{{#Wiki_filter:December 19, 2007  
{{#Wiki_filter:December 19, 2007 Mr. Barry S. Allen Site Vice President FirstEnergy Nuclear Operating Company Perry Nuclear Power Plant P. O. Box 97, 10 Center Road, A-PY-290 Perry, OH 44081-0097
 
Mr. Barry S. Allen  
 
Site Vice President  
 
FirstEnergy Nuclear Operating Company Perry Nuclear Power Plant P. O. Box 97, 10 Center Road, A-PY-290 Perry, OH 44081-0097  


==SUBJECT:==
==SUBJECT:==
CHANGE TO THE INSPECTION PLAN - PERRY NUCLEAR POWER PLANT  
CHANGE TO THE INSPECTION PLAN - PERRY NUCLEAR POWER PLANT


==Dear Mr. Allen:==
==Dear Mr. Allen:==


As part of a periodic self-assessment, the Nuclear Regulatory Commission (NRC) thoroughly reviewed its inspection procedures to ensure the continued effective application of inspection resources. The main objective of the review was to determine the appropriate inspection scope for the majority of the inspection procedures in the reactor oversight process (ROP). The result of this effort (designated ROP realignment) created changes to both inspection scope and/or inspection frequency for selected inspection procedures in the ROP. The purpose of this letter is to update the schedule of future inspection activities at your facility that was provided with the mid-cycle assessment letter in August 2007. Please note that there were no changes made to inspection procedures in the security, emergency preparedness, and health physics areas. The enclosed inspection plan details the inspections (less those related to security) scheduled for calendar year 2008. The inspection plan is provided to resolve any scheduling and/or personnel availability issues well in advance of the inspectors' arrival onsite. Routine resident inspections are not listed due to their continuous nature. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
As part of a periodic self-assessment, the Nuclear Regulatory Commission (NRC) thoroughly reviewed its inspection procedures to ensure the continued effective application of inspection resources. The main objective of the review was to determine the appropriate inspection scope for the majority of the inspection procedures in the reactor oversight process (ROP). The result of this effort (designated ROP realignment) created changes to both inspection scope and/or inspection frequency for selected inspection procedures in the ROP. The purpose of this letter is to update the schedule of future inspection activities at your facility that was provided with the mid-cycle assessment letter in August 2007. Please note that there were no changes made to inspection procedures in the security, emergency preparedness, and health physics areas.
The enclosed inspection plan details the inspections (less those related to security) scheduled for calendar year 2008. The inspection plan is provided to resolve any scheduling and/or personnel availability issues well in advance of the inspectors arrival onsite. Routine resident inspections are not listed due to their continuous nature.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).


Please contact me at 630-829-9629 with any questions you may have regarding this letter or the inspection plan.
B. Allen                                    Please contact me at 630-829-9629 with any questions you may have regarding this letter or the inspection plan.
Sincerely, /RA/ Bruce Burgess, Chief Projects Branch 6 Division of Reactor Projects Docket No. 50-440 License No. NPF-58  
Sincerely,
                                              /RA/
Bruce Burgess, Chief Projects Branch 6 Division of Reactor Projects Docket No. 50-440 License No. NPF-58


==Enclosure:==
==Enclosure:==
As Stated  
As Stated cc w/encl:    J. Hagan, President and Chief Nuclear Officer - FENOC J. Lash, Senior Vice President of Operations and Chief Operating Officer - FENOC D. Pace, Senior Vice President, Fleet Engineering - FENOC J. Rinckel, Vice President, Fleet Oversight - FENOC Director, Fleet Regulatory Affairs - FENOC Manager, Fleet Licensing - FENOC Manager, Site Regulatory Compliance - FENOC D. Jenkins, Attorney, FirstEnergy Corp.
Public Utilities Commission of Ohio Ohio State Liaison Officer R. Owen, Ohio Department of Health


cc w/encl: J. Hagan, President and Chief Nuclear Officer - FENOC J. Lash, Senior Vice President of Operations and Chief Operating Officer - FENOC D. Pace, Senior Vice President, Fleet Engineering - FENOC J. Rinckel, Vice President, Fleet Oversight - FENOC Director, Fleet Regulatory Affairs - FENOC Manager, Fleet Licensing - FENOC Manager, Site Regulatory Compliance - FENOC D. Jenkins, Attorney, FirstEnergy Corp. Public Utilities Commission of Ohio Ohio State Liaison Officer R. Owen, Ohio Department of Health 
B. Allen                                                                Please contact me at 630-829-9629 with any questions you may have regarding this letter or the inspection plan.
 
