{{#Wiki_filter:UNITED STATESNUCLEAR REGULATORY COMMISSIONREGION IV612 EAST LAMAR BLVD, SUITE 400ARLINGTON, TEXAS 76011-4125July 27, 2009  
{{#Wiki_filter:UNITED STATES
  Rafael Flores, Senior Vice President  
                                NUC LE AR RE G UL AT O RY C O M M I S S I O N
   and Chief Nuclear Officer Luminant Generation Company LLC Comanche Peak Steam Electric Station P.O. Box 1002 Glen Rose, TX 76043  
                                                    R E GI ON I V
                                        612 EAST LAMAR BLVD , SU I TE 400
                                        AR LI N GTON , TEXAS 76011-4125
                                              July 27, 2009
Rafael Flores, Senior Vice President
   and Chief Nuclear Officer
Luminant Generation Company LLC
Comanche Peak Steam Electric Station
P.O. Box 1002
Glen Rose, TX 76043
SUBJECT:        Comanche Peak Steam Electric Station - NOTIFICATION OF INSPECTION
                (NRC INSPECTION REPORT 05000446/2009005) AND REQUEST FOR
                INFORMATION
Dear Mr. Flores:
From October 8 -16, 2009, reactor inspectors from the Nuclear Regulatory Commissions (NRC)
Region IV office will perform the baseline inservice inspection at Comanche Peak Steam
Electric Station, using NRC Inspection Procedure 71111.08, "Inservice Inspection Activities,"
and TI 2515/172, "Reactor Coolant System Dissimilar Metal Butt Welds." Experience has
shown that this inspection is a resource intensive inspection both for the NRC inspectors and
your staff. In order to minimize the impact to your onsite resources and to ensure a productive
inspection, we have enclosed a request for documents needed for this inspection. These
documents have been divided into two groups. The first group (Section A of the enclosure)
identified information to be provided prior to the inspection to ensure that the inspectors are
adequately prepared. The second group (Section B of the enclosure) identifies the information
the inspectors will need upon arrival at the site. It is important that all of these documents are
up to date and complete in order to minimize the number of additional documents requested
during the preparation and/or the onsite portions of the inspection.
We have discussed the schedule for these inspection activities with your staff and understand
that our regulatory contact for this inspection will be Mr. James Barnette of your licensing
organization. Our inspection dates are subject to change based on your updated schedule of
outage activities. If there are any questions about this inspection or the material requested,
please contact the lead inspector Kelly Clayton at (817) 860-8216 (kelly.clayton@nrc.gov) or
Doug Bollock at (817)-276-6510 (douglas.bollock@nrc.gov).
In accordance with 10 CFR 2.390 of the NRCs "Rules of Practice," a copy of this letter and its
enclosure will be available electronically for public inspection in the NRC Public Document
Room or from the Publicly Available Records (PARS) component of NRCs document
system (ADAMS). ADAMS is accessible from the NRC web site at http://www.nrc.gov/reading-
rm/adams.html (the Public Electronic Reading Room).


SUBJECT: Comanche Peak Steam Electric Station - NOTIFICATION OF INSPECTION (NRC INSPECTION REPORT 05000446/2009005) AND REQUEST FOR INFORMATION
                                      Sincerely,
Dear Mr. Flores:
                                            /RA/
                                      Thomas Farnholtz, Chief
From October 8 -16, 2009, reactor inspectors from the Nuclear Regulatory Commission's (NRC) Region IV office will perform the baseline inservice inspection at Comanche Peak Steam Electric Station, using NRC Inspection Procedure 71111.08, "Inservice Inspection Activities," and TI 2515/172, "Reactor Coolant System Dissimilar Metal Butt Welds."  Experience has shown that this inspection is a resource intensive inspection both for the NRC inspectors and
                                      Engineering Branch 1
your staff.  In order to minimize the impact to your onsite resources and to ensure a productive inspection, we have enclosed a request for documents needed for this inspection.  These documents have been divided into two groups.  The first group (Section A of the enclosure) identified information to be provided prior to the inspection to ensure that the inspectors are adequately prepared.  The second group (Section B of the enclosure) identifies the information
                                      Division of Reactor Safety
the inspectors will need upon arrival at the site.  It is important that all of these documents are up to date and complete in order to minimize the number of additional documents requested during the preparation and/or the onsite portions of the inspection.
Docket: 50-446
We have discussed the schedule for these inspection activities with your staff and understand
License: NPF-89
that our regulatory contact for this inspection will be Mr. James Barnette of your licensing organization.  Our inspection dates are subject to change based on your updated schedule of outage activities.  If there are any questions about this inspection or the material requested, please contact the lead inspector Kelly Clayton at (817) 860-8216 (kelly.clayton@nrc.gov) or Doug Bollock at (817)-276-6510 (douglas.bollock@nrc.gov).  In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its
Enclosure:
enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS).  ADAMS is accessible from the NRC web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). 
Inservice Inspection Document Request
  Sincerely,  /RA/  Thomas Farnholtz, Chief  
Greg Doyle, Sheriff
Engineering Branch 1 Division of Reactor Safety Docket:   50-446 License: NPF-89  
Somervell County
750 E. Gibbs Blvd.
Enclosure: Inservice Inspection Document Request  
Glen Rose, TX 76043
Greg Doyle, Sheriff Somervell County 750 E. Gibbs Blvd. Glen Rose, TX 76043  
The Honorable Pam Miller
Mayor of Glen Rose
P.O. Box 1949
Glen Rose, TX 76043
The Honorable Andy Rash
Hood County Judge
100 E. Pearl Street
Granbury, TX 76048
The Honorable Walter Maynard
Somervell County Judge
P.O. Box 851
Glen Rose, TX 76043
The Honorable David Southern
Mayor of Granbury
P.O. Box 969
Granbury, TX 76048
Auburn Mitchell
Environmental and Natural
Resources Policy Director
Office of the Governor
State Capitol Building
P. O. Box 12428
Austin, TX 78701


  The Honorable Pam Miller Mayor of Glen Rose P.O.  Box 1949 Glen Rose, TX 76043  
Barry Smitherman, Chairman
Public Utility Commission
William B. Travis Bldg.
P.O. Box 13326
Austin, TX 78711-3326
Zak Covar
Environmental and Natural
  Resources Policy Director
Office of the Governor
State Capitol Building
P. O. Box 12428
Austin, TX 78701
William ADub@ Taylor
State Energy Conservation Office
Comptroller of Public Accounts
P.O. Box 13528
Austin, TX 78711-3528
David Featherson
Director Infrastructure Reliability Division, PUC
1701 N. Congress Ave
Austin, TX 78711-3326
Gene Mayo
Sheriff, Hood County
400 N. Gordon Street
Granbury, TX 76048
Dan Eden, Deputy Director,
Office of Permitting, Remediation
  and Registration TCEQ
MC-122
P.O. Box 13087
Austin, TX 78711-3087
Jack Colley, State Coordinator
Division of Emergency Management
Texas Department of Public Safety
5805 North Lamar Blvd.
Austin, TX 78773-4087
Mike Blevins, Chief Operating Officer
Luminant Generation Company LLC
Comanche Peak Steam Electric Station
P.O. Box 1002
Glen Rose, TX 76043


The Honorable Andy Rash Hood County Judge 100 E. Pearl Street Granbury, TX 76048
Mr. Fred W. Madden, Director
Regulatory Affairs
Luminant Generation Company LLC
P.O. Box 1002
Glen Rose, TX 76043
Timothy P. Matthews, Esq.
Morgan Lewis
1111 Pennsylvania Avenue, NW
Washington, DC 20004
County Judge
P.O. Box 851
Glen Rose, TX 76043
Mr. Richard A. Ratliff, Chief
Bureau of Radiation Control
Texas Department of Health
P.O. Box 149347, Mail Code 2835
Austin, TX 78714-9347
Environmental and Natural
  Resources Policy Director
Office of the Governor
P.O. Box 12428
Austin, TX 78711-3189
Mr. Brian Almon
Public Utility Commission
William B. Travis Building
P.O. Box 13326
Austin, TX 78711-3326
Ms. Susan M. Jablonski
Office of Permitting, Remediation
and Registration
Texas Commission on
Environmental Quality
MC-122
P.O. Box 13087
Austin, TX 78711-3087
Anthony Jones
Chief Boiler Inspector
Texas Department of Licensing
  And Regulation
Boiler Division
E.O. Thompson State Office Building
P.O. Box 12157
Austin, TX 78711


