{{#Wiki_filter:Dominion Energy Kewaunee, Inc.5000 Dominion Boulevard, Glen Allen, VA 23060Web Address:
www.dom.com February 24, 201410 CFR 2.202EA-12-051 Attention:
Document Control Desk Serial No.: 12-164DU.S. Nuclear Regulatory Commission NL&OS/MAE:
R2Washington, D.C. 20555-0001 Docket No.: 50-305License No.: DPR-43DOMINION ENERGY KEWAUNEE, INC.KEWAUNEE POWER STATION (KPS)STATUS REPORT FOR ORDER MODIFYING LICENSES WITH REGARD TOREQUIREMENTS FOR RELIABLE SPENT FUEL POOL INSTRUMENTATION (ORDER NUMBER EA-12-051)
On March 12, 2012, the Nuclear Regulatory Commission (NRC) issued OrderEA-12-051, "Order to Modify Licenses with Regard to Requirements for Reliable SpentFuel Pool Instrumentation" (the Order) to Dominion Energy Kewaunee, Inc. (DEK).DEK responded to the Order by letters dated March 26, 2012, October 25, 2012,February 28, 2013 and August 23, 2013 (Serial Nos. 12-164, 12-164A, 12-164B and 12-164C, respectively).
On May 7, 2013 KPS was permanently shut down. The certification of permanent removal of the fuel from the reactor vessel was submitted to the NRC on May 14, 2013(Serial No. 13-293).
Therefore, pursuant to 10 CFR 50.82(a)(2),
the 10 CFR Part 50license for KPS no longer authorizes operation of the reactor or emplacement orretention of fuel in the reactor vessel.In accordance with Section IV, Condition C.2, of the Order, DEK is required to submitstatus reports at six (6)-month intervals following submittal of the overall integrated plan(which was submitted on February 28, 2013). This letter fulfills that requirement.
DEK'sAugust 23, 2013 letter requested that the NRC rescind the Order in its entirety, andseparately committed to alternate measures that would enhance the reliability of theexisting spent fuel pool (SFP) instrumentation.
The rescission request for the Order iscurrently being reviewed by the NRC. The status of the completion of the sitemodifications to enhance the reliability of the SFP instrumentation is provided in theattachment to this letter.
Serial No. 12-164DDocket No.:50-305 Order EA-12-051 Page 2 of 3If you have any questions, please contact Ms. Margaret Earle at (804) 273-2768.
Sincerely, Mark D. SartainVice President
-Nuclear Engineering VICKI .HULLDominion Energy Kewaunee, Inc. Notary PublicCommonwealth of VirginiaCOMMONWEALTH OF VIRGINIA
)140542COMMOWEALH OFVIRGNIAI My Commission Expires May 31. 2014)COUNTY OF HENRICO )The foregoing document was acknowledged before me today, in and for the County andCommonwealth aforesaid, by Mark D. Sartain who is Vice President
-NuclearEngineering for Dominion Energy Kewaunee, Inc. He has affirmed before me that he isduly authorized to execute and file the foregoing document in behalf of the Company,and that the statements in the document are true to the best of his knowledge andbelief.Acknowledged before me this 0 2014.My Commission Expires:
3/ JNotaryAtta Attachment Commitments made by this letter: None Serial No. 12-164DDocket No.:50-305 Order EA-12-051 Page 3 of 3cc: Director of Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission One White Flint NorthMail Stop 13H16M11555 Rockville PikeRockville, MD 20852-2738 U. S. Nuclear Regulatory Commission, Region IIIRegional Administrator 2443 Warrenville RoadSuite 210Lisle, Illinois 60532-4352 Mr. Christopher
: Gratton, Project ManagerU. S. Nuclear Regulatory Commission One White Flint North, Mail Stop 08-D1511555 Rockville PikeRockville, MD 20852-2738 Mr. William C. Huffman Jr., Project ManagerU. S. Nuclear Regulatory Commission One White Flint North, Mail Stop 08-D1511555 Rockville PikeRockville, MD 20852-2738 Mr. Theodore Smith, Project ManagerU. S. Nuclear Regulatory Commission Two White Flint North, Mail Stop 8-F511545 Rockville PikeRockville, MD 20852-2738 Mr. Jonathan E. EvansU. S. Nuclear Regulatory Commission One White Flint NorthMail Stop 10 C 1511555 Rockville PikeRockville, MD 20852-2738 i "Serial No. 12-164DDocket No. 50-305Order EA-12-051 Attachment Update Regarding Enhancement of Spent Fuel Pool Instrumentation Order Modifying Licenses with Regard to Requirements for ReliableSpent Fuel Pool Instrumentation Kewaunee Power StationDominion Energy Kewaunee, Inc.
Serial No. 12-164DDocket No. 50-305Attachment, Page 1 of 1Enhancement of Spent Fuel Pool Instrumentation Dominion Energy Kewaunee, Inc. (DEK) committed to enhance spent fuel pool (SFP)level instrumentation in Attachment 2 of an August 23, 2013 letter (Serial No. 12-164C).
These commitments were made separate from Order EA-12-051.
Primary and backup SFP level instrumentation was committed to be installed by the endof 2014. A status of the commitments associated with the SFP level instrumentation isprovided below.Number Commitment StatusPrimary and backup SFP level Completeinstrumentation will be installed.
The1 instrumentation will be seismically qualified with readouts located in the SFPheat exchanger room.Initially, station batteries will be available The 120 VAC portable dieselto re-power both the primary and backup generator has been purchased.
SFP level instruments.
For an event that The connection point that allowsrequires backup power for an extended the portable diesel generator toperiod of time, an onsite portable 120VAC supply power to the SFP level2 diesel generator will be available, instrumentation has beeninstalled.
The procedure for theuse of the generator will bedeveloped and issued by the endof 2014.}}

Revision as of 10:02, 2 July 2018

Kewaunee Power Station - Status Report for Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)
ML14064A199
Person / Time
Site: Kewaunee Dominion icon.png
Issue date: 02/24/2014
From: Sartain M D
Dominion Energy Kewaunee
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
12-164D, EA-12-051
Download: ML14064A199 (5)


Text

Dominion Energy Kewaunee, Inc.5000 Dominion Boulevard, Glen Allen, VA 23060Web Address:

www.dom.com February 24, 201410 CFR 2.202EA-12-051 Attention:

Document Control Desk Serial No.: 12-164DU.S. Nuclear Regulatory Commission NL&OS/MAE:

R2Washington, D.C. 20555-0001 Docket No.: 50-305License No.: DPR-43DOMINION ENERGY KEWAUNEE, INC.KEWAUNEE POWER STATION (KPS)STATUS REPORT FOR ORDER MODIFYING LICENSES WITH REGARD TOREQUIREMENTS FOR RELIABLE SPENT FUEL POOL INSTRUMENTATION (ORDER NUMBER EA-12-051)

On March 12, 2012, the Nuclear Regulatory Commission (NRC) issued OrderEA-12-051, "Order to Modify Licenses with Regard to Requirements for Reliable SpentFuel Pool Instrumentation" (the Order) to Dominion Energy Kewaunee, Inc. (DEK).DEK responded to the Order by letters dated March 26, 2012, October 25, 2012,February 28, 2013 and August 23, 2013 (Serial Nos.12-164, 12-164A, 12-164B and 12-164C, respectively).

On May 7, 2013 KPS was permanently shut down. The certification of permanent removal of the fuel from the reactor vessel was submitted to the NRC on May 14, 2013(Serial No.13-293).

Therefore, pursuant to 10 CFR 50.82(a)(2),

the 10 CFR Part 50license for KPS no longer authorizes operation of the reactor or emplacement orretention of fuel in the reactor vessel.In accordance with Section IV, Condition C.2, of the Order, DEK is required to submitstatus reports at six (6)-month intervals following submittal of the overall integrated plan(which was submitted on February 28, 2013). This letter fulfills that requirement.

