M220087 June 17, 2022 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555-0001
Subject:
GNF-A Written Follow-up Report - Fire System Impairment
References:
- 1) NRC License SNM-1097, Docket 70-1113
- 2) GNF-A Event Report 55853, 4/22/2022
Dear Sir or Madam:
In accordance with 10 CFR 70.74(b), Global Nuclear Fuel-Americas, LLC (GNF-A) hereby submits a written follow-up report for Event Notification 55853 that was provided to NRC on April 22, 2022 (Reference 2).
Event 55853 As discussed in the initial event report, GNF-A reported an unplanned fire system impairment to the New Hanover County (NHC) Deputy Fire Marshall. Consistent with 10 CFR 70, Appendix A(c), a concurrent report was provided to NRC and is included as Attachment 1 to this letter.
Additional information is provided as follows:
Event Details and Safety Significance On April 21st, a roll up fire door located between a boiler room and the rad waste system malfunctioned in the open position. The door was approximately 3/4 closed. Compensatory measures were discussed with the New Hanover County Deputy Fire Marshall and then implemented.
Immediate Corrective Actions Taken A fire retardant tarp was used to cover the opening between the bottom of the roll up door and the floor.
Probable Cause of Event A mechanical misalignment of the door tracks caused the door to jam.
Global Nuclear Fuel Phillip D. Ollis Facility Licensing 3901 Castle Hayne Road P.O. Box 780 Wilmington, NC 28402 USA T (910) 616-4018 Phillip.ollis@ge.com
US NRC M220087 June 17, 2022 Page 2 Short Term Corrective Actions
- 1) The vendor was contacted to repair the door. The door was restored to operability at approximately 10:45 EDT on April 22nd.
Longer Term Corrective Action None - The cause of the mechanical misalignment was undetermined.
If you have any questions regarding this matter, please contact me at (910) 616-4018.
Sincerely, Phillip D. Ollis Facility Licensing Attachments: 1) Event 55853 Notification Description cc: NRC Region II Administrator, Atlanta, GA J. Rivera, NRC RII Atlanta. GA L. Cooke, NRC RII Atlanta. GA J. Rowley, NRC NMSS, Washington, DC PDO 22-004
US NRC M220087 June 17, 2022 Page 3 Event 55853 Notification Description At approximately 1454 EDT on April 21st, the New Hanover County Deputy Fire Marshall was notified that a roll up fire door located between a boiler room and the rad waste system malfunctioned in the open position. The door was approximately 3/4 closed. Compensatory measures were discussed with the Deputy Fire Marshall and then implemented. The door was repaired at approximately 10:45 EDT on April 22nd. Because the New Hanover County Deputy Fire Marshall was notified, a concurrent notification to the NRC Operations Center is being made per 10 CFR 70, Appendix A(c).
Phillip Ollis, Facility Licensing 1335 4/22/2022