Category:Letter
MONTHYEARML24017A1602024-01-31031 January 2024 Global Nuclear Fuel - Americas - Core Inspection Report 07001113-2023004 ML24030A5182024-01-30030 January 2024 Global Nuclear Fuel - Americas, LLC (GNF-A), Submittal of Revised ISA Summary Per 10CFR70.72(d) ML24008A2892024-01-10010 January 2024 Global Nuclear Fuel-Americas - NRC Inspection Report 07001113/2023006 ML24003A6832024-01-0404 January 2024 Global Nuclear Fuel - Americas, L.L.C. Material Control and Accounting Program Inspection Report 07001113-2023401 - Public ML23311A3802023-12-11011 December 2023 Cover Letter - Safety Evaluation Report for GNF-A Request for 8 Weight Percent Uranium 235 ML23283A3292023-11-30030 November 2023 NRC Issuance of Order Consenting to Indirect Transfer of Control of Ge/Geha/Gnfa Licenses ML23334A2222023-11-30030 November 2023 GE Hitachi Nuclear Energy - NRC Notice Before Actions Necessary to Accomplish the Indirect Transfers of Control Are Completed ML23276B3952023-10-13013 October 2023 the U.S. Nuclear Regulatory Commission Staff Assessment of Ge/Geha/Gnfa Reponses to Acceptance Observations Application for the U.S. Nuclear Regulatory Commission Consent to Indirect Transfer of Licenses ML24005A2842023-09-18018 September 2023 23-004 M230129 GNF-A 2023 Biennial Exercise Supplement NRC Cover Letter 9-18-2023 ML23255A2902023-09-13013 September 2023 Global Nuclear Fuel Americas, L.L.C. Inspection Schedule for Calendar Year 2024 ML23230A3942023-08-18018 August 2023 GNF-A Semi-Annual Effluent Monitoring Report ML23229A5122023-08-17017 August 2023 GE-Hitachi Nuclear Energy Americas, LLC, Response to NRC Staff Observations Enclosed with NRC Acceptance Letter (Reference 2) Related to GE, Geha and GNF-A Application (Reference 1) ML23213A1452023-08-0202 August 2023 Global Nuclear Fuel Americas, LLC Core Inspection Report 07001113/2023002 ML23209A6762023-07-28028 July 2023 GNF-A Response to NRC Request for Additional Information ML23191A8592023-07-27027 July 2023 Acceptance Letter GE GNFA and Geha Application for NRC Consent to Indirect Transfer of Licenses ML24005A2782023-07-27027 July 2023 23-030 M230100 GNF-A 2023 Biennial Exercise NRC Cover Letter 7-27-23 ML23195A0942023-07-14014 July 2023 GNF-A Written Follow-up Report Fire System Impairment ML23192A5162023-07-11011 July 2023 GNF-A Natrium Fuel Fabrication Facility Schedule Update ML23156A1832023-07-0303 July 2023 Request for Additional Information Regarding GNF-A License Amendment Request for 8 Weight Percent Uranium 235 ML23178A0992023-06-27027 June 2023 GNF-A Additional Response to Nrg Request for Supplemental Information - Decommissioning Funding Plan (DFP) ML23177A0892023-06-26026 June 2023 Geha and GNF-A Application for Indirect Transfer of Control - Revision 2 ML23171A9762023-06-20020 June 2023 Geha and GNF-A Application for Indirect Transfer of Control - Revision 1 ML23159A1342023-06-0808 June 2023 Global Nuclear Fuel - Americas, LLC, Physical Inventory Summary Reports ML23152A1162023-05-30030 May 2023 Application for Order Consenting to Indirect Transfer of Control with Respect to Reactor Licenses, Materials Licenses, and Export Licenses, and Notification Regarding Other Approvals ML23116A3212023-04-27027 April 2023 Public Meeting Summary Licensee Performance Review of Global Nuclear Fuel Americas, LLC, Docket Number 07001113 ML23116A1842023-04-26026 April 2023 GNF-A Response to NRC Request for Supplemental Information - Decommissioning Funding Plan (DFP) ML23089A2392023-04-10010 April 2023 Global Nuclear Fuel Americas, LLC, Triennial - 2022 Update to Decommissioning Funding Plan - Supplemental Information Needed - Enterprise Project Identification Number L-2022-DDP-0002 ML23104A4172023-03-31031 March 2023 GNF-AGEH Financial Assurance of Decommissioning Funds - Surety Bond Riders Cover Letter and Affidavit ML23065A0722023-03-0606 March 2023 Global Nuclear Fuel Americas (GNF-A), Supplemental Environmental Report Information and Request to Begin Construction ML23060A0862023-03-0303 March 2023 Global Nuclear Fuel - Americas, LLC Licensee Performance Review (Nuclear Regulatory Commission Inspection Report 07001113/2023005) ML23039A1512023-03-0303 March 2023 Cover Letter - Approval of GNF-A Er Exemption Request ML23058A2232023-02-27027 February 2023 GNF-A Semi-Annual Effluent Monitoring Report ML23044A4522023-02-13013 February 2023 Global Nuclear Fuel - Americas, L.L.C. (GNF-A), Submittal of Revision to GNF-A Radiological Contingency & Emergency Plan (Rc&Ep) ML23033A5422023-02-0202 February 2023 Global Nuclear Fuel - Americas, LLC - Submittal of FOCI Information Update ML23030A8022023-01-30030 January 2023 Submittal of GNF-A Natrium Fuel Fabrication Facility Pre-Application - Meeting Slides ML23027A0522023-01-27027 January 2023 Global Nuclear Fuel- Americas, LLC, Revised ISA Summary Per 10CFR70.72(d) ML23032A3722023-01-17017 January 2023 Concurrence from Nc Shpo - January 17 2023 ER-08-0036 ML23017A0102023-01-17017 January 2023 Global Nuclear Fuel-Americas, LLC - Core Inspection Report 07001113/2022004 ML23004A1962023-01-0404 January 2023 Global Nuclear Fuel Americas (GNF-A) Request for Exemption from Supplemental Environmental Report Timing Requirement of 10 CFR 51.60(a) ML22355A1622022-12-20020 December 2022 GNF-A Submittal of FOCI Information Update ML22346A0702022-12-12012 December 2022 GNF-A Written Follow-up Report - Fire System Impairment ML22346A2482022-12-12012 December 2022 Notice of Global Nuclear Fuel Americas, LLC (GNF-A) Facility Manager Change 2024-01-04
