Global Nuclear Fuel Americas, L.L.C. Inspection Schedule for Calendar Year 2024
ML23255A290
Person / Time
Site: 07001113
Issue date: 09/13/2023
From: Mathis R
NRC/RGN-II/DFFI
To: Huth R
Global Nuclear Fuel - Americas
References
Download: ML23255A290 (1)


Text

September 13, 2023 Mr. Ryan Huth Facility Manager Global Nuclear Fuel - Americas, L.L.C.

P.O. Box 780, Mail Code J20 Wilmington, NC 28402

SUBJECT:

GLOBAL NUCLEAR FUEL - AMERICAS, L.L.C. - INSPECTION SCHEDULE FOR CALENDAR YEAR 2024

Dear Mr. Huth:

Enclosed is the schedule of inspections to be performed by the U.S. Nuclear Regulatory Commission (NRC) inspectors at the Global Nuclear Fuel - Americas facility in calendar year 2024. The inspection schedule is provided in advance to minimize the resource impact on your staff and allow for the resolution of any scheduling conflicts and personnel availability issues, well in advance of inspector arrival onsite.

Please note that any regional initiative or reactive inspections are not included in the schedule.

If circumstances arise which cause the NRC inspectors to change the dates of the planned inspections, we will contact you to discuss the change as early as possible. Please contact Joel Rivera at (404) 997-4825 with any questions or concerns you may have regarding this letter or the inspection schedule.

This letter and its enclosure will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html, and at the NRC Public Document Room, in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Signed by Mathis, Robert on 09/13/23 Robert Mathis, III, Chief (Acting)

Projects Branch 1 Division of Fuel Facility Inspection Docket No. 07001113 License No. SNM-1097

Enclosure:

As stated cc w/ encl: Distribution via LISTSERV

ML23255A290 X Non-Sensitive X Publicly Available X SUNSI Review Sensitive Non-Publicly Available OFFICE RII/DFFI RII/DFFI RII/DFFI NAME J. Rivera Ortiz T. Vukovinsky R. Mathis DATE 09/13/2023 09/13/2023 09/13/2023 2024 U.S. NUCLEAR REGULATORY COMMISSION INSPECTION/ACTIVITY PLAN FOR GLOBAL NUCLEAR FUEL - AMERICAS, L.L.C.

Dates Number of Description/Inspection Procedures (IPs)

Inspectors 2 Nuclear Criticality Safety 1 (IP 88015)

February 5 - 9 Transportation (IP 86740)

March 11 - 15 2 Radiation Protection (IP 88030)

June 24 - 28 2 Operational Safety 1 (IP 88020)

August 5 - 9 2 Nuclear Criticality Safety 2 (IP 88015)

Emergency Preparedness (IP 88050)

November 4 - 8 3 Operational Safety 2 (IP 88020)

Plant Modifications - Annual (IP 88070)

Enclosure