Category:Letter
MONTHYEARIR 05000341/20245012024-10-0808 October 2024 – Emergency Preparedness Inspection Report 05000341/2024501 ML24276A2032024-10-0303 October 2024 FEMA Level 1 Finding Transmittal Letter ML24268A0992024-10-0101 October 2024 Power Plant – Audit Summary for License Amendment Request and Regulatory Exemptions for a Risk Informed Approach to Address ECCS Strainer Performance IR 05000341/20240132024-09-30030 September 2024 Phase 2 Post Approval License Renewal Report 05000341/2024013 ML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status ML24257A1652024-09-13013 September 2024 FEMA Region 5 Fermi 2 Nuclear Power Plant Level 1 Finding September 2024 ML24254A3562024-09-0909 September 2024 FEMA Level 1 Finding for Fermi 2024 Biennial Exercise ML24240A3532024-08-27027 August 2024 Inservice Testing (IST) Program for the Fourth 10-Year Inspection Interval Update IR 05000341/20240052024-08-22022 August 2024 Updated Inspection Plan for Fermi Power Plant, Unit 2 (Report 05000341/2024005) IR 05000341/20240022024-08-14014 August 2024 Integrated Inspection Report 05000341/2024002 ML24199A2182024-07-25025 July 2024 Enrico Fermi Atomic Power Plant, Unit 1 - NRC Position on Continuation of Possession-Only License No. DPR-9 Past the Current Expiration Date (Docket No. 50-016) ML24169A4092024-07-18018 July 2024 Relief Request RR-A25, Alternative to Reactor Vessel Circumferential Shell Weld Examination IR 05000341/20243022024-07-0909 July 2024 NRC Initial License Reexamination Report 05000341/2024302 ML24173A1012024-06-14014 June 2024 Retake Exam Post-Exam Cover Letter & Comments ML24155A0852024-06-11011 June 2024 Operator Licensing Reexamination Approval Letter - Fermi Power Plant, June 2024 ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities IR 05000341/20244022024-05-30030 May 2024 Security Baseline Inspection Report 05000341/2024402 ML24143A1852024-05-29029 May 2024 – Regulatory Audit in Support of LAR to Adopt TSTF-505, Rev. 2, TSTF-439, Rev. 2, and TSTF-591, Rev. 0 ML24141A2072024-05-20020 May 2024 Plant—Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection 05000341/LER-2024-002, Primary Containment Isolation Valve Declared Inoperable for a Period Prohibited by Technical Specifications2024-05-16016 May 2024 Primary Containment Isolation Valve Declared Inoperable for a Period Prohibited by Technical Specifications 05000341/LER-2024-001, Automatic RPS Scram on High RPV Pressure While Attempting to Lower Generator Output During RF-222024-05-15015 May 2024 Automatic RPS Scram on High RPV Pressure While Attempting to Lower Generator Output During RF-22 IR 05000341/20240102024-05-0606 May 2024 NRC Inspection Report 05000341/2024010 ML24052A2772024-04-30030 April 2024 Issuance of Amendment No. 229 Regarding Revision of Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.12 IR 05000341/20240012024-04-30030 April 2024 Integrated Inspection Report 05000341/2024001 ML24107B1372024-04-18018 April 2024 Confirmation of Initial License Reexamination June 2024 ML24101A3732024-04-11011 April 2024 Request for Information for NRC Commercial Grade Dedication Inspection: Inspection Report 05000341/2024012 ML24100A8422024-04-0909 April 2024 Request for Information for an NRC Post-Approval Site Inspection for License Renewal Inspection: Inspection Report 05000341/2024013 IR 05000341/20234022024-04-0808 April 2024 Reissue - Fermi Power Plant, Unit 2 - Cyber Security Inspection Report 05000341/2023402 (Public) ML24088A2162024-04-0404 April 2024 Change in Estimated Review Schedule and Level of Effort for License Amendment Request for Risk Informed Approach to ECCS Strainer Performance ML24086A5732024-04-0101 April 2024 Response to Disputed Non-Cited Violation Documents in Fermi Power Plant, Unit 2 - Cyber Security Inspection Report 05000341/2023402-01 Withdrawal of Non-Cited Violation (Public) IR 05000341/20243012024-04-0101 April 2024 NRC Initial License Examination Report 05000341/2024301 IR 05000341/20244012024-03-22022 March 2024 – Security Baseline Inspection Report 05000341/2024401 (Public) IR 05000341/20240112024-03-0808 March 2024 Nbsp;Safety Conscious Work Environment Issue of Concern Follow-up Inspection Report 05000341/2024011 ML24002B1812024-03-0404 March 2024 Issuance of Amendment No. 228 Regarding Revision of Non-Conservative