| =Text= | | =Text= |
| {{#Wiki_filter:Global Nuclear Fuel Phillip D. Ollis Facility Licensing | | {{#Wiki_filter:M220161 December 12, 2022 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555-0001 |
| | |
| 3901 Castle Hayne Road P.O. Box 780 Wilmington, NC 28402 M220161 USA
| |
| | |
| T (910) 616-4018 December 12, 2022 Phillip.ollis@ge.com
| |
| | |
| U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555-0001 | |
|
| |
|
| ==Subject:== | | ==Subject:== |
| GNF-A Written Follow-up Report - Fire System Impairme nt | | GNF-A Written Follow-up Report - Fire System Impairment |
|
| |
|
| ==References:== | | ==References:== |
| : 1) NRC License SNM-1097, Docket 70-1113 | | : 1) NRC License SNM-1097, Docket 70-1113 |
| : 2) GNF-A Event N otification 56159, 10/13/2022 | | : 2) GNF-A Event N otification 56159, 10/13/2022 |
|
| |
|
| ==Dear Sir or Madam:== | | ==Dear Sir or Madam:== |
| In accordance with 10 CFR 70.74(b), Global Nuclear Fuel-America s, LLC (GNF-A) hereby submits a written follow-up report for Event Notification 56159 that was provided to NRC on October 13, 2022 (Reference 2). | | In accordance with 10 CFR 70.74(b), Global Nuclear Fuel-Americas, LLC (GNF-A) hereby submits a written follow-up report for Event Notification 56159 that was provided to NRC on October 13, 2022 (Reference 2). |
| | | Event 56159 As discussed in the initial event report, GNF-A reported an unplanned fire system impairment to the New Hanover County (NHC) Deputy Fire Marshall. Consistent with 10 CFR 70, Appendix A(c), a concurrent report was provided to NRC and is included as Attachment 1 to this letter. |
| Event 56159 | |
| | |
| As discussed in the initial event report, GNF-A reported an unp lanned fire system impairment to the New Hanover County (NHC) Deputy Fire Marshall. Consistent w ith 10 CFR 70, Appendix A(c), a concurrent report was pro vided to NRC and is included a s Attachment 1 to this letter. | |
| | |
| Additional information is provided as follows: | | Additional information is provided as follows: |
| | Event Details and Safety Significance At approximately 1311 (EDT) on October 12th, 2022, the New Hanover County Deputy Fire Marshall was notified per State code requirements that the fire suppression system encompassing the Fuel Manufacturing Operation (FMO) was impaired. During a flow test, the backup diesel fire pump experienced an overheating condition. |
| | Immediate Corrective Actions Taken The diesel fire pump was placed in the manual "Off" position. The electric fire pump was verified to be fully operational and available to perform its safety function. A repair vendor was contacted to restore operation. |
| | Probable Cause of Event A failed pressure regulator was determined to be the cause of the issue. |
| | Global Nuclear Fuel Phillip D. Ollis Facility Licensing 3901 Castle Hayne Road P.O. Box 780 Wilmington, NC 28402 USA T (910) 616-4018 Phillip.ollis@ge.com |
|
| |
|
| Event Details and Safety Significance
| | US NRC M220161 December 12, 2022 Page 2 Short Term Corrective Actions The pressure regulator was replaced and the diesel pump was returned to service at approximately 1000 on October 13th. The Fire Marshall was notified of restoration at 1020. |
| | | Longer Term Corrective Action None - The failure was detected during a routine test as intended. |
| At approximately 1311 (EDT) on October 12th, 2022, the New Hano ver County Deputy Fire Marshall was notified per State code requirements that the fire suppression system encompassing the Fuel Manufacturing Operation (FMO) was impaire d. During a flow test, the backup diesel fire pump experienced an overheating condition.
| |
| | |
| Immediate Corrective Actions Taken
| |
| | |
| The diesel fire pump was placed in the manual "Off" position. T he electric fire pump was verified to be fully operational and available to perform its safety fun ction. A repair vendor was contacted to restore operation.
