| {{#Wiki_filter:October 20, 2016 | | {{#Wiki_filter:UNITED STATES |
|
| | NUCLEAR REGULATORY COMMISSION |
| Mr. Oscar A. Limpias | | REGION IV |
| Vice President-Nuclear and CNO | | 1600 E. LAMAR BLVD |
| Nebraska Public Power District | | ARLINGTON, TX 76011-4511 |
| | October 20, 2016 |
| | Mr. Oscar A. Limpias |
| | Vice President-Nuclear and CNO |
| | Nebraska Public Power District |
| | Cooper Nuclear Station |
| | 72676 648A Avenue |
| | P.O. Box 98 |
| | Brownville, NE 68321 |
| | SUBJECT: COOPER NUCLEAR STATION - NOTIFICATION OF NRC INITIAL OPERATOR |
| | LICENSING EXAMINATION 05000298/2017301 |
| | Dear Mr. Limpias: |
| | In a telephone conversation on June 30, 2016, between Messrs. J. Florence, Simulator and |
| | Training Support Superintendent, and B. Larson, Chief Examiner, arrangements were made for |
| | the administration of licensing examinations at Cooper Nuclear Station, during the weeks of |
| | March 6 and 13, 2017. |
| | As agreed during the telephone conversation, your staff will prepare the examinations based on |
| | the guidelines in NUREG-1021, Operator Licensing Examination Standards for Power |
| | Reactors, Revision 10, and NUREG-1122, Knowledge and Abilities Catalog for Nuclear Power |
| | Plant Operators, Revision 2, Supplement 1. The NRCs regional office will discuss with your |
| | staff any changes that might be necessary before the examinations are administered. |
| | To meet the above schedule, it will be necessary for your staff to furnish the examination |
| | outlines by December 5, 2016. The written examinations, operating tests, and supporting |
| | reference materials identified in Attachment 3 of ES-201 will be due by January 2, 2017. |
| | Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations |
| | (10 CFR 55.40(b)(3)), an authorized representative of the facility licensee shall approve the |
| | outlines, examinations, and tests before they are submitted to the NRC for review and approval. |
| | All materials shall be complete and ready to use. We request that any personal, proprietary, |
| | sensitive unclassified, or Safeguards Information in your response be contained in a separate |
| | enclosure and appropriately marked. Any delay in receiving the required examinations and |
| | reference materials, or the submittal of inadequate or incomplete materials, may cause the |
| | examinations to be rescheduled. In addition, your support for on-site validation of the |
| | examinations is required during the week of January 30, 2017. |
|
| |
|
| Cooper Nuclear Station 72676 648A Avenue P.O. Box 98
| | O. Limpias -2- |
| | In order to conduct the requested written examinations and operating tests, it will be necessary |
| | for your staff to provide adequate space and accommodations in accordance with ES-402, and |
| | to make the simulation facility available on the dates noted above. In accordance with ES-302, |
| | your staff should retain the original simulator performance data (e.g., system pressures, |
| | temperatures, and levels) generated during the dynamic operating tests until the examination |
| | results are final. |
| | Appendix E to NUREG-1021 contains a number of NRC policies and guidelines that will be in |
| | effect while the written examinations and operating tests are being administered. |
| | To permit timely NRC review and evaluation, your staff should submit preliminary operator and |
| | senior operator license applications (Office of Management and Budget (OMB) approval |
| | number 3150-0090), medical certifications (OMB approval number 3150-0024), and waiver |
| | requests (if any) (OMB approval number 3150-0090) at least 30 days before the first |
| | examination date. If the applications are not received at least 30 days before the examination |
| | date, a postponement may be necessary. Signed applications certifying that all training has |
| | been completed should be submitted at least 14 days before the first examination date. |
| | This letter contains information collections that are subject to the Paperwork Reduction Act of |
| | 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under |
| | approval number 3150-0018, which expires on June 30, 2019. The public reporting burden for |
| | this collection of information is estimated to average 50 hours per response, including the time |
| | for reviewing instructions, gathering and maintaining the data needed, and completing and |
| | reviewing the collection of information. Send comments regarding this burden estimate or any |
| | other aspect of these information collections, including suggestions for reducing the burden, to |
| | the Records and FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory |
| | Commission, Washington, DC 20555-0001, or by Internet electronic mail to |
| | INFOCOLLECTS@NRC.GOV. |
| | The NRC may neither conduct nor sponsor, and a person is not required to respond to, an |
| | information collection, unless it displays a currently valid OMB control number. |
| | In accordance with 10 CFR 2.390 of the NRCs Rules of Practice and Procedure, a copy of |
| | this letter will be available electronically for public inspection in the NRCs Public Document |
| | Room or from the Publicly Available Records (PARS) component of the NRCs Agencywide |
| | Documents Access and Management System (ADAMS). ADAMS is accessible from the |
| | electronic Reading Room page of the NRCs public Web site at http://www.nrc.gov/reading- |
| | rm/adams.html. |
|
| |
|
| Brownville, NE 68321
| | O. Limpias -3- |
| | Thank you for your cooperation in this matter. Mr. Florence has been advised of the policies |
| | and guidelines referenced in this letter. If you have any questions regarding the NRCs |
| | examination procedures and guidelines, please contact Mr. Larson at 817-200-1172, or myself |
| | at 817-200-1159. |
| | Sincerely, |
| | /RA/ |
| | Vincent G. Gaddy, Chief |
| | Operations Branch |
| | Division of Reactor Safety |
| | Docket No. 50-298 |
| | License No. DPR-46 |
| | cc: Electronic Distribution |
|
| |
|
|
| |
| SUBJECT: COOPER NUCLEAR STATION - NOTIFICATION OF NRC INITIAL OPERATOR LICENSING EXAMINATION 05000298/2017301
| |
|
| |
| Dear Mr. Limpias:
| |
|
| |
|
| |
| In a telephone conversation on June 30, 2016, between Messrs. J. Florence, Simulator and
| |
| Training Support Superintendent, and B. Larson, Chief Examiner, arrangements were made for the administration of licensing examinations at Cooper Nuclear Station, during the weeks of March 6 and 13, 2017.
| |
|
| |
|
| |
| As agreed during the telephone conversation, your staff will prepare the examinations based on the guidelines in NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 10, and NUREG-1122, "Knowledge and Abilities Catalog for Nuclear Power
| |
| Plant Operators," Revision 2, Supplement 1.
| |
| The NRC's regional office will discuss with your staff any changes that might be necessary before the examinations are administered.
| |
|
| |
| To meet the above schedule, it will be necessary for your staff to furnish the examination outlines by December 5, 2016. The written examinations, operating tests, and supporting reference materials identified in Attachment 3 of ES-201 will be due by January 2, 2017.
| |
| Pursuant to Title 10, Section 55.40(b)(3), of the
| |
| Code of Federal Regulations
| |
| (10 CFR 55.40(b)(3)), an authorized representative of the facility licensee shall approve the
| |
| outlines, examinations, and tests before they are submitted to the NRC for review and approval. All materials shall be complete and ready to use. We request that any personal, proprietary, sensitive unclassified, or Safeguards Information in your response be contained in a separate enclosure and appropriately marked. Any delay in receiving the required examinations and reference materials, or the submittal of inadequate or incomplete materials, may cause the
| |
| examinations to be rescheduled. In addition, your support for on-site validation of the examinations is required during the week of January 30, 2017.
| |
| UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 1600 E. LAMAR BLVD ARLINGTON, TX 76011-4511
| |
| O. Limpias - 2 -
| |
|
| |
| In order to conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and to make the simulation facility available on the dates noted above. In accordance with ES-302,
| |
| your staff should retain the original simulator performance data (e.g., system pressures,
| |
| temperatures, and levels) generated during the dynamic operating tests until the examination results are final.
| |
|
| |
| Appendix E to NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered.
| |
|
| |
|
| |
| To permit timely NRC review and evaluation, your staff should submit preliminary operator and senior operator license applications (Office of Management and Budget (OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024), and waiver requests (if any) (OMB approval number 3150-0090) at least 30 days before the first examination date. If the applications are not
| |
| received at least 30 days before the examination date, a postponement may be necessary. Signed applications certifying that all training has
| |
| been completed should be submitted at least 14 days before the first examination date.
| |
| This letter contains information collections that are subject to the
| |
| Paperwork Reduction Act of
| |
| 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under approval number 3150-0018, which expires on June 30, 2019. The public reporting burden for
| |
| this collection of information is estimated to average 50 hours per response, including the time
| |
| for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of these information collections, including suggestions for reducing the burden, to
| |
| the Records and FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory
| |
| Commission, Washington, DC 20555-0001, or by Internet electronic mail to
| |
| INFOCOLLECTS@NRC.GOV. The NRC may neither conduct nor sponsor, and a person is not required to respond to, an
| |
| information collection, unless it displays a currently valid OMB control number.
| |
|
| |
|
| |
| In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice and Procedure," a copy of
| |
|
| |
| this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the electronic Reading Room page of the NRC's public Web site at http://www.nrc.gov/reading-rm/adams.html.
| |
| O. Limpias - 3 -
| |
|
| |
| Thank you for your cooperation in this matter. Mr. Florence has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. Larson at 817-200-1172, or myself
| |
|
| |
| at 817-200-1159.
| |
|
| |
|
| |
| Sincerely,
| |
|
| |
|
| |
| /RA/
| |
| Vincent G. Gaddy, Chief
| |
| Operations Branch Division of Reactor Safety
| |
|
| |
| Docket No. 50-298
| |
| License No. DPR-46
| |
|
| |
| cc: Electronic Distribution
| |
|
| |
| O. Limpias - 3 -
| |
|
| |
| Thank you for your cooperation in this matter. Mr. Florence has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. Larson at 817-200-1172, or
| |
|
| |
| myself at 817-200-1159.
| |
|
| |
|
| |
| Sincerely,
| |
|
| |
|
| |
| /RA/
| |
| Vincent G. Gaddy, Chief
| |
| Operations Branch Division of Reactor Safety
| |
|
| |
| Docket No. 50-298
| |
| License No. DPR-46
| |
|
| |
| cc: Electronic Distribution
| |
|
| |
|
| |
|
| |
|
| |
|
| |
|
| |
|
| |
|
| |
|
| |
|
| |
|
| |
|
| |
|
| |
| Distribution:
| |
| See next page
| |
|
| |
| ADAMS ACCESSION NUMB
| |
| ER: ML16294A126 SUNSI Review By: BTL ADAMS Yes No Publicly Available Non-Publicly Available Non-Sensitive Sensitive Keyword: NRC-002 OFFICE SOE:OB C:OB NAME BLarson VGaddy SIGNATURE /RA/ /RA/ DATE 10/19/16 10/20/16 OFFICIAL RECORD COPY
| |
|
| |
| Letter to Oscar A. Limpias from Vincent G. Gaddy, dated October 20, 2016
| |
|
| |
| SUBJECT: COOPER NUCLEAR STATION - NOTIFICATION OF NRC INITIAL OPERATOR LICENSING EXAMINATION 05000298/2017301
| |
|
| |
| Electronic distribution by RIV: Regional Administrator (Kriss.Kennedy@nrc.gov)
| |
| Deputy Regional Administrator (Scott.Morris@nrc.gov) DRP Director (Troy.Pruett@nrc.gov) DRP Deputy Director (Ryan.Lantz@nrc.gov)
| |
| DRS Director (Anton.Vegel@nrc.gov)
| |
| DRS Deputy Director (Jeff.Clark@nrc.gov)
| |
| Senior Resident Inspector (Patricia.Voss@nrc.gov)
| |
| Resident Inspector (Christopher.Henderson@nrc.gov)
| |
| Branch Chief, DRP/C (Greg.Warnick@nrc.gov)
| |
| Senior Project Engineer (Cale.Young@nrc.gov)
| |
|
| |
| Project Engineer (Michael.Stafford@nrc.gov)
| |
| Administrative Assistant (Amy.Elam@nrc.gov) Public Affairs Officer (Victor.Dricks@nrc.gov) Project Manager (Thomas.Wengert@nrc.gov)
| |
|
| |
| Team Leader, DRS/IPAT (Thomas.Hipschman@nrc.gov)
| |
| Project Engineer, DRS/IPAT (Eduardo.Uribe@nrc.gov)
| |
|
| |
| ACES (R4Enforcement.Resource@nrc.gov)
| |
| RITS Coordinator (Marisa.Herrera@nrc.gov) Regional Counsel (Karla.Fuller@nrc.gov) Congressional Affairs Officer (Jenny.Weil@nrc.gov)
| |
| Congressional Affairs O
| |
| fficer (Angel.Moreno@nrc.gov) RIV/ETA: OEDO (Jeremy.Bowen@nrc.gov)
| |
|
| |
|
| | ML16294A126 |
| | SUNSI Review ADAMS Publicly Available Non-Sensitive Keyword: |
| | By: BTL Yes No Non-Publicly Available Sensitive NRC-002 |
| | OFFICE SOE:OB C:OB |
| | NAME BLarson VGaddy |
| | SIGNATURE /RA/ /RA/ |
| | DATE 10/19/16 10/20/16 |
| | |
| | Letter to Oscar A. Limpias from Vincent G. Gaddy, dated October 20, 2016 |
| | SUBJECT: COOPER NUCLEAR STATION - NOTIFICATION OF NRC INITIAL OPERATOR |
| | LICENSING EXAMINATION 05000298/2017301 |
| | Electronic distribution by RIV: |
| | Regional Administrator (Kriss.Kennedy@nrc.gov) |
| | Deputy Regional Administrator (Scott.Morris@nrc.gov) |
| | DRP Director (Troy.Pruett@nrc.gov) |
| | DRP Deputy Director (Ryan.Lantz@nrc.gov) |
| | DRS Director (Anton.Vegel@nrc.gov) |
| | DRS Deputy Director (Jeff.Clark@nrc.gov) |
| | Senior Resident Inspector (Patricia.Voss@nrc.gov) |
| | Resident Inspector (Christopher.Henderson@nrc.gov) |
| | Branch Chief, DRP/C (Greg.Warnick@nrc.gov) |
| | Senior Project Engineer (Cale.Young@nrc.gov) |
| | Project Engineer (Michael.Stafford@nrc.gov) |
| | Administrative Assistant (Amy.Elam@nrc.gov) |
| | Public Affairs Officer (Victor.Dricks@nrc.gov) |
| | Project Manager (Thomas.Wengert@nrc.gov) |
| | Team Leader, DRS/IPAT (Thomas.Hipschman@nrc.gov) |
| | Project Engineer, DRS/IPAT (Eduardo.Uribe@nrc.gov) |
| | ACES (R4Enforcement.Resource@nrc.gov) |
| | RITS Coordinator (Marisa.Herrera@nrc.gov) |
| | Regional Counsel (Karla.Fuller@nrc.gov) |
| | Congressional Affairs Officer (Jenny.Weil@nrc.gov) |
| | Congressional Affairs Officer (Angel.Moreno@nrc.gov) |
| | RIV/ETA: OEDO (Jeremy.Bowen@nrc.gov) |
| RIV RSLO (Bill.Maier@nrc.gov) | | RIV RSLO (Bill.Maier@nrc.gov) |
| }} | | }} |
|
---|
Category:Letter
MONTHYEARML24227A0822024-09-0303 September 2024 Summary of Regulatory Audit in Support of License Amendment Request to Modify the High Pressure Coolant Injection Low Flow Value IR 05000298/20240052024-08-22022 August 2024 Updated Inspection Plan for Cooper Nuclear Station (Report 05000298/2024005) IR 05000298/20240022024-07-25025 July 2024 Integrated Inspection Report 05000298/2024002 ML24183A1722024-07-17017 July 2024 Issuance of Amendment No. 277 to Adopt TSTF-374, Revision to TS 5.5.13 and Associated TS Bases for Diesel Fuel Oil ML24197A1462024-07-15015 July 2024 NRC Region IV Ltr to Cooper Nuclear Station Re FEMA Level 1 Finding IR 05000298/20243012024-07-12012 July 2024 NRC Examination Report 05000298/2024301 ML24134A1782024-07-0303 July 2024 Issuance of Amendment No. 276 Revision to Technical Specification 3.8.3, Diesel Fuel Oil, Lube Oil and Starting Air, to Allow for Cleaning, Inspection and Any Needed Repairs During Refuel Outage 33 ML24197A0682024-06-24024 June 2024 FEMA Ltr to Missouri State Emergency Management Agency - Level 1 Finding, 24 June 2024 ML24192A0112024-06-13013 June 2024 2024-06-Post Exam Comments IR 05000298/20244012024-06-0404 June 2024 Security Baseline Inspection Report 05000298/2024401 ML24151A1082024-05-30030 May 2024 NRC Initial Operator Licensing Examination Approval 05000298/2024301 ML24137A0942024-05-17017 May 2024 Regulatory Audit Plan in Support of License Amendment Request to Modify Allowable Value Regarding Technical Specification for High Pressure Coolant Injection Pump Discharge Low Flow IR 05000298/20240012024-05-0303 May 2024 Integrated Inspection Report 05000298/2024001 ML24129A0952024-04-25025 April 2024 Preparation and Scheduling of Operator Licensing Examinations IR 05000298/20240102024-04-24024 April 2024 Comprehensive Engineering Team Inspection Report 05000298/2024010 ML24096A1202024-04-0505 April 2024 Issuance of Amendment No. 275 Revision to Technical Specification 3.3.1.1 (Emergency Circumstances) ML24093A2282024-04-0202 April 2024 Notice of Enforcement Discretion for Cooper Nuclear Station IR 05000298/20240902024-04-0101 April 2024 – Notice of Violation, NRC Inspection Report 05000298/2024090 IR 05000298/20230062024-02-28028 February 2024 Annual Assessment Letter for Cooper Nuclear Station - Report 05000298/2023006 IR 05000298/20230042024-02-12012 February 2024 Integrated Inspection Report 05000298/2023004 ML24033A3092024-02-12012 February 2024 Summary of Regulatory Audit Regarding the Relief Request RC3-02 Regarding Drywell Head Bolting IR 05000298/20230122024-02-12012 February 2024 NRC Inspection Report 05000298/2023012 ML23334A2012024-01-0303 January 2024 Issuance of Amendment No. 274 Revision to Technical Specifications to Adopt TSTF-551, Revision 3, Revise Secondary Containment Surveillance Requirements ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV ML23311A1122023-11-0909 November 2023 Project Manager Assignment IR 05000298/20230032023-11-0202 November 2023 Integrated Inspection Report 05000298/2023003 IR 05000298/20234012023-11-0101 November 2023 Cyber Security Report 05000298/2023401 Public ML23264A8052023-10-11011 October 2023 Issuance of Amendment No. 273 Revision to Technical Specifications to Adopt TSTF-580, Revision 1, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling ML23233A1882023-09-0505 September 2023 Regulatory Audit Plan in Support of Relief Request RC3-02 Regarding Drywell Head Bolting IR 05000298/20230052023-08-21021 August 2023 Updated Inspection Plan for Cooper Nuclear Station (Report 05000298/2023005)- Mid Cycle Letter IR 05000298/20230022023-08-0808 August 2023 Integrated Inspection Report 05000298/2023002 IR 05000298/20234022023-08-0303 August 2023 NRC Security Inspection Report 05000298/2023402 ML23214A2742023-08-0303 August 2023 Nuclear Station - Notification of Inspection (NRC Inspection Report 05000298/2023004) and Request for Information IR 05000298/20234202023-08-0101 August 2023 Security Baseline Inspection Report 05000298/2023420 ML23173A0862023-06-26026 June 2023 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000298/2023401 IR 05000298/20230102023-05-17017 May 2023 Biennial Problem Identification and Resolution Inspection Report 05000298/2023010 IR 05000298/20234032023-05-0404 May 2023 Security Baseline Inspection Report 05000298/2023403 ML23129A2822023-04-20020 April 2023 Submittal of Revision 31 to Updated Safety Analysis Report ML23102A0282023-04-19019 April 2023 U.S. Nuclear Regulatory Commission Presentation at the May 8, 2023, Brownville Village Meeting IR 05000298/20230012023-04-17017 April 2023 Integrated Inspection Report 05000298/2023001 ML23060A1582023-03-0808 March 2023 Design Basis Assurance Inspection (Programs) Inspection Report 05000298/2023001 IR 05000298/20220062023-03-0101 March 2023 Annual Assessment Letter for Cooper Nuclear Station Report 05000298/2022006 ML23041A1622023-02-10010 February 2023 Licensed Operator Positive Fitness-for-Duty Test Request for Additional Information IR 05000298/20220042023-01-30030 January 2023 Integrated Inspection Report 05000298/2022004 IR 05000298/20220112022-12-23023 December 2022 License Renewal Phase 4 Inspection Report 05000298/2022011 ML22286A2072022-11-30030 November 2022 Issuance of Amendment No. 272 Revision to Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements IR 05000298/20220032022-10-27027 October 2022 Integrated Inspection Report 05000298/2022003 ML22304A0052022-10-26026 October 2022 Surveillance Capsule Location (Re-insertion Into the Reactor Vessel) IR 05000298/20223022022-10-20020 October 2022 NRC Initial Operator Licensing Examination Approval 05000298/2022302 ML22276A1562022-10-0505 October 2022 Notification of Commercial Grade Dedication Inspection 05000298/2023011 and Request for Information 2024-09-03
[Table view] Category:License-Operator
MONTHYEARIR 05000298/20243012024-07-12012 July 2024 NRC Examination Report 05000298/2024301 ML24192A0112024-06-13013 June 2024 2024-06-Post Exam Comments ML24197A0752024-06-12012 June 2024 2024-06-Public Forms ML24151A1082024-05-30030 May 2024 NRC Initial Operator Licensing Examination Approval 05000298/2024301 ML24129A0952024-04-25025 April 2024 Preparation and Scheduling of Operator Licensing Examinations NLS2024033, Preparation and Scheduling of Operator Licensing Examinations2024-04-25025 April 2024 Preparation and Scheduling of Operator Licensing Examinations NLS2022054, Preparation and Scheduling of Operator Licensing Examinations2023-01-0505 January 2023 Preparation and Scheduling of Operator Licensing Examinations NLS2022053, CNS-2022-11 Post Exam Submittal2022-11-22022 November 2022 CNS-2022-11 Post Exam Submittal ML23018A0192022-11-22022 November 2022 CNS-2022-11 Public Forms NLS2022028, 10 CNS-2022-06 Post Exam Comments2022-07-0505 July 2022 10_CNS-2022-06 Post Exam Comments ML22228A2602022-06-21021 June 2022 11_CNS-2022-06 Public Documents ML22228A2572022-05-12012 May 2022 11 CNS-2022-06 Public Documents ML21230A3522021-06-30030 June 2021 CN-2021-06-DRAFT Outline Comments Rev 0 ML21230A3472021-06-25025 June 2021 Initial Licensing Retake Examination Material Cover Letter ML21230A3252021-06-25025 June 2021 CN-2021-06 Public Forms ML21208A4192021-06-25025 June 2021 CN-2021-06 Post Exam Analysis ML21230A3512021-06-25025 June 2021 CN-2021-06-DRAFT Op Test Comments kdc-rev1-final ML21208A4212021-06-25025 June 2021 CN-2021-06 Final Op Test ML21230A3492021-06-25025 June 2021 CN-2021-06 Draft Written Exam ML21208A4222021-06-25025 June 2021 CN-2021-06 Final Written Exam ML21230A3502021-06-25025 June 2021 CN-2021-06 Final Outlines ML21230A3462021-06-25025 June 2021 CN 2021-06 Draft Written Comments kdc-rev1 Final ML21055A1822021-02-24024 February 2021 CNS2021301-Corp Notification LTR of NRC Retake Initial Operator Licensing Examination 05000298/2021301 kdc1 NLS2021019, CN-2021-06 Draft Outlines2021-02-22022 February 2021 CN-2021-06 Draft Outlines ML20288A2042020-10-12012 October 2020 CN-2020-09-Post Exam Comments ML20324A0442020-09-29029 September 2020 CN-2020-09-Public Forms, Exam Assignment Tickler ML20324A0382020-09-29029 September 2020 CN-2020-09-DRAFT Outline Comments