[Table view] Category:Written Event Report (30 or 60 day)
MONTHYEARML23195A0942023-07-14014 July 2023 GNF-A Written Follow-up Report Fire System Impairment ML22346A0702022-12-12012 December 2022 GNF-A Written Follow-up Report - Fire System Impairment ML22168A0402022-06-17017 June 2022 GNF-A Written Follow-up Report - Fire System Impairment ML22129A1162022-05-0909 May 2022 GNF-A Written Follow-up Report - Fire System Impairment ML22032A0612022-02-0101 February 2022 GNF-A Written Follow-up Report - Fire Door Impairment ML21175A0862021-06-24024 June 2021 GNF - a Written Follow-up Report - Fire Barrier Impairment ML21096A2322021-04-0606 April 2021 GNF-A Written Follow-up Report - Fire System Impairment ML20309A5692020-11-0404 November 2020 GNF-A Written Follow-up Report - Fire System Impairments ML20303A1582020-10-29029 October 2020 GNF-A Written Follow-up Report - Fire System Impairments ML20254A1132020-09-10010 September 2020 GNF-A Written Follow-up Report - Fire System Impairments ML20154K6012020-06-0202 June 2020 GNF - a Written Follow-up Report - Fire System Impairments ML20113E9992020-04-22022 April 2020 GNF-A Written Follow-up Report - Fire System Impairment 2023-07-14
[Table view] |
Text
Global Nuclear Fuel Phillip D. Ollis Facility Licensing 3901 Castle Hayne Road P.O. Box 780 Wilmington, NC 28402 M220067 USA T (910) 616-4018 May 9, 2022 Phillip.ollis@ge.com U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555-0001
Subject:
GNF-A Written Follow-up Report - Fire System Impairment
References:
- 1) NRC License SNM-1097, Docket 70-1113
- 2) GNF-A Event Report 55786, 3/13/2022
Dear Sir or Madam:
In accordance with 10 CFR 70.74(b), Global Nuclear Fuel-Americas, LLC (GNF-A) hereby submits a written follow-up report for Event Notification 55786 that was provided to NRC on March 13, 2022 (Reference 2).
Event 55786 As discussed in the initial event report, GNF-A reported an unplanned fire system impairment to the New Hanover County (NHC) Deputy Fire Marshall. Consistent with 10 CFR 70, Appendix A(c), a concurrent report was provided to NRC and is included as Attachment 1 to this letter.
Additional information is provided as follows:
Event Details and Safety Significance On March 13th, GNF-A underwent an unplanned local power outage from downed powerlines.
High winds caused a tree to fall on the power line resulting in loss of power to the electric fire pump. The backup diesel fire pump remained fully operational and available to perform its safety function. The Fuel Maufacturing Operation was unaffected by the power loss as it is fed from different distribution lines.
Immediate Corrective Actions Taken At approximately 1045 (EST) on March 12th, 2022, the New Hanover County Deputy Fire Marshall was notified per State code requirements regarding fire systems impairments. Because the New Hanover County Deputy Fire Marshall was notified, a concurrent notification to the NRC Operations Center was made on March 13, 2022 per 10 CFR 70, Appendix A(c).
Probable Cause of Event High winds caused a tree to fall across power lines causing a localized power outage.
US NRC M220067 May 9, 2022 Page 2 Short Term Corrective Actions
- 1) The diesel fire pump was verified as fully operational and available to perform its safety function.
- 2) Surveillance activities were initiated. Compensatory measures related to fire safety were communicated to the New Hanover County Fire Marshalls office.
- 3) Duke Energy Progress was contacted to repair the downed lines. Power was restored to service at approximately 1600 EDT on March 12, 2022. The NHC Deputy Fire Marshal was notified of the return to service.
Longer Term Corrective Action None - Duke Energy Progress owns and controls the power lines.
If you have any questions regarding this matter, please contact me at (910) 616-4018.
Sincerely, Phillip D. Ollis Facility Licensing Attachments: 1) Event 55786 Notification Description cc: NRC Region II Administrator, Atlanta, GA J. Rivera, NRC RII Atlanta. GA L. Cooke, NRC RII Atlanta. GA J. Rowley, NRC NMSS, Washington, DC PDO 22-003
US NRC M220067 May 9, 2022 Page 3 Attachment 1 Event 55786 Notification Description At approximately 1045 (EST) on March 12th, 2022, the New Hanover County Deputy Fire Marshall was notified per State code requirements that the fire suppression system encompassing the Fuel Manufacturing Operation (FMO) was impaired. High winds had caused a tree to fall on a power line. As a result, the electric fire pump was without power. The backup diesel fire pump remained fully operational and available to perform its safety function. Power was restored at approximately 1600 on March 12th, 2022 and the Deputy Fire Marshall was notified of system restoration. Because the New Hanover County Deputy Fire Marshall was notified, a concurrent notification to the NRC Operations Center is being made per 10 CFR 70, Appendix A(c).
Phillip Ollis, Facility Licensing 0934 3/13/2022