The Honorable Walter Maynard Somervell County Judge P.O. Box  851 Glen Rose, TX 76043
Chief, Technological Hazards
  Branch
FEMA Region VI
800 North Loop 288
Federal Regional Center
Denton, TX 76209


The Honorable David Southern Mayor of Granbury P.O. Box  969 Granbury, TX  76048
Electronic distribution by RIV:
Regional Administrator (Elmo.Collins@nrc.gov )
Deputy Regional Administrator (Chuck.Casto@nrc.gov )
DRP Director (Dwight.Chamberlain@nrc.gov )
DRP Deputy Director (Anton.Vegel@nrc.gov )
DRS Director (Roy.Caniano@nrc.gov )
DRS Deputy Director (Troy.Pruett@nrc.gov )
Senior Resident Inspector (John.Kramer@nrc.gov )
Resident Inspector (Brian.Tindell@nrc.gov )
Branch Chief, DRP/A (Wayne.Walker@nrc.gov )
Senior Project Engineer, DRP/A (Bob.Hagar@nrc.gov )
CP Site Secretary (Sue.Sanner@nrc.gov )
Public Affairs Officer (Victor.Dricks@nrc.gov )
Team Leader, DRP/TSS (Chuck.Paulk@nrc.gov )
RITS Coordinator (Marisa.Herrera@nrc.gov )
Regional Counsel (Karla.Fuller@nrc.gov )
Congressional Affairs Officer (Jenny.Weil@nrc.gov )
OEMail Resource
SUNSI Review Completed: ___Y___              ADAMS: 7 Yes        No  Initials: __KDC_
7 Publicly Available        Non-Publicly Available    Sensitive    7 Non-Sensitive
                                                                          MLXXXXXXXXX
SRI:EB1              C:EB1
K. Clayton            T. Farnholtz
/RA/                  /RA/
7/24/09              7/27/09
OFFICIAL RECORD COPY T=Telephone                  E=E-mail    F=Fax


Auburn Mitchell Environmental and Natural  Resources Policy Director Office of the Governor State Capitol Building P. O. Box 12428
                        INSERVICE INSPECTION DOCUMENT REQUEST
Austin, TX  78701
Inspection Dates:          October 8 through October 16, 2009
 
Inspection Procedures:      IP 71111.08 "Inservice Inspection (ISI) Activities"
Barry Smitherman, Chairman Public Utility Commission William B. Travis Bldg. P.O. Box 13326 Austin, TX  78711-3326
                            TI 2515/172 "Reactor Coolant System Dissimilar Metal Butt Welds"
Inspectors:                Kelly Clayton, Senior Reactor Inspector (Lead Inspector - ISI)
Zak Covar Environmental and Natural    Resources Policy Director Office of the Governor State Capitol Building
                            Doug Bollock, Reactor Inspector
P. O. Box 12428 Austin, TX  78701
A.     Information Requested for the In-Office Preparation Week
William A Dub@ Taylor State Energy Conservation Office
      The following information should be sent to the Region IV office in hard copy or
Comptroller of Public Accounts P.O. Box 13528 Austin, TX 78711-3528
      electronic format (ims.certrec.com preferred), in care of Kelly Clayton, by September 24,
      2009, to facilitate the selection of specific items that will be reviewed during the onsite
David Featherson Director Infrastructure Reliability Division, PUC 1701 N. Congress Ave Austin, TX  78711-3326
      inspection week. The inspector will select specific items from the information requested
      below and then request from your staff additional documents needed during the onsite
Gene Mayo Sheriff, Hood County 400  N. Gordon Street Granbury, TX  76048
      inspection week (Section B of this enclosure). We ask that the specific items selected
Dan Eden, Deputy Director, Office of Permitting, Remediation 
      from the lists be available and ready for review on the first day of inspection. *Please
  and Registration TCEQ MC-122 P.O. Box 13087 Austin, TX  78711-3087
      provide requested documentation electronically if possible. If requested documents are
      large and only hard copy formats are available, please inform the inspector(s), and
Jack Colley, State Coordinator Division of Emergency Management Texas Department of Public Safety 5805 North Lamar Blvd. Austin, TX 78773-4087
      provide subject documentation during the first day of the onsite inspection. If you have
      any questions regarding this information request, please call the inspector as soon as
      possible.
A.1    ISI/Welding Programs and Schedule Information
      a)      A detailed schedule (including preliminary dates) of:
              i)      Nondestructive examinations (NDEs) planned for Class 1 & 2 systems
                        and containment, performed as part of your ASME Section XI, Risk
                        Informed (if applicable), and augmented ISI programs during the
                        upcoming outage.
                        Provide a status summary of the NDE inspection activities vs. the
                        required inspection period percentages for this Interval by category per
                        ASME Section XI, IWX-2400 (Do not provide separately if other
                        documentation requested contains this information)
              ii)      Reactor pressure vessel head (RPVH) examinations planned for the
                        upcoming outage.
              iii)    Examinations planned for Alloy 82/182/600 components that are not
                        included in the Section XI scope. (If applicable)
              iv)      Examinations planned as part of your Boric Acid Corrosion Control
                        Program (Mode 3 walkdowns, bolted connection walkdowns, etc.)
                                            -1-                                         Enclosure


Mike Blevins, Chief Operating Officer Luminant Generation Company LLC Comanche Peak Steam Electric Station P.O. Box 1002
          v)      Welding activities that are scheduled to be completed during the
Glen Rose, TX  76043
                  upcoming outage. (ASME Class 1, 2, or 3 structures, systems, or
 
                  components (SSCs))
Mr. Fred W. Madden, Director Regulatory Affairs  Luminant Generation Company LLC P.O. Box 1002 Glen Rose, TX  76043 Timothy P. Matthews, Esq. Morgan Lewis 1111 Pennsylvania Avenue, NW Washington, DC  20004 County Judge P.O. Box 851 Glen Rose, TX  76043 Mr. Richard A. Ratliff, Chief Bureau of Radiation Control  Texas Department of Health P.O. Box 149347, Mail Code 2835 Austin, TX  78714-9347 Environmental and Natural     Resources Policy Director
    b)    A copy of ASME Section XI Code Relief Requests and associated NRC Safety
Office of the Governor P.O. Box 12428 Austin, TX  78711-3189 Mr. Brian Almon Public Utility Commission William B. Travis Building P.O. Box 13326 Austin, TX  78711-3326 Ms. Susan M. Jablonski Office of Permitting, Remediation    and Registration Texas Commission on   Environmental Quality MC-122
          Evaluations applicable to the examinations identified above.
P.O. Box 13087 Austin, TX  78711-3087 Anthony Jones Chief Boiler Inspector Texas Department of Licensing    And Regulation Boiler Division E.O. Thompson State Office Building
    c)    A list of NDE reports (ultrasonic, radiography, magnetic particle, dye penetrate,
P.O. Box 12157 Austin, TX  78711
          Visual VT-1, VT-2, and VT-3), which have identified relevant conditions on Code
 
