IR 05000324/2014301: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 3: Line 3:
| issue date = 11/19/2014
| issue date = 11/19/2014
| title = Er 05000325/2014301 and Er 05000324/2014301; Operating Test October 6 - 14, 2014, & Written Exam October 21, 2014; Brunswick Steam Electric Plant, Units 1 & 2; Operator License Examinations
| title = Er 05000325/2014301 and Er 05000324/2014301; Operating Test October 6 - 14, 2014, & Written Exam October 21, 2014; Brunswick Steam Electric Plant, Units 1 & 2; Operator License Examinations
| author name = McCoy G J
| author name = Mccoy G
| author affiliation = NRC/RGN-II/DRS
| author affiliation = NRC/RGN-II/DRS
| addressee name = Hamrick G T
| addressee name = Hamrick G
| addressee affiliation = Duke Energy Carolinas, LLC
| addressee affiliation = Duke Energy Carolinas, LLC
| docket = 05000324, 05000325
| docket = 05000324, 05000325
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 November 19, 2014  
{{#Wiki_filter:November 19, 2014


George Vice President Brunswick Steam Electric Plant P.O. Box 10429 Southport, NC 28461-0429
==SUBJECT:==
 
BRUNSWICK STEAM ELECTRIC PLANT - NRC EXAMINATION REPORT 05000325/2014301 AND 05000324/2014301
SUBJECT: BRUNSWICK STEAM ELECTRIC PLANT - NRC EXAMINATION REPORT 05000325/2014301 AND 05000324/2014301


==Dear Mr. Hamrick:==
==Dear Mr. Hamrick:==
Line 43: Line 42:
Docket Nos: 50-325, 50-324 License Nos: DPR-71, DPR-62  
Docket Nos: 50-325, 50-324 License Nos: DPR-71, DPR-62  


Enclosures:  
===Enclosures:===
 
1. Report Details 2. Simulator Fidelity Report  
1. Report Details 2. Simulator Fidelity Report  


cc: Distribution via ListServ
REGION II==
 
__ML14323A888__________ x G SUNSI REVIEW COMPLETE G FORM 665 ATTACHED OFFICE RII:DRS RII:DRS SIGNATURE EFG FOR PFGC1 EFG FOR GJM1 NAME Capehart McCoy DATE 11/19/2013 11/19/2013 E-MAIL COPY? YES NO YES NO YES YES NO YES NO YES NO YES NO Letter to George from Gerald J. McCoy dated November 19, 2014.
 
SUBJECT: BRUNSWICK STEAM ELECTRIC PLANT - NRC EXAMINATION REPORT 05000325/2014301 AND 05000324/2014301 Distribution:
RIDSNRRDIRS
 
PUBLIC RidsNrrPMBrunswick Resource
 
Enclosure 1 U.S. NUCLEAR REGULATORY COMMISSION
 
==REGION II==


Docket No.: 05000325, 05000324  
Docket No.: 05000325, 05000324  
Line 131: Line 118:
Item Description
Item Description


Inadequate labeling of H2- O2 monitor  
Inadequate labeling of H2-O2 monitor  


Alarm Panel Procedure directs operators to wrong procedure section  
Alarm Panel Procedure directs operators to wrong procedure section  
Line 139: Line 126:
drain valves for CRD  
drain valves for CRD  


pumps 2OP-15, SAMPLING SYSTEM OPERATING PROCEDURE, step 8.1.2.1.A states to ensure H2-O2 monitor, CAC-AT-4410 (CAC-AT4410) is in OFF. This step should be enhanced to add that this step is performed on the XU-51 panel to prevent the confusion of placing the 4409/4410 power to OFF on the XU-75/79 panel. PR- 713615 written to document this issue.
pumps 2OP-15, SAMPLING SYSTEM OPERATING PROCEDURE, step 8.1.2.1.A states to ensure H2-O2 monitor, CAC-AT-4410 (CAC-AT4410) is in OFF. This step should be enhanced to add that this step is performed on the XU-51 panel to prevent the confusion of placing the 4409/4410 power to OFF on the XU-75/79 panel. PR-713615 written to document this issue.