Sincerely,
Please contact me at 630-829-9629 with any questions you may have regarding this letter or the inspection plan.
                                                                          /RA/
Sincerely, /RA/ Bruce Burgess, Chief Projects Branch 6 Division of Reactor Projects Docket No. 50-440 License No. NPF-58  
Bruce Burgess, Chief Projects Branch 6 Division of Reactor Projects Docket No. 50-440 License No. NPF-58


==Enclosure:==
==Enclosure:==
As Stated  
As Stated cc w/encl:               J. Hagan, President and Chief Nuclear Officer - FENOC J. Lash, Senior Vice President of Operations and Chief Operating Officer - FENOC D. Pace, Senior Vice President, Fleet Engineering - FENOC J. Rinckel, Vice President, Fleet Oversight - FENOC Director, Fleet Regulatory Affairs - FENOC Manager, Fleet Licensing - FENOC Manager, Site Regulatory Compliance - FENOC D. Jenkins, Attorney, FirstEnergy Corp.
 
Public Utilities Commission of Ohio Ohio State Liaison Officer R. Owen, Ohio Department of Health DOCUMENT NAME:G:\BRANCH TSS\ALL MOC\MIDCYCLE 2006 TO 2007\ROP REALIGNMENT LETTER\PERRY.DOC G Publicly Available                        G Non-Publicly Available                  G Sensitive              G Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE              RIII                                RIII                            RIII                              RIII NAME                BBurgess:cms DATE                12/19/07 OFFICIAL RECORD COPY
cc w/encl: J. Hagan, President and Chief Nuclear Officer - FENOC J. Lash, Senior Vice President of Operations and Chief Operating Officer - FENOC D. Pace, Senior Vice President, Fleet Engineering - FENOC J. Rinckel, Vice President, Fleet Oversight - FENOC Director, Fleet Regulatory Affairs - FENOC Manager, Fleet Licensing - FENOC Manager, Site Regulatory Compliance - FENOC D. Jenkins, Attorney, FirstEnergy Corp. Public Utilities Commission of Ohio Ohio State Liaison Officer R. Owen, Ohio Department of Health  


DOCUMENT NAME:G:\BRANCH TSS\ALL MOC\MIDCYCLE 2006 TO 2007\ROP REALIGNMENT LETTER\PERRY.DOC G Publicly Available G Non-Publicly Available G Sensitive G Non-Sensitive To receive a copy of this document, indicate in the concurrence  box "C" = Copy without attach/encl "E" = Copy with attach/encl  "N" = No copy OFFICE  RIII    RIII    RIII    RIII    NAME  BBurgess:cms DATE  12/19/07      OFFICIAL RECORD COPY Letter to B. Allen from B. Burgess dated December 19, 2007  
Letter to B. Allen from B. Burgess dated December 19, 2007


==SUBJECT:==
==SUBJECT:==
CHANGE TO THE INSPECTION PLAN - PERRY NUCLEAR POWER PLANT DISTRIBUTION:
CHANGE TO THE INSPECTION PLAN - PERRY NUCLEAR POWER PLANT DISTRIBUTION:
RAG1 TEB TJW2 RidsNrrDirsIrib  
RAG1 TEB TJW2 RidsNrrDirsIrib MAS KGO JKH3 MEF1 CAA1 DRPIII DRSIII PLB1 TXN