          Class 1 & 2 systems since the beginning of the last refueling outage. This should
Chief, Technological Hazards    Branch FEMA Region VI 800 North Loop 288 Federal Regional Center Denton, TX  76209
          include the previous Section XI pressure test(s) conducted during start up and
          any evaluations associated with the results of the pressure tests. Also, include in
          the list the NDE reports with relevant conditions in the RPVH penetration nozzles
          which have been accepted for continued service. The list of NDE reports should
          include a brief description of the SSC where the relevant condition was identified.
    d)    A list with a brief description (e.g., system, material, pipe size, weld number, and
          NDE performed) of the welds in Code Class 1 and 2 systems which have been
          fabricated due to component repair/replacement activities since the beginning of
          the last refueling outage, or are planned to be fabricated this refueling outage.
    e)    If reactor vessel weld examinations required by the ASME Code are scheduled to
          occur during the upcoming outage, provide a detailed description of the welds to
          be examined and the extent of the planned examination. Please also provide
          reference numbers for applicable procedures that will be used to conduct these
          examinations.
     f)    Copy of any 10 CFR Part 21 reports applicable to your SSCs within the scope of
          Section XI of the ASME Code that have been identified since the beginning of the
          last refueling outage.
    g)    A list of any temporary non-code repairs in service (e.g., pinhole leaks).
    h)    Please provide copies of the most recent self assessments for the ISI, Welding,
          and Alloy 600 Programs.
A.2 Reactor Pressure Vessel Head (RPVH)
    a)    Provide the detailed scope of the planned NDE of the reactor vessel head which
          identifies the types of NDE methods to be used on each specific part of the
          vessel head to fulfill commitments made in response to NRC Bulletin 2002-02
          and NRC Order EA-03-009. Also, include examination scope expansion criteria
          and planned expansion sample sizes if relevant conditions are identified. (If
          applicable)
    b)    A list of the standards and/or requirements that will be used to evaluate
          indications identified during NDE of the reactor vessel head (e.g., the specific
          industry or procedural standards which will be used to evaluate potential leakage
          and/or flaw indications).
                                        -2-                                        Enclosure


      
A.3 Boric Acid Corrosion Control Program (BACCP)
Electronic distribution by RIV: Regional Administrator (Elmo.Collins@nrc.gov ) Deputy Regional Administrator (Chuck.Casto@nrc.gov ) DRP Director (Dwight.Chamberlain@nrc.gov ) DRP Deputy Director (Anton.Vegel@nrc.gov ) DRS Director (Roy.Caniano@nrc.gov ) DRS Deputy Director (Troy.Pruett@nrc.gov ) Senior Resident Inspector (John.Kramer@nrc.gov ) Resident Inspector (Brian.Tindell@nrc.gov ) Branch Chief, DRP/A (Wayne.Walker@nrc.gov ) Senior Project Engineer, DRP/A (Bob.Hagar@nrc.gov ) CP Site Secretary (Sue.Sanner@nrc.gov ) Public Affairs Officer (Victor.Dricks@nrc.gov ) Team Leader, DRP/TSS (Chuck.Paulk@nrc.gov ) RITS Coordinator (Marisa.Herrera@nrc.gov ) Regional Counsel (Karla.Fuller@nrc.gov ) Congressional Affairs Officer (Jenny.Weil@nrc.gov ) OEMail Resource
    a)     Copy of the procedures that govern the scope, equipment and implementation of
          the inspections required to identify boric acid leakage and the procedures for
          boric acid leakage/corrosion evaluation.
    b)     Please provide a list of leaks (including Code class of the components) that have
          been identified since the last refueling outage and associated corrective action
          documentation. If during the last cycle, the Unit was shutdown, please provide
          documentation of containment walkdown inspections performed as part of the
          BACCP.
    c)     Please provide a copy of the most recent self-assessment performed for the
          BACCP.
A.4 Steam Generator Tube (SGT) Inspections
    a)    A detailed schedule of:
          i)      SGT inspection, data analyses, and repair activities for the upcoming
                  outage. (If occurring)
          ii)    SG secondary side inspection activities for the upcoming outage. (If
                  occurring)
    b)     Please provide a copy of your SG ISI Inspection Program and Plan. Please
          include a copy of the Operational Assessment from last outage and a copy of the
          following documents as they become available:
          i)     Degradation Assessment
          ii)     Condition Monitoring Assessment
    c)     If you are planning on modifying your Technical Specifications such that they are
          consistent with TSTF-449, please provide copies of your correspondence with
          the NRC regarding deviations from the STS.
    d)     Copy of SG history documentation given to vendors performing eddy current (ET)
          testing of the SGs during the upcoming outage.
    e)     Copy of SG Eddy Current Data Analyst Guidelines and Site Validated Eddy
          Current Technique Specification Sheets (ETSS). Additionally, please provide a
          copy of EPRI Appendix H ETSS Qualification Records.
    f)     Identify and quantify any SGT leakage experienced during the previous operating
          cycle. Also provide documentation identifying which SG was leaking and
          corrective actions completed or planned for this condition (If applicable).
    g)     Provide past history of the condition and issues pertaining to the secondary side
          of the steam generators (including items such as loose parts, fouling, top of tube
          sheet condition, crud removal amounts, etc.)
                                        -3-                                        Enclosure


   
    h)    Please provide copies of your most recent self assessments of the SG
   
          monitoring, loose parts monitoring, and secondary side water chemistry control
   
          programs.
   
    i)    Please also indicate where the primary, secondary, and resolution analyses are
  SUNSI Review Completed:  ___Y___ ADAMS:  Yes  No        Initials: __KDC
          scheduled to take place.
_     Publicly Available        Non-Publicly Available        Sensitive    Non-Sensitive MLXXXXXXXXX SRI:EB1 C:EB1    K. Clayton T. Farnholtz    /RA/ /RA/    7/24/09 7/27/09    OFFICIAL RECORD COPY  T=Telephone          E=E-mail        F=Fax
     j)    Please provide a summary of the scope of the SGT examinations, including
 
          examination methods such as Bobbin, Rotating Pancake, or Plus Point, and the
  - 1 - Enclosure INSERVICE INSPECTION DOCUMENT REQUEST
          percentage of tubes to be examined. *Do not provide these documents
  Inspection Dates: October 8 through October 16, 2009
          separately if already included in other information requested.
Inspection Procedures: IP 71111.08 "Inservice Inspection (ISI) Activities" TI 2515/172 "Reactor Coolant System Dissimilar Metal Butt Welds"  Inspectors: Kelly Clayton, Senior Reactor Inspector (Lead Inspector - ISI) Doug Bollock, Reactor Inspector
A.5 Materials Reliability (MRP-139) Program Activities
    a)    A list of, with verification, that the baseline inspections of all applicable Dissimilar
A. Information Requested for the In-Office Preparation Week
          Metal Butt Welds (DMBWs) have been completed by December 31, 2008.
The following information should be sent to the Region IV office in hard copy or electronic format (ims.certrec.com preferred), in care of Kelly Clayton, by September 24, 2009, to facilitate the selection of specific items that will be reviewed during the onsite inspection week.  The inspector will select specific items from the information requested below and then request from your staff additional documents needed during the onsite
    b)     Verification that baseline inspection of hot leg and cold leg temperature DMBWs
inspection week (Section B of this enclosure).  We ask that the specific items selected from the lists be available and ready for review on the first day of inspection. *Please provide requested documentation electronically if possible.  If requested documents are large and only hard copy formats are available, please inform the inspector(s), and provide subject documentation during the first day of the onsite inspection. If you have any questions regarding this information request, please call the inspector as soon as possible.  
          have been included in the inspection program and that the schedules for the
A.1 ISI/Welding Programs and Schedule Information
          baseline inspections are consistent with the baseline schedules in MRP-139.
  a) A detailed schedule (including preliminary dates) of:
    c)     A list and schedule (examination dates) of all DMBW examinations planned for
i)  Nondestructive examinations (NDEs) planned for Class 1 & 2 systems and containment, performed as part of your ASME Section XI, Risk Informed (if applicable), and augmented ISI programs during the
          the upcoming refueling outage. If none are scheduled, then data from previous
upcoming outage.  
          examinations should be available for review.
Provide a status summary of the NDE inspection activities vs. the required inspection period percentages for this Interval by category per ASME Section XI, IWX-2400 (Do not provide separately if other
    d)     A list and schedule for any welding to be performed on DMBWs in the upcoming
documentation requested contains this information)
          outage. If no welding will be performed then records of previous welding on
ii)  Reactor pressure vessel head (RPVH) examinations planned for the upcoming outage.  
          DMBWs and postweld NDE documentation.
iii) Examinations planned for Alloy 82/182/600 components that are not included in the Section XI scope. (If applicable)
    e)    A list and schedule of any stress improvement (SI) activities planned for the
iv) Examinations planned as part of your Boric Acid Corrosion Control Program (Mode 3 walkdowns, bolted connection walkdowns, etc.)  
          upcoming refueling outage. If none are scheduled then have qualification reports
 
          for any SIs previously performed.
  - 2 - Enclosure v) Welding activities that are scheduled to be completed during the upcoming outage. (ASME Class 1, 2, or 3 structures, systems, or components (SSCs))
    f)    Documentation and description of how the baseline and inservice inspection
b) A copy of ASME Section XI Code Relief Requests and associated NRC Safety Evaluations applicable to the examinations identified above. 
          specifications in MRP-139 are satisfied at your facility.
  c) A list of NDE reports (ultrasonic, radiography, magnetic particle, dye penetrate, Visual VT-1, VT-2, and VT-3), which have identified relevant conditions on Code Class 1 & 2 systems since the beginning of the last refueling outage. This should include the previous Section XI pressure test(s) conducted during start up and
    g)    A list of weld locations controlled by MRP-139 which includes the MRP-139 weld
any evaluations associated with the results of the pressure tests.  Also, include in the list the NDE reports with relevant conditions in the RPVH penetration nozzles which have been accepted for continued service.  The list of NDE reports should include a brief description of the SSC where the relevant condition was identified.
          category, pre-mitigation volumetric examination date, type of mitigation or stress
d) A list with a brief description (e.g., system, material, pipe size, weld number, and NDE performed) of the welds in Code Class 1 and 2 systems which have been
          improvement, post mitigation volumetric examination date, and plans for future
fabricated due to component repair/replacement activities since the beginning of the last refueling outage, or are planned to be fabricated this refueling outage.  
          MRP-139 required examinations.
e) If reactor vessel weld examinations required by the ASME Code are scheduled to occur during the upcoming outage, provide a detailed description of the welds to
A.6 Additional information related to all ISI activities
be examined and the extent of the planned examination.  Please also provide reference numbers for applicable procedures that will be used to conduct these examinations.  
    a)     A list with a brief description of ISI, BACCP, and SGT inspection related issues
f) Copy of any 10 CFR Part 21 reports applicable to your SSCs within the scope of Section XI of the ASME Code that have been identified since the beginning of the last refueling outage.
          (e.g., condition reports) entered into your corrective action program since the
g) A list of any temporary non-code repairs in service (e.g., pinhole leaks).
          beginning of the last refueling outage (for Unit 2). For example, a list based upon
h) Please provide copies of the most recent self assessments for the ISI, Welding, and Alloy 600 Programs. 
          data base searches using key words related to piping or SG tube degradation
A.2 Reactor Pressure Vessel Head (RPVH)
          such as: ISI, ASME Code, Section XI, NDE, cracks, wear, thinning, leakage, rust,
  a) Provide the detailed scope of the planned NDE of the reactor vessel head which identifies the types of NDE methods to be used on each specific part of the vessel head to fulfill commitments made in response to NRC Bulletin 2002-02 and NRC Order EA-03-009. Also, include examination scope expansion criteria and planned expansion sample sizes if relevant conditions are identified. (If applicable)  
          corrosion, boric acid, or errors in piping/SGT examinations.
b) A list of the standards and/or requirements that will be used to evaluate indications identified during NDE of the reactor vessel head (e.g., the specific industry or procedural standards which will be used to evaluate potential leakage and/or flaw indications).  
                                          -4-                                        Enclosure
 
 
  - 3 - Enclosure A.3 Boric Acid Corrosion Control Program (BACCP)
    b)    Please provide names and phone numbers for the following program leads:
  a)  Copy of the procedures that govern the scope, equipment and implementation of the inspections required to identify boric acid leakage and the procedures for boric acid leakage/corrosion evaluation.
          ISI contacts (Examination, planning)
b) Please provide a list of leaks (including Code class of the components) that have been identified since the last refueling outage and associated corrective action documentation.  If during the last cycle, the Unit was shutdown, please provide documentation of containment walkdown inspections performed as part of the BACCP. c) Please provide a copy of the most recent self-assessment performed for the BACCP.  A.4 Steam Generator Tube (SGT) Inspections
          Containment Exams
  a) A detailed schedule of:
          RPVH Exams
i)  SGT inspection, data analyses, and repair activities for the upcoming outage. (If occurring)
          Snubbers and Supports
ii) SG secondary side inspection activities for the upcoming outage. (If occurring)  
          Repair and Replacement Program Manager
b) Please provide a copy of your SG ISI Inspection Program and Plan. Please include a copy of the Operational Assessment from last outage and a copy of the following documents as they become available: 
          Licensing Contact
i) Degradation Assessment ii) Condition Monitoring Assessment 
          Site Welding Engineer
c) If you are planning on modifying your Technical Specifications such that they are consistent with TSTF-449, please provide copies of your correspondence with the NRC regarding deviations from the STS.  
          Boric Acid Corrosion Control Program
d) Copy of SG history documentation given to vendors performing eddy current (ET) testing of the SGs during the upcoming outage.  
          SG Inspection Activities (site lead and vendor contact)
e) Copy of SG Eddy Current Data Analyst Guidelines and Site Validated Eddy Current Technique Specification Sheets (ETSS). Additionally, please provide a copy of EPRI Appendix H ETSS Qualification Records.  
B.  Information to be provided onsite to the inspector(s) at the entrance meeting
f) Identify and quantify any SGT leakage experienced during the previous operating cycle.  Also provide documentation identifying which SG was leaking and
    (October 8, 2009):
corrective actions completed or planned for this condition (If applicable).  
B.1 ISI / Welding Programs and Schedule Information
g) Provide past history of the condition and issues pertaining to the secondary side of the steam generators (including items such as loose parts, fouling, top of tube sheet condition, crud removal amounts, etc.) 
    a)     Updated schedules for ISI/NDE activities, including SGT inspections, planned
  - 4 - Enclosure
          welding activities, and schedule showing contingency repair plans, if available.
h) Please provide copies of your most recent self assessments of the SG monitoring, loose parts monitoring, and secondary side water chemistry control programs.
    b)    For ASME Code Class 1 and 2 welds selected by the inspector from the lists
i) Please also indicate where the primary, secondary, and resolution analyses are scheduled to take place.  
          provided from section A of this enclosure, please provide copies of the following
j) Please provide a summary of the scope of the SGT examinations, including examination methods such as Bobbin, Rotating Pancake, or Plus Point, and the percentage of tubes to be examined. *Do not provide these documents separately if already included in other information requested.  A.5 Materials Reliability (MRP-139) Program Activities
          documentation for each subject weld:
  a) A list of, with verification, that the baseline inspections of all applicable Dissimilar Metal Butt Welds (DMBWs) have been completed by December 31, 2008.  
          i)     Weld data sheet (traveler)
b) Verification that baseline inspection of hot leg and cold leg temperature DMBWs have been included in the inspection program and that the schedules for the baseline inspections are consistent with the baseline schedules in MRP-139.  
          ii)     Weld configuration and system location
c) A list and schedule (examination dates) of all DMBW examinations planned for the upcoming refueling outage. If none are scheduled, then data from previous examinations should be available for review.  
          iii)   Applicable Code Edition and Addenda for weldment
d) A list and schedule for any welding to be performed on DMBWs in the upcoming outage.  If no welding will be performed then records of previous welding on
          iv)    Applicable Code Edition and Addenda for welding procedures
DMBWs and postweld NDE documentation.  
          v)     Applicable weld procedures (WPS) used to fabricate the welds
e) A list and schedule of any stress improvement (SI) activities planned for the upcoming refueling outage.  If none are scheduled then have qualification reports for any SIs previously performed.  
          vi)    Copies of procedure qualification records (PQRs) supporting the WPS
f) Documentation and description of how the baseline and inservice inspection specifications in MRP-139 are satisfied at your facility.
                  from B.1.b.v
g) A list of weld locations controlled by MRP-139 which includes the MRP-139 weld category, pre-mitigation volumetric examination date, type of mitigation or stress improvement, post mitigation volumetric examination date, and plans for future MRP-139 required examinations.  
          vii)    Copies of mechanical test reports identified in the PQRs above
A.6 Additional information related to all ISI activities
          viii)  Copies of the nonconformance reports for the selected welds (If
  a) A list with a brief description of ISI, BACCP, and SGT inspection related issues (e.g., condition reports) entered into your corrective action program since the beginning of the last refueling outage (for Unit 2).  For example, a list based upon data base searches using key words related to piping or SG tube degradation such as: ISI, ASME Code, Section XI, NDE, cracks, wear, thinning, leakage, rust, corrosion, boric acid, or errors in piping/SGT examinations. 
                  applicable)
  - 5 - Enclosure
          ix)     Radiographs of the selected welds and access to equipment to allow
b) Please provide names and phone numbers for the following program leads:
                  viewing radiographs (If RT was performed)
ISI contacts (Examination, planning) Containment Exams RPVH Exams
          x)      Copies of the preservice examination records for the selected welds.
Snubbers and Supports Repair and Replacement Program Manager Licensing Contact Site Welding Engineer Boric Acid Corrosion Control Program
          xi)     Copies of welder performance qualifications records applicable to the
SG Inspection Activities (site lead and vendor contact)  
                  selected welds, including documentation that welder maintained
B. Information to be provided onsite to the inspector(s) at the entrance meeting (October 8, 2009):
                  proficiency in the applicable welding processes specified in the WPS (at
B.1 ISI / Welding Programs and Schedule Information
                  least six months prior to the date of subject work)
  a) Updated schedules for ISI/NDE activities, including SGT inspections, planned welding activities, and schedule showing contingency repair plans, if available.
          xii)   Copies of NDE personnel qualifications (VT, PT, UT, RT), as applicable
b) For ASME Code Class 1 and 2 welds selected by the inspector from the lists provided from section A of this enclosure, please provide copies of the following
    c)     For the ISI related corrective action issues selected by the inspector(s) from
documentation for each subject weld:
          section A of this enclosure, provide a copy of the corrective actions and
i) Weld data sheet (traveler) ii) Weld configuration and system location iii) Applicable Code Edition and Addenda for weldment
          supporting documentation.
iv) Applicable Code Edition and Addenda for welding procedures v) Applicable weld procedures (WPS) used to fabricate the welds vi) Copies of procedure qualification records (PQRs) supporting the WPS from B.1.b.v vii) Copies of mechanical test reports identified in the PQRs above
    d)     For the NDE reports with relevant conditions on Code Class 1 & 2 systems
viii) Copies of the nonconformance reports for the selected welds (If applicable) ix) Radiographs of the selected welds and access to equipment to allow viewing radiographs (If RT was performed) x) Copies of the preservice examination records for the selected welds.
          selected by the inspector from section A above, provide a copy of the
xi) Copies of welder performance qualifications records applicable to the selected welds, including documentation that welder maintained proficiency in the applicable welding processes specified in the WPS (at least six months prior to the date of subject work) xii) Copies of NDE personnel qualifications (VT, PT, UT, RT), as applicable
                                        -5-                                        Enclosure
c) For the ISI related corrective action issues selected by the inspector(s) from section A of this enclosure, provide a copy of the corrective actions and supporting documentation.
 