Technical Specification 3.4.5, RCS Pressure Isolation Valve (PIV) Leakage IR 05000341/20230062024-02-28028 February 2024 Annual Assessment Letter for Fermi Power Plant, Unit 2 (Report 05000341/2023006) ML24019A1842024-02-16016 February 2024 Exemption from Select Requirements of 10 CFR Part 73 Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting ML24045A1602024-02-14014 February 2024 Operator Licensing Examination Approval - Fermi Power Plant, February 2024 IR 05000341/20230042024-02-0505 February 2024 Integrated Inspection Report 05000341/2023004 IR 05000341/20230102023-12-0808 December 2023 Nbsp;Biennial Problem Identification and Resolution Inspection Report 05000341/2023010 ML23310A1492023-12-0808 December 2023 Issuance of Amendment No. 227 Regarding Revision of Technical Specification 3.8.1, AC Sources - Operating, Emergency Diesel Generator Voltage and Frequency Surveillance Requirements ML23341A1852023-12-0808 December 2023 Acknowledgement of Response to NRC Inspection Report 05000341/2023402 and Disputed Non-Cited Violation ML23243A9432023-12-0606 December 2023 Closeout Letter to DTE Regarding 2017, 2020 and 2023 Updated DFPs for Fermi 2 ISFSI IR 05000016/20230012023-12-0101 December 2023 NRC Inspection Report No. 050-00016/2023-001 (Drss) - Enrico Fermi Atomic Power Plant, Unit 1 ML23334A1902023-12-0101 December 2023 Request for Information for an NRC Post-Approval Site Inspection for License Renewal Inspection Report 05000341/2024010 ML23335A0062023-12-0101 December 2023 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000341/2024002 IR 05000341/20230032023-11-0707 November 2023 Integrated Inspection Report 05000341/2023003 and 07200071/2023001 ML23297A0512023-10-30030 October 2023 Issuance of Amendment No. 226 Regarding Revision of Technical Specifications 3.8.1, AC Sources - Operating (Exigent Circumstances) ML23311A3482023-10-20020 October 2023 DTE Electric Company (DTE) - Submittal of the Renewed Fermi 3 Michigan Department of Environmental, Great Lakes, and Energy (EGLE) National Pollutant Discharge Elimination System (NPDES) Permit No. MI0058892 ML23272A1552023-10-10010 October 2023 Letter to Licensee and Federal Register Notification of Amendment to Renewed Facility Operating License and Proposed No Significant Hazards Consideration Determination (Exigent Circumstances) (EPID L-2023-LLA-0134) (Letter) ML23283A0222023-10-0909 October 2023 Follow Up to Fermi Unit 2 Inservice Testing (IST) Program for the Fourth 10-Year Inspection Interval 2024-09-09
[Table view] Category:Updated Final Safety Analysis Report (UFSAR)
MONTHYEARML22325A1242022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Appendix a, Applicable Regulatory Guides ML22325A1252022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 8, Electric Power ML22325A1262022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 12, Radiation Protection ML22325A1272022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 14, Initial Tests and Operation ML22325A1292022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Main Page ML22325A1302022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Features ML22325A1312022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 4, Reactor ML22325A1322022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 15, Accident Analysis ML22325A1332022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System ML22325A1342022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems ML22325A1352022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Controls ML22325A1362022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Appendix B, Aging Management Programs and Activities ML22325A1382022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems ML22325A1392022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems ML22325A1422022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 2, Site Characteristics ML22325A1432022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 13, Conduct of Operations ML22325A1442022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 11, Radioactive Waste Management ML22325A1452022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant ML22325A1462022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 17, Quality Assurance ML22325A1472022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, List