ML18153C785: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:./ I e e VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 October 17, 1991 United States Nuclear Regulatory Commission Attention:
{{#Wiki_filter:./ I e                                 e VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 October 17, 1991 United States Nuclear Regulatory Commission                     Serial No. 91-583 Attention: Document Control Desk                               NL&P/CGL      R3 Washington, D. C. 20555                                         Docket Nos. 50-280 50-281 50-338 50-339 License Nos. DPR-32 DPR-37 NPF-4 NPF-7 Gentlemen:
Document Control Desk Washington, D. C. 20555 Gentlemen:
VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNITS 1 AND 2 NORTH ANNA POWER STATION UNITS 1 AND 2 RESPONSE TO FINAL RULE - NOTIFICATION OF IMPLEMENTATION SCHEDULE FOR EMERGENCY RESPONSE DATA SYSTEM The following information is provided in response to 1OCFR50. 72, the final rule regarding implementation of the Emergency Response Data System (EROS). As noted in a September 23, 1991 NRC letter, Virginia Electric and Power Company volunteered to participate in implementation of the EROS. In September 1991, operational testing of the EROS links at Surry and North Anna was satisfactorily completed. Also during September 1991, revisions to the associated Emergency Plan Implementing Procedures (EPIPs) were developed for the EROS. However, prior to declaring the EROS fully operable at both stations, training for operators as Emergency Communicators must be completed.
VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNITS 1 AND 2 NORTH ANNA POWER STATION UNITS 1 AND 2 RESPONSE TO FINAL RULE -NOTIFICATION OF IMPLEMENTATION SCHEDULE FOR EMERGENCY RESPONSE DATA SYSTEM Serial No. NL&P/CGL Docket Nos. License Nos. 91-583 R3 50-280 50-281 50-338 50-339 DPR-32 DPR-37 NPF-4 NPF-7 The following information is provided in response to 1 OCFR50. 72, the final rule regarding implementation of the Emergency Response Data System (EROS). As noted in a September 23, 1991 NRC letter, Virginia Electric and Power Company volunteered to participate in implementation of the EROS. In September 1991, operational testing of the EROS links at Surry and North Anna was satisfactorily completed.
Training for Emergency Communicators will be accomplished as part of the Licensed Operator Requalification Program (LORP) and Non-Licensed Operator Continuing Training (NLOCT) at both Surry and North Anna. This training is scheduled for completion by the end of December 1991. Following completion of this training, we will formally notify you that the EROS links at Surry and North Anna are fully operable and prepared to transmit data in the event of an emergency at either station.
Also during September 1991, revisions to the associated Emergency Plan Implementing Procedures (EPIPs) were developed for the EROS. However, prior to declaring the EROS fully operable at both stations, training for operators as Emergency Communicators must be completed.
D I
Training for Emergency Communicators will be accomplished as part of the Licensed Operator Requalification Program (LORP) and Non-Licensed Operator Continuing Training (NLOCT) at both Surry and North Anna. This training is scheduled for completion by the end of December 1991. Following completion of this training, we will formally notify you that the EROS links at Surry and North Anna are fully operable and prepared to transmit data in the event of an emergency at either station. D I I
* Implementation of the EROS at Surry and North Anna Power Stations is in accordance with the guidance provided in NUREG-1394, Revision 1, with one exception, which relates to periodic (i.e., quarterly) testing. As stated in the September 23, 1991 NRC letter, the NRC is developing a comprehensive plan to conduct quarterly testing- for all EROS participants and will notify us of the testing requirements. Upon receipt of this guidance, we will develop a periodic test plan.
* Implementation of the EROS at Surry and North Anna Power Stations is in accordance with the guidance provided in NUREG-1394, Revision 1, with one exception, which relates to periodic (i.e., quarterly) testing. As stated in the September 23, 1991 NRC letter, the NRC is developing a comprehensive plan to conduct quarterly testing-for all EROS participants and will notify us of the testing requirements.
Very truly yours,
Upon receipt of this guidance, we will develop a periodic test plan. Very truly yours, ~--/ftl_/d~ W. L. Stewart Senior Vice President  
  ~--W./ftl_/d~
-Nuclear cc: U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, N. W. Suite 2900 Atlanta, Georgia 30323 Mr. M. W. Branch NRC Senior Resident Inspector Surry Power Station Mr. M. S. Lesser NRG Senior Resident Inspector North Anna Power Station}}
L. Stewart Senior Vice President - Nuclear cc:     U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, N. W.
Suite 2900 Atlanta, Georgia 30323 Mr. M. W. Branch NRC Senior Resident Inspector Surry Power Station Mr. M. S. Lesser NRG Senior Resident Inspector North Anna Power Station}}

Revision as of 00:11, 21 October 2019

Responds to Final Rule 10CFR50.72 Re Implementation of Erds. Training for Emergency Communicators Will Be Accomplished as Part of Licensed Operator Requalification Program & Nonlicensed Operator Continuing Training
ML18153C785
Person / Time
Site: Surry, North Anna  Dominion icon.png
Issue date: 10/17/1991
From: Stewart W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
91-583, NUDOCS 9110240157
Download: ML18153C785 (2)


Text

./ I e e VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 October 17, 1991 United States Nuclear Regulatory Commission Serial No.91-583 Attention: Document Control Desk NL&P/CGL R3 Washington, D. C. 20555 Docket Nos. 50-280 50-281 50-338 50-339 License Nos. DPR-32 DPR-37 NPF-4 NPF-7 Gentlemen:

VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNITS 1 AND 2 NORTH ANNA POWER STATION UNITS 1 AND 2 RESPONSE TO FINAL RULE - NOTIFICATION OF IMPLEMENTATION SCHEDULE FOR EMERGENCY RESPONSE DATA SYSTEM The following information is provided in response to 1OCFR50. 72, the final rule regarding implementation of the Emergency Response Data System (EROS). As noted in a September 23, 1991 NRC letter, Virginia Electric and Power Company volunteered to participate in implementation of the EROS. In September 1991, operational testing of the EROS links at Surry and North Anna was satisfactorily completed. Also during September 1991, revisions to the associated Emergency Plan Implementing Procedures (EPIPs) were developed for the EROS. However, prior to declaring the EROS fully operable at both stations, training for operators as Emergency Communicators must be completed.

Training for Emergency Communicators will be accomplished as part of the Licensed Operator Requalification Program (LORP) and Non-Licensed Operator Continuing Training (NLOCT) at both Surry and North Anna. This training is scheduled for completion by the end of December 1991. Following completion of this training, we will formally notify you that the EROS links at Surry and North Anna are fully operable and prepared to transmit data in the event of an emergency at either station.

D I

  • Implementation of the EROS at Surry and North Anna Power Stations is in accordance with the guidance provided in NUREG-1394, Revision 1, with one exception, which relates to periodic (i.e., quarterly) testing. As stated in the September 23, 1991 NRC letter, the NRC is developing a comprehensive plan to conduct quarterly testing- for all EROS participants and will notify us of the testing requirements. Upon receipt of this guidance, we will develop a periodic test plan.

Very truly yours,

~--W./ftl_/d~

L. Stewart Senior Vice President - Nuclear cc: U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, N. W.

Suite 2900 Atlanta, Georgia 30323 Mr. M. W. Branch NRC Senior Resident Inspector Surry Power Station Mr. M. S. Lesser NRG Senior Resident Inspector North Anna Power Station