ML14262A046: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 18: Line 18:
=Text=
=Text=
{{#Wiki_filter:UNITED STATES
{{#Wiki_filter:UNITED STATES
NUCLEAR REGULATORY COMMISSION REGION IV 1600 E. LAMAR BLVD. ARLINGTON, TX 76011-4511
                              NUCLEAR REGULATORY COMMISSION
  September 19, 2014  
                                                REGION IV
                                          1600 E. LAMAR BLVD.
                                        ARLINGTON, TX 76011-4511
                                          September 19, 2014
  Mr. Michael R. Chisum
Mr. Michael R. Chisum
Site Vice President  
Site Vice President
Entergy Operations, Inc.  
Entergy Operations, Inc.
17265 River Road
Killona, LA 70057-0751
SUBJECT: WATERFORD STEAM ELECTRIC STATION, UNIT 3 - NOTIFICATION OF
              AN NRC TRIENNIAL FIRE PROTECTION BASELINE INSPECTION
              (NRC INSPECTION REPORT 05000382/2015007) AND REQUEST FOR
              INFORMATION
Dear Mr. Chisum:
The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC),
Region IV staff will conduct a triennial fire protection baseline inspection at the Waterford Steam
Electric Station, Unit 3, in January and February 2015. The inspection team will be comprised
of four reactor inspectors from the NRC Region IV office. The inspection will be conducted in
accordance with Inspection Procedure 71111.05T, Fire Protection (Triennial), the NRCs
baseline fire protection inspection procedure.
The schedule for the inspection is as follows:
    *  Information gathering visit:    January 6-8, 2015
    *  On-site inspection:              January 26-30, 2015
                                        February 9-13, 2015
The purpose of the information gathering visit is to obtain information and documentation
needed to support the inspection and to become familiar with the fire protection program, fire
protection features, post-fire safe shutdown capabilities, plant layout, and mitigating strategies
to address Section B.5.b of NRC Order EA-02-026, Order for Interim Safeguards and Security
Compensatory Measures, dated February 25, 2002, and 10 CFR 50.54(hh)(2).


17265 River Road Killona, LA  70057-0751
M. Chisum                                        -2-
The team leader will participate in the information gathering visit to select the fire areas for
SUBJECT: WATERFORD STEAM ELECTRIC STATION, UNIT 3 - NOTIFICATION OF AN NRC TRIENNIAL FIRE PROTECTION BASELINE INSPECTION
evaluation, identify additional documents needed to support the inspection, obtain unescorted
(NRC INSPECTION REPORT 05000382/2015007) AND REQUEST FOR INFORMATION
access, and meet with the key personnel who will support the inspection. The fire area
selection will require a walkdown of candidate fire areas accompanied by key personnel from
Dear Mr. Chisum:
your staff. The enclosure to this letter provides an initial list of the documents the team will need
for their review. We request that your staff transmit copies of the documents listed in the
enclosure to the NRC Region IV office for team use in preparation for the inspection. Please
send this information so that it will arrive in the NRC Region IV office by the dates listed in the
enclosure.
During the information gathering visit, the team leader will also discuss the following inspection
support administrative details: (1) office space size and location, (2) specific documents
requested to be made available to the team in their office spaces, (3) arrangements for reactor
site access, and (4) the availability of knowledgeable plant engineering and licensing
organization personnel to serve as points of contact during the inspection.
We request that during the on-site inspection weeks, you ensure that copies of analyses,
evaluations, or documentation regarding the implementation and maintenance of the fire
protection program, including post-fire safe shutdown capability, be readily accessible to the
team for their review. Of specific interest for the fire protection portion of the inspection are
those documents that establish that your fire protection program satisfies the NRC regulatory
requirements and conforms to applicable NRC and industry fire protection guidance. For
the B.5.b portion of the inspection, those documents implementing your mitigating strategies
and demonstrating the management of your commitments for the strategies are of specific
interest. Also, please ensure that appropriate personnel are available to support the team at the
site during the inspection. These personnel should be knowledgeable of the plant systems
required to achieve and maintain safe shutdown conditions from inside and outside the control
room, the electrical aspects of the post-fire safe shutdown analyses, the reactor plant fire
protection systems, and the fire protection program and its implementation.
This letter does not contain new or amended information collection requirements subject to
the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection
requirements were approved by the Office of Management and Budget under control
number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to
respond to, a request for information or an information collection requirement unless the
requesting document displays a currently valid Office of Management and Budget control
number.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and
its enclosure will be available electronically for public inspection in the NRC Public Document
Room or from the Publicly Available Records (PARS) component of NRCs document system
(ADAMS). ADAMS is accessible from the NRC Web site at
http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).


M. Chisum                                    -3-
The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC),  
Your cooperation and support during this inspection will be appreciated. If you have questions
Region IV staff will conduct a triennial fire protection baseline inspection at the Waterford Steam Electric Station, Unit 3, in January and February 2015.  The inspection team will be comprised of four reactor inspectors from the NRC Region IV office. The inspection will be conducted in accordance with Inspection Procedure 71111.05T, "Fire Protection (Triennial)," the NRC's baseline fire protection inspection procedure.
concerning this inspection or the inspection teams information or logistical needs, please
contact Greg Pick, the team lead inspector, in the Region IV office at (817) 200-1270 or
Greg.Pick@nrc.gov.
                                              Sincerely,
                                              /RA/
                                              Eric A. Ruesch, Acting Branch Chief
                                              Engineering Branch 2
                                              Division of Reactor Safety
Docket: 50-382
License: NPF-38
Enclosure:
Triennial Fire Protection Inspection
  Documentation Request
cc w/encl.:
Electronic Distribution for Waterford
  Steam Electric Station, Unit 3