d) For the NDE reports with relevant conditions on Code Class 1 & 2 systems selected by the inspector from section A above, provide a copy of the 
          examination records, examiner qualification records, and associated corrective
  - 6 - Enclosure examination records, examiner qualification records, and associated corrective action documents.
          action documents.
e) A copy of (or ready access to) most current revision of the ISI Program Manual and Plan for the current Interval. 
    e)     A copy of (or ready access to) most current revision of the ISI Program Manual
f) For the NDEs selected by the inspector from section A of this enclosure, provide copy of the NDE procedures used to perform the examinations (including calibration and flaw characterization/sizing procedures).  For ultrasonic examination procedures qualified in accordance with ASME Code, Section XI, Appendix VIII, provide documentation supporting the procedure qualification (e.g., the EPRI performance demonstration qualification summary sheets).  Also, include qualification documentation of the specific equipment to be used (e.g., ultrasonic unit, cables, and transducers including serial numbers) and NDE personnel qualification records.
          and Plan for the current Interval.
B.2 Reactor Pressure Vessel Head (RPVH)
    f)    For the NDEs selected by the inspector from section A of this enclosure, provide
  a) Provide the NDE personnel qualification records for the examiners who will perform examinations of the RPVH. 
          copy of the NDE procedures used to perform the examinations (including
b) Provide drawings showing the following: (If a visual examination is planned for the upcoming refueling outage)
          calibration and flaw characterization/sizing procedures). For ultrasonic
i) RPVH and CRDM nozzle configurations  ii) RPVH insulation configuration 
          examination procedures qualified in accordance with ASME Code, Section XI,
The drawings listed above should include fabrication drawings for the nozzle attachment
          Appendix VIII, provide documentation supporting the procedure qualification
welds as applicable. 
          (e.g., the EPRI performance demonstration qualification summary sheets). Also,
c) Copy of NDE reports from the last RPVH examination.
          include qualification documentation of the specific equipment to be used (e.g.,
d) Copy of evaluation or calculation demonstrating that the scope of the visual examination of the upper head will meet the 95 percent minimum coverage required by NRC Order EA-03-009 (If a visual examination is planned for the upcoming refueling outage).
          ultrasonic unit, cables, and transducers including serial numbers) and NDE
e) Provide a copy of the procedures that will be used to identify the source of any boric acid deposits identified on the RPVH.  If no explicit procedures exist which govern this activity, provide a description of the process to be followed including personnel responsibilities and expectations. 
          personnel qualification records.
f)  Provide a copy of the updated calculation of effective degradation years (EDY) for the RPVH susceptibility ranking.
B.2 Reactor Pressure Vessel Head (RPVH)
    a)     Provide the NDE personnel qualification records for the examiners who will
g)  Provide copy of the vendor qualification report(s) that demonstrates the detection capability of the NDE equipment used for the RPVH examinations.  Also, identify any changes in equipment configurations used for the RPVH examinations which differ from that used in the vendor qualification report(s).
          perform examinations of the RPVH.
 
    b)     Provide drawings showing the following: (If a visual examination is planned for
  - 7 - Enclosure B.3 Boric Acid Corrosion Control Program (BACCP)
          the upcoming refueling outage)
  a) Please provide boric acid walkdown inspection results, an updated list of boric acid leaks identified so far this outage, associated corrective action documentation, and overall status of planned boric acid inspections. 
          i)       RPVH and CRDM nozzle configurations
          ii)     RPVH insulation configuration
b) Please provide any engineering evaluations completed for boric acid leaks identified since the end of the last refueling outage.  Please include a status of corrective actions to repair and/or clean these boric acid leaks.  Please identify specifically which known leaks, if any, have remained in service or will remain in service as active leaks. 
    The drawings listed above should include fabrication drawings for the nozzle attachment
B.4 Steam Generator Tube (SGT) Inspections
    welds as applicable.
  a) Copies of the Examination Technique Specification Sheets (ETSS) and associated justification for any revisions.
    c)     Copy of NDE reports from the last RPVH examination.
b) Copy of the guidance to be followed if a loose part or foreign material is identified in the SGs.
    d)    Copy of evaluation or calculation demonstrating that the scope of the visual
c) Please provide a copy of the ET procedures used to perform the SGT inspections (specifically calibration and flaw characterization/sizing procedures, etc.).  Also include documentation for the specific equipment to be used.
          examination of the upper head will meet the 95 percent minimum coverage
d) Please provide copies of your responses to NRC and industry operating experience communications such as Generic Letters, Information Notices, etc. (as applicable to SGT inspections) *Do not provide these documents separately if already included in other information requested such as the degradation
          required by NRC Order EA-03-009 (If a visual examination is planned for the
assessment.
          upcoming refueling outage).
e) List of corrective action documents generated by the vendor and/or site with respect to SG inspection activities.  
    e)    Provide a copy of the procedures that will be used to identify the source of any
 
          boric acid deposits identified on the RPVH. If no explicit procedures exist which
          govern this activity, provide a description of the process to be followed including
          personnel responsibilities and expectations.
    f)     Provide a copy of the updated calculation of effective degradation years (EDY)
          for the RPVH susceptibility ranking.
    g)    Provide copy of the vendor qualification report(s) that demonstrates the detection
          capability of the NDE equipment used for the RPVH examinations. Also, identify
          any changes in equipment configurations used for the RPVH examinations which
          differ from that used in the vendor qualification report(s).
                                        -6-                                        Enclosure
 
