{{#Wiki_filter:UNITED NUCLEAR REGULATORY WASHINGTON, D.C. 20555-0001 March 23, 2011 LICENSEE:
Entergy Operations, Inc. (ENO) FACILITIES:
Palisades Nuclear Plant (PNP)
==SUBJECT:==
==SUMMARY==
OF TELEPHONE CONFERENCE CALL HELD ON FEBRUARY 22,2011, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND ENTERGY OPERATIONS, INC. REGARDING PROGRESS ON NATIONAL FIRE PROTECTION ASSOCIATION (NFPA) STANDARD 805 TRANSITION ACTIVITIES A teleconference was held between representatives of Entergy Nuclear Operations, Inc. (ENO) and the Nuclear Regulatory Commission (NRC) staff to discuss progress on the Palisades Nuclear Plant (PNP) National Fire Protection Association (NFPA) 805 transition activities.
ENO submitted "Palisades NFPA 805 Project Milestones" table (see Enclosure
: 1) which provides the list of NFPA 805 transition activities and their status. The enclosure provides the status of each task and shows several tasks as complete.
Some of the task completion dates were pushed out due to rearrangement of the priorities.
However, the licensee still shows the target date for Palisades NFPA 805 project completion as May 27,2011. The licensee will be bringing additional resources as necessary to support this date and will also incorporate comments from independent Probabilistic Risk Assessment peer reviews and any lessons learned from the Oconee Safety Evaluation Report. Background On December 9, 2008 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML083260577), NRC staff granted additional enforcement discretion to Palisades.
ENO in its letter dated November 25, 2008 (ADAMS Accession No. ML083370155) made a commitment to conduct a monthly teleconference with the NRC staff to discuss progress on the PNP NFPA 805 transition activities. Mahesh Chawla, Project Manager Plant Licensing Branch 111-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-255
==Enclosures:==
1: Table -Palisades NFPA 805 Project Milestones 2: Table -List of Attendees cc w/encls: Distribution via ListServ 02-22-11 Palisades NFPA 805 Project Milestones NEI Task No. Title ask 1: Transition of Nuclear Safety Performance Criteria (NEI 02 Table B-2) ask 2: Fundamental Fire Protection Program & Design Elements (NEI 04-02 Table B-1) ask 3: Radioactive Release Transition (NEI 04-02 Table G-l) Task 4: Nuclear Safety Analysis Transition NEI 04-02 Table B-3) ST 4.1.1 Off-Site Power Cable Selection and Analysis ST 4.1.2 Other Power Cable Selection and Analysis ST 4.1.3 Subsequent Cablellnstrument Identification
& Analysis ST 4.1.4  Issues from the FPRA Peer Review Task 5: Non-Power Operational Modes Transition NEI 04-02 Table F-l) Task 6: Internal Events PRA ST 6.2.1 Prepare LERF Model ST 6.2.2 Update Flooding Analysis ST6.3 Thermal Hydraulic Analysis for MSO/H RA ST 6.4 Internal Events PRA Peer Review Task 7: Fire PRA ST 7.6.4 R3 Internal Events Model ST7.7 Quantification Risk Screening ST7.8 Scoping for Fire Modeling ST 7.9/10 Circuit Failure Mode Likelihood Analysis ST7.12 Post Fire HRA ST 7.13 Seismic Fire Interaction Assessment ST 7.14 ,Fire Risk Quantification ST 7.15 Uncertainty and Sensitivity Analysis ST 7.17.4 In-Process Fire PRA Peer Review ST 7.17.5 Final Fire PRA Peer Review Task 8: NFPA 805 Fire Risk 1 Change Evaluations ST 8.1 Fire Risk 1 Change Evaluations ST 8.2 Non-Compliance Risk Evaluations Task 10: Transition Report Task 11: License Amendment Request (LAR) CR App. R Non-Compliance associated with a potential loss of 04255 SR 2400 VAC power. Milestone Status Date Complete 04/29/11 See Comments -Complete 05/03/11 See Comments 02116111 See Comments -Complete -Complete 03/29/11 On Track 04/29/11 See Comments Complete -Complete Complete Complete -Complete 05118/11 See Comments -Complete Complete -Complete Complete 04/01/11 See Comments -Complete 05/18/11 See Comments 05/18/11 See Comments -Complete 04/25/01 See Comments 04/29/11 See Comments 04/29111 See Comments 04/29/11 See Comments 05/09/11 See Comments 05/27/11 See Comments 10/01/11 New Start Oate --------------I 02/24/11 * -I 10/01/10 Task 2 -Priorities were rearranged resulting in this task complelion pushing Task 4 -Priorities were rearranged resulting in this task completion pushing Task 5 -Rearranged priorities resulling in this lask completion date pushing Task 7 -Subtask 7.12 caused this overall task to push Task 7.12 -Rearranged priorities resulting in this task completion date pushing Tasks 7.14 & 7.15 -Completion extended due 10 extension of Subtasks Task 7.17.5 -Rnal Fire PRA Peer Review moved based on personnel Tasks 8, 8.1, & 8.2 -Rearranged priorilies resulted in these tasks pushing Tasks 10 & 11 -Predecessor tasks pUshing out causing these tasks to push E:\Palisades\PlPIEn!orcement ExtensionlNRC Conf callsWilestone Itrs12011INRC Milestones 02-22-11.>Os Enclosure 1
TELEPHONE CONFERENCE ON NFPA 805 TRANSITION PROGRESS U.S. NUCLEAR REGULATORY AND ENTERGY OPERATIONS, LIST OF FEBRUARY 22, PARTICIPANTS TITLE/POSITION AFFILIATIONS U.S. NUCLEAR REGULATORY COMMISSION (NRC) Mahesh Chawla Project Manaaer HEADQUARTERS Alex Klein Branch Chief Harrv Barrett Senior Fire Protection Enaineer ENTERGY Jim Miksa Program Engineering Manager Chad Main Project Manager Brian Brogan Fuels and Analysis Engineer Tom Swiecicki Fire Protection Engineer Amy Hazelhoff Contract Licensing Engineer Roger Stobert Contract Project Manager Jim Kuemin Licensing Engineer Enclosure 2
March 23, 2011 LICENSEE:
Entergy Operations, Inc. (ENO) FACILITIES:
Palisades Nuclear Plant (PNP)
==SUBJECT:==
==SUMMARY==
OF TELEPHONE CONFERENCE CALL HELD ON FEBRUARY 22,2011, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND ENTERGY OPERATIONS, INC. REGARDING PROGRESS ON NATIONAL FIRE PROTECTION ASSOCIATION (NFPA) STANDARD 805 TRANSITION ACTIVITIES A teleconference was held between representatives of Entergy Nuclear Operations, Inc. (ENO) and the Nuclear Regulatory Commission (NRC) staff to discuss progress on the Palisades Nuclear Plant (PNP)
National Fire Protection Association (NFPA) 805 transition activities.
ENO submitted "Palisades NFPA 805 Project Milestones" table (see Enclosure
: 1) which provides the list of NFPA 805 transition activities and their status. The enclosure provides the status of each task and shows several tasks as complete.
Some of the task completion dates were pushed out due to rearrangement of the priorities.
However, the licensee still shows the target date for Palisades NFPA 805 project completion as May 27, 2011. The licensee will be bringing additional resources as necessary to support this date and will also incorporate comments from independent Probabilistic Risk Assessment peer reviews and any lessons learned from the Oconee Safety Evaluation Report. Background On December 9, 2008 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML083260577), NRC staff granted additional enforcement discretion to Palisades.
ENO in its letter dated November 25, 2008 (ADAMS Accession No. ML083370155) made a commitment to conduct a monthly teleconference with the NRC staff to discuss progress on the PNP NFPA 805 transition activities.
Mahesh Chawla, Project Manager IRAJ Plant Licensing Branch 111-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-255
==Enclosures:==
1: Table -Palisades NFPA 805 Project Milestones 2: Table -List of Attendees cc w/encls: Distribution via Listserv Distribution:
PUBLIC LPL3-1 rtf RidsRgn3MailCenter Resource AKlein, NRR JGeissner, Rill RidsNrrDorLpl3-1 Resource RidsNrrPMANO Resource MVaaler, NRR TTaylor, Rill RidsNrrPMPalisades Resource RidsNrrLABTully Paul Lain, NRR HBarrett, NRR RidsAcrsAcnw_MailCtr Resource RidsOgcRp Resource JEllegood, Rill DMerzke, EDO R-1I1 CSteger, NRR ADAMS Accession No.: ML 110800417 OFFICE LPL3-1/LA DRAlAFPB/BC NAME DATE OFFICIAL RECORD COPY BTully AKlein 03/22/11 03/23/11 PL3-1/BC RPascarelli 03/23/11}}

Revision as of 23:19, 8 August 2018

Palisades: Summary of Telephone Conference Call Held on February 22, 2011, Between the U.S. Nuclear Regulatory Commission and Entergy Operations, Inc. Regarding Progress on National Fire Protection Association (NFPA) Standard 805 Transition
ML110800417
Person / Time
Site: Palisades Entergy icon.png
Issue date: 03/23/2011
From: Chawla M L
Plant Licensing Branch III
To:
Office of Nuclear Reactor Regulation
chawla M
References
Download: ML110800417 (4)


Text

UNITED NUCLEAR REGULATORY WASHINGTON, D.C. 20555-0001 March 23, 2011 LICENSEE:

Entergy Operations, Inc. (ENO) FACILITIES:

Palisades Nuclear Plant (PNP)

SUBJECT:

SUMMARY

OF TELEPHONE CONFERENCE CALL HELD ON FEBRUARY 22,2011, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND ENTERGY OPERATIONS, INC. REGARDING PROGRESS ON NATIONAL FIRE PROTECTION ASSOCIATION (NFPA) STANDARD 805 TRANSITION ACTIVITIES A teleconference was held between representatives of Entergy Nuclear Operations, Inc. (ENO) and the Nuclear Regulatory Commission (NRC) staff to discuss progress on the Palisades Nuclear Plant (PNP) National Fire Protection Association (NFPA) 805 transition activities.

ENO submitted "Palisades NFPA 805 Project Milestones" table (see Enclosure

1) which provides the list of NFPA 805 transition activities and their status. The enclosure provides the status of each task and shows several tasks as complete.

Some of the task completion dates were pushed out due to rearrangement of the priorities.

However, the licensee still shows the target date for Palisades NFPA 805 project completion as May 27,2011. The licensee will be bringing additional resources as necessary to support this date and will also incorporate comments from independent Probabilistic Risk Assessment peer reviews and any lessons learned from the Oconee Safety Evaluation Report. Background On December 9, 2008 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML083260577), NRC staff granted additional enforcement discretion to Palisades.

ENO in its letter dated November 25, 2008 (ADAMS Accession No. ML083370155) made a commitment to conduct a monthly teleconference with the NRC staff to discuss progress on the PNP NFPA 805 transition activities. Mahesh Chawla, Project Manager Plant Licensing Branch 111-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-255

Enclosures:

1: Table -Palisades NFPA 805 Project Milestones 2: Table -List of Attendees cc w/encls: Distribution via ListServ 02-22-11 Palisades NFPA 805 Project Milestones NEI Task No. Title ask 1: Transition of Nuclear Safety Performance Criteria (NEI 02 Table B-2) ask 2: Fundamental Fire Protection Program & Design Elements (NEI 04-02 Table B-1) ask 3: Radioactive Release Transition (NEI 04-02 Table G-l) Task 4: Nuclear Safety Analysis Transition NEI 04-02 Table B-3) ST 4.1.1 Off-Site Power Cable Selection and Analysis ST 4.1.2 Other Power Cable Selection and Analysis ST 4.1.3 Subsequent Cablellnstrument Identification

& Analysis ST 4.1.4 Issues from the FPRA Peer Review Task 5: Non-Power Operational Modes Transition NEI 04-02 Table F-l) Task 6: Internal Events PRA ST 6.2.1 Prepare LERF Model ST 6.2.2 Update Flooding Analysis ST6.3 Thermal Hydraulic Analysis for MSO/H RA ST 6.4 Internal Events PRA Peer Review Task 7: Fire PRA ST 7.6.4 R3 Internal Events Model ST7.7 Quantification Risk Screening ST7.8 Scoping for Fire Modeling ST 7.9/10 Circuit Failure Mode Likelihood Analysis ST7.12 Post Fire HRA ST 7.13 Seismic Fire Interaction Assessment ST 7.14 ,Fire Risk Quantification ST 7.15 Uncertainty and Sensitivity Analysis ST 7.17.4 In-Process Fire PRA Peer Review ST 7.17.5 Final Fire PRA Peer Review Task 8: NFPA 805 Fire Risk 1 Change Evaluations ST 8.1 Fire Risk 1 Change Evaluations ST 8.2 Non-Compliance Risk Evaluations Task 10: Transition Report Task 11: License Amendment Request (LAR) CR App. R Non-Compliance associated with a potential loss of 04255 SR 2400 VAC power. Milestone Status Date Complete 04/29/11 See Comments -Complete 05/03/11 See Comments 02116111 See Comments -Complete -Complete 03/29/11 On Track 04/29/11 See Comments Complete -Complete Complete Complete -Complete 05118/11 See Comments -Complete Complete -Complete Complete 04/01/11 See Comments -Complete 05/18/11 See Comments 05/18/11 See Comments -Complete 04/25/01 See Comments 04/29/11 See Comments 04/29111 See Comments 04/29/11 See Comments 05/09/11 See Comments 05/27/11 See Comments 10/01/11 New Start Oate --------------I 02/24/11 * -I 10/01/10 Task 2 -Priorities were rearranged resulting in this task complelion pushing Task 4 -Priorities were rearranged resulting in this task completion pushing Task 5 -Rearranged priorities resulling in this lask completion date pushing Task 7 -Subtask 7.12 caused this overall task to push Task 7.12 -Rearranged priorities resulting in this task completion date pushing Tasks 7.14 & 7.15 -Completion extended due 10 extension of Subtasks Task 7.17.5 -Rnal Fire PRA Peer Review moved based on personnel Tasks 8, 8.1, & 8.2 -Rearranged priorilies resulted in these tasks pushing Tasks 10 & 11 -Predecessor tasks pUshing out causing these tasks to push E:\Palisades\PlPIEn!orcement ExtensionlNRC Conf callsWilestone Itrs12011INRC Milestones 02-22-11.>Os Enclosure 1

TELEPHONE CONFERENCE ON NFPA 805 TRANSITION PROGRESS U.S. NUCLEAR REGULATORY AND ENTERGY OPERATIONS, LIST OF FEBRUARY 22, PARTICIPANTS TITLE/POSITION AFFILIATIONS U.S. NUCLEAR REGULATORY COMMISSION (NRC) Mahesh Chawla Project Manaaer HEADQUARTERS Alex Klein Branch Chief Harrv Barrett Senior Fire Protection Enaineer ENTERGY Jim Miksa Program Engineering Manager Chad Main Project Manager Brian Brogan Fuels and Analysis Engineer Tom Swiecicki Fire Protection Engineer Amy Hazelhoff Contract Licensing Engineer Roger Stobert Contract Project Manager Jim Kuemin Licensing Engineer Enclosure 2

March 23, 2011 LICENSEE:

Entergy Operations, Inc. (ENO) FACILITIES:

Palisades Nuclear Plant (PNP)

SUBJECT:

SUMMARY

OF TELEPHONE CONFERENCE CALL HELD ON FEBRUARY 22,2011, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND ENTERGY OPERATIONS, INC. REGARDING PROGRESS ON NATIONAL FIRE PROTECTION ASSOCIATION (NFPA) STANDARD 805 TRANSITION ACTIVITIES A teleconference was held between representatives of Entergy Nuclear Operations, Inc. (ENO) and the Nuclear Regulatory Commission (NRC) staff to discuss progress on the Palisades Nuclear Plant (PNP)

National Fire Protection Association (NFPA) 805 transition activities.

ENO submitted "Palisades NFPA 805 Project Milestones" table (see Enclosure

1) which provides the list of NFPA 805 transition activities and their status. The enclosure provides the status of each task and shows several tasks as complete.

Some of the task completion dates were pushed out due to rearrangement of the priorities.

However, the licensee still shows the target date for Palisades NFPA 805 project completion as May 27, 2011. The licensee will be bringing additional resources as necessary to support this date and will also incorporate comments from independent Probabilistic Risk Assessment peer reviews and any lessons learned from the Oconee Safety Evaluation Report. Background On December 9, 2008 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML083260577), NRC staff granted additional enforcement discretion to Palisades.

ENO in its letter dated November 25, 2008 (ADAMS Accession No. ML083370155) made a commitment to conduct a monthly teleconference with the NRC staff to discuss progress on the PNP NFPA 805 transition activities.

Mahesh Chawla, Project Manager IRAJ Plant Licensing Branch 111-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-255

Enclosures:

1: Table -Palisades NFPA 805 Project Milestones 2: Table -List of Attendees cc w/encls: Distribution via Listserv Distribution:

PUBLIC LPL3-1 rtf RidsRgn3MailCenter Resource AKlein, NRR JGeissner, Rill RidsNrrDorLpl3-1 Resource RidsNrrPMANO Resource MVaaler, NRR TTaylor, Rill RidsNrrPMPalisades Resource RidsNrrLABTully Paul Lain, NRR HBarrett, NRR RidsAcrsAcnw_MailCtr Resource RidsOgcRp Resource JEllegood, Rill DMerzke, EDO R-1I1 CSteger, NRR ADAMS Accession No.: ML 110800417 OFFICE LPL3-1/LA DRAlAFPB/BC NAME DATE OFFICIAL RECORD COPY BTully AKlein 03/22/11 03/23/11 PL3-1/BC RPascarelli 03/23/11