{{#Wiki_filter:~~ Comm~tted to Nuclear F~rrllcnce I Point Beach Nuclear Plant. Operated by Nuclear Management Company, LLC May 19,2006 NRC 2006-0053 I OCFR50+46(b)(5)
{{#Wiki_filter:~~               I Comm~ttedto Nuclear F ~ r r l l c n c e                                              Point Beach Nuclear Plant.
U.S. Nuclear Regulatory Commission AKTN: Document Control Desk 1 1555 Rockville Pike Rockville, MD 20852 Point Beach Nuclear Plant, Units 1 and 2 Dockets 50-266 and 50-301 License Nos. DPR-24 and DPR-27 Clarification of Commitment  
Operated by Nuclear Management Company, LLC May 19,2006                                                                                   NRC 2006-0053 IOCFR50+46(b)(5)
U.S. Nuclear Regulatory Commission AKTN: Document Control Desk 11555 Rockville Pike Rockville, MD 20852 Point Beach Nuclear Plant, Units 1 and 2 Dockets 50-266 and 50-301 License Nos. DPR-24 and DPR-27 Clarification of Commitment


==Reference:==
==Reference:==
 
I.Letter from NMC to NRC dated February 16, 2006 (NRC 2006-0009)
I. Letter from NMC to NRC dated February 16, 2006 (NRC 2006-0009)
: 2. Letter from NMC to NRC dated May 12,2006 (NRC 2006-0049)
: 2. Letter from NMC to NRC dated May 12,2006 (NRC 2006-0049)
This letter clarifies the Nuclear Management Company, LCC (NMC) response to Question I .C provided in Reference 2, which stated that, "Engineering of the design and installation of the new solenoid operated valves will be performed on a schedule commensurate with the safety significance of the change and in consideration of the plant conditions required to implement the change." As discussed during a telephone conference between Nuclear Regulatory Commission (NRC) staff and NMC personnel, the completion date for resolution of the above actions is clarified to be consistent with that previously stated in Reference I. At the latest, these actions will be completed consistent with the existing NMC commitment to resolve GSI-I 91 by December 31,2007. This letter contains one clarification to a regulatory commitment.
This letter clarifies the Nuclear Management Company, LCC (NMC) response to Question I.Cprovided in Reference 2, which stated that, "Engineering of the design and installation of the new solenoid operated valves will be performed on a schedule commensurate with the safety significance of the change and in consideration of the plant conditions required to implement the change."
I Dennis b. Koehl Site Vice-President, Point Beach Nuclear Plant Nuclear Management Company, LLC cc: Regional Administrator, Region I I I, USNRC Project Manager, Point Beach Nuclear Plant, USNRC Resident Inspector, Point Beach Nuclear Plant, USNRC 6590 Nuclear Road Two Rivers, Wisconsin 54241 Telephone:
As discussed during a telephone conference between Nuclear Regulatory Commission (NRC) staff and NMC personnel, the completion date for resolution of the above actions is clarified to be consistent with that previously stated in Reference I.At the latest, these actions will be completed consistent with the existing NMC commitment to resolve GSI-I 91 by December 31,2007.
920.755.232 t}}
This letter contains one clarification to a regulatory commitment.
I Dennis b. Koehl Site Vice-President, Point Beach Nuclear Plant Nuclear Management Company, LLC cc:     Regional Administrator, Region I II, USNRC Project Manager, Point Beach Nuclear Plant, USNRC Resident Inspector, Point Beach Nuclear Plant, USNRC 6590 Nuclear Road Two Rivers, Wisconsin 54241 Telephone: 920.755.232t}}

Latest revision as of 19:20, 23 November 2019

Clarification of Commitment
ML061420132
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 05/19/2006
From: Koehl D
Nuclear Management Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NRC 2006-0009, NRC 2006-0049, NRC 2006-0053
Download: ML061420132 (1)


Text

~~ I Comm~ttedto Nuclear F ~ r r l l c n c e Point Beach Nuclear Plant.

Operated by Nuclear Management Company, LLC May 19,2006 NRC 2006-0053 IOCFR50+46(b)(5)

U.S. Nuclear Regulatory Commission AKTN: Document Control Desk 11555 Rockville Pike Rockville, MD 20852 Point Beach Nuclear Plant, Units 1 and 2 Dockets 50-266 and 50-301 License Nos. DPR-24 and DPR-27 Clarification of Commitment

Reference:

I.Letter from NMC to NRC dated February 16, 2006 (NRC 2006-0009)

2. Letter from NMC to NRC dated May 12,2006 (NRC 2006-0049)

This letter clarifies the Nuclear Management Company, LCC (NMC) response to Question I.Cprovided in Reference 2, which stated that, "Engineering of the design and installation of the new solenoid operated valves will be performed on a schedule commensurate with the safety significance of the change and in consideration of the plant conditions required to implement the change."

As discussed during a telephone conference between Nuclear Regulatory Commission (NRC) staff and NMC personnel, the completion date for resolution of the above actions is clarified to be consistent with that previously stated in Reference I.At the latest, these actions will be completed consistent with the existing NMC commitment to resolve GSI-I 91 by December 31,2007.

This letter contains one clarification to a regulatory commitment.

I Dennis b. Koehl Site Vice-President, Point Beach Nuclear Plant Nuclear Management Company, LLC cc: Regional Administrator, Region I II, USNRC Project Manager, Point Beach Nuclear Plant, USNRC Resident Inspector, Point Beach Nuclear Plant, USNRC 6590 Nuclear Road Two Rivers, Wisconsin 54241 Telephone: 920.755.232t