2APP-A-06 contains action steps that reference the wrong procedure sections for OP-02. The procedure was revised to the  
2APP-A-06 contains action steps that reference the wrong procedure sections for OP-02. The procedure was revised to the  

Revision as of 07:20, 21 June 2019

Er 05000325/2014301 and Er 05000324/2014301; Operating Test October 6 - 14, 2014, & Written Exam October 21, 2014; Brunswick Steam Electric Plant, Units 1 & 2; Operator License Examinations
ML14323A888
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 11/19/2014
From: Gerald Mccoy
Division of Reactor Safety II
To: Hamrick G
Duke Energy Carolinas
References
ER 2014301
Download: ML14323A888 (9)


Text

November 19, 2014

SUBJECT:

BRUNSWICK STEAM ELECTRIC PLANT - NRC EXAMINATION REPORT 05000325/2014301 AND 05000324/2014301

Dear Mr. Hamrick:

During the period of October 6 - 14, 2014, the Nuclear Regulatory Commission (NRC)

administered operating tests to employees of your company who had applied for licenses to operate the Brunswick Steam Electric Plant. At the conclusion of the tests, the examiners discussed preliminary findings related to the operating tests with those members of your staff identified in the enclosed report. The written examination was administered by your staff on October 21, 2014.

All applicants passed both the operating test and written examination. There were no post-administration comments concerning the written examination.

The initial examination submittal was within the range of acceptability expected for a proposed examination. All examination changes agreed upon between the NRC and your staff were made according to NUREG-1021, Operator Licensing Examination Standards for Power Reactors, Revision 9, Supplement 1.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosures will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm.adams.html (the Public Electronic Reading Room).

If you have any questions concerning this letter, please contact me at (404) 997-4551.

Sincerely,

/RA: Eugene F. Guthrie for/

Gerald J. McCoy, Chief Operations Branch 1 Division of Reactor Safety

Docket Nos: 50-325, 50-324 License Nos: DPR-71, DPR-62

Enclosures:

1. Report Details 2. Simulator Fidelity Report

REGION II==

Docket No.: 05000325, 05000324

License No.: DPR-71, DPR-62

Report No.: 05000325/2014301 and 05000324/2014301

Licensee: Duke Energy Progress, Inc.

Facility: Brunswick Steam Electric Plant, Units 1 and 2

Location: Southport, NC

Dates: Operating Tests - October 6 - 14, 2014 Written Examination - October 21, 2014

Examiners: P. Capehart, Chief Examiner B. Caballero, Senior Operations Engineer

A. Goldau, Operations Engineer

Approved by: Gerald J. McCoy, Chief Operations Branch 1

Division of Reactor Safety SUMMARY OF FINDINGS ER 05000325/2014301 and ER 05000324/2014301; operating test October 6 - 14, 2014, & written exam October 21, 2014; Brunswick Steam Electric Plant, Units 1 & 2; Operator License Examinations.

Nuclear Regulatory Commission (NRC) examiners conducted an initial examination in accordance with the guidelines in Revision 9, Supplement 1, of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors." This examination implemented the operator licensing requirements identified in 10 CFR §55.41, §55.43, and §55.45, as applicable.

Members of the Brunswick training staff developed both the operating tests and the written examination. The NRC developed the written examination outline.

The NRC administered the operating tests during the period of October 6 - 14, 2014. The Brunswick training staff administered the written examination on October 21, 2014. Four

Reactor Operators (RO) and seven Senior Reactor Operators (SRO) applicants passed both the operating test and written examination. All applicants were issued licenses commensurate with the level of examination administered.

There were no post-examination comments.

No findings were identified.