B.3 Boric Acid Corrosion Control Program (BACCP)
    a)     Please provide boric acid walkdown inspection results, an updated list of boric
          acid leaks identified so far this outage, associated corrective action
          documentation, and overall status of planned boric acid inspections.
    b)     Please provide any engineering evaluations completed for boric acid leaks
          identified since the end of the last refueling outage. Please include a status of
          corrective actions to repair and/or clean these boric acid leaks. Please identify
          specifically which known leaks, if any, have remained in service or will remain in
          service as active leaks.
B.4 Steam Generator Tube (SGT) Inspections
    a)     Copies of the Examination Technique Specification Sheets (ETSS) and
          associated justification for any revisions.
    b)    Copy of the guidance to be followed if a loose part or foreign material is identified
          in the SGs.
    c)    Please provide a copy of the ET procedures used to perform the SGT
          inspections (specifically calibration and flaw characterization/sizing procedures,
          etc.). Also include documentation for the specific equipment to be used.
    d)    Please provide copies of your responses to NRC and industry operating
          experience communications such as Generic Letters, Information Notices, etc.
          (as applicable to SGT inspections) *Do not provide these documents separately if
          already included in other information requested such as the degradation
          assessment.
    e)    List of corrective action documents generated by the vendor and/or site with
          respect to SG inspection activities.
B.5 Codes and Standards
B.5 Codes and Standards
  a) Ready access to (i.e., copies provided to the inspector(s) for use during the inspection at the onsite inspection location, or room number and location where available):  
    a)     Ready access to (i.e., copies provided to the inspector(s) for use during the
i) Applicable Editions of the ASME Code (Sections V, IX and XI) for the inservice inspection program and the repair/replacement program.
          inspection at the onsite inspection location, or room number and location where
ii) EPRI and industry standards referenced in the procedures used to perform the SGT eddy current examination.  
          available):
          i)       Applicable Editions of the ASME Code (Sections V, IX and XI) for the
 
                    inservice inspection program and the repair/replacement program.
  - 8 - Enclosure  
          ii)     EPRI and industry standards referenced in the procedures used to
Inspector Contact Information:  
                    perform the SGT eddy current examination.
Kelly Clayton   Doug Bollock     Senior Reactor Inspector Reactor Inspector   817-860-8216   817-276-6510    
                                        -7-                                       Enclosure
kelly.clayton@nrc.gov  
 
douglas.bollock@nrc.gov     Mailing Address: US NRC Region IV Attn: Kelly Clayton  
Inspector Contact Information:
612 E. Lamar Blvd, Suite 400 Arlington, TX 76011
Kelly Clayton               Doug Bollock
Senior Reactor Inspector     Reactor Inspector
817-860-8216                 817-276-6510
kelly.clayton@nrc.gov       douglas.bollock@nrc.gov
Mailing Address:
US NRC Region IV
Attn: Kelly Clayton
612 E. Lamar Blvd, Suite 400
Arlington, TX 76011
                                          -8-        Enclosure
}}
}}

Latest revision as of 04:53, 14 November 2019

Comanche, Notification of Inspection (NRC Inspection Report 05000446-09-005) and Request for Information
ML092080570
Person / Time
Site: Comanche Peak Luminant icon.png
Issue date: 07/27/2009
From: Thomas Farnholtz
Region 4 Engineering Branch 1
To: Flores R
Luminant Generation Co
References
IR-09-005
Download: ML092080570 (14)


See also: IR 05000446/2009005

Text

UNITED STATES

NUC LE AR RE G UL AT O RY C O M M I S S I O N

R E GI ON I V

612 EAST LAMAR BLVD , SU I TE 400

AR LI N GTON , TEXAS 76011-4125

July 27, 2009

Rafael Flores, Senior Vice President

and Chief Nuclear Officer

Luminant Generation Company LLC

Comanche Peak Steam Electric Station

P.O. Box 1002

Glen Rose, TX 76043

SUBJECT: Comanche Peak Steam Electric Station - NOTIFICATION OF INSPECTION

(NRC INSPECTION REPORT 05000446/2009005) AND REQUEST FOR

INFORMATION

Dear Mr. Flores:

From October 8 -16, 2009, reactor inspectors from the Nuclear Regulatory Commissions (NRC)

Region IV office will perform the baseline inservice inspection at Comanche Peak Steam

Electric Station, using NRC Inspection Procedure 71111.08, "Inservice Inspection Activities,"

and TI 2515/172, "Reactor Coolant System Dissimilar Metal Butt Welds." Experience has

shown that this inspection is a resource intensive inspection both for the NRC inspectors and

your staff. In order to minimize the impact to your onsite resources and to ensure a productive

inspection, we have enclosed a request for documents needed for this inspection. These

documents have been divided into two groups. The first group (Section A of the enclosure)

identified information to be provided prior to the inspection to ensure that the inspectors are

adequately prepared. The second group (Section B of the enclosure) identifies the information

the inspectors will need upon arrival at the site. It is important that all of these documents are

up to date and complete in order to minimize the number of additional documents requested

during the preparation and/or the onsite portions of the inspection.

We have discussed the schedule for these inspection activities with your staff and understand

that our regulatory contact for this inspection will be Mr. James Barnette of your licensing

organization. Our inspection dates are subject to change based on your updated schedule of

outage activities. If there are any questions about this inspection or the material requested,

please contact the lead inspector Kelly Clayton at (817) 860-8216 (kelly.clayton@nrc.gov) or

Doug Bollock at (817)-276-6510 (douglas.bollock@nrc.gov).

In accordance with 10 CFR 2.390 of the NRCs "Rules of Practice," a copy of this letter and its

enclosure will be available electronically for public inspection in the NRC Public Document

Room or from the Publicly Available Records (PARS) component of NRCs document

system (ADAMS). ADAMS is accessible from the NRC web site at http://www.nrc.gov/reading-

rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Thomas Farnholtz, Chief

Engineering Branch 1

Division of Reactor Safety

Docket: 50-446

License: NPF-89

Enclosure:

Inservice Inspection Document Request

Greg Doyle, Sheriff

Somervell County

750 E. Gibbs Blvd.

Glen Rose, TX 76043

The Honorable Pam Miller

Mayor of Glen Rose

P.O. Box 1949

Glen Rose, TX 76043

The Honorable Andy Rash

Hood County Judge

100 E. Pearl Street

Granbury, TX 76048

The Honorable Walter Maynard

Somervell County Judge

P.O. Box 851

Glen Rose, TX 76043

The Honorable David Southern

Mayor of Granbury

P.O. Box 969

Granbury, TX 76048

Auburn Mitchell

Environmental and Natural

Resources Policy Director

Office of the Governor

State Capitol Building

P. O. Box 12428

Austin, TX 78701

Barry Smitherman, Chairman

Public Utility Commission

William B. Travis Bldg.

P.O. Box 13326

Austin, TX 78711-3326

Zak Covar

Environmental and Natural

Resources Policy Director

Office of the Governor

State Capitol Building

P. O. Box 12428

Austin, TX 78701

William ADub@ Taylor

State Energy Conservation Office

Comptroller of Public Accounts

P.O. Box 13528

Austin, TX 78711-3528

David Featherson

Director Infrastructure Reliability Division, PUC

1701 N. Congress Ave

Austin, TX 78711-3326

Gene Mayo

Sheriff, Hood County

400 N. Gordon Street

Granbury, TX 76048

Dan Eden, Deputy Director,

Office of Permitting, Remediation

and Registration TCEQ

MC-122

P.O. Box 13087

Austin, TX 78711-3087

Jack Colley, State Coordinator

Division of Emergency Management

Texas Department of Public Safety

5805 North Lamar Blvd.

Austin, TX 78773-4087

Mike Blevins, Chief Operating Officer

Luminant Generation Company LLC

Comanche Peak Steam Electric Station

P.O. Box 1002

Glen Rose, TX 76043

Mr. Fred W. Madden, Director

Regulatory Affairs

Luminant Generation Company LLC

P.O. Box 1002

Glen Rose, TX 76043

Timothy P. Matthews, Esq.