| |
| | |
| Probable Cause of Event
| |
| | |
| A failed pressure regulator was determined to be the cause of t he issue.
| |
| | |
| US NRC M220161 December 12, 2022 Page 2 | |
| | |
| Short Term Corrective Actions | |
| | |
| The pressure regulator was replaced and the diesel pump was ret urned to service at approximately 1000 on October 13th. The Fire Marshall was notif ied of restoration at 1020. | |
| | |
| Longer Term Corrective Action | |
| | |
| None - The failure was detected during a routine test as intend ed. | |
| | |
| If you have any questions regarding this matter, please contact me at (910) 616-4018. | | If you have any questions regarding this matter, please contact me at (910) 616-4018. |
| | Sincerely, Phillip D. Ollis Facility Licensing Attachments: 1) Event Description cc: NRC Region II Administrator, Atlanta, GA J. Rivera, NRC RII Atlanta. GA L. Cooke, NRC RII Atlanta. GA J. Rowley, NRC NMSS, Washington, DC PDO 22-008 |
|
| |
|
| Sincerely,
| | US NRC M220161 December 12, 2022 Page 3 Event Description At approximately 1311 (EDT) on October 12th, 2022, the New Hanover County Deputy Fire Marshall was notified per State code requirements that the fire suppression system encompassing the Fuel Manufacturing Operation (FMO) was impaired. During a flow test, the backup diesel fire pump experienced an overheating condition. As a result, the diesel fire pump was placed in the manual "Off" position. The electric fire pump remained fully operational and available to perform its safety function. The diesel pump was repaired and returned to operation at approximately 1000 (EDT) on Thursday, October 13th. The New Hanover County Deputy Fire Marshall was notified of restoration at 1020 (EDT). Because the New Hanover County Deputy Fire Marshall was notified, a concurrent notification to the NRC Operations Center is being made per 10 CFR 70, Appendix A(c). |
| | |
| Phillip D. Ollis Facility Licensing
| |
| | |
| Attachments: 1) Event Description
| |
| | |
| cc: NRC Region II Administrator, Atlanta, GA J. Rivera, NRC RII Atlanta. GA L. Cooke, NRC RII Atlanta. GA J. Rowley, NRC NMSS, Washington, DC PDO 22-008
| |
| | |
| US NRC M220161 December 12, 2022 Page 3 | |
| | |
| Attachment 1
| |
| | |
| Event Description | |
| | |
| At approximately 1311 (EDT) on October 12th, 2022, the New Hano ver County Deputy Fire Marshall was notified per State code requirements that the fire suppression system encompassing the Fuel Manufacturing Operation (FMO) was impaire d. During a flow test, the backup diesel fire pump experienced an overheating condition. A s a result, the diesel fire pump was placed in the manual "Off" position. The electric fire pump remained fully operational and available to perform its safety function. The diesel pump was r epaired and returned to operation at approximately 1000 (EDT) on Thursday, October 13th. The New Hanover County Deputy Fire Marshall was notified of restoration at 1020 (EDT). Because the New Hanover County Deputy Fire Marshall was notified, a concurrent notification to the NR C Operations Center is being made per 10 CFR 70, Appendix A(c). | |
| | |
| Phillip Ollis, Facility Licensing 1039 10/13/2022}} | | Phillip Ollis, Facility Licensing 1039 10/13/2022}} |
|
---|
Category:Letter