The schedule for the inspection is as follows:
                  Triennial Fire Protection Inspection Documentation Request
* Information gathering visit:  January 6-8, 2015
Please provide the following documentation (items 1-5) prior to the on-site information
* On-site inspection:  January 26-30, 2015      February 9-13, 2015
gathering visit, preferably no later than December 15, 2014. Whenever practical, please
provide copies electronically. Please provide an index of the requested documents that
The purpose of the information gathering visit is to obtain information and documentation
includes a brief description of the document and the numerical heading associated with the
needed to support the inspection and to become familiar with the fire protection program, fire protection features, post-fire safe shutdown capabilities, plant layout, and mitigating strategies to address Section B.5.b of NRC Order EA-02-026, "Order for Interim Safeguards and Security
request (i.e., where it can be found in the list of documents requested).
Compensatory Measures," dated February 25, 2002, and 10 CFR 50.54(hh)(2).  
1. The current version of the fire protection program and fire hazards analysis.
2. Post-fire safe shutdown analysis and the supporting calculations that demonstrate
    acceptable plant response.
3. Licensing basis documents for fire protection (safety evaluation reports, pertinent sections of
    the final safety analysis report, exemptions, deviations, letters to/from the NRC regarding fire
    protection/fire safe shutdown, etc.).
4. The fire probabilistic risk assessment or portions of the plants individual plant examination
    of external events (IPEEE) report addressing fire events. Also, include the results of any
    post-IPEEE reviews and listings of actions taken or plant modifications conducted in
    response to IPEEE information that relate to fire risk.
5. A copy of the documents that support your multiple spurious operation evaluations
    (i.e., expert panel reports, evaluation packages, etc.).
Please provide the following documentation (items 6-50) during the information gathering visit
on January 6-8, 2015, to support inspection preparation. Whenever practical, please provide
copies electronically. Drawings should be provided as paper copies of sufficient size such that
all details are legible.
6. Plant layout and equipment drawings for fire areas that identify: (a) the physical plant
    locations of major hot standby and cold shutdown equipment; (b) plant fire area and/or fire
    zone delineation; (c) the locations of fire protection equipment, such as detection,
    suppression, and post-fire emergency lighting units; and (d) fire area boundaries. The
    specific documents needed to support inspection preparation will be discussed during the
    site visit.
7. Fire protection program implementing procedures (e.g., administrative controls, operator
    response procedures for fires, firefighting procedures, etc.).
8. Operating procedures used for achieving and maintaining hot and cold shutdown conditions
    from the control room in the event of a fire outside the control room (III.G.2 areas).
9. Operating procedures used to implement an alternative shutdown capability with or without
    control room evacuation (III.G.3 areas).
                                                                                          Enclosure


10. A list of equipment used to achieve and maintain hot standby and cold shutdown in the
 
    event of a fire (safe shutdown equipment list).
M. Chisum - 2 -
11. Piping and instrumentation (flow) diagrams showing the components used to achieve and
    maintain hot standby and cold shutdown for normal and alternative shutdown. Please
The team leader will participate in the information gathering visit to select the fire areas for evaluation, identify additional documents needed to support the inspection, obtain unescorted access, and meet with the key personnel who will support the inspection. The fire area
    provide one copy of the piping and instrumentation (flow) diagrams for these systems of a
selection will require a walkdown of candidate fire areas accompanied by key personnel from
    size sufficient to read all details. These should include the systems used for reactor
your staff. The enclosure to this letter provides an initial list of the documents the team will need
    coolant system makeup, reactor coolant system pressure control, decay heat removal, and
for their review. We request that your staff transmit copies of the documents listed in the  
    reactivity control, including the essential support systems.
enclosure to the NRC Region IV office for team
12. A listing, with descriptions, of design change packages performed since the last triennial
use in preparation for the inspection. Please send this information so that it will arrive in the NRC Region IV office by the dates listed in the enclosure.  
    fire protection inspection that were determined to impact fire protection and post-fire safe
    shutdowns.
13. Fire protection program change evaluations (Generic Letter 86-10 evaluations) performed
    since the last triennial fire protection inspection.
14. Procedures and instructions that control the configuration of the plants fire protection
    program features and post-fire safe shutdown methodology and system design. Also,
    procedures and instructions that govern the implementation of plant modifications,
    maintenance, and special operations and their impact on fire protection.
15. A listing of open and closed corrective action documents initiated since the last triennial fire
    protection inspection that relate to the fire protection program or equipment, including
    corrective actions for fire-induced circuit failures (both single and multiple spurious
    actuations) for the selected fire areas. Include the corrective action program document
    number, date, and subject.
16. A listing of the applicable codes and standards (with the versions/dates) related to the
    design of plant fire protection features and evaluations of any code deviations. Copies of
    these codes should be available for review.
17. Drawings of the portions of the emergency lighting system that support fire response.
18. Procedures used to remove smoke from safety-related areas and the engineering studies
    or calculations that support the design basis.
19. Drawings of communication systems credited in the license basis for firefighting and plant
    operations during fires where control room is occupied and/or evacuated.
20. Piping and instrumentation (flow) diagrams for the fire water and sprinkler systems.
21. A listing of maintenance and surveillance testing procedures for alternative shutdown
    capability and fire barriers, detectors, pumps, and suppression systems. Also, include
    a list of maintenance and surveillance testing procedures that verify fuse and breaker
    coordination in accordance with the post-fire safe shutdown coordination analysis.
                                                  -2-


22. Maintenance rule performance criteria and a summary of the performance history for
During the information gathering visit, the team leader will also discuss the following inspection  
    systems or functions monitored within the maintenance rule program that support the fire
support administrative details:  (1) office space size and location, (2) specific documents requested to be made available to the team in their office spaces, (3) arrangements for reactor site access, and (4) the availability of knowledgeable plant engineering and licensing
    protection program or involve safe shutdown equipment over the period since the last
organization personnel to serve as points of contact during the inspection.  
    triennial fire protection inspection.
23. Fire protection program requirements (e.g., limiting conditions for operation, surveillance
    test requirements) covered by technical specifications, the technical requirements manual,
    the updated final safety analysis report, or similar documents.
24. Internal and external self-assessments, audits, peer-assessments, or similar reviews
    related to post-fire safe shutdown capability or the fire protection program completed since
    the last triennial fire protection inspection.
25. A list of manual actions taken outside the control room that are credited to mitigate the
    consequences of fires in III.G.2 areas (non-alternative shutdown areas). The list should
    group actions by the initiating fire area or zone and indicate where the action must take
    place.
26. Electronic copies of operator study guides (i.e., lesson plan text and graphics) or design
    basis documents that describe the purpose/function/operating characteristics of the safe
    shutdown systems (reactor coolant system makeup, reactor coolant system pressure
    control, decay heat removal, and reactivity control, including the essential support systems)
    and fire protection systems (detection, suppression, and water supply).
27. Two copies of one-line diagrams of the AC and vital DC electrical distribution systems.
    These should depict how power gets from the switchyard to the engineered safety feature
    loads (480V and 4160V).
28. A list of automatic and manually initiated gaseous fire suppression systems in the plant,
    giving their location and the key equipment being protected.
29. A list of repairs (and the procedure that controls the repairs) needed to reach and/or
    maintain hot or cold shutdown.
30. A list of high to low pressure interface valves.
31. Procedures governing the training and operation of the fire brigade.
32. Organization charts of site personnel down to the level of fire protection staff personnel.
33. A contact list of key site personnel who will be supporting this inspection, giving the office
    location and phone number on-site.
34. The team would like to observe an unannounced fire brigade drill in the plant, if possible,
    during the week of February 9, 2015. Please put us in contact with the appropriate
    personnel for planning fire brigade drills during the on-site information gathering trip.
                                                  -3-


35. The team would like to perform a walk-through of the alternative shutdown procedure with
We request that during the on-site inspection weeks, you ensure that copies of analyses, evaluations, or documentation regarding the implementation and maintenance of the fire protection program, including post-fire safe shutdown capability, be readily accessible to the  
    qualified operators in the plant during the week of January 26, 2015. The team would like
team for their review. Of specific interest for the fire protection portion of the inspection are
    to perform a walk-through of a sample of manual actions required for other fires not
those documents that establish that your fire protection program satisfies the NRC regulatory
    requiring control room evacuation. Please put us in contact with the appropriate personnel
requirements and conforms to applicable NRC and industry fire protection guidance. For
    for planning the walk-throughs during the on-site information gathering trip.
the B.5.b portion of the inspection, those documents implementing your mitigating strategies
36. Procedures and data from the latest performance of the fire pump flow and pressure tests
and demonstrating the management of your commitments for the strategies are of specific interest.  Also, please ensure that appropriate personnel are available to support the team at the  
    and the yard loop flow test along with available performance trending data.
site during the inspection. These personnel should be knowledgeable of the plant systems
37. The corrective actions taken to address the following previously identified issues:
required to achieve and maintain safe shutdown conditions from inside and outside the control
  a. NCV 05000382/2012007-01, Failure to Adequately Evaluate the Impact of Fire Damage
room, the electrical aspects of the post-fire safe shutdown analyses, the reactor plant fire protection systems, and the fire protection program and its implementation.  
        on the Dry Cooling Tower Fans
  b. NCV 05000382/2012007-02, Failure to Calculate Adequate Cooling Provided to Diesel
This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection
        Generator B within Required Time
requirements were approved by the Offi
The following documents (items 38-50) involve B.5.b mitigating strategies:
ce of Management and Budget under control number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control
38. License condition that incorporated the requirements issued to address Section B.5.b of
number.  
    NRC Order EA-02-026, Order for NRC Interim Safeguards and Security Compensatory
    Measures, dated February 25, 2002, and 10 CFR 50.54(hh)(2).
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at 
39. A list of all modifications to regulatory commitments made to meet the requirements of
http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
    Section B.5.b of NRC Order EA-02-026, Order for NRC Interim Safeguards and Security
    Compensatory Measures, dated February 25, 2002; the subsequently imposed license
    conditions; and 10 CFR 50.54(hh)(2).
40. A list of procedures and guidelines that were revised or generated to implement the
    mitigation strategies. These could be extensive damage mitigation guidelines, severe
    accident management guidelines, emergency operating procedures, abnormal operating
    procedures, etc.
41. A matrix that shows the correlation between the mitigation strategies identified in NEI 06-12
    and the site-specific procedures or guidelines that are used to implement each strategy.
42. A list of engineering evaluations/calculations that were used to verify engineering bases for
    the mitigation strategies.
43. Piping and instrumentation diagrams or simplified flow diagrams for systems relied upon in
    the mitigation strategies. These could be the type used for training.
44. A list of modification packages and simplified drawings/descriptions of modifications that
    were made to plant systems to implement the mitigation strategies.
45. Procedures used to inventory equipment (hoses, fittings, pumps, etc.) required to be used
    to implement the mitigation strategies.
46. A list of B.5.b strategies, if any, that have implementing details that differ from that
    documented in the submittals to the NRC and the safety evaluation report.
                                                  -4-


47. Site general arrangement drawing(s) that show the majority of buildings/areas referenced in
 
    B.5.b documents.
M. Chisum - 3 -  
48. Training records and lesson plans related to the B.5.b mitigating strategies.
49. Copies of Memoranda of Understanding (MOUs) (e.g., with local fire departments) required
Your cooperation and support during this inspection will be appreciated. If you have questions concerning this inspection or the inspection team's information or logistical needs, please contact Greg Pick, the team lead inspector, in the Region IV office at (817) 200-1270 or
    to implement any mitigating strategies.
50. The team would like to perform a walk-through of the procedure implementing a sample
    mitigating strategy (to be selected by the inspector during the information gathering visit)
    and the inventory equipment (hoses, fittings, pumps, etc.) required to be used to implement
    the mitigation strategies during the week of February 9, 2015. Please put us in contact with
    the appropriate personnel for planning the walk-through during the on-site information
    gathering trip.
The following documentation needs (items 51-54) will be dependent upon sample selections
and will be finalized during discussions with your staff. Please provide the required documents
by January 14, 2015. Whenever practical, please provide copies electronically. Drawings
should be provided as paper copies of sufficient size such that all details are legible.
51. Pre-fire plans for the selected fire areas (areas to be selected by the team during the
    on-site information gathering trip).
52. List of identified fire-induced circuit failure configurations that could prevent operation or
    cause maloperation of equipment credited for safe shutdown in the event of a fire (for the
    selected fire areas). Include failure configurations associated with hot shorts, open circuits,
    or shorts to ground identified as potentially causing spurious or multiple spurious actuations
    or maloperations of this equipment.
53. Cable routing information for components and equipment credited for safe shutdown in the
    selected fire areas. This information request item will be discussed and finalized with your
    staff during the information gathering visit.
54. Drawings showing the location details for detection and suppression systems in the
    selected fire areas.
                                                  -5-


Greg.Pick@nrc.gov.
Sincerely, 


   
  ML14262A046
/RA/    
   SUNSI Review              ADAMS          Publicly Available      Non-Sensitive     Keyword:
Eric A. Ruesch, Acting Branch Chief
  By: GAPick                   Yes No     Non-Publicly Available  Sensitive         NRC-002
Engineering Branch 2
OFFICE       RIV:DRS/SRI   C:EB2
Division of Reactor Safety
NAME         GPick\dch     ERuesch
SIGNATURE     /RA/         /RA/
Docket:  50-382
DATE         9/18/14       9/19/14
License:  NPF-38
                                     