Morgan Lewis

1111 Pennsylvania Avenue, NW

Washington, DC 20004

County Judge

P.O. Box 851

Glen Rose, TX 76043

Mr. Richard A. Ratliff, Chief

Bureau of Radiation Control

Texas Department of Health

P.O. Box 149347, Mail Code 2835

Austin, TX 78714-9347

Environmental and Natural

Resources Policy Director

Office of the Governor

P.O. Box 12428

Austin, TX 78711-3189

Mr. Brian Almon

Public Utility Commission

William B. Travis Building

P.O. Box 13326

Austin, TX 78711-3326

Ms. Susan M. Jablonski

Office of Permitting, Remediation

and Registration

Texas Commission on

Environmental Quality

MC-122

P.O. Box 13087

Austin, TX 78711-3087

Anthony Jones

Chief Boiler Inspector

Texas Department of Licensing

And Regulation

Boiler Division

E.O. Thompson State Office Building

P.O. Box 12157

Austin, TX 78711

Chief, Technological Hazards

Branch

FEMA Region VI

800 North Loop 288

Federal Regional Center

Denton, TX 76209

Electronic distribution by RIV:

Regional Administrator (Elmo.Collins@nrc.gov )

Deputy Regional Administrator (Chuck.Casto@nrc.gov )

DRP Director (Dwight.Chamberlain@nrc.gov )

DRP Deputy Director (Anton.Vegel@nrc.gov )

DRS Director (Roy.Caniano@nrc.gov )

DRS Deputy Director (Troy.Pruett@nrc.gov )

Senior Resident Inspector (John.Kramer@nrc.gov )

Resident Inspector (Brian.Tindell@nrc.gov )

Branch Chief, DRP/A (Wayne.Walker@nrc.gov )

Senior Project Engineer, DRP/A (Bob.Hagar@nrc.gov )

CP Site Secretary (Sue.Sanner@nrc.gov )

Public Affairs Officer (Victor.Dricks@nrc.gov )

Team Leader, DRP/TSS (Chuck.Paulk@nrc.gov )

RITS Coordinator (Marisa.Herrera@nrc.gov )

Regional Counsel (Karla.Fuller@nrc.gov )

Congressional Affairs Officer (Jenny.Weil@nrc.gov )

OEMail Resource

SUNSI Review Completed: ___Y___ ADAMS: 7 Yes No Initials: __KDC_

7 Publicly Available Non-Publicly Available Sensitive 7 Non-Sensitive

MLXXXXXXXXX

SRI:EB1 C:EB1

K. Clayton T. Farnholtz

/RA/ /RA/

7/24/09 7/27/09

OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax

INSERVICE INSPECTION DOCUMENT REQUEST

Inspection Dates: October 8 through October 16, 2009

Inspection Procedures: IP 71111.08 "Inservice Inspection (ISI) Activities"

TI 2515/172 "Reactor Coolant System Dissimilar Metal Butt Welds"

Inspectors: Kelly Clayton, Senior Reactor Inspector (Lead Inspector - ISI)

Doug Bollock, Reactor Inspector

A. Information Requested for the In-Office Preparation Week

The following information should be sent to the Region IV office in hard copy or

electronic format (ims.certrec.com preferred), in care of Kelly Clayton, by September 24,

2009, to facilitate the selection of specific items that will be reviewed during the onsite

inspection week. The inspector will select specific items from the information requested

below and then request from your staff additional documents needed during the onsite

inspection week (Section B of this enclosure). We ask that the specific items selected

from the lists be available and ready for review on the first day of inspection. *Please

provide requested documentation electronically if possible. If requested documents are

large and only hard copy formats are available, please inform the inspector(s), and

provide subject documentation during the first day of the onsite inspection. If you have

any questions regarding this information request, please call the inspector as soon as

possible.

A.1 ISI/Welding Programs and Schedule Information

a) A detailed schedule (including preliminary dates) of:

i) Nondestructive examinations (NDEs) planned for Class 1 & 2 systems

and containment, performed as part of your ASME Section XI, Risk

Informed (if applicable), and augmented ISI programs during the

upcoming outage.

Provide a status summary of the NDE inspection activities vs. the

required inspection period percentages for this Interval by category per

ASME Section XI, IWX-2400 (Do not provide separately if other

documentation requested contains this information)

ii) Reactor pressure vessel head (RPVH) examinations planned for the

upcoming outage.

iii) Examinations planned for Alloy 82/182/600 components that are not

included in the Section XI scope. (If applicable)

iv) Examinations planned as part of your Boric Acid Corrosion Control

Program (Mode 3 walkdowns, bolted connection walkdowns, etc.)

-1- Enclosure

v) Welding activities that are scheduled to be completed during the

upcoming outage. (ASME Class 1, 2, or 3 structures, systems, or

components (SSCs))

b) A copy of ASME Section XI Code Relief Requests and associated NRC Safety

Evaluations applicable to the examinations identified above.

c) A list of NDE reports (ultrasonic, radiography, magnetic particle, dye penetrate,

Visual VT-1, VT-2, and VT-3), which have identified relevant conditions on Code

Class 1 & 2 systems since the beginning of the last refueling outage. This should

include the previousSection XI pressure test(s) conducted during start up and

any evaluations associated with the results of the pressure tests. Also, include in

the list the NDE reports with relevant conditions in the RPVH penetration nozzles

which have been accepted for continued service. The list of NDE reports should

include a brief description of the SSC where the relevant condition was identified.

d) A list with a brief description (e.g., system, material, pipe size, weld number, and

NDE performed) of the welds in Code Class 1 and 2 systems which have been

fabricated due to component repair/replacement activities since the beginning of

the last refueling outage, or are planned to be fabricated this refueling outage.

e) If reactor vessel weld examinations required by the ASME Code are scheduled to

occur during the upcoming outage, provide a detailed description of the welds to

be examined and the extent of the planned examination. Please also provide

reference numbers for applicable procedures that will be used to conduct these

examinations.

f) Copy of any 10 CFR Part 21 reports applicable to your SSCs within the scope of

Section XI of the ASME Code that have been identified since the beginning of the

last refueling outage.

g) A list of any temporary non-code repairs in service (e.g., pinhole leaks).

h) Please provide copies of the most recent self assessments for the ISI, Welding,

and Alloy 600 Programs.

A.2 Reactor Pressure Vessel Head (RPVH)

a) Provide the detailed scope of the planned NDE of the reactor vessel head which

identifies the types of NDE methods to be used on each specific part of the

vessel head to fulfill commitments made in response to NRC Bulletin 2002-02

and NRC Order EA-03-009. Also, include examination scope expansion criteria

and planned expansion sample sizes if relevant conditions are identified. (If

applicable)

b) A list of the standards and/or requirements that will be used to evaluate

indications identified during NDE of the reactor vessel head (e.g., the specific

industry or procedural standards which will be used to evaluate potential leakage

and/or flaw indications).

-2- Enclosure

A.3 Boric Acid Corrosion Control Program (BACCP)

a) Copy of the procedures that govern the scope, equipment and implementation of

the inspections required to identify boric acid leakage and the procedures for

boric acid leakage/corrosion evaluation.

b) Please provide a list of leaks (including Code class of the components) that have

been identified since the last refueling outage and associated corrective action

documentation. If during the last cycle, the Unit was shutdown, please provide

documentation of containment walkdown inspections performed as part of the

BACCP.

c) Please provide a copy of the most recent self-assessment performed for the

BACCP.

A.4 Steam Generator Tube (SGT) Inspections

a) A detailed schedule of:

i) SGT inspection, data analyses, and repair activities for the upcoming

outage. (If occurring)

ii) SG secondary side inspection activities for the upcoming outage. (If

occurring)

b) Please provide a copy of your SG ISI Inspection Program and Plan. Please

include a copy of the Operational Assessment from last outage and a copy of the

following documents as they become available:

i) Degradation Assessment

ii) Condition Monitoring Assessment

c) If you are planning on modifying your Technical Specifications such that they are

consistent with TSTF-449, please provide copies of your correspondence with

the NRC regarding deviations from the STS.

d) Copy of SG history documentation given to vendors performing eddy current (ET)

testing of the SGs during the upcoming outage.

e) Copy of SG Eddy Current Data Analyst Guidelines and Site Validated Eddy

Current Technique Specification Sheets (ETSS). Additionally, please provide a

copy of EPRI Appendix H ETSS Qualification Records.

f) Identify and quantify any SGT leakage experienced during the previous operating

cycle. Also provide documentation identifying which SG was leaking and

corrective actions completed or planned for this condition (If applicable).

g) Provide past history of the condition and issues pertaining to the secondary side

of the steam generators (including items such as loose parts, fouling, top of tube

sheet condition, crud removal amounts, etc.)