REPORT DETAILS 4. OTHER ACTIVITIES 4OA5 Operator Licensing Examinations a. Inspection Scope Members of the Brunswick training staff developed both the operating tests and the written examination. All examination material was developed in accordance with the guidelines contained in Revision 9, Supplement 1, of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors." The NRC examination team reviewed the proposed examination. Examination changes agreed upon between the NRC and the licensee were made per NUREG-1021, and incorporated into the final version of the examination materials.

The NRC reviewed the licensee's examination security measures while preparing and administering the examinations in order to ensure compliance with 10 CFR §55.49,

"Integrity of examinations and tests."

The NRC examiners evaluated four RO and seven SRO applicants using the guidelines contained in NUREG-1021. The examiners administered the operating tests during the period of October 6 - 14, 2014. Members of the Brunswick training staff administered the written examination on October 21, 2014. Evaluations of applicants and reviews of associated documentation were performed to determine if the applicants, who applied for licenses to operate the Brunswick Steam Electric Plant, met the requirements specified in 10 CFR Part 55, "Operators' Licenses."

b. Findings No findings were identified. The NRC determined, using NUREG-1021, that the licensee's initial examination submittal was within the range of acceptability expected for a proposed examination.

All applicants passed both the operating test and written examination and were issued licenses.

Copies of all individual examination reports were sent to the Training Manager for evaluation and determination of appropriate remedial training.

The licensee submitted no post-examination comments concerning the written examination. A copy of the final RO written examination and answer key, final SRO written examination and answer key, with all changes incorporated, may be accessed not earlier than October 4, 2016, in the ADAMS system (ADAMS Accession Numbers ML14316A366 and ML14316A391).

4 4OA6 Meetings, Including Exit Exit Meeting Summary On October 13, 2014, the NRC examination team discussed generic issues associated with the operating test with you and members of the Brunswick Steam Electric Plant staff. The examiners asked the licensee if any of the examination material was proprietary. No proprietary information was identified.

KEY POINTS OF CONTACT Licensee Personnel M. Similey, Superintendent of Operator Training B. Bolin, Exam Writer

L. Sosler, Exam Writer F. Jefferson, Engineer Manager

J. Barry, Simulator Supervisor J. Angel, Operator Training Supervisor J. Kalamaja, Operations Manager A. Padleckas, Shift Operations Manager

L. Grzeck, Regulatory Affairs Manager S. Braown, NOS Manager J. Krakuszeki, Plant Manager

Enclosure 2 SIMULATOR FIDELITY REPORT Facility Licensee: Brunswick Steam Electric Plant

Facility Docket No.: 05000325 and 05000324

Operating Tests Administered on: October 6 - 14, 2014

This form is to used only to report observations. This observation does not constitute audit or inspection findings and, without further verification and review in accordance with Inspection Procedure 71111.11, is not indicative of noncompliance with 10 CFR 55.46. No licensee action is required in response to these observations.

While conducting the simulator portion of the operating test, examiners observed the following:

Item Description

Inadequate labeling of H2-O2 monitor

Alarm Panel Procedure directs operators to wrong procedure section

Improper labeling of drip

drain valves for CRD

pumps 2OP-15, SAMPLING SYSTEM OPERATING PROCEDURE, step 8.1.2.1.A states to ensure H2-O2 monitor, CAC-AT-4410 (CAC-AT4410) is in OFF. This step should be enhanced to add that this step is performed on the XU-51 panel to prevent the confusion of placing the 4409/4410 power to OFF on the XU-75/79 panel. PR-713615 written to document this issue.

2APP-A-06 contains action steps that reference the wrong procedure sections for OP-02. The procedure was revised to the

new Duke format and the APP actions were not revised to the new procedure sections from the format change. This issue is addressed as part of PR-713615 and has been previously addressed by PR-690669 during the 2013 NRC exam.

An Engineering Change Request (ECR) has been submitted to have the names of the "Drain Isolation Valves" