{{#Wiki_filter:October 20, 2016  
{{#Wiki_filter:UNITED STATES
 
                            NUCLEAR REGULATORY COMMISSION
Mr. Oscar A. Limpias  
                                              REGION IV
Vice President-Nuclear and CNO  
                                        1600 E. LAMAR BLVD
Nebraska Public Power District  
                                      ARLINGTON, TX 76011-4511
                                        October 20, 2016
Mr. Oscar A. Limpias
Vice President-Nuclear and CNO
Nebraska Public Power District
Cooper Nuclear Station
72676 648A Avenue
P.O. Box 98
Brownville, NE 68321
SUBJECT: COOPER NUCLEAR STATION - NOTIFICATION OF NRC INITIAL OPERATOR
              LICENSING EXAMINATION 05000298/2017301
Dear Mr. Limpias:
In a telephone conversation on June 30, 2016, between Messrs. J. Florence, Simulator and
Training Support Superintendent, and B. Larson, Chief Examiner, arrangements were made for
the administration of licensing examinations at Cooper Nuclear Station, during the weeks of
March 6 and 13, 2017.
As agreed during the telephone conversation, your staff will prepare the examinations based on
the guidelines in NUREG-1021, Operator Licensing Examination Standards for Power
Reactors, Revision 10, and NUREG-1122, Knowledge and Abilities Catalog for Nuclear Power
Plant Operators, Revision 2, Supplement 1. The NRCs regional office will discuss with your
staff any changes that might be necessary before the examinations are administered.
To meet the above schedule, it will be necessary for your staff to furnish the examination
outlines by December 5, 2016. The written examinations, operating tests, and supporting
reference materials identified in Attachment 3 of ES-201 will be due by January 2, 2017.
Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations
(10 CFR 55.40(b)(3)), an authorized representative of the facility licensee shall approve the
outlines, examinations, and tests before they are submitted to the NRC for review and approval.
All materials shall be complete and ready to use. We request that any personal, proprietary,
sensitive unclassified, or Safeguards Information in your response be contained in a separate
enclosure and appropriately marked. Any delay in receiving the required examinations and
reference materials, or the submittal of inadequate or incomplete materials, may cause the
examinations to be rescheduled. In addition, your support for on-site validation of the
examinations is required during the week of January 30, 2017.


Cooper Nuclear Station 72676 648A Avenue P.O. Box 98
O. Limpias                                        -2-
In order to conduct the requested written examinations and operating tests, it will be necessary
for your staff to provide adequate space and accommodations in accordance with ES-402, and
to make the simulation facility available on the dates noted above. In accordance with ES-302,
your staff should retain the original simulator performance data (e.g., system pressures,
temperatures, and levels) generated during the dynamic operating tests until the examination
results are final.
Appendix E to NUREG-1021 contains a number of NRC policies and guidelines that will be in
effect while the written examinations and operating tests are being administered.
To permit timely NRC review and evaluation, your staff should submit preliminary operator and
senior operator license applications (Office of Management and Budget (OMB) approval
number 3150-0090), medical certifications (OMB approval number 3150-0024), and waiver
requests (if any) (OMB approval number 3150-0090) at least 30 days before the first
examination date. If the applications are not received at least 30 days before the examination
date, a postponement may be necessary. Signed applications certifying that all training has
been completed should be submitted at least 14 days before the first examination date.
This letter contains information collections that are subject to the Paperwork Reduction Act of
1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under
approval number 3150-0018, which expires on June 30, 2019. The public reporting burden for
this collection of information is estimated to average 50 hours per response, including the time
for reviewing instructions, gathering and maintaining the data needed, and completing and
reviewing the collection of information. Send comments regarding this burden estimate or any
other aspect of these information collections, including suggestions for reducing the burden, to
the Records and FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory
Commission, Washington, DC 20555-0001, or by Internet electronic mail to
INFOCOLLECTS@NRC.GOV.
The NRC may neither conduct nor sponsor, and a person is not required to respond to, an
information collection, unless it displays a currently valid OMB control number.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice and Procedure, a copy of
this letter will be available electronically for public inspection in the NRCs Public Document
Room or from the Publicly Available Records (PARS) component of the NRCs Agencywide
Documents Access and Management System (ADAMS). ADAMS is accessible from the
electronic Reading Room page of the NRCs public Web site at http://www.nrc.gov/reading-
rm/adams.html.


Brownville, NE  68321
O. Limpias                                    -3-
Thank you for your cooperation in this matter. Mr. Florence has been advised of the policies
and guidelines referenced in this letter. If you have any questions regarding the NRCs
examination procedures and guidelines, please contact Mr. Larson at 817-200-1172, or myself
at 817-200-1159.
                                                Sincerely,
                                                /RA/
                                                Vincent G. Gaddy, Chief
                                                Operations Branch
                                                Division of Reactor Safety
Docket No. 50-298
License No. DPR-46
cc: Electronic Distribution


SUBJECT: COOPER NUCLEAR STATION - NOTIFICATION OF NRC INITIAL OPERATOR LICENSING EXAMINATION 05000298/2017301 
Dear Mr. Limpias:
In a telephone conversation on June 30, 2016, between Messrs. J. Florence, Simulator and
Training Support Superintendent, and B. Larson, Chief Examiner, arrangements were made for the administration of licensing examinations at Cooper Nuclear Station, during the weeks of March 6 and 13, 2017.
As agreed during the telephone conversation, your staff will prepare the examinations based on the guidelines in NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 10, and NUREG-1122, "Knowledge and Abilities Catalog for Nuclear Power
Plant Operators," Revision 2, Supplement 1.
The NRC's regional office will discuss with your staff any changes that might be necessary before the examinations are administered.
To meet the above schedule, it will be necessary for your staff to furnish the examination outlines by December 5, 2016.  The written examinations, operating tests, and supporting reference materials identified in Attachment 3 of ES-201 will be due by January 2, 2017. 
Pursuant to Title 10, Section 55.40(b)(3), of the
Code of Federal Regulations
(10 CFR 55.40(b)(3)), an authorized representative of the facility licensee shall approve the
outlines, examinations, and tests before they are submitted to the NRC for review and approval.  All materials shall be complete and ready to use.  We request that any personal, proprietary, sensitive unclassified, or Safeguards Information in your response be contained in a separate enclosure and appropriately marked.  Any delay in receiving the required examinations and reference materials, or the submittal of inadequate or incomplete materials, may cause the
examinations to be rescheduled.  In addition, your support for on-site validation of the examinations is required during the week of January 30, 2017.
  UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 1600 E. LAMAR BLVD ARLINGTON, TX 76011-4511 
O. Limpias - 2 -
In order to conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and to make the simulation facility available on the dates noted above.  In accordance with ES-302,
your staff should retain the original simulator performance data (e.g., system pressures,
temperatures, and levels) generated during the dynamic operating tests until the examination results are final.
Appendix E to NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered.
To permit timely NRC review and evaluation, your staff should submit preliminary operator and senior operator license applications (Office of Management and Budget (OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024), and waiver requests (if any) (OMB approval number 3150-0090) at least 30 days before the first examination date.  If the applications are not
received at least 30 days before the examination date, a postponement may be necessary.  Signed applications certifying that all training has
been completed should be submitted at least 14 days before the first examination date.
This letter contains information collections that are subject to the
Paperwork Reduction Act of
1995 (44 U.S.C. 3501 et seq.).  These information collections were approved by OMB, under approval number 3150-0018, which expires on June 30, 2019.  The public reporting burden for
this collection of information is estimated to average 50 hours per response, including the time
for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information.  Send comments regarding this burden estimate or any other aspect of these information collections, including suggestions for reducing the burden, to
the Records and FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory
Commission, Washington, DC 20555-0001, or by Internet electronic mail to
INFOCOLLECTS@NRC.GOV.  The NRC may neither conduct nor sponsor, and a person is not required to respond to, an
information collection, unless it displays a currently valid OMB control number.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice and Procedure," a copy of
this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS).  ADAMS is accessible from the electronic Reading Room page of the NRC's public Web site at http://www.nrc.gov/reading-rm/adams.html.   
O. Limpias - 3 -
Thank you for your cooperation in this matter.  Mr. Florence has been advised of the policies and guidelines referenced in this letter.  If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. Larson at 817-200-1172, or myself
at 817-200-1159.
Sincerely, 
/RA/ 
Vincent G. Gaddy, Chief
Operations Branch  Division of Reactor Safety
Docket No. 50-298
License No. DPR-46
cc:  Electronic Distribution 
 
O. Limpias - 3 -
Thank you for your cooperation in this matter.  Mr. Florence has been advised of the policies and guidelines referenced in this letter.  If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. Larson at 817-200-1172, or 
myself at 817-200-1159.
Sincerely, 
/RA/ 
Vincent G. Gaddy, Chief
Operations Branch  Division of Reactor Safety
Docket No. 50-298
License No. DPR-46
cc:  Electronic Distribution 
 
 
 
  Distribution:
See next page
ADAMS ACCESSION NUMB
ER:  ML16294A126  SUNSI Review By:  BTL ADAMS  Yes    No  Publicly Available  Non-Publicly Available  Non-Sensitive  Sensitive Keyword: NRC-002 OFFICE SOE:OB C:OB        NAME BLarson VGaddy      SIGNATURE /RA/ /RA/      DATE 10/19/16 10/20/16      OFFICIAL RECORD COPY
 
Letter to Oscar A. Limpias from Vincent G. Gaddy, dated October 20, 2016
SUBJECT: COOPER NUCLEAR STATION - NOTIFICATION OF NRC INITIAL OPERATOR LICENSING EXAMINATION 05000298/2017301 
Electronic distribution by RIV: Regional Administrator (Kriss.Kennedy@nrc.gov)
Deputy Regional Administrator (Scott.Morris@nrc.gov) DRP Director (Troy.Pruett@nrc.gov) DRP Deputy Director (Ryan.Lantz@nrc.gov)
DRS Director (Anton.Vegel@nrc.gov)
DRS Deputy Director (Jeff.Clark@nrc.gov) 
Senior Resident Inspector (Patricia.Voss@nrc.gov)
Resident Inspector (Christopher.Henderson@nrc.gov)
Branch Chief, DRP/C (Greg.Warnick@nrc.gov) 
Senior Project Engineer (Cale.Young@nrc.gov)
Project Engineer (Michael.Stafford@nrc.gov)
Administrative Assistant (Amy.Elam@nrc.gov) Public Affairs Officer (Victor.Dricks@nrc.gov) Project Manager (Thomas.Wengert@nrc.gov)
Team Leader, DRS/IPAT (Thomas.Hipschman@nrc.gov)
Project Engineer, DRS/IPAT (Eduardo.Uribe@nrc.gov)
ACES (R4Enforcement.Resource@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov) Regional Counsel (Karla.Fuller@nrc.gov) Congressional Affairs Officer (Jenny.Weil@nrc.gov)
Congressional Affairs O
fficer (Angel.Moreno@nrc.gov) RIV/ETA: OEDO (Jeremy.Bowen@nrc.gov)


ML16294A126
  SUNSI Review          ADAMS            Publicly Available      Non-Sensitive Keyword:
By: BTL                  Yes  No        Non-Publicly Available  Sensitive    NRC-002
OFFICE        SOE:OB    C:OB
NAME          BLarson  VGaddy
SIGNATURE      /RA/      /RA/
DATE          10/19/16  10/20/16
                                       
Letter to Oscar A. Limpias from Vincent G. Gaddy, dated October 20, 2016
SUBJECT: COOPER NUCLEAR STATION - NOTIFICATION OF NRC INITIAL OPERATOR
              LICENSING EXAMINATION 05000298/2017301
Electronic distribution by RIV:
Regional Administrator (Kriss.Kennedy@nrc.gov)
Deputy Regional Administrator (Scott.Morris@nrc.gov)
DRP Director (Troy.Pruett@nrc.gov)
DRP Deputy Director (Ryan.Lantz@nrc.gov)
DRS Director (Anton.Vegel@nrc.gov)
DRS Deputy Director (Jeff.Clark@nrc.gov)
Senior Resident Inspector (Patricia.Voss@nrc.gov)
Resident Inspector (Christopher.Henderson@nrc.gov)
Branch Chief, DRP/C (Greg.Warnick@nrc.gov)
Senior Project Engineer (Cale.Young@nrc.gov)
Project Engineer (Michael.Stafford@nrc.gov)
Administrative Assistant (Amy.Elam@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov)
Project Manager (Thomas.Wengert@nrc.gov)
Team Leader, DRS/IPAT (Thomas.Hipschman@nrc.gov)
Project Engineer, DRS/IPAT (Eduardo.Uribe@nrc.gov)
ACES (R4Enforcement.Resource@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
Congressional Affairs Officer (Angel.Moreno@nrc.gov)
RIV/ETA: OEDO (Jeremy.Bowen@nrc.gov)
RIV RSLO (Bill.Maier@nrc.gov)
RIV RSLO (Bill.Maier@nrc.gov)
}}
}}

Latest revision as of 13:58, 30 October 2019

Notification of NRC Initial Operator Licensing Examination 05000298/2017301
ML16294A126
Person / Time
Site: Cooper Entergy icon.png
Issue date: 10/20/2016
From: Vincent Gaddy
Operations Branch IV
To: Limpias O
Nebraska Public Power District (NPPD)
References
50-298/OL-17
Download: ML16294A126 (5)


See also: IR 05000298/2017301

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION IV

1600 E. LAMAR BLVD

ARLINGTON, TX 76011-4511

October 20, 2016

Mr. Oscar A. Limpias

Vice President-Nuclear and CNO

Nebraska Public Power District

Cooper Nuclear Station

72676 648A Avenue

P.O. Box 98

Brownville, NE 68321

SUBJECT: COOPER NUCLEAR STATION - NOTIFICATION OF NRC INITIAL OPERATOR

LICENSING EXAMINATION 05000298/2017301

Dear Mr. Limpias:

In a telephone conversation on June 30, 2016, between Messrs. J. Florence, Simulator and

Training Support Superintendent, and B. Larson, Chief Examiner, arrangements were made for

the administration of licensing examinations at Cooper Nuclear Station, during the weeks of

March 6 and 13, 2017.

As agreed during the telephone conversation, your staff will prepare the examinations based on

the guidelines in NUREG-1021, Operator Licensing Examination Standards for Power

Reactors, Revision 10, and NUREG-1122, Knowledge and Abilities Catalog for Nuclear Power

Plant Operators, Revision 2, Supplement 1. The NRCs regional office will discuss with your

staff any changes that might be necessary before the examinations are administered.

To meet the above schedule, it will be necessary for your staff to furnish the examination

outlines by December 5, 2016. The written examinations, operating tests, and supporting

reference materials identified in Attachment 3 of ES-201 will be due by January 2, 2017.

Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations

(10 CFR 55.40(b)(3)), an authorized representative of the facility licensee shall approve the

outlines, examinations, and tests before they are submitted to the NRC for review and approval.

All materials shall be complete and ready to use. We request that any personal, proprietary,

sensitive unclassified, or Safeguards Information in your response be contained in a separate

enclosure and appropriately marked. Any delay in receiving the required examinations and

reference materials, or the submittal of inadequate or incomplete materials, may cause the

examinations to be rescheduled. In addition, your support for on-site validation of the

examinations is required during the week of January 30, 2017.

O. Limpias -2-

In order to conduct the requested written examinations and operating tests, it will be necessary

for your staff to provide adequate space and accommodations in accordance with ES-402, and

to make the simulation facility available on the dates noted above. In accordance with ES-302,

your staff should retain the original simulator performance data (e.g., system pressures,

temperatures, and levels) generated during the dynamic operating tests until the examination

results are final.

Appendix E to NUREG-1021 contains a number of NRC policies and guidelines that will be in

effect while the written examinations and operating tests are being administered.

To permit timely NRC review and evaluation, your staff should submit preliminary operator and

senior operator license applications (Office of Management and Budget (OMB) approval

number 3150-0090), medical certifications (OMB approval number 3150-0024), and waiver

requests (if any) (OMB approval number 3150-0090) at least 30 days before the first

examination date. If the applications are not received at least 30 days before the examination

date, a postponement may be necessary. Signed applications certifying that all training has

been completed should be submitted at least 14 days before the first examination date.

This letter contains information collections that are subject to the Paperwork Reduction Act of

1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under

approval number 3150-0018, which expires on June 30, 2019. The public reporting burden for

this collection of information is estimated to average 50 hours5.787037e-4 days <br />0.0139 hours <br />8.267196e-5 weeks <br />1.9025e-5 months <br /> per response, including the time

for reviewing instructions, gathering and maintaining the data needed, and completing and

reviewing the collection of information. Send comments regarding this burden estimate or any

other aspect of these information collections, including suggestions for reducing the burden, to

the Records and FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory

Commission, Washington, DC 20555-0001, or by Internet electronic mail to

INFOCOLLECTS@NRC.GOV.

The NRC may neither conduct nor sponsor, and a person is not required to respond to, an

information collection, unless it displays a currently valid OMB control number.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice and Procedure, a copy of

this letter will be available electronically for public inspection in the NRCs Public Document

Room or from the Publicly Available Records (PARS) component of the NRCs Agencywide

Documents Access and Management System (ADAMS). ADAMS is accessible from the

electronic Reading Room page of the NRCs public Web site at http://www.nrc.gov/reading-

rm/adams.html.

O. Limpias -3-

Thank you for your cooperation in this matter. Mr. Florence has been advised of the policies

and guidelines referenced in this letter. If you have any questions regarding the NRCs

examination procedures and guidelines, please contact Mr. Larson at 817-200-1172, or myself

at 817-200-1159.

Sincerely,

/RA/

Vincent G. Gaddy, Chief

Operations Branch

Division of Reactor Safety

Docket No. 50-298

License No. DPR-46

cc: Electronic Distribution

ML16294A126

SUNSI Review ADAMS Publicly Available Non-Sensitive Keyword:

By: BTL Yes No Non-Publicly Available Sensitive NRC-002

OFFICE SOE:OB C:OB

NAME BLarson VGaddy

SIGNATURE /RA/ /RA/

DATE 10/19/16 10/20/16

Letter to Oscar A. Limpias from Vincent G. Gaddy, dated October 20, 2016

SUBJECT: COOPER NUCLEAR STATION - NOTIFICATION OF NRC INITIAL OPERATOR

LICENSING EXAMINATION 05000298/2017301

Electronic distribution by RIV:

Regional Administrator (Kriss.Kennedy@nrc.gov)

Deputy Regional Administrator (Scott.Morris@nrc.gov)

DRP Director (Troy.Pruett@nrc.gov)

DRP Deputy Director (Ryan.Lantz@nrc.gov)

DRS Director (Anton.Vegel@nrc.gov)

DRS Deputy Director (Jeff.Clark@nrc.gov)

Senior Resident Inspector (Patricia.Voss@nrc.gov)

Resident Inspector (Christopher.Henderson@nrc.gov)

Branch Chief, DRP/C (Greg.Warnick@nrc.gov)

Senior Project Engineer (Cale.Young@nrc.gov)

Project Engineer (Michael.Stafford@nrc.gov)

Administrative Assistant (Amy.Elam@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Project Manager (Thomas.Wengert@nrc.gov)

Team Leader, DRS/IPAT (Thomas.Hipschman@nrc.gov)

Project Engineer, DRS/IPAT (Eduardo.Uribe@nrc.gov)

ACES (R4Enforcement.Resource@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

Regional Counsel (Karla.Fuller@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov)

Congressional Affairs Officer (Angel.Moreno@nrc.gov)

RIV/ETA: OEDO (Jeremy.Bowen@nrc.gov)

RIV RSLO (Bill.Maier@nrc.gov)