ML17266A091: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 2: Line 2:
| number = ML17266A091
| number = ML17266A091
| issue date = 08/17/1979
| issue date = 08/17/1979
| title = LER 79-025/03L-0 on 790720:Variable High Power Trip Setpoint in Core Protection Calculator Failed to Track Reactor Power. Caused by Power Supply in Core Protection Calculator Failing Due to Filter Capacitor Failure
| title = LER 79-025/03L-0 on 790720:variable High Power Trip Setpoint in Core Protection Calculator Failed to Track Reactor Power. Caused by Power Supply in Core Protection Calculator Failing Due to Filter Capacitor Failure
| author name = SCHOPPMAN M A
| author name = SCHOPPMAN M A
| author affiliation = FLORIDA POWER & LIGHT CO.
| author affiliation = FLORIDA POWER & LIGHT CO.

Revision as of 01:45, 27 February 2018

LER 79-025/03L-0 on 790720:variable High Power Trip Setpoint in Core Protection Calculator Failed to Track Reactor Power. Caused by Power Supply in Core Protection Calculator Failing Due to Filter Capacitor Failure
ML17266A091
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 08/17/1979
From: SCHOPPMAN M A
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML17207A322 List:
References
LER-79-025-03L, LER-79-25-3L, NUDOCS 7908300711
Download: ML17266A091 (1)