ML20324A0422020-09-29029 September 2020 CN-2020-09-FINAL Outlines ML20324A0402020-09-29029 September 2020 CN-2020-09-DRAFT Written Exam Comments ML20324A0392020-09-29029 September 2020 CN-2020-09-DRAFT Outlines ML20324A0372020-09-29029 September 2020 CN-2020-09-DRAFT Op Test ML20288A1982020-09-29029 September 2020 CN-2020-09-FINAL Written Exam ML20288A1962020-09-29029 September 2020 CN-2020-09-FINAL Op Test ML20324A0412020-09-29029 September 2020 CN-2020-09-DRAFT Written Exam ML20324A0362020-09-29029 September 2020 CN-2020-09-DRAFT Op Test Comments ML20241A2412020-08-0404 August 2020 1-CN-2020-04-Draft Outlines 1-2-3 ML20241A2442020-08-0404 August 2020 4-CN-2020-04 Written Exam Comments ML20241A2452020-08-0404 August 2020 5-CN-2020-04-Draft Operating Test 1-2-3 ML20241A2422020-08-0404 August 2020 2-CN-2020-04 Draft Outline Comments 1-2-3, Written Exam Outline ML20241A2432020-08-0404 August 2020 3-CN-2020-04-Draft Written Exam ML20241A2462020-08-0404 August 2020 6-CN-2020-04 Operating Test Comments Final 1-2-3 ML20241A2472020-08-0404 August 2020 7-CN-2020-04 Final Outlines ML20241A2482020-08-0404 August 2020 8-CN-2020-04 Final Written Exam ML20241A2492020-08-0404 August 2020 9-CN-2020-04 Final Operating Test, Cooper Nuclear Station, Administrative Topics Outline ML20252A1102020-08-0404 August 2020 11-Public Forms ML20241A2502020-08-0404 August 2020 CN-2020-04 Post Exam Comments NLS2020013, Preparation and Scheduling of Operator Licensing Examinations2020-03-12012 March 2020 Preparation and Scheduling of Operator Licensing Examinations ML19011A3712019-01-10010 January 2019 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2019 NLS2018019, Preparation and Scheduling of Operator Licensing Examinations2018-04-0404 April 2018 Preparation and Scheduling of Operator Licensing Examinations ML18009A9852018-01-0808 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 2024-07-12
[Table view] Category:Part 55 Examination Related Material
MONTHYEARIR 05000298/20243012024-07-12012 July 2024 NRC Examination Report 05000298/2024301 ML24192A0112024-06-13013 June 2024 2024-06-Post Exam Comments ML24197A0752024-06-12012 June 2024 2024-06-Public Forms ML24151A1082024-05-30030 May 2024 NRC Initial Operator Licensing Examination Approval 05000298/2024301 ML24129A0952024-04-25025 April 2024 Preparation and Scheduling of Operator Licensing Examinations NLS2024033, Preparation and Scheduling of Operator Licensing Examinations2024-04-25025 April 2024 Preparation and Scheduling of Operator Licensing Examinations NLS2022054, Preparation and Scheduling of Operator Licensing Examinations2023-01-0505 January 2023 Preparation and Scheduling of Operator Licensing Examinations ML23018A0192022-11-22022 November 2022 CNS-2022-11 Public Forms NLS2022053, CNS-2022-11 Post Exam Submittal2022-11-22022 November 2022 CNS-2022-11 Post Exam Submittal NLS2022028, 10 CNS-2022-06 Post Exam Comments2022-07-0505 July 2022 10_CNS-2022-06 Post Exam Comments ML22228A2602022-06-21021 June 2022 11_CNS-2022-06 Public Documents ML22228A2572022-05-12012 May 2022 11 CNS-2022-06 Public Documents ML21230A3522021-06-30030 June 2021 CN-2021-06-DRAFT Outline Comments Rev 0 ML21230A3472021-06-25025 June 2021 Initial Licensing Retake Examination Material Cover Letter ML21230A3462021-06-25025 June 2021 CN 2021-06 Draft Written Comments kdc-rev1 Final ML21208A4192021-06-25025 June 2021 CN-2021-06 Post Exam Analysis ML21230A3492021-06-25025 June 2021 CN-2021-06 Draft Written Exam ML21230A3252021-06-25025 June 2021 CN-2021-06 Public Forms ML21208A4212021-06-25025 June 2021 CN-2021-06 Final Op Test ML21208A4222021-06-25025 June 2021 CN-2021-06 Final Written Exam ML21230A3502021-06-25025 June 2021 CN-2021-06 Final Outlines ML21230A3512021-06-25025 June 2021 CN-2021-06-DRAFT Op Test Comments kdc-rev1-final ML21055A1822021-02-24024 February 2021 CNS2021301-Corp Notification LTR of NRC Retake Initial Operator Licensing Examination 05000298/2021301 kdc1 