 
Letter to Michael Chisum from Eric Ruesch, dated September 19, 2014
Enclosure:  Triennial Fire Protection Inspection 
SUBJECT:       WATERFORD STEAM ELECTRIC STATION, UNIT 3 - NOTIFICATION OF
 
                AN NRC TRIENNIAL FIRE PROTECTION BASELINE INSPECTION
  Documentation Request
                (NRC INSPECTION REPORT 05000382/2015007) AND REQUEST FOR
 
                INFORMATION
Electronic distribution by RIV:
cc w/encl.: 
Regional Administrator (Marc.Dapas@nrc.gov)
Electronic Distribution for Waterford     Steam Electric Station, Unit 3
Deputy Regional Administrator (Kriss.Kennedy@nrc.gov)
Acting DRP Director (Troy.Pruett@nrc.gov)
Acting DRP Deputy Director (Michael.Hay@nrc.gov)
DRS Director (Anton.Vegel@nrc.gov)
 
DRS Deputy Director (Jeff.Clark@nrc.gov)
  Enclosure Triennial Fire Protection Inspection Documentation Request
Senior Resident Inspector (Frances.Ramirez@nrc.gov)
Please provide the following documentation (items 1-5) prior to the on-site information gathering visit, preferably no later than December 15, 2014.  Whenever practical, please provide copies electronically.  Please provide an index of the requested documents that includes a brief description of the document and the numerical heading associated with the
Resident Inspector (Chris.Speer@nrc.gov)
request (i.e., where it can be found in the list of documents requested). 
WAT Administrative Assistant (Linda.Dufrene@nrc.gov)
 
Branch Chief, DRP/E (Greg.Werner@nrc.gov)
Senior Project Engineer, DRP/E (Cale.Young@nrc.gov)
1. The current version of the fire protection program and fire hazards analysis.
Project Engineer, DRP/E (Jim.Melfi@nrc.gov)
2. Post-fire safe shutdown analysis and the supporting calculations that demonstrate acceptable plant response.
Public Affairs Officer (Victor.Dricks@nrc.gov)
Public Affairs Officer (Lara.Uselding@nrc.gov)
3. Licensing basis documents for fire protection (safety evaluation reports, pertinent sections of
Project Manager (Peter.Bamford@nrc.gov)
the final safety analysis report, exemptions, deviations, letters to/from the NRC regarding fire protection/fire safe shutdown, etc.).
Branch Chief, DRS/TSB (Geoffrey.Miller@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
4. The fire probabilistic risk assessment or portions of the plant's individual plant examination
ACES (R4Enforcement.Resource@nrc.gov)
of external events (IPEEE) report addressing fire events.  Also, include the results of any post-IPEEE reviews and listings of actions ta
Regional Counsel (Karla.Fuller@nrc.gov)
ken or plant modifications conducted in response to IPEEE information that relate to fire risk. 
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
Technical Support Assistant (Loretta.Williams@nrc.gov)
5. A copy of the documents that support your multiple spurious operation evaluations (i.e., expert panel reports, evaluation packages, etc.).
RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)
Please provide the following documentation (items 6-50) during the information gathering visit on January 6-8, 2015, to support inspection preparation.  Whenever practical, please provide
RIV/ETA: OEDO (John.Jandovitz@nrc.gov)
copies electronically.  Drawings should be provided as paper copies of sufficient size such that
all details are legible. 
 
6. Plant layout and equipment drawings for fire areas that identify:  (a) the physical plant locations of major hot standby and cold shutdown equipment; (b) plant fire area and/or fire
zone delineation; (c) the locations of fire protection equipment, such as detection,
suppression, and post-fire emergency lighting units; and (d) fire area boundaries.  The
specific documents needed to support inspection preparation will be discussed during the
site visit.
7. Fire protection program implementing procedures (e.g., administrative controls, operator response procedures for fires, firefighting procedures, etc.). 
8. Operating procedures used for achieving and maintaining hot and cold shutdown conditions from the control room in the event of a fire outside the control room (III.G.2 areas).
9. Operating procedures used to implement an al
ternative shutdown capability with or without
control room evacuation (III.G.3 areas).
 
  - 2 -    10. A list of equipment used to achieve and maintain hot standby and cold shutdown in the  event of a fire (safe shutdown equipment list).
11. Piping and instrumentation (flow) diagrams showing the components used to achieve and  maintain hot standby and cold shutdown for normal and alternative shutdown.  Please
 
provide one copy of the piping and instrumentat
ion (flow) diagrams for these systems of a size sufficient to read all details.  These should include the systems used for reactor
coolant system makeup, reactor coolant system pressure control, decay heat removal, and reactivity control, including the essential support systems.
12. A listing, with descriptions, of design change packages performed since the last triennial  fire protection inspection that were determined to impact fire protection and post-fire safe
 
shutdowns. 
13. Fire protection program change evaluations (Generic Letter 86-10 evaluations) performed  since the last triennial fire protection inspection.
 
14. Procedures and instructions that control the configuration of the plant's fire protection  program features and post-fire safe shutdown methodology and system design.  Also, procedures and instructions that govern the implementation of plant modifications, maintenance, and special operations and their impact on fire protection.
15. A listing of open and closed corrective action documents initiated since the last triennial fire  protection inspection that relate to the fire protection program or equipment, including
corrective actions for fire-induced circuit failures (both single and multiple spurious actuations) for the selected fire areas.  Include the corrective action program document number, date, and subject.
16. A listing of the applicable codes and standards (with the versions/dates) related to the  design of plant fire protection features and evaluations of any code deviations.  Copies of these codes should be available for review.
17. Drawings of the portions of the emergency lighting system that support fire response. 
 
18. Procedures used to remove smoke from safety-related areas and the engineering studies 
or calculations that support the design basis.
19. Drawings of communication systems credited in the license basis for firefighting and plant  operations during fires where control room is occupied and/or evacuated.
 
20. Piping and instrumentation (flow) diagrams for the fire water and sprinkler systems.
21. A listing of maintenance and surveillance testing procedures for alternative shutdown  capability and fire barriers, detectors, pumps, and suppression systems.  Also, include
a list of maintenance and surveillance testing procedures that verify fuse and breaker
coordination in accordance with the post-fire safe shutdown coordination analysis.
 
- 3 -    22. Maintenance rule performance criteria and a summary of the performance history for  systems or functions monitored within the maintenance rule program that support the fire protection program or involve safe shutdown equipment over the period since the last triennial fire protection inspection.
 
23. Fire protection program requirements (e.g., limiting conditions for operation, surveillance  test requirements) covered by technical specifications, the technical requirements manual,
the updated final safety analysis report, or similar documents.
24. Internal and external self-assessments, audits, peer-assessments, or similar reviews  related to post-fire safe shutdown capability or the fire protection program completed since
the last triennial fire protection inspection.
25. A list of manual actions taken outside the control room that are credited to mitigate the  consequences of fires in III.G.2 areas (non-alternative shutdown areas).  The list should
group actions by the initiating fire area or zone and indicate where the action must take
place.  26. Electronic copies of operator study guides (i.e., lesson plan text and graphics) or design  basis documents that describe the purpose/function/operating characteristics of the safe shutdown systems (reactor coolant system makeup, reactor coolant system pressure
control, decay heat removal, and reactivity control, including the essential support systems)
and fire protection systems (detection, suppression, and water supply).
27. Two copies of one-line diagrams of the AC and vital DC electrical distribution systems.  These should depict how power gets from the switchyard to the engineered safety feature
loads (480V and 4160V). 
28. A list of automatic and manually initiated gaseous fire suppression systems in the plant,  giving their location and the key equipment being protected. 
29. A list of repairs (and the procedure that controls the repairs) needed to reach and/or  maintain hot or cold shutdown.
30. A list of high to low pressure interface valves.
31. Procedures governing the training and operation of the fire brigade.
 
32. Organization charts of site personnel down to the level of fire protection staff personnel.
 
33. A contact list of key site personnel who will be supporting this inspection, giving the office  location and phone number on-site.
34. The team would like to observe an unannounced fire brigade drill in the plant, if possible,  during the week of February 9, 2015.  Please put us in contact with the appropriate
personnel for planning fire brigade drills during the on-site information gathering trip.
 
- 4 -  35. The team would like to perform a walk-through of the alternative shutdown procedure with  qualified operators in the plant during the week of January 26, 2015.  The team would like
to perform a walk-through of a sample of manual actions required for other fires not requiring control room evacuation.  Please put us in contact with the appropriate personnel for planning the walk-throughs during the on-site information gathering trip.
36. Procedures and data from the latest performance of the fire pump flow and pressure tests  and the yard loop flow test along with available performance trending data.
37.  The corrective actions taken to address the following previously identified issues:
a. NCV 05000382/2012007-01, "Failure to Adequately Evaluate the Impact of Fire Damage on the Dry Cooling Tower Fans"
 
b. NCV 05000382/2012007-02, "Failure to Calculate Adequate Cooling Provided to Diesel
Generator B within Required Time"
 
The following documents (items 38-50) involve B.5.b mitigating strategies:  
 
38. License condition that incorporated the requirements issued to address Section B.5.b of  NRC Order EA-02-026, "Order for NRC Interim Safeguards and Security Compensatory
 
Measures," dated February 25, 2002, and 10 CFR 50.54(hh)(2).
39. A list of all modifications to regulatory co
mmitments made to meet the requirements of  Section B.5.b of NRC Order EA-02-026, "Order for NRC Interim Safeguards and Security Compensatory Measures," dated February 25, 2002; the subsequently imposed license conditions; and 10 CFR 50.54(hh)(2).
   
40. A list of procedures and guidelines that were revised or generated to implement the  mitigation strategies.  These could be extensive damage mitigation guidelines, severe accident management guidelines, emergency operating procedures, abnormal operating procedures, etc.
41. A matrix that shows the correlation between the mitigation strategies identified in NEI 06-12 
and the site-specific procedures or guidelines that are used to implement each strategy.
 
42. A list of engineering evaluations/calculations that were used to verify engineering bases for  the mitigation strategies.
 
43. Piping and instrumentation diagrams or simplified flow diagrams for systems relied upon in  the mitigation strategies.  These could be the type used for training.
44. A list of modification packages and simplified drawings/descriptions of modifications that 
were made to plant systems to implement the mitigation strategies.
 
45. Procedures used to inventory equipment (hoses, fittings, pumps, etc.) required to be used 
to implement the mitigation strategies.
46. A list of B.5.b strategies, if any, that have implementing details that differ from that 
documented in the submittals to the NRC and the safety evaluation report.
 
 
- 5 -  47. Site general arrangement drawing(s) that show the majority of buildings/areas referenced in  B.5.b documents.
 
48. Training records and lesson plans related to the B.5.b mitigating strategies.
49. Copies of Memoranda of Understanding (MOUs) (e.g., with local fire departments) required 
to implement any mitigating strategies.
 
50. The team would like to perform a walk-through of the procedure implementing a sample  mitigating strategy (to be selected by the inspector during the information gathering visit) and the inventory equipment (hoses, fittings, pumps, etc.) required to be used to implement the mitigation strategies during the week of February 9, 2015.  Please put us in contact with
the appropriate personnel for planning the walk-through during the on-site information
 
gathering trip.
The following documentation needs (items 51-54) will be dependent upon sample selections
and will be finalized during discussions with your staff.  Please provide the required documents by January 14, 2015.  Whenever practical, please provide copies electronically.  Drawings should be provided as paper copies of sufficient size such that all details are legible. 
51. Pre-fire plans for the selected fire areas (areas to be selected by the team during the 
on-site information gathering trip). 
52. List of identified fire-induced circuit failure configurations that could prevent operation or  cause maloperation of equipment credited for safe shutdown in the event of a fire (for the
selected fire areas).  Include failure configurations associated with hot shorts, open circuits,
or shorts to ground identified as potentially causing spurious or multiple spurious actuations
or maloperations of this equipment.
53. Cable routing information for components and equipment credited for safe shutdown in the  selected fire areas.  This information request item will be discussed and finalized with your
staff during the information gathering visit.
54. Drawings showing the location details for detection and suppression systems in the  selected fire areas.
 
