{{#Wiki_filter:U.S.NUCLEAR REGULATORY COMMISSION NT REPORT~(OAR 1339){PLEASE PRINT OR TYPE ALL REQUIRED INFORMATION)
{{#Wiki_filter:NRC FORM 366 I7-77) r CONTROL BLOCK:
NRC FORM 366 I7-77)r f 79-019/CENSEE EVE CONTROL BLOCK: Qi 1 6 N Y R B G 1Q20 0-0 0 0 0 0-0 0 Q34 1 1 1 1 QE~QE 9 LICENSEE CODE 14 15 LICENSE NUMBER 25 26 LICENSE TYPE 30 57 CAT 58[oat 7 8 CON'T~8 7 8 REDRT~LQB 0 5 0 0 0 2 4 4 7 0 9 1 9 7 9 B 1 0 1 9 7 9 QB 60 61 DOCKET NUMBER 68 69 EVENT DATE 74 75 REPORT DATE 80 EVENT DESCRIPTION AND PROBABLE CONSEQUENCES
1 f
+10 During inspections required by IE Burietin 79-14, loose nuts on anchor bolts were~o3 found on pipe supports SW-1 4 1,-1 42,-1 43,-.1 45, and-1 46, on service water piping~o4 to the"D" standby auxiliary feedwater pump.Although the pump was declared'I~os inoperable (T~S~3~4~2.d)all three auxiliary feedwater pumps and the alternate~OB standby auxiliary f eedwater pump were operable.7~O7~OS 80 7 8 9~OB 7 8 SYSTEM CAUSE CAUSE COMP.VALVE CODE CODE SUBCODE COMPONENT CODE SUBCODE SUBCODE~OH Q77.~B Q72~O Q73 9 U P 0 R T Q74~B Q78~Z QE 9 10 11 12 13 18 19 20 SEQUENTIAL OCCURRENCE REPORT REVISION LERIRO EVENT YEAR REPORT NO.CODE TYPE NO, Q17 REPoRT~79~~01 9+r~03~L++0 21 22 23 24 26 27 28 29 30 31 ACTION FUTURE EFFECT SHUTDOWN ATTACHMENT NPRDQ PRIME COMP.COMPONENT TAKEN ACTION ON PLANT METHOD HOURS l@2 SUBMITTED FORM SUB.SUPPLIER MANUFACTURER Q18~Z Q18~ZQ20~Z Q27 0 0 0 0~N Q23~N Q24~A Q28 G 1 9 0 Q28 33 34 35 36 37 40 41 42 43 44 47 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS Q27 o Construction requirements at the time of installation (1975-1977) did not detail anchor bolt torqueing requirements.
                                                                            -
Nuts worked loose during system operation.
6 Qi 79-019/
Nuts were torqued to current requirements, and pump was then declared operable.These anchor 3 bolts will continue to be inspected in accordance with the station IS I program.4 7 8 9 FACILITY STATUS%POWER OTHER STATUS Q E 1 0 0 NA 44 METHOD OF DISCOVERY GR~Q28~CQ31 7 8 9 10 12 13 44 45 46 ACTIVITY CONTENT RELEASED OF RELEASE AMOUNT OF ACTIVITY 6~Z Q33~ZQ34 NA 7 8 9 10 11 45 PERSONNEL EXPOSURES NUMBER TYPE DESCRIPTION Q39 7~000 0 0 0Q3 7 Z Q3 8 NA 7 8 9 11 12 13 PERSONNEL INJURIES NUMBER DESCRIPTIONQ41 8~00 OQR NA DISCOVERY DESCRIPTION Q32 IE Bulletin 79-14 LOCATION OF RELEASE 80 80 80 80 7 8 7 8 o 7 8 9 11 12 LOSS OF OR DAMAGE TO FACILITY 43 TYPE DESCRIPTION Z Q4, NA 9 IO PUBLICITY ISSUED DESCRIPTION
CENSEE EVE NT REPORT U. S. NUCLEAR REGULATORY COMMISSION
~~NQ44 NA 9 10 80 80 79102203~NRC USE ONLY Tohn T.St Martin NAME OF PREPARER 7 68 69 80 ER PHDNE.7 1 6/546-2700, ext~29 1-253}}
                                                                                                                                                ~
{PLEASE PRINT OR TYPE ALL REQUIRED INFORMATION)
                                                                                                                -
(OAR 1339)
[oat            N Y         R     B     G     1Q20                 0         0     0   0   0       0         0   0 25 Q34           1     1     1     1   QE~QE 7        8    9       LICENSEE CODE             14       15                     LICENSE NUMBER                                 26       LICENSE TYPE       30   57 CAT 58 CON'T REDRT                      0                              2    4    4                                                            0          9          9
    ~8                             ~LQB                   5     0     0   0                       7     0   9     1     9     7     9     B     1           1         7         QB 7        8                      60           61               DOCKET NUMBER                 68     69       EVENT DATE               74       75       REPORT DATE           80 EVENT DESCRIPTION AND PROBABLE CONSEQUENCES +10 During inspections required by IE Burietin 79-14, loose nuts on anchor bolts were
    ~o3               found on pipe supports SW- 1 4 1,                                   - 1 42,   -1 43,     -. 1 45,     and     1 46,       on service water piping
    ~o4             to the "D" standby auxiliary feedwater pump. Although the pump was declared
'I
    ~os               inoperable             (T ~ S   ~   3 ~ 4 ~ 2 . d)   all three auxiliary feedwater                             pumps and the alternate
    ~OB             standby auxiliary feedwater pump were operable                                                 .
7
    ~O7
    ~OS 7         8 9                                                                                                                                                                           80 SYSTEM                 CAUSE         CAUSE                                                           COMP.           VALVE CODE                 CODE       SUBCODE                   COMPONENT CODE                     SUBCODE           SUBCODE
    ~OB                              ~OH             Q77.       ~B     Q72   ~O     Q73       9     U     P   0     R   T     Q74       ~B     Q78     ~Z     QE 7        8                      9           10             11             12             13                               18           19               20 SEQUENTIAL                           OCCURRENCE               REPORT                       REVISION Q17 LERIRO REPoRT ACTION FUTURE EVENT YEAR
                                      ~79 21        22 EFFECT
                                                                ~
23 SHUTDOWN
                                                                              ~01 24 REPORT NO.
9 26
                                                                                                        +r 27
                                                                                                                        ~03 28 ATTACHMENT CODE 29 NPRDQ TYPE
                                                                                                                                                ~L 30 PRIME COMP.
                                                                                                                                                                +31
                                                                                                                                                                              +0 NO, COMPONENT TAKEN ACTION                 ON PLANT               METHOD                   HOURS l@2         SUBMITTED           FORM SUB.         SUPPLIER           MANUFACTURER Q18 ~Z     Q18         ~ZQ20                 ~Z   Q27           0   0   0     0       ~N     Q23       ~N     Q24       ~A     Q28       G     1   9 0   Q28 33         34                 35                   36             37                   40     41                 42                 43             44               47 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS Q27 o         Construction requirements at the time of installation (1975-1977) did not detail anchor bolt torqueing requirements.                                 Nuts worked loose during system operation.                                             Nuts were torqued to current requirements, and pump was then declared operable.                                                                             These anchor 3         bolts     will continue                 to be inspected in accordance with the station IS I program                                                     .
4 7       8     9                                                                                                                                                                       80 FACILITY Q        METHOD OF 7        8 STATUS 9
E  GR      ~Q28 10 1
                                    % POWER 0      0 12        13 OTHER STATUS NA 44 DISCOVERY
                                                                                                    ~CQ31 45         46 IE  Bulletin 79-14 DISCOVERY DESCRIPTION Q32 80 ACTIVITY CONTENT RELEASED OF RELEASE                           AMOUNT OF ACTIVITY                                                           LOCATION OF RELEASE 6       ~Z     Q33   ~ZQ34                             NA 7       8   9             10           11                                             44            45                                                                             80 PERSONNEL EXPOSURES NUMBER             TYPE         DESCRIPTION Q39 7       ~0000 00Q3 7               Z   Q3 8             NA 7       8   9               11       12           13                                                                                                                               80 PERSONNEL INJURIES NUMBER             DESCRIPTIONQ41 7
8 8
                ~00 9
OQR 12 NA 11                                                                                                                                                      80 LOSS OF OR DAMAGE TO FACILITY                 43 TYPE       DESCRIPTION Z   Q4,                                       NA 7        8    9           IO                                                                                                                                                           80 o
ISSUED
                ~NQ44 PUBLICITY DESCRIPTION      ~                   NA 79102203~                                                         NRC USE ONLY 7
7        8    9          10                                                                                                                        68    69                          80  ER NAME OF PREPARER                          Tohn T. St           Martin                                   PHDNE.7 1     6/546-2700, ext 29 1- 253     ~}}

Revision as of 18:06, 29 October 2019

LER 79-019/03L-0:on 790919,loose Nuts on Anchor Bolts Were Found on Pipe Supports & on Svc Water Piping to Standby Auxiliary Feedwater Pump.Caused by Nuts Working Loose During Sys Operation.Nuts Were Torqued to Current Requirement
ML17261A145
Person / Time
Site: Ginna Constellation icon.png
Issue date: 10/19/1979
From: St Martin J
ROCHESTER GAS & ELECTRIC CORP.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML17249A212 List:
References
LER-79-019-03L, LER-79-19-3L, NUDOCS 7910220354
Download: ML17261A145 (2)


Text

NRC FORM 366 I7-77) r CONTROL BLOCK:

1 f

-

6 Qi 79-019/

CENSEE EVE NT REPORT U. S. NUCLEAR REGULATORY COMMISSION

~

{PLEASE PRINT OR TYPE ALL REQUIRED INFORMATION)

-

(OAR 1339)

[oat N Y R B G 1Q20 0 0 0 0 0 0 0 0 25 Q34 1 1 1 1 QE~QE 7 8 9 LICENSEE CODE 14 15 LICENSE NUMBER 26 LICENSE TYPE 30 57 CAT 58 CON'T REDRT 0 2 4 4 0 9 9

~8 ~LQB 5 0 0 0 7 0 9 1 9 7 9 B 1 1 7 QB 7 8 60 61 DOCKET NUMBER 68 69 EVENT DATE 74 75 REPORT DATE 80 EVENT DESCRIPTION AND PROBABLE CONSEQUENCES +10 During inspections required by IE Burietin 79-14, loose nuts on anchor bolts were

~o3 found on pipe supports SW- 1 4 1, - 1 42, -1 43, -. 1 45, and 1 46, on service water piping

~o4 to the "D" standby auxiliary feedwater pump. Although the pump was declared

'I

~os inoperable (T ~ S ~ 3 ~ 4 ~ 2 . d) all three auxiliary feedwater pumps and the alternate

~OB standby auxiliary feedwater pump were operable .

7

~O7

~OS 7 8 9 80 SYSTEM CAUSE CAUSE COMP. VALVE CODE CODE SUBCODE COMPONENT CODE SUBCODE SUBCODE

~OB ~OH Q77. ~B Q72 ~O Q73 9 U P 0 R T Q74 ~B Q78 ~Z QE 7 8 9 10 11 12 13 18 19 20 SEQUENTIAL OCCURRENCE REPORT REVISION Q17 LERIRO REPoRT ACTION FUTURE EVENT YEAR

~79 21 22 EFFECT

~

23 SHUTDOWN

~01 24 REPORT NO.

9 26

+r 27

~03 28 ATTACHMENT CODE 29 NPRDQ TYPE

~L 30 PRIME COMP.

+31

+0 NO, COMPONENT TAKEN ACTION ON PLANT METHOD HOURS l@2 SUBMITTED FORM SUB. SUPPLIER MANUFACTURER Q18 ~Z Q18 ~ZQ20 ~Z Q27 0 0 0 0 ~N Q23 ~N Q24 ~A Q28 G 1 9 0 Q28 33 34 35 36 37 40 41 42 43 44 47 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS Q27 o Construction requirements at the time of installation (1975-1977) did not detail anchor bolt torqueing requirements. Nuts worked loose during system operation. Nuts were torqued to current requirements, and pump was then declared operable. These anchor 3 bolts will continue to be inspected in accordance with the station IS I program .

4 7 8 9 80 FACILITY Q METHOD OF 7 8 STATUS 9

E GR ~Q28 10 1

% POWER 0 0 12 13 OTHER STATUS NA 44 DISCOVERY

~CQ31 45 46 IE Bulletin 79-14 DISCOVERY DESCRIPTION Q32 80 ACTIVITY CONTENT RELEASED OF RELEASE AMOUNT OF ACTIVITY LOCATION OF RELEASE 6 ~Z Q33 ~ZQ34 NA 7 8 9 10 11 44 45 80 PERSONNEL EXPOSURES NUMBER TYPE DESCRIPTION Q39 7 ~0000 00Q3 7 Z Q3 8 NA 7 8 9 11 12 13 80 PERSONNEL INJURIES NUMBER DESCRIPTIONQ41 7

8 8

~00 9

OQR 12 NA 11 80 LOSS OF OR DAMAGE TO FACILITY 43 TYPE DESCRIPTION Z Q4, NA 7 8 9 IO 80 o

ISSUED

~NQ44 PUBLICITY DESCRIPTION ~ NA 79102203~ NRC USE ONLY 7