AE-12002956, Response to Request for Additional Information Regarding Relief Request RR-ENG-3-09 for the Essential Cooling Water System31 January 2013Response to Request for Additional Information Regarding Relief Request RR-ENG-3-09 for the Essential Cooling Water SystemSafe Shutdown Earthquake
Operating Basis Earthquake
Earthquake
ML12243A34310 September 2012RR RE-ENG-3-04 to Apply Alternative to the American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI Requirements for Examination of Class 1 and 2 Piping WeldsHigh winds
Probabilistic Risk Assessment
Nondestructive Examination
Incorporated by reference
Large early release frequency
Exemption Request
Dissimilar Metal Weld
ML12235A34728 August 2012Relief Request RR-ENG-3-06 from ASME Code Requirements for Leak Testing Boundaries of Class 1 Pressure-Retaining Components, Third 10-Year Inservice Inspection Interval (TAC ME7053-ME7054)Boric Acid
High Radiation Area
Hydrostatic
VT-2
Incorporated by reference
ML12201A25616 August 2012Relief Request RR-ENG-3-08, Deferral of Code Repair of Flaws in U2 Essential Cooling Water Class 3 Piping Until Restart from Current Refueling Outage Scheduled for Mid-April 2012Time of Discovery
Safe Shutdown Earthquake
Operating Basis Earthquake
VT-2
Through-Wall Leak
NOC-AE-12002837, Response to Request for Additional Information: Application of an Alternative to Requirements for Examination of Class 1 and Class 2 Piping Welds (Relief Request RR-ENG-3-04)9 May 2012Response to Request for Additional Information: Application of an Alternative to Requirements for Examination of Class 1 and Class 2 Piping Welds (Relief Request RR-ENG-3-04)Probabilistic Risk Assessment
NOC-AE-12002807, Request for Relief from ASME Boiler and Pressure Vessel Code, Section XI Requirements for the Essential Cooling Water System (Relief Request RR-ENG-3-08)12 March 2012Request for Relief from ASME Boiler and Pressure Vessel Code, Section XI Requirements for the Essential Cooling Water System (Relief Request RR-ENG-3-08)Time of Discovery
Mission time
VT-2
Earthquake
Through-Wall Leak
ML11186053529 July 2011Relief Request RR-ENG-2-55 from ASME Code Requirements for Weld Examinations, Second 10-Year Inservice Inspection IntervalWeld Overlay
Nondestructive Examination
VT-2
Incorporated by reference
Liquid penetrant
ML11098034720 April 2011Relief Request RR-ENG-3-01, from ASME Code Requirements for Steam Generator Main Steam Nozzle Non-Destructive Examination, Third 10-Year Inservice Inspection IntervalNondestructive Examination
Incorporated by reference
ML1108109487 April 2011Request for Relief RR-ENG-3-03 from ASME Code Requirements for Pump Casing Inservice Inspection Examination, Third 10-Year Inservice Inspection IntervalIncorporated by reference
ML1108400765 April 2011Request for Relief RR-ENG-3-02 from ASME Code Requirements for Reactor Pressure Vessel Flange Insert Non-Destructive Examination, Third 10-Year Inservice Inspection IntervalNon-Destructive Examination
Incorporated by reference
NOC-AE-10002600, Request for Relief from ASME Section XI Requirements for Ultrasonic Examination of Reactor Pressure Vessel Shell-to-Flange Welds (RR-ENG-3-05)18 October 2010Request for Relief from ASME Section XI Requirements for Ultrasonic Examination of Reactor Pressure Vessel Shell-to-Flange Welds (RR-ENG-3-05)
NOC-AE-10002594, Request for Relief from ASME Section XI Code Requirements for Pump Casing Inservice Inspection Examination (Relief Request RR-ENG-3-03)20 September 2010Request for Relief from ASME Section XI Code Requirements for Pump Casing Inservice Inspection Examination (Relief Request RR-ENG-3-03)Nondestructive Examination
ML1021500772 September 2010Relief Request Nos. VRR-01, PRR-03, PRR-02, and PRR-01 for Third 10-year Interval Inservice Testing Program for Pumps and Valves (TAC Nos. ME3515 Through ME3522)Stroke time
Probabilistic Risk Assessment
Large early release frequency
ML10062086924 March 2010Authorization of Relief Request RR-ENG-2-53, Alternative to Inservice Inspection Requirements for Ultrasonic Exam of Reactor Pressure Vessel Shell-to-Flange WeldIncorporated by reference
ML10053958812 March 2010Relief Request RR-ENG-2-52 from ASME Code, Section XI Requirements for Essential Cooling Water System Code RepairSafe Shutdown
Time of Discovery
Mission time
VT-2
Incorporated by reference
