ML18178A577: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:70-1312-gil, Yuseong-daero, Yuseong-gu, Daejeon, 34101, KOREA Tel: +82-42-870-5400 / Fax: +82-42-870-5449 http://www.khnp.co.kr June 27, 2018 Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Attention: Mr. William Ward                                                  Docket No. 52-046 Division of New Reactor Licensing                            MKD/NW-18-0095L
 
==Subject:==
Revised Response to RAI ER 1-8428 for Question EIS ACC/SA-15 (Rev.3)
 
==References:==
: 1) NRC Request for Additional Information ER 1-8428, dated March 22, 2016
: 2) KHNP Letter MKD/NW-16-1110L, Response to RAI ER 1-8428 for Questions EIS ACC/SA-2, EIS ACC/SA-8, EIS ACC/SA-11 and EIS ACC/SA-15, dated November 28, 2016
: 3) KHNP Letter MKD/NW-17-0288L, Revised Response to RAI ER 1-8428 for the Questions EIS ACC/SA-5 and EIS ACC/SA-15, dated September 15, 2017
: 4) KHNP Letter MKD/NW-18-0003L, Revised Response to RAI ER 1-8428 for the Questions EIS ACC/SA-5 and EIS ACC/SA-15 (Rev.2), dated January 2, 2018 KHNP is hereby submitting the response to RAI ER 1-8428, dated March 22, 2016. The revised response addresses Question EIS ACC/SA-15 to reflect the latest costs determined by SAMDA analysis. The enclosure provides the revised response to RAI ER 1-8428 for Question EIS ACC/SA-15 (Rev.3) (Non-Proprietary).
If additional information or clarification is required, please contact Daegeun Ahn, Director of KHNP Washington DC Center at ahn.daegeun@khnp.co.kr or 703-388-0592.
Sincerely, Han-gon Kim Project Manager Advanced Reactors Development Laboratory Korea Hydro & Nuclear Power Co., Ltd.
 
==Enclosure:==
Revised Response to RAI ER 1-8428 for Question EIS ACC/SA-15 (Rev.3) (Non-Proprietary)
 
Enclosure Revised Response to RAI ER 1-8428 for Question EIS ACC/SA-15 (Rev.3)
(Non-Proprietary)
June 27, 2018}}

Latest revision as of 09:46, 17 March 2020

Korea Hydro & Nuclear Power Co., Ltd - Transmittal of Revised Response to RAI Er 1-8428 for Question EIS ACC/SA-15 (Rev.3)
ML18178A577
Person / Time
Site: 05200046
Issue date: 06/27/2018
From: Kim H
Korea Hydro & Nuclear Power Co, Ltd
To: William Ward
Document Control Desk, Office of New Reactors
Shared Package
ML18178A576 List:
References
MKD-NW-18-0095L
Download: ML18178A577 (2)


Text

70-1312-gil, Yuseong-daero, Yuseong-gu, Daejeon, 34101, KOREA Tel: +82-42-870-5400 / Fax: +82-42-870-5449 http://www.khnp.co.kr June 27, 2018 Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Attention: Mr. William Ward Docket No.52-046 Division of New Reactor Licensing MKD/NW-18-0095L

Subject:

Revised Response to RAI ER 1-8428 for Question EIS ACC/SA-15 (Rev.3)

References:

1) NRC Request for Additional Information ER 1-8428, dated March 22, 2016
2) KHNP Letter MKD/NW-16-1110L, Response to RAI ER 1-8428 for Questions EIS ACC/SA-2, EIS ACC/SA-8, EIS ACC/SA-11 and EIS ACC/SA-15, dated November 28, 2016
3) KHNP Letter MKD/NW-17-0288L, Revised Response to RAI ER 1-8428 for the Questions EIS ACC/SA-5 and EIS ACC/SA-15, dated September 15, 2017
4) KHNP Letter MKD/NW-18-0003L, Revised Response to RAI ER 1-8428 for the Questions EIS ACC/SA-5 and EIS ACC/SA-15 (Rev.2), dated January 2, 2018 KHNP is hereby submitting the response to RAI ER 1-8428, dated March 22, 2016. The revised response addresses Question EIS ACC/SA-15 to reflect the latest costs determined by SAMDA analysis. The enclosure provides the revised response to RAI ER 1-8428 for Question EIS ACC/SA-15 (Rev.3) (Non-Proprietary).

If additional information or clarification is required, please contact Daegeun Ahn, Director of KHNP Washington DC Center at ahn.daegeun@khnp.co.kr or 703-388-0592.

Sincerely, Han-gon Kim Project Manager Advanced Reactors Development Laboratory Korea Hydro & Nuclear Power Co., Ltd.

Enclosure:

Revised Response to RAI ER 1-8428 for Question EIS ACC/SA-15 (Rev.3) (Non-Proprietary)

Enclosure Revised Response to RAI ER 1-8428 for Question EIS ACC/SA-15 (Rev.3)

(Non-Proprietary)

June 27, 2018