   
 
  ML14262A046
  SUNSI Review By: GAPick  
ADAMS Yes    No Publicly Available  Non-Publicly Available  Non-Sensitive Sensitive Keyword: NRC-002 OFFICE RIV:DRS/SRI C:EB2     NAME GPick\dch ERuesch     SIGNATURE /RA/ /RA/     DATE 9/18/14 9/19/14      
  Letter to Michael Chisum from Eric Ruesch, dated September 19, 2014  
SUBJECT: WATERFORD STEAM ELECTRIC STATION, UNIT 3 - NOTIFICATION OF AN NRC TRIENNIAL FIRE PROTECTION BASELINE INSPECTION (NRC INSPECTION REPORT 05000382/2015007) AND REQUEST FOR  
INFORMATION  
Electronic distribution by RIV
: Regional Administrator (Marc.Dapas@nrc.gov)  
Deputy Regional Administrator (Kriss.Kennedy@nrc.gov)  
Acting DRP Director (Troy.Pruett@nrc.gov)  
Acting DRP Deputy Director (Michael.Hay@nrc.gov) DRS Director (Anton.Vegel@nrc.gov) DRS Deputy Director (Jeff.Clark@nrc.gov)
Senior Resident Inspector (Frances.Ramirez@nrc.gov)  
 
Resident Inspector (Chris.Speer@nrc.gov)  
WAT Administrative Assistant (Linda.Dufrene@nrc.gov)  
 
Branch Chief, DRP/E (Greg.Werner@nrc.gov) Senior Project Engineer, DRP/E (Cale.Young@nrc.gov) Project Engineer, DRP/E (Jim.Melfi@nrc.gov)  
Public Affairs Officer (Victor.Dricks@nrc.gov)  
Public Affairs Officer (Lara.Uselding@nrc.gov)  
Project Manager (Peter.Bamford@nrc.gov) Branch Chief, DRS/TSB (Geoffrey.Miller@nrc.gov) RITS Coordinator (Marisa.Herrera@nrc.gov)  
 
ACES (R4Enforcement.Resource@nrc.gov)  
Regional Counsel (Karla.Fuller@nrc.gov)  
Congressional Affairs Officer (Jenny.Weil@nrc.gov) Technical Support Assistant (Loretta.Williams@nrc.gov) RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)  
RIV/ETA: OEDO (John.Jandovitz@nrc.gov)  
ROPReports
ROPReports
}}
}}

Latest revision as of 01:07, 4 November 2019

Notification of an NRC Triennial Fire Protection Baseline Inspection (NRC Inspection Report 05000382/2015007) and Request for Information
ML14262A046
Person / Time
Site: Waterford Entergy icon.png
Issue date: 09/19/2014
From: Ruesch E
NRC/RGN-IV/DRS/EB-2
To: Chisum M
Entergy Operations
References
IR-2015-007
Download: ML14262A046 (10)


See also: IR 05000382/2015007

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION IV

1600 E. LAMAR BLVD.

ARLINGTON, TX 76011-4511

September 19, 2014

Mr. Michael R. Chisum

Site Vice President

Entergy Operations, Inc.

17265 River Road

Killona, LA 70057-0751

SUBJECT: WATERFORD STEAM ELECTRIC STATION, UNIT 3 - NOTIFICATION OF

AN NRC TRIENNIAL FIRE PROTECTION BASELINE INSPECTION

(NRC INSPECTION REPORT 05000382/2015007) AND REQUEST FOR

INFORMATION

Dear Mr. Chisum:

The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC),

Region IV staff will conduct a triennial fire protection baseline inspection at the Waterford Steam

Electric Station, Unit 3, in January and February 2015. The inspection team will be comprised

of four reactor inspectors from the NRC Region IV office. The inspection will be conducted in

accordance with Inspection Procedure 71111.05T, Fire Protection (Triennial), the NRCs

baseline fire protection inspection procedure.

The schedule for the inspection is as follows:

  • Information gathering visit: January 6-8, 2015
  • On-site inspection: January 26-30, 2015

February 9-13, 2015

The purpose of the information gathering visit is to obtain information and documentation

needed to support the inspection and to become familiar with the fire protection program, fire

protection features, post-fire safe shutdown capabilities, plant layout, and mitigating strategies

to address Section B.5.b of NRC Order EA-02-026, Order for Interim Safeguards and Security

Compensatory Measures, dated February 25, 2002, and 10 CFR 50.54(hh)(2).

M. Chisum -2-

The team leader will participate in the information gathering visit to select the fire areas for

evaluation, identify additional documents needed to support the inspection, obtain unescorted

access, and meet with the key personnel who will support the inspection. The fire area

selection will require a walkdown of candidate fire areas accompanied by key personnel from

your staff. The enclosure to this letter provides an initial list of the documents the team will need

for their review. We request that your staff transmit copies of the documents listed in the

enclosure to the NRC Region IV office for team use in preparation for the inspection. Please

send this information so that it will arrive in the NRC Region IV office by the dates listed in the

enclosure.

During the information gathering visit, the team leader will also discuss the following inspection

support administrative details: (1) office space size and location, (2) specific documents

requested to be made available to the team in their office spaces, (3) arrangements for reactor

site access, and (4) the availability of knowledgeable plant engineering and licensing

organization personnel to serve as points of contact during the inspection.

We request that during the on-site inspection weeks, you ensure that copies of analyses,

evaluations, or documentation regarding the implementation and maintenance of the fire

protection program, including post-fire safe shutdown capability, be readily accessible to the

team for their review. Of specific interest for the fire protection portion of the inspection are

those documents that establish that your fire protection program satisfies the NRC regulatory

requirements and conforms to applicable NRC and industry fire protection guidance. For

the B.5.b portion of the inspection, those documents implementing your mitigating strategies

and demonstrating the management of your commitments for the strategies are of specific

interest. Also, please ensure that appropriate personnel are available to support the team at the

site during the inspection. These personnel should be knowledgeable of the plant systems

required to achieve and maintain safe shutdown conditions from inside and outside the control

room, the electrical aspects of the post-fire safe shutdown analyses, the reactor plant fire

protection systems, and the fire protection program and its implementation.

This letter does not contain new or amended information collection requirements subject to

the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection

requirements were approved by the Office of Management and Budget under control

number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to

respond to, a request for information or an information collection requirement unless the

requesting document displays a currently valid Office of Management and Budget control

number.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and

its enclosure will be available electronically for public inspection in the NRC Public Document

Room or from the Publicly Available Records (PARS) component of NRCs document system

(ADAMS). ADAMS is accessible from the NRC Web site at

http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

M. Chisum -3-

Your cooperation and support during this inspection will be appreciated. If you have questions

concerning this inspection or the inspection teams information or logistical needs, please

contact Greg Pick, the team lead inspector, in the Region IV office at (817) 200-1270 or

Greg.Pick@nrc.gov.