NOC-AE-09002399, Request for Relief from ASME Boiler and Pressure Vessel Code Section XI Requirements for the Essential Cooling Water System (Relief Request RR-ENG-2-52)12 March 2009Request for Relief from ASME Boiler and Pressure Vessel Code Section XI Requirements for the Essential Cooling Water System (Relief Request RR-ENG-2-52)Safe Shutdown
Time of Discovery
Mission time
VT-2
Through-Wall Leak
ML0827502209 December 2008Relief Request RR-ENG-2-30, Request for Relief to Use ASME Code Case N-516-3, Underwater Welding, Section XI, Division 1Incorporated by reference
ML08277078512 November 2008Authorization of Relief Request RR-ENG-2-51 from ASME Code Case N-498-4, on 10-Year System Hydrostatic Testing for Class 1, 2, and 3 SystemsHydrostatic
VT-2
Incorporated by reference
ML08249016026 September 2008Relief Request RR-ENG-2-49, Second 10-Year Inservice Inspection Interval, Deferral of Code Repair in the Essential Cooling Water System PipingSafe Shutdown
Time of Discovery
VT-2
Through-Wall Leak
ML07354107210 January 2008Request for Relief No. RR-ENG-2-48 from ASME Code Case N-638-1 Requirements Regarding Start Time for 48-Hour Hold Period Before Non-Destructive Examination of Weld Overlay RepairNon-Destructive Examination
Weld Overlay
Nondestructive Examination
Incorporated by reference
ML07312044630 November 2007Relief Request RR-ENG-2-47 for Approval of Temporary Non-code Repair and Deferral of Code Repair Upgraded Essential Cooling Water System PipingTime of Discovery
VT-2
NOC-AE-07002211, Relief Request (RR-ENG-2-50) for the Second 10 Year ISI Interval from 10 CFR 50.55a for the Purpose of Invoking Code Case N-698, Design Stress Intensities and Yield Strength Values For...2 October 2007Relief Request (RR-ENG-2-50) for the Second 10 Year ISI Interval from 10 CFR 50.55a for the Purpose of Invoking Code Case N-698, Design Stress Intensities and Yield Strength Values For...
ML07085100830 April 2007Relief Request No. RR-ENG-2-44 on Deferral of Code Repair of Essential Cooling Water System IndicationIncorporated by reference
ML0708102642 April 2007Relief, Request for Relief No. RR-ENG-2-43 for Remainder of Second 10-year Inservice Inspection Interval Application of Weld Overlays in Pressurizer Nozzle Safe End Welds (TAC Nos. MD1414 - MD1423)Weld Overlay
Hydrostatic
Nondestructive Examination
Incorporated by reference
Dissimilar Metal Weld
ML07065007515 March 2007Request to Use 2001 Edition Through 2003 Addenda of ASME Code for Operations and Maintenance for Remainder of Second 10-Year Inservice Testing Program IntervalIncorporated by reference
ML0704400591 March 2007Request for Relief No. RR-ENG-2-45 for Remainder of Second 10-year Inservice Inspection Interval Use of Penetrameters in Radiography ExaminationHydrostatic
Nondestructive Examination
ML06223030926 October 2006Response to Relief Request RR-ENG-2-42 for Approval Non-Code Repair and Deferral of Code Repair of Essential Cooling Water System Piping, TAC MC8804Time of Discovery
VT-2
NOC-AE-06002031, Request for Relief from ASME Boiler and Pressure Vessel Code, Section XI Requirements for Use of Penetrameters in Radiographic Examinations14 June 2006Request for Relief from ASME Boiler and Pressure Vessel Code, Section XI Requirements for Use of Penetrameters in Radiographic ExaminationsNon-Destructive Examination
Hydrostatic
Nondestructive Examination
ML06109075425 May 2006Relief, Relief Request RR-ENG-2-39 and RR-ENG-2-40 for Approval of Temporary Non-code Repair and Deferral of Code Repair of Essential Cooling Water System Piping, Trains 1B and 1CMission time
Coatings
Nondestructive Examination
VT-2
ML06097024012 May 2006Relief, RR-ENG-2-41 TAC No. MC8279Mission time
Coatings
Nondestructive Examination
VT-2
NOC-AE-05001899, Request for Relief from ASME Boiler and Pressure Vessel Code, Section Xl Requirements for the Essential Cooling Water System (Ecw Train 1 C) (Relief Request RR-ENG-2-40)19 July 2005Request for Relief from ASME Boiler and Pressure Vessel Code, Section Xl Requirements for the Essential Cooling Water System (Ecw Train 1 C) (Relief Request RR-ENG-2-40)Mission time
Coatings
Nondestructive Examination
VT-2
ML05062050515 March 2005Request for Relief from Requirements of ASME and Pressure Vessel Code RR-ENG-IWE-07
NOC-AE-04001817, Revised Request for Authorization to Use an Alternative to the ASME Boiler and Pressure Vessel Code Section XI Requirements (Relief Request VRR-05)9 November 2004Revised Request for Authorization to Use an Alternative to the ASME Boiler and Pressure Vessel Code Section XI Requirements (Relief Request VRR-05)Packing leak
Stroke time
Power-Operated Valves