NLS2021019, CN-2021-06 Draft Outlines2021-02-22022 February 2021 CN-2021-06 Draft Outlines ML20288A2042020-10-12012 October 2020 CN-2020-09-Post Exam Comments ML20324A0422020-09-29029 September 2020 CN-2020-09-FINAL Outlines ML20324A0442020-09-29029 September 2020 CN-2020-09-Public Forms, Exam Assignment Tickler ML20324A0362020-09-29029 September 2020 CN-2020-09-DRAFT Op Test Comments ML20324A0412020-09-29029 September 2020 CN-2020-09-DRAFT Written Exam ML20324A0402020-09-29029 September 2020 CN-2020-09-DRAFT Written Exam Comments ML20324A0372020-09-29029 September 2020 CN-2020-09-DRAFT Op Test ML20324A0392020-09-29029 September 2020 CN-2020-09-DRAFT Outlines ML20324A0382020-09-29029 September 2020 CN-2020-09-DRAFT Outline Comments ML20288A1962020-09-29029 September 2020 CN-2020-09-FINAL Op Test ML20288A1982020-09-29029 September 2020 CN-2020-09-FINAL Written Exam ML20241A2502020-08-0404 August 2020 CN-2020-04 Post Exam Comments ML20241A2412020-08-0404 August 2020 1-CN-2020-04-Draft Outlines 1-2-3 ML20241A2422020-08-0404 August 2020 2-CN-2020-04 Draft Outline Comments 1-2-3, Written Exam Outline ML20252A1102020-08-0404 August 2020 11-Public Forms ML20241A2432020-08-0404 August 2020 3-CN-2020-04-Draft Written Exam ML20241A2442020-08-0404 August 2020 4-CN-2020-04 Written Exam Comments ML20241A2482020-08-0404 August 2020 8-CN-2020-04 Final Written Exam ML20241A2462020-08-0404 August 2020 6-CN-2020-04 Operating Test Comments Final 1-2-3 ML20241A2472020-08-0404 August 2020 7-CN-2020-04 Final Outlines ML20241A2492020-08-0404 August 2020 9-CN-2020-04 Final Operating Test, Cooper Nuclear Station, Administrative Topics Outline ML20241A2452020-08-0404 August 2020 5-CN-2020-04-Draft Operating Test 1-2-3 NLS2020013, Preparation and Scheduling of Operator Licensing Examinations2020-03-12012 March 2020 Preparation and Scheduling of Operator Licensing Examinations NLS2018019, Preparation and Scheduling of Operator Licensing Examinations2018-04-0404 April 2018 Preparation and Scheduling of Operator Licensing Examinations ML18009A9852018-01-0808 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 NLS2017037, 2017-03 Post Exam Comments & Analysis2017-03-24024 March 2017 2017-03 Post Exam Comments & Analysis 2024-07-12
[Table view] |
See also: IR 05000298/2017301
Text
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION IV
1600 E. LAMAR BLVD
ARLINGTON, TX 76011-4511
October 20, 2016
Mr. Oscar A. Limpias
Vice President-Nuclear and CNO
Nebraska Public Power District
Cooper Nuclear Station
72676 648A Avenue
P.O. Box 98
Brownville, NE 68321
SUBJECT: COOPER NUCLEAR STATION - NOTIFICATION OF NRC INITIAL OPERATOR
LICENSING EXAMINATION 05000298/2017301
Dear Mr. Limpias:
In a telephone conversation on June 30, 2016, between Messrs. J. Florence, Simulator and
Training Support Superintendent, and B. Larson, Chief Examiner, arrangements were made for
the administration of licensing examinations at Cooper Nuclear Station, during the weeks of
March 6 and 13, 2017.
As agreed during the telephone conversation, your staff will prepare the examinations based on
the guidelines in NUREG-1021, Operator Licensing Examination Standards for Power
Reactors, Revision 10, and NUREG-1122, Knowledge and Abilities Catalog for Nuclear Power
Plant Operators, Revision 2, Supplement 1. The NRCs regional office will discuss with your
staff any changes that might be necessary before the examinations are administered.
To meet the above schedule, it will be necessary for your staff to furnish the examination
outlines by December 5, 2016. The written examinations, operating tests, and supporting
reference materials identified in Attachment 3 of ES-201 will be due by January 2, 2017.
Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations
(10 CFR 55.40(b)(3)), an authorized representative of the facility licensee shall approve the
outlines, examinations, and tests before they are submitted to the NRC for review and approval.