MAS KGO JKH3 MEF1 CAA1 DRPIII  DRSIII PLB1 TXN Perry Inspection / Activity Plan 01/01/2008
Perry Inspection / Activity Plan 01/01/2008 - 12/31/2008 No. of Staff   Planned Dates        Inspection Inspection Activity                                              Title                                        on Site       Start    End            Type BI RP         - RADIATION PROTECTION BASELINE INSPECTION                                                             1 IP 7112203         Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control P             03/10/2008 03/14/2008 Baseline Inspections IP 71151-PR01       RETS/ODCM Radiological Effluent                                                                     03/10/2008 03/14/2008 Baseline Inspections BI ENG       - COMPONENT DESIGN BASES INSPECTION                                                                     5 IP 7111121          Component Design Bases Inspection                                                                    05/05/2008 06/06/2008 Baseline Inspections RPV HEAD - RPV HEAD DROP ANALYSIS INSPECTION                                                                         1 IP 7111120          Refueling and Other Outage Activities                                                                07/21/2008 08/08/2008 Baseline Inspections BI RP         - RADIATION PROTECTION BASELINE INSPECTION                                                             1 IP 7112101         Access Control to Radiologically Significant Areas                                                   09/08/2008 09/12/2008 Baseline Inspections IP 71151-OR01       Occupational Exposure Control Effectiveness                                                         09/08/2008 09/12/2008 Baseline Inspections BI EP         - EP EXERCISE INSPECTION / PI VERIFICATION                                                             3 IP 7111401         Exercise Evaluation                                                                                 10/06/2008 10/10/2008 EP Baseline Inspectio IP 71151-EP01       Drill/Exercise Performance                                                                           10/06/2008 10/10/2008 Baseline Inspections IP 71151-EP02       ERO Drill Participation                                                                             10/06/2008 10/10/2008 Baseline Inspections IP 71151-EP03       Alert & Notification System                                                                         10/06/2008 10/10/2008 Baseline Inspections BI RP        - RADIATION PROTECTION BASELINE INSPECTION                                                              1 IP 7112102         ALARA Planning and Controls                                                                         10/20/2008 10/24/2008 Baseline Inspections IP 71151-BI01       Reactor Coolant System Activity                                                                     10/20/2008 10/24/2008 Baseline Inspections BI RP         - RADIATION PROTECTION BASELINE INSPECTION                                                             1 IP 7112202          Radioactive Material Processing and Transportation                                                  11/17/2008 11/21/2008 Baseline Inspections BI OL         - BIENNIAL REQUAL. PROGRAM INSPECTION                                                                   2 IP 7111111B        Licensed Operator Requalification Program                                                            12/01/2008 12/05/2008 Baseline Inspections}}
-12/31/2008 Inspection Type Inspection Activity Planned Dates Start          End No. of Staff on Site Title Unit Number Page 1 of 1 12/19/2007 Report 22 1 BI RP-RADIATION PROTECTION BASELINE INSPECTION Baseline Inspections 03/10/2008 03/14/2008 1     7112203 IP Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control P Baseline Inspections 03/10/2008 03/14/2008 1    71151-PR01 IP RETS/ODCM Radiological Effluent 5 BI ENG-COMPONENT DESIGN BASES INSPECTION Baseline Inspections 05/05/2008 06/06/2008 1    7111121 IP Component Design Bases Inspection 1 RPV HEAD-RPV HEAD DROP ANALYSIS INSPECTION Baseline Inspections 07/21/2008 08/08/2008 1    7111120 IP Refueling and Other Outage Activities 1 BI RP-RADIATION PROTECTION BASELINE INSPECTION Baseline Inspections 09/08/2008 09/12/2008 1     7112101 IP A ccess Control to Radiologically Significant Areas Baseline Inspections 09/08/2008 09/12/2008 1    71151-OR01 IP Occupational Exposure Control Effectiveness 3 BI EP-EP EXERCISE INSPECTION / PI VERIFICATION EP Baseline Inspecti o 10/06/2008 10/10/2008 1    7111401 IP Exercise Evaluation Baseline Inspections 10/06/2008 10/10/2008 1    71151-EP01 IP Drill/Exercise Performance Baseline Inspections 10/06/2008 10/10/2008 1    71151-EP02 IP ERO Drill Participation Baseline Inspections 10/06/2008 10/10/2008 1    71151-EP03 IP A lert & Notification System 1 BI RP-RADIATION PROTECTION BASELINE INSPECTION Baseline Inspections 10/20/2008 10/24/2008 1     7112102 IP A LARA Planning and Controls Baseline Inspections 10/20/2008 10/24/2008 1    71151-BI01 IP Reactor Coolant System Activity 1 BI RP-RADIATION PROTECTION BASELINE INSPECTION Baseline Inspections 11/17/2008 11/21/2008 1    7112202 IP Radioactive Material Processing and Transportation 2 BI OL-BIENNIAL REQUAL. PROGRAM INSPECTION Baseline Inspections 12/01/2008 12/05/2008 1    7111111B IP Licensed Operator Requalification Program This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.}}

Latest revision as of 21:46, 14 November 2019

Change to the Inspection Plan 1/1/08 - 12/31/08
ML073540379
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 12/19/2007
From: Burgess B
NRC/RGN-III/DRP/B6
To: Allen B
FirstEnergy Nuclear Operating Co
References
Download: ML073540379 (5)


Text

December 19, 2007 Mr. Barry S. Allen Site Vice President FirstEnergy Nuclear Operating Company Perry Nuclear Power Plant P. O. Box 97, 10 Center Road, A-PY-290 Perry, OH 44081-0097

SUBJECT:

CHANGE TO THE INSPECTION PLAN - PERRY NUCLEAR POWER PLANT

Dear Mr. Allen:

As part of a periodic self-assessment, the Nuclear Regulatory Commission (NRC) thoroughly reviewed its inspection procedures to ensure the continued effective application of inspection resources. The main objective of the review was to determine the appropriate inspection scope for the majority of the inspection procedures in the reactor oversight process (ROP). The result of this effort (designated ROP realignment) created changes to both inspection scope and/or inspection frequency for selected inspection procedures in the ROP. The purpose of this letter is to update the schedule of future inspection activities at your facility that was provided with the mid-cycle assessment letter in August 2007. Please note that there were no changes made to inspection procedures in the security, emergency preparedness, and health physics areas.