Sincerely,

/RA/

Eric A. Ruesch, Acting Branch Chief

Engineering Branch 2

Division of Reactor Safety

Docket: 50-382

License: NPF-38

Enclosure:

Triennial Fire Protection Inspection

Documentation Request

cc w/encl.:

Electronic Distribution for Waterford

Steam Electric Station, Unit 3

Triennial Fire Protection Inspection Documentation Request

Please provide the following documentation (items 1-5) prior to the on-site information

gathering visit, preferably no later than December 15, 2014. Whenever practical, please

provide copies electronically. Please provide an index of the requested documents that

includes a brief description of the document and the numerical heading associated with the

request (i.e., where it can be found in the list of documents requested).

1. The current version of the fire protection program and fire hazards analysis.

2. Post-fire safe shutdown analysis and the supporting calculations that demonstrate

acceptable plant response.

3. Licensing basis documents for fire protection (safety evaluation reports, pertinent sections of

the final safety analysis report, exemptions, deviations, letters to/from the NRC regarding fire

protection/fire safe shutdown, etc.).

4. The fire probabilistic risk assessment or portions of the plants individual plant examination

of external events (IPEEE) report addressing fire events. Also, include the results of any

post-IPEEE reviews and listings of actions taken or plant modifications conducted in

response to IPEEE information that relate to fire risk.

5. A copy of the documents that support your multiple spurious operation evaluations

(i.e., expert panel reports, evaluation packages, etc.).

Please provide the following documentation (items 6-50) during the information gathering visit

on January 6-8, 2015, to support inspection preparation. Whenever practical, please provide

copies electronically. Drawings should be provided as paper copies of sufficient size such that

all details are legible.

6. Plant layout and equipment drawings for fire areas that identify: (a) the physical plant

locations of major hot standby and cold shutdown equipment; (b) plant fire area and/or fire

zone delineation; (c) the locations of fire protection equipment, such as detection,

suppression, and post-fire emergency lighting units; and (d) fire area boundaries. The

specific documents needed to support inspection preparation will be discussed during the

site visit.

7. Fire protection program implementing procedures (e.g., administrative controls, operator

response procedures for fires, firefighting procedures, etc.).

8. Operating procedures used for achieving and maintaining hot and cold shutdown conditions

from the control room in the event of a fire outside the control room (III.G.2 areas).

9. Operating procedures used to implement an alternative shutdown capability with or without

control room evacuation (III.G.3 areas).

Enclosure

10. A list of equipment used to achieve and maintain hot standby and cold shutdown in the

event of a fire (safe shutdown equipment list).

11. Piping and instrumentation (flow) diagrams showing the components used to achieve and

maintain hot standby and cold shutdown for normal and alternative shutdown. Please

provide one copy of the piping and instrumentation (flow) diagrams for these systems of a

size sufficient to read all details. These should include the systems used for reactor

coolant system makeup, reactor coolant system pressure control, decay heat removal, and

reactivity control, including the essential support systems.

12. A listing, with descriptions, of design change packages performed since the last triennial

fire protection inspection that were determined to impact fire protection and post-fire safe

shutdowns.

13. Fire protection program change evaluations (Generic Letter 86-10 evaluations) performed

since the last triennial fire protection inspection.

14. Procedures and instructions that control the configuration of the plants fire protection

program features and post-fire safe shutdown methodology and system design. Also,

procedures and instructions that govern the implementation of plant modifications,

maintenance, and special operations and their impact on fire protection.

15. A listing of open and closed corrective action documents initiated since the last triennial fire

protection inspection that relate to the fire protection program or equipment, including

corrective actions for fire-induced circuit failures (both single and multiple spurious

actuations) for the selected fire areas. Include the corrective action program document

number, date, and subject.

16. A listing of the applicable codes and standards (with the versions/dates) related to the

design of plant fire protection features and evaluations of any code deviations. Copies of

these codes should be available for review.

17. Drawings of the portions of the emergency lighting system that support fire response.

18. Procedures used to remove smoke from safety-related areas and the engineering studies

or calculations that support the design basis.

19. Drawings of communication systems credited in the license basis for firefighting and plant

operations during fires where control room is occupied and/or evacuated.

20. Piping and instrumentation (flow) diagrams for the fire water and sprinkler systems.

21. A listing of maintenance and surveillance testing procedures for alternative shutdown

capability and fire barriers, detectors, pumps, and suppression systems. Also, include

a list of maintenance and surveillance testing procedures that verify fuse and breaker

coordination in accordance with the post-fire safe shutdown coordination analysis.

-2-

22. Maintenance rule performance criteria and a summary of the performance history for

systems or functions monitored within the maintenance rule program that support the fire

protection program or involve safe shutdown equipment over the period since the last

triennial fire protection inspection.

23. Fire protection program requirements (e.g., limiting conditions for operation, surveillance

test requirements) covered by technical specifications, the technical requirements manual,

the updated final safety analysis report, or similar documents.

24. Internal and external self-assessments, audits, peer-assessments, or similar reviews

related to post-fire safe shutdown capability or the fire protection program completed since

the last triennial fire protection inspection.

25. A list of manual actions taken outside the control room that are credited to mitigate the

consequences of fires in III.G.2 areas (non-alternative shutdown areas). The list should

group actions by the initiating fire area or zone and indicate where the action must take

place.

26. Electronic copies of operator study guides (i.e., lesson plan text and graphics) or design

basis documents that describe the purpose/function/operating characteristics of the safe

shutdown systems (reactor coolant system makeup, reactor coolant system pressure

control, decay heat removal, and reactivity control, including the essential support systems)

and fire protection systems (detection, suppression, and water supply).

27. Two copies of one-line diagrams of the AC and vital DC electrical distribution systems.

These should depict how power gets from the switchyard to the engineered safety feature

loads (480V and 4160V).

28. A list of automatic and manually initiated gaseous fire suppression systems in the plant,

giving their location and the key equipment being protected.

29. A list of repairs (and the procedure that controls the repairs) needed to reach and/or

maintain hot or cold shutdown.