All materials shall be complete and ready to use. We request that any personal, proprietary,
sensitive unclassified, or Safeguards Information in your response be contained in a separate
enclosure and appropriately marked. Any delay in receiving the required examinations and
reference materials, or the submittal of inadequate or incomplete materials, may cause the
examinations to be rescheduled. In addition, your support for on-site validation of the
examinations is required during the week of January 30, 2017.
O. Limpias -2-
In order to conduct the requested written examinations and operating tests, it will be necessary
for your staff to provide adequate space and accommodations in accordance with ES-402, and
to make the simulation facility available on the dates noted above. In accordance with ES-302,
your staff should retain the original simulator performance data (e.g., system pressures,
temperatures, and levels) generated during the dynamic operating tests until the examination
results are final.
Appendix E to NUREG-1021 contains a number of NRC policies and guidelines that will be in
effect while the written examinations and operating tests are being administered.
To permit timely NRC review and evaluation, your staff should submit preliminary operator and
senior operator license applications (Office of Management and Budget (OMB) approval
number 3150-0090), medical certifications (OMB approval number 3150-0024), and waiver
requests (if any) (OMB approval number 3150-0090) at least 30 days before the first
examination date. If the applications are not received at least 30 days before the examination
date, a postponement may be necessary. Signed applications certifying that all training has
been completed should be submitted at least 14 days before the first examination date.
This letter contains information collections that are subject to the Paperwork Reduction Act of
1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under
approval number 3150-0018, which expires on June 30, 2019. The public reporting burden for
this collection of information is estimated to average 50 hours5.787037e-4 days <br />0.0139 hours <br />8.267196e-5 weeks <br />1.9025e-5 months <br /> per response, including the time
for reviewing instructions, gathering and maintaining the data needed, and completing and
reviewing the collection of information. Send comments regarding this burden estimate or any
other aspect of these information collections, including suggestions for reducing the burden, to
the Records and FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory
Commission, Washington, DC 20555-0001, or by Internet electronic mail to
INFOCOLLECTS@NRC.GOV.
The NRC may neither conduct nor sponsor, and a person is not required to respond to, an
information collection, unless it displays a currently valid OMB control number.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice and Procedure, a copy of
this letter will be available electronically for public inspection in the NRCs Public Document
Room or from the Publicly Available Records (PARS) component of the NRCs Agencywide
Documents Access and Management System (ADAMS). ADAMS is accessible from the
electronic Reading Room page of the NRCs public Web site at http://www.nrc.gov/reading-
rm/adams.html.
O. Limpias -3-
Thank you for your cooperation in this matter. Mr. Florence has been advised of the policies
and guidelines referenced in this letter. If you have any questions regarding the NRCs
examination procedures and guidelines, please contact Mr. Larson at 817-200-1172, or myself
at 817-200-1159.
Sincerely,
/RA/
Vincent G. Gaddy, Chief
Operations Branch
Division of Reactor Safety
Docket No. 50-298
License No. DPR-46
cc: Electronic Distribution
ML16294A126
SUNSI Review ADAMS Publicly Available Non-Sensitive Keyword:
By: BTL Yes No Non-Publicly Available Sensitive NRC-002
OFFICE SOE:OB C:OB
NAME BLarson VGaddy
SIGNATURE /RA/ /RA/
DATE 10/19/16 10/20/16
Letter to Oscar A. Limpias from Vincent G. Gaddy, dated October 20, 2016
SUBJECT: COOPER NUCLEAR STATION - NOTIFICATION OF NRC INITIAL OPERATOR
LICENSING EXAMINATION 05000298/2017301
Electronic distribution by RIV:
Regional Administrator (Kriss.Kennedy@nrc.gov)
Deputy Regional Administrator (Scott.Morris@nrc.gov)
DRP Director (Troy.Pruett@nrc.gov)
DRP Deputy Director (Ryan.Lantz@nrc.gov)
DRS Director (Anton.Vegel@nrc.gov)
DRS Deputy Director (Jeff.Clark@nrc.gov)
Senior Resident Inspector (Patricia.Voss@nrc.gov)
Resident Inspector (Christopher.Henderson@nrc.gov)
Branch Chief, DRP/C (Greg.Warnick@nrc.gov)
Senior Project Engineer (Cale.Young@nrc.gov)
Project Engineer (Michael.Stafford@nrc.gov)
Administrative Assistant (Amy.Elam@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov)
Project Manager (Thomas.Wengert@nrc.gov)
Team Leader, DRS/IPAT (Thomas.Hipschman@nrc.gov)
Project Engineer, DRS/IPAT (Eduardo.Uribe@nrc.gov)
ACES (R4Enforcement.Resource@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
Congressional Affairs Officer (Angel.Moreno@nrc.gov)
RIV/ETA: OEDO (Jeremy.Bowen@nrc.gov)
RIV RSLO (Bill.Maier@nrc.gov)