The enclosed inspection plan details the inspections (less those related to security) scheduled for calendar year 2008. The inspection plan is provided to resolve any scheduling and/or personnel availability issues well in advance of the inspectors arrival onsite. Routine resident inspections are not listed due to their continuous nature.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

B. Allen Please contact me at 630-829-9629 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

Bruce Burgess, Chief Projects Branch 6 Division of Reactor Projects Docket No. 50-440 License No. NPF-58

Enclosure:

As Stated cc w/encl: J. Hagan, President and Chief Nuclear Officer - FENOC J. Lash, Senior Vice President of Operations and Chief Operating Officer - FENOC D. Pace, Senior Vice President, Fleet Engineering - FENOC J. Rinckel, Vice President, Fleet Oversight - FENOC Director, Fleet Regulatory Affairs - FENOC Manager, Fleet Licensing - FENOC Manager, Site Regulatory Compliance - FENOC D. Jenkins, Attorney, FirstEnergy Corp.

Public Utilities Commission of Ohio Ohio State Liaison Officer R. Owen, Ohio Department of Health

B. Allen Please contact me at 630-829-9629 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

Bruce Burgess, Chief Projects Branch 6 Division of Reactor Projects Docket No. 50-440 License No. NPF-58

Enclosure:

As Stated cc w/encl: J. Hagan, President and Chief Nuclear Officer - FENOC J. Lash, Senior Vice President of Operations and Chief Operating Officer - FENOC D. Pace, Senior Vice President, Fleet Engineering - FENOC J. Rinckel, Vice President, Fleet Oversight - FENOC Director, Fleet Regulatory Affairs - FENOC Manager, Fleet Licensing - FENOC Manager, Site Regulatory Compliance - FENOC D. Jenkins, Attorney, FirstEnergy Corp.

Public Utilities Commission of Ohio Ohio State Liaison Officer R. Owen, Ohio Department of Health DOCUMENT NAME:G:\BRANCH TSS\ALL MOC\MIDCYCLE 2006 TO 2007\ROP REALIGNMENT LETTER\PERRY.DOC G Publicly Available G Non-Publicly Available G Sensitive G Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII RIII RIII NAME BBurgess:cms DATE 12/19/07 OFFICIAL RECORD COPY

Letter to B. Allen from B. Burgess dated December 19, 2007

SUBJECT:

CHANGE TO THE INSPECTION PLAN - PERRY NUCLEAR POWER PLANT DISTRIBUTION:

RAG1 TEB TJW2 RidsNrrDirsIrib MAS KGO JKH3 MEF1 CAA1 DRPIII DRSIII PLB1 TXN

Perry Inspection / Activity Plan 01/01/2008 - 12/31/2008 No. of Staff Planned Dates Inspection Inspection Activity Title on Site Start End Type BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 IP 7112203 Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control P 03/10/2008 03/14/2008 Baseline Inspections IP 71151-PR01 RETS/ODCM Radiological Effluent 03/10/2008 03/14/2008 Baseline Inspections BI ENG - COMPONENT DESIGN BASES INSPECTION 5 IP 7111121 Component Design Bases Inspection 05/05/2008 06/06/2008 Baseline Inspections RPV HEAD - RPV HEAD DROP ANALYSIS INSPECTION 1 IP 7111120 Refueling and Other Outage Activities 07/21/2008 08/08/2008 Baseline Inspections BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 IP 7112101 Access Control to Radiologically Significant Areas 09/08/2008 09/12/2008 Baseline Inspections IP 71151-OR01 Occupational Exposure Control Effectiveness 09/08/2008 09/12/2008 Baseline Inspections BI EP - EP EXERCISE INSPECTION / PI VERIFICATION 3 IP 7111401 Exercise Evaluation 10/06/2008 10/10/2008 EP Baseline Inspectio IP 71151-EP01 Drill/Exercise Performance 10/06/2008 10/10/2008 Baseline Inspections IP 71151-EP02 ERO Drill Participation 10/06/2008 10/10/2008 Baseline Inspections IP 71151-EP03 Alert & Notification System 10/06/2008 10/10/2008 Baseline Inspections BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 IP 7112102 ALARA Planning and Controls 10/20/2008 10/24/2008 Baseline Inspections IP 71151-BI01 Reactor Coolant System Activity 10/20/2008 10/24/2008 Baseline Inspections BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 IP 7112202 Radioactive Material Processing and Transportation 11/17/2008 11/21/2008 Baseline Inspections BI OL - BIENNIAL REQUAL. PROGRAM INSPECTION 2 IP 7111111B Licensed Operator Requalification Program 12/01/2008 12/05/2008 Baseline Inspections