-3- Enclosure

h) Please provide copies of your most recent self assessments of the SG

monitoring, loose parts monitoring, and secondary side water chemistry control

programs.

i) Please also indicate where the primary, secondary, and resolution analyses are

scheduled to take place.

j) Please provide a summary of the scope of the SGT examinations, including

examination methods such as Bobbin, Rotating Pancake, or Plus Point, and the

percentage of tubes to be examined. *Do not provide these documents

separately if already included in other information requested.

A.5 Materials Reliability (MRP-139) Program Activities

a) A list of, with verification, that the baseline inspections of all applicable Dissimilar

Metal Butt Welds (DMBWs) have been completed by December 31, 2008.

b) Verification that baseline inspection of hot leg and cold leg temperature DMBWs

have been included in the inspection program and that the schedules for the

baseline inspections are consistent with the baseline schedules in MRP-139.

c) A list and schedule (examination dates) of all DMBW examinations planned for

the upcoming refueling outage. If none are scheduled, then data from previous

examinations should be available for review.

d) A list and schedule for any welding to be performed on DMBWs in the upcoming

outage. If no welding will be performed then records of previous welding on

DMBWs and postweld NDE documentation.

e) A list and schedule of any stress improvement (SI) activities planned for the

upcoming refueling outage. If none are scheduled then have qualification reports

for any SIs previously performed.

f) Documentation and description of how the baseline and inservice inspection

specifications in MRP-139 are satisfied at your facility.

g) A list of weld locations controlled by MRP-139 which includes the MRP-139 weld

category, pre-mitigation volumetric examination date, type of mitigation or stress

improvement, post mitigation volumetric examination date, and plans for future

MRP-139 required examinations.

A.6 Additional information related to all ISI activities

a) A list with a brief description of ISI, BACCP, and SGT inspection related issues

(e.g., condition reports) entered into your corrective action program since the

beginning of the last refueling outage (for Unit 2). For example, a list based upon

data base searches using key words related to piping or SG tube degradation

such as: ISI, ASME Code,Section XI, NDE, cracks, wear, thinning, leakage, rust,

corrosion, boric acid, or errors in piping/SGT examinations.

-4- Enclosure

b) Please provide names and phone numbers for the following program leads:

ISI contacts (Examination, planning)

Containment Exams

RPVH Exams

Snubbers and Supports

Repair and Replacement Program Manager

Licensing Contact

Site Welding Engineer

Boric Acid Corrosion Control Program

SG Inspection Activities (site lead and vendor contact)

B. Information to be provided onsite to the inspector(s) at the entrance meeting

(October 8, 2009):

B.1 ISI / Welding Programs and Schedule Information

a) Updated schedules for ISI/NDE activities, including SGT inspections, planned

welding activities, and schedule showing contingency repair plans, if available.

b) For ASME Code Class 1 and 2 welds selected by the inspector from the lists

provided from section A of this enclosure, please provide copies of the following

documentation for each subject weld:

i) Weld data sheet (traveler)

ii) Weld configuration and system location

iii) Applicable Code Edition and Addenda for weldment

iv) Applicable Code Edition and Addenda for welding procedures

v) Applicable weld procedures (WPS) used to fabricate the welds

vi) Copies of procedure qualification records (PQRs) supporting the WPS

from B.1.b.v

vii) Copies of mechanical test reports identified in the PQRs above

viii) Copies of the nonconformance reports for the selected welds (If

applicable)

ix) Radiographs of the selected welds and access to equipment to allow

viewing radiographs (If RT was performed)

x) Copies of the preservice examination records for the selected welds.

xi) Copies of welder performance qualifications records applicable to the

selected welds, including documentation that welder maintained

proficiency in the applicable welding processes specified in the WPS (at

least six months prior to the date of subject work)

xii) Copies of NDE personnel qualifications (VT, PT, UT, RT), as applicable

c) For the ISI related corrective action issues selected by the inspector(s) from

section A of this enclosure, provide a copy of the corrective actions and

supporting documentation.

d) For the NDE reports with relevant conditions on Code Class 1 & 2 systems

selected by the inspector from section A above, provide a copy of the

-5- Enclosure

examination records, examiner qualification records, and associated corrective

action documents.

e) A copy of (or ready access to) most current revision of the ISI Program Manual

and Plan for the current Interval.

f) For the NDEs selected by the inspector from section A of this enclosure, provide

copy of the NDE procedures used to perform the examinations (including

calibration and flaw characterization/sizing procedures). For ultrasonic

examination procedures qualified in accordance with ASME Code,Section XI,

Appendix VIII, provide documentation supporting the procedure qualification

(e.g., the EPRI performance demonstration qualification summary sheets). Also,

include qualification documentation of the specific equipment to be used (e.g.,

ultrasonic unit, cables, and transducers including serial numbers) and NDE

personnel qualification records.

B.2 Reactor Pressure Vessel Head (RPVH)

a) Provide the NDE personnel qualification records for the examiners who will

perform examinations of the RPVH.

b) Provide drawings showing the following: (If a visual examination is planned for

the upcoming refueling outage)

i) RPVH and CRDM nozzle configurations

ii) RPVH insulation configuration

The drawings listed above should include fabrication drawings for the nozzle attachment

welds as applicable.

c) Copy of NDE reports from the last RPVH examination.

d) Copy of evaluation or calculation demonstrating that the scope of the visual

examination of the upper head will meet the 95 percent minimum coverage

required by NRC Order EA-03-009 (If a visual examination is planned for the

upcoming refueling outage).

e) Provide a copy of the procedures that will be used to identify the source of any

boric acid deposits identified on the RPVH. If no explicit procedures exist which

govern this activity, provide a description of the process to be followed including

personnel responsibilities and expectations.

f) Provide a copy of the updated calculation of effective degradation years (EDY)

for the RPVH susceptibility ranking.

g) Provide copy of the vendor qualification report(s) that demonstrates the detection

capability of the NDE equipment used for the RPVH examinations. Also, identify

any changes in equipment configurations used for the RPVH examinations which

differ from that used in the vendor qualification report(s).

-6- Enclosure

B.3 Boric Acid Corrosion Control Program (BACCP)

a) Please provide boric acid walkdown inspection results, an updated list of boric

acid leaks identified so far this outage, associated corrective action

documentation, and overall status of planned boric acid inspections.

b) Please provide any engineering evaluations completed for boric acid leaks

identified since the end of the last refueling outage. Please include a status of

corrective actions to repair and/or clean these boric acid leaks. Please identify

specifically which known leaks, if any, have remained in service or will remain in

service as active leaks.

B.4 Steam Generator Tube (SGT) Inspections

a) Copies of the Examination Technique Specification Sheets (ETSS) and

associated justification for any revisions.

b) Copy of the guidance to be followed if a loose part or foreign material is identified

in the SGs.

c) Please provide a copy of the ET procedures used to perform the SGT

inspections (specifically calibration and flaw characterization/sizing procedures,

etc.). Also include documentation for the specific equipment to be used.

d) Please provide copies of your responses to NRC and industry operating

experience communications such as Generic Letters, Information Notices, etc.

(as applicable to SGT inspections) *Do not provide these documents separately if

already included in other information requested such as the degradation

assessment.

e) List of corrective action documents generated by the vendor and/or site with

respect to SG inspection activities.

B.5 Codes and Standards

a) Ready access to (i.e., copies provided to the inspector(s) for use during the

inspection at the onsite inspection location, or room number and location where

available):

i) Applicable Editions of the ASME Code (Sections V, IX and XI) for the

inservice inspection program and the repair/replacement program.

ii) EPRI and industry standards referenced in the procedures used to

perform the SGT eddy current examination.

-7- Enclosure

Inspector Contact Information:

Kelly Clayton Doug Bollock

Senior Reactor Inspector Reactor Inspector

817-860-8216 817-276-6510

kelly.clayton@nrc.gov douglas.bollock@nrc.gov

Mailing Address:

US NRC Region IV

Attn: Kelly Clayton

612 E. Lamar Blvd, Suite 400

Arlington, TX 76011