MONTHYEARML24353A1232024-12-20020 December 2024 (U) Global Laser Enrichment Written Follow-up Report, Degraded IROFS ML24327A0512024-11-22022 November 2024 GNF-A Written Follow-up Report - Fire Door Impairment ML24296A0712024-10-23023 October 2024 Global Nuclear Fuels - America – Core Inspection Report 07001113-2024003 ML24275A0342024-10-0101 October 2024 GNF-A Emergency Response Telephone Listing Dated 9/27/2024 ML24268A0382024-09-25025 September 2024 Approval Letter of Global Nuclear Fuel - Americas, LLC 2022 Triennial Update to Decommissioning Funding Plan ML24255A8022024-09-11011 September 2024 GNF-A DFP Supplemental Information ML24250A0482024-09-0606 September 2024 Global Nuclear Fuel Americas, LLC (GNF-A) NRC Licensee Contacts ML24240A0702024-08-26026 August 2024 GNF-A Submittal of FOCI Information Update ML24236A0222024-08-22022 August 2024 GNF-A Written Follow-up Report - Fire System Impairment ML24219A2632024-08-0606 August 2024 GNF-A Semi-Annual Effluent Monitoring Report ML24205A1392024-07-25025 July 2024 Global Nuclear Fuels-America - Core Inspection Report 07001113/2024002 ML24184A1262024-07-0202 July 2024 Global Nuclear Fuel - Americas, LLC, Submittal of Response to NRC Request for Additional Information ML24180A0132024-06-28028 June 2024 GNF-A Fundamental Nuclear Material Control Plan ML24176A2742024-06-25025 June 2024 Global Nuclear Fuel – Americas, L.L.C. – Inspection Schedule for Calendar Year 2025 ML24172A0612024-06-20020 June 2024 GNF-A Comments on Buildings as IROFS - Meeting Slides ML24156A2032024-06-0404 June 2024 GNF-A Natrium Fuel Fabrication Facility Pre-Application - Meeting Slides ML24129A1832024-05-21021 May 2024 Global Nuclear Fuel - Americas LLC RAI to Support Review of Global Nuclear Fuel-Americas Updated Fuel Fabrication Facility Decommissioning Funding Plan ML24128A1602024-05-0707 May 2024 Submittal of Revision to GNF-A Radiological Contingency & Emergency Plan (Rc&Ep) ML24121A1652024-04-30030 April 2024 Global Nuclear Fuel - Americas, LLC - Annual Reporting ML24110A0432024-04-23023 April 2024 Global Nuclear Fuel - Americas - Core Inspection Report 07001113/2024001 ML24103A1992024-04-12012 April 2024 Submittal of Revision to GNF-A Radiological Contingency & Emergency Plan (Rc&Ep) ML24101A2372024-04-10010 April 2024 GNF-A Submittal of Emergency Response Telephone Listing Dated 4/2/2024 ML24074A3632024-03-15015 March 2024 Global Nuclear Fuels - Americas - NRC Inspection Report 07001113-2024006 ML24068A1302024-03-0808 March 2024 Global Nuclear Fuel - Request to Withdraw GNF-A Supplemental Environmental Report ML24017A1602024-01-31031 January 2024 Global Nuclear Fuel - Americas - Core Inspection Report 07001113-2023004 ML24030A5182024-01-30030 January 2024 Global Nuclear Fuel - Americas, LLC (GNF-A), Submittal of Revised ISA Summary Per 10CFR70.72(d) ML24008A2892024-01-10010 January 2024 Global Nuclear Fuel-Americas - NRC Inspection Report 07001113/2023006 ML24003A6832024-01-0404 January 2024 Global Nuclear Fuel - Americas, L.L.C. – Material Control and Accounting Program Inspection Report 07001113-2023401 - Public ML23311A3802023-12-11011 December 2023 Cover Letter - Safety Evaluation Report for GNF-A Request for 8 Weight Percent Uranium 235 ML23283A3292023-11-30030 November 2023 NRC Issuance of Order Consenting to Indirect Transfer of Control of Ge/Geha/Gnfa Licenses ML23334A2222023-11-30030 November 2023 GE Hitachi Nuclear Energy - NRC Notice Before Actions Necessary to Accomplish the Indirect Transfers of Control Are Completed ML23276B3952023-10-13013 October 2023 The U.S. Nuclear Regulatory Commission Staff Assessment of Ge/Geha/Gnfa Reponses to Acceptance Observations Application for the U.S. Nuclear Regulatory Commission Consent to Indirect Transfer of Licenses ML24005A2842023-09-18018 September 2023 23-004 M230129 GNF-A 2023 Biennial Exercise