30. A list of high to low pressure interface valves.

31. Procedures governing the training and operation of the fire brigade.

32. Organization charts of site personnel down to the level of fire protection staff personnel.

33. A contact list of key site personnel who will be supporting this inspection, giving the office

location and phone number on-site.

34. The team would like to observe an unannounced fire brigade drill in the plant, if possible,

during the week of February 9, 2015. Please put us in contact with the appropriate

personnel for planning fire brigade drills during the on-site information gathering trip.

-3-

35. The team would like to perform a walk-through of the alternative shutdown procedure with

qualified operators in the plant during the week of January 26, 2015. The team would like

to perform a walk-through of a sample of manual actions required for other fires not

requiring control room evacuation. Please put us in contact with the appropriate personnel

for planning the walk-throughs during the on-site information gathering trip.

36. Procedures and data from the latest performance of the fire pump flow and pressure tests

and the yard loop flow test along with available performance trending data.

37. The corrective actions taken to address the following previously identified issues:

a. NCV 05000382/2012007-01, Failure to Adequately Evaluate the Impact of Fire Damage

on the Dry Cooling Tower Fans

b. NCV 05000382/2012007-02, Failure to Calculate Adequate Cooling Provided to Diesel

Generator B within Required Time

The following documents (items 38-50) involve B.5.b mitigating strategies:

38. License condition that incorporated the requirements issued to address Section B.5.b of

NRC Order EA-02-026, Order for NRC Interim Safeguards and Security Compensatory

Measures, dated February 25, 2002, and 10 CFR 50.54(hh)(2).

39. A list of all modifications to regulatory commitments made to meet the requirements of

Section B.5.b of NRC Order EA-02-026, Order for NRC Interim Safeguards and Security

Compensatory Measures, dated February 25, 2002; the subsequently imposed license

conditions; and 10 CFR 50.54(hh)(2).

40. A list of procedures and guidelines that were revised or generated to implement the

mitigation strategies. These could be extensive damage mitigation guidelines, severe

accident management guidelines, emergency operating procedures, abnormal operating

procedures, etc.

41. A matrix that shows the correlation between the mitigation strategies identified in NEI 06-12

and the site-specific procedures or guidelines that are used to implement each strategy.

42. A list of engineering evaluations/calculations that were used to verify engineering bases for

the mitigation strategies.

43. Piping and instrumentation diagrams or simplified flow diagrams for systems relied upon in

the mitigation strategies. These could be the type used for training.

44. A list of modification packages and simplified drawings/descriptions of modifications that

were made to plant systems to implement the mitigation strategies.

45. Procedures used to inventory equipment (hoses, fittings, pumps, etc.) required to be used

to implement the mitigation strategies.

46. A list of B.5.b strategies, if any, that have implementing details that differ from that

documented in the submittals to the NRC and the safety evaluation report.

-4-

47. Site general arrangement drawing(s) that show the majority of buildings/areas referenced in

B.5.b documents.

48. Training records and lesson plans related to the B.5.b mitigating strategies.

49. Copies of Memoranda of Understanding (MOUs) (e.g., with local fire departments) required

to implement any mitigating strategies.

50. The team would like to perform a walk-through of the procedure implementing a sample

mitigating strategy (to be selected by the inspector during the information gathering visit)

and the inventory equipment (hoses, fittings, pumps, etc.) required to be used to implement

the mitigation strategies during the week of February 9, 2015. Please put us in contact with

the appropriate personnel for planning the walk-through during the on-site information

gathering trip.

The following documentation needs (items 51-54) will be dependent upon sample selections

and will be finalized during discussions with your staff. Please provide the required documents

by January 14, 2015. Whenever practical, please provide copies electronically. Drawings

should be provided as paper copies of sufficient size such that all details are legible.

51. Pre-fire plans for the selected fire areas (areas to be selected by the team during the

on-site information gathering trip).

52. List of identified fire-induced circuit failure configurations that could prevent operation or

cause maloperation of equipment credited for safe shutdown in the event of a fire (for the

selected fire areas). Include failure configurations associated with hot shorts, open circuits,

or shorts to ground identified as potentially causing spurious or multiple spurious actuations

or maloperations of this equipment.

53. Cable routing information for components and equipment credited for safe shutdown in the

selected fire areas. This information request item will be discussed and finalized with your

staff during the information gathering visit.

54. Drawings showing the location details for detection and suppression systems in the

selected fire areas.

-5-

ML14262A046

SUNSI Review ADAMS Publicly Available Non-Sensitive Keyword:

By: GAPick Yes No Non-Publicly Available Sensitive NRC-002

OFFICE RIV:DRS/SRI C:EB2

NAME GPick\dch ERuesch

SIGNATURE /RA/ /RA/

DATE 9/18/14 9/19/14

Letter to Michael Chisum from Eric Ruesch, dated September 19, 2014

SUBJECT: WATERFORD STEAM ELECTRIC STATION, UNIT 3 - NOTIFICATION OF

AN NRC TRIENNIAL FIRE PROTECTION BASELINE INSPECTION

(NRC INSPECTION REPORT 05000382/2015007) AND REQUEST FOR

INFORMATION

Electronic distribution by RIV:

Regional Administrator (Marc.Dapas@nrc.gov)

Deputy Regional Administrator (Kriss.Kennedy@nrc.gov)

Acting DRP Director (Troy.Pruett@nrc.gov)

Acting DRP Deputy Director (Michael.Hay@nrc.gov)

DRS Director (Anton.Vegel@nrc.gov)

DRS Deputy Director (Jeff.Clark@nrc.gov)

Senior Resident Inspector (Frances.Ramirez@nrc.gov)

Resident Inspector (Chris.Speer@nrc.gov)

WAT Administrative Assistant (Linda.Dufrene@nrc.gov)

Branch Chief, DRP/E (Greg.Werner@nrc.gov)

Senior Project Engineer, DRP/E (Cale.Young@nrc.gov)

Project Engineer, DRP/E (Jim.Melfi@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Public Affairs Officer (Lara.Uselding@nrc.gov)

Project Manager (Peter.Bamford@nrc.gov)

Branch Chief, DRS/TSB (Geoffrey.Miller@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

ACES (R4Enforcement.Resource@nrc.gov)

Regional Counsel (Karla.Fuller@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov)

Technical Support Assistant (Loretta.Williams@nrc.gov)

RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)

RIV/ETA: OEDO (John.Jandovitz@nrc.gov)

ROPReports