of Effective Sections, Tables, and Figures ML22325A1542022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Figures (for Public Use) NRC-22-0052, Replacement Files for Submittal of Revision 24 to the Fermi 2 Updated Final Safety Analysis Report (UFSAR) Through EIE on November 9, 20222022-11-17017 November 2022 Replacement Files for Submittal of Revision 24 to the Fermi 2 Updated Final Safety Analysis Report (UFSAR) Through EIE on November 9, 2022 ML21055A2202021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2230-04, Rev. E, Logic Diagram Reactor Core Isolation Cooling System ML21055A1742021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2796-01, Rev. F, Remote Shutdown System Division I System Diagram ML21055A2192021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6A721-2411, Fire Protection Evaluation Reactor and Auxiliary Buildings Section D-D ML21055A2182021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6C721-2431, Reactor Support Sections & Details ML21055A2172021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2200-4, Rev. D, Logic Diagram Residual Heat Removal System ML21055A2162021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2043, Diagram High Press Coolant Injection System Barometric Cndr (HPCI) Reac Building ML21055A2152021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6C721-2313, Reactor & Auxiliary Building Foundation Reinforcing Plan ML21055A2142021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6I721-2196-01, Area Radiation Monitor System Diagram Sht 1 of 2 ML21055A2132021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2090-6, Logic Diagram Nuclear Boiler System Document Control No. B21-00 ML21055A2122021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6A721TS-2002, Onsite Technical Support Center Grade Floor Plan ML21055A2112021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6C721Y-2003, Rev. G, Condensate Storage Tanks Retaining Barrier Details ML21055A2102021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2004-1, Diagram Condensate System ML21055A2092021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2140-01, Rev. B, Logic Diagram Neutron Monitoring System Part 1 ML21055A2082021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6C721-2441, Reactor Drywell Framing Plan El. 646-91516 Unit 2 ML21055A2072021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2200-09, Rev. B, Logic Diagram Residual Heat Removal System ML21055A2062021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 4I721-2440-08, Logic Diagram Emergency Equipment Cooling Water System Valve - Auto Close Division II ML21055A2052021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2181-06, Rev. O, Diagram Process Radiation Monitoring Subsystems ML21055A2042021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 4I721-2440-07, Logic Diagram Emergency Equipment Cooling Water System Valve - Division II ML21055A2032021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2570-01, Functional Logic Diagram Operation of Power Line Feed & Tie Breakers 4160V Buss 64B & 11EA ML21055A2022021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2230-01, Logic Diagram Reactor Core Isolation Cooling System ML21055A2012021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2513, Side Stream Lrwp System P&ID ML21055A2002021-02-0202 February 2021 3 to Final Safety Analysis Report, Drawing No. 6A721-2406, Fire Protection Evaluation Reactor and Auxiliary Buildings Cable Spreading Area Plan El. 630'-6 ML21055A1992021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6I721-2400-03, Diagram of Samples in Turbine Bldg ML21055A1982021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2035, Diagram High Pressure Coolant Injection System (HPCI) Reactor Building ML21055A1792021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2010-1, Rev. a, Diagram General Service Water System ML21055A1852021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2551, Flow Diagram of Floor Drains in the Radwaste Building ML21055A1842021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6M721-2007, Diagram Circulating Water System ML21055A1832021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2029, Rev. H, Process Diagram Information Tables Sheet 1 Radwaste System 2022-11-17
[Table view] |