Supplement NRC Cover Letter 9-18-2023 ML23255A2902023-09-13013 September 2023 Global Nuclear Fuel – Americas, L.L.C. – Inspection Schedule for Calendar Year 2024 ML23230A3942023-08-18018 August 2023 GNF-A Semi-Annual Effluent Monitoring Report ML23229A5122023-08-17017 August 2023 GE-Hitachi Nuclear Energy Americas, LLC, Response to NRC Staff Observations Enclosed with NRC Acceptance Letter (Reference 2) Related to GE, Geha and GNF-A Application (Reference 1) ML23213A1452023-08-0202 August 2023 Global Nuclear Fuel – Americas, LLC – Core Inspection Report 07001113/2023002 ML23209A6762023-07-28028 July 2023 GNF-A Response to NRC Request for Additional Information ML23191A8592023-07-27027 July 2023 Acceptance Letter GE GNFA and Geha Application for NRC Consent to Indirect Transfer of Licenses ML24005A2782023-07-27027 July 2023 23-030 M230100 GNF-A 2023 Biennial Exercise NRC Cover Letter 7-27-23 ML23195A0942023-07-14014 July 2023 GNF-A Written Follow-up Report – Fire System Impairment ML23192A5162023-07-11011 July 2023 GNF-A Natrium Fuel Fabrication Facility Schedule Update ML23156A1832023-07-0303 July 2023 Request for Additional Information Regarding GNF-A License Amendment Request for 8 Weight Percent Uranium 235 ML23178A0992023-06-27027 June 2023 GNF-A Additional Response to Nrg Request for Supplemental Information - Decommissioning Funding Plan (DFP) ML23177A0892023-06-26026 June 2023 Geha and GNF-A Application for Indirect Transfer of Control - Revision 2 ML23171A9762023-06-20020 June 2023 Geha and GNF-A Application for Indirect Transfer of Control - Revision 1 ML23159A1342023-06-0808 June 2023 Global Nuclear Fuel - Americas, LLC, Physical Inventory Summary Reports ML23152A1162023-05-30030 May 2023 Application for Order Consenting to Indirect Transfer of Control with Respect to Reactor Licenses, Materials Licenses, and Export Licenses, and Notification Regarding Other Approvals ML23116A3212023-04-27027 April 2023 Public Meeting Summary Licensee Performance Review of Global Nuclear Fuel Americas, LLC, Docket Number 07001113 ML23116A1842023-04-26026 April 2023 GNF-A Response to NRC Request for Supplemental Information - Decommissioning Funding Plan (DFP) 2024-09-06
[Table view] Category:Written Event Report (30 or 60 day)
MONTHYEARML24353A1232024-12-20020 December 2024 (U) Global Laser Enrichment Written Follow-up Report, Degraded IROFS ML24236A0222024-08-22022 August 2024 GNF-A Written Follow-up Report - Fire System Impairment ML23195A0942023-07-14014 July 2023 GNF-A Written Follow-up Report – Fire System Impairment ML22346A0702022-12-12012 December 2022 GNF-A Written Follow-up Report - Fire System Impairment ML22168A0402022-06-17017 June 2022 GNF-A Written Follow-up Report - Fire System Impairment ML22129A1162022-05-0909 May 2022 GNF-A Written Follow-up Report - Fire System Impairment ML22032A0612022-02-0101 February 2022 GNF-A Written Follow-up Report - Fire Door Impairment ML21175A0862021-06-24024 June 2021 GNF - a Written Follow-up Report - Fire Barrier Impairment ML21096A2322021-04-0606 April 2021 GNF-A Written Follow-up Report - Fire System Impairment ML20309A5692020-11-0404 November 2020 GNF-A Written Follow-up Report - Fire System Impairments ML20303A1582020-10-29029 October 2020 GNF-A Written Follow-up Report - Fire System Impairments ML20254A1132020-09-10010 September 2020 GNF-A Written Follow-up Report - Fire System Impairments ML20154K6012020-06-0202 June 2020 GNF - a Written Follow-up Report - Fire System Impairments ML20113E9992020-04-22022 April 2020 GNF-A Written Follow-up Report - Fire System Impairment ML20031D0982020-01-31031 January 2020 GNF-A Written Follow-up Report - Fire System Impairment ML19316A9142019-11-12012 November 2019 GNF - a Written Follow-up Reports - Fire System Impairments 2024-08-22