DEK'sAugust 23, 2013 letter requested that the NRC rescind the Order in its entirety, andseparately committed to alternate measures that would enhance the reliability of theexisting spent fuel pool (SFP) instrumentation.

The rescission request for the Order iscurrently being reviewed by the NRC. The status of the completion of the sitemodifications to enhance the reliability of the SFP instrumentation is provided in theattachment to this letter.

Serial No. 12-164DDocket No.:50-305 Order EA-12-051 Page 2 of 3If you have any questions, please contact Ms. Margaret Earle at (804) 273-2768.

Sincerely, Mark D. SartainVice President

-Nuclear Engineering VICKI .HULLDominion Energy Kewaunee, Inc. Notary PublicCommonwealth of VirginiaCOMMONWEALTH OF VIRGINIA

)140542COMMOWEALH OFVIRGNIAI My Commission Expires May 31. 2014)COUNTY OF HENRICO )The foregoing document was acknowledged before me today, in and for the County andCommonwealth aforesaid, by Mark D. Sartain who is Vice President

-NuclearEngineering for Dominion Energy Kewaunee, Inc. He has affirmed before me that he isduly authorized to execute and file the foregoing document in behalf of the Company,and that the statements in the document are true to the best of his knowledge andbelief.Acknowledged before me this 0 2014.My Commission Expires:

3/ JNotaryAtta Attachment Commitments made by this letter: None Serial No. 12-164DDocket No.:50-305 Order EA-12-051 Page 3 of 3cc: Director of Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission One White Flint NorthMail Stop 13H16M11555 Rockville PikeRockville, MD 20852-2738 U. S. Nuclear Regulatory Commission, Region IIIRegional Administrator 2443 Warrenville RoadSuite 210Lisle, Illinois 60532-4352 Mr. Christopher

Gratton, Project ManagerU. S. Nuclear Regulatory Commission One White Flint North, Mail Stop 08-D1511555 Rockville PikeRockville, MD 20852-2738 Mr. William C. Huffman Jr., Project ManagerU. S. Nuclear Regulatory Commission One White Flint North, Mail Stop 08-D1511555 Rockville PikeRockville, MD 20852-2738 Mr. Theodore Smith, Project ManagerU. S. Nuclear Regulatory Commission Two White Flint North, Mail Stop 8-F511545 Rockville PikeRockville, MD 20852-2738 Mr. Jonathan E. EvansU. S. Nuclear Regulatory Commission One White Flint NorthMail Stop 10 C 1511555 Rockville PikeRockville, MD 20852-2738 i "Serial No. 12-164DDocket No. 50-305Order EA-12-051 Attachment Update Regarding Enhancement of Spent Fuel Pool Instrumentation Order Modifying Licenses with Regard to Requirements for ReliableSpent Fuel Pool Instrumentation Kewaunee Power StationDominion Energy Kewaunee, Inc.

Serial No. 12-164DDocket No. 50-305Attachment, Page 1 of 1Enhancement of Spent Fuel Pool Instrumentation Dominion Energy Kewaunee, Inc. (DEK) committed to enhance spent fuel pool (SFP)level instrumentation in Attachment 2 of an August 23, 2013 letter (Serial No. 12-164C).

These commitments were made separate from Order EA-12-051.

Primary and backup SFP level instrumentation was committed to be installed by the endof 2014. A status of the commitments associated with the SFP level instrumentation isprovided below.Number Commitment StatusPrimary and backup SFP level Completeinstrumentation will be installed.

The1 instrumentation will be seismically qualified with readouts located in the SFPheat exchanger room.Initially, station batteries will be available The 120 VAC portable dieselto re-power both the primary and backup generator has been purchased.

SFP level instruments.

For an event that The connection point that allowsrequires backup power for an extended the portable diesel generator toperiod of time, an onsite portable 120VAC supply power to the SFP level2 diesel generator will be available, instrumentation has beeninstalled.

The procedure for theuse of the generator will bedeveloped and issued by the endof 2014.