[Table view] |
Text
M220161 December 12, 2022 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555-0001
Subject:
GNF-A Written Follow-up Report - Fire System Impairment
References:
- 1) NRC License SNM-1097, Docket 70-1113
- 2) GNF-A Event N otification 56159, 10/13/2022
Dear Sir or Madam:
In accordance with 10 CFR 70.74(b), Global Nuclear Fuel-Americas, LLC (GNF-A) hereby submits a written follow-up report for Event Notification 56159 that was provided to NRC on October 13, 2022 (Reference 2).
Event 56159 As discussed in the initial event report, GNF-A reported an unplanned fire system impairment to the New Hanover County (NHC) Deputy Fire Marshall. Consistent with 10 CFR 70, Appendix A(c), a concurrent report was provided to NRC and is included as Attachment 1 to this letter.
Additional information is provided as follows:
Event Details and Safety Significance At approximately 1311 (EDT) on October 12th, 2022, the New Hanover County Deputy Fire Marshall was notified per State code requirements that the fire suppression system encompassing the Fuel Manufacturing Operation (FMO) was impaired. During a flow test, the backup diesel fire pump experienced an overheating condition.
Immediate Corrective Actions Taken The diesel fire pump was placed in the manual "Off" position. The electric fire pump was verified to be fully operational and available to perform its safety function. A repair vendor was contacted to restore operation.
Probable Cause of Event A failed pressure regulator was determined to be the cause of the issue.
Global Nuclear Fuel Phillip D. Ollis Facility Licensing 3901 Castle Hayne Road P.O. Box 780 Wilmington, NC 28402 USA T (910) 616-4018 Phillip.ollis@ge.com
US NRC M220161 December 12, 2022 Page 2 Short Term Corrective Actions The pressure regulator was replaced and the diesel pump was returned to service at approximately 1000 on October 13th. The Fire Marshall was notified of restoration at 1020.
Longer Term Corrective Action None - The failure was detected during a routine test as intended.
If you have any questions regarding this matter, please contact me at (910) 616-4018.
Sincerely, Phillip D. Ollis Facility Licensing Attachments: 1) Event Description cc: NRC Region II Administrator, Atlanta, GA J. Rivera, NRC RII Atlanta. GA L. Cooke, NRC RII Atlanta. GA J. Rowley, NRC NMSS, Washington, DC PDO 22-008
US NRC M220161 December 12, 2022 Page 3 Event Description At approximately 1311 (EDT) on October 12th, 2022, the New Hanover County Deputy Fire Marshall was notified per State code requirements that the fire suppression system encompassing the Fuel Manufacturing Operation (FMO) was impaired. During a flow test, the backup diesel fire pump experienced an overheating condition. As a result, the diesel fire pump was placed in the manual "Off" position. The electric fire pump remained fully operational and available to perform its safety function. The diesel pump was repaired and returned to operation at approximately 1000 (EDT) on Thursday, October 13th. The New Hanover County Deputy Fire Marshall was notified of restoration at 1020 (EDT). Because the New Hanover County Deputy Fire Marshall was notified, a concurrent notification to the NRC Operations Center is being made per 10 CFR 70, Appendix A(c).
Phillip Ollis, Facility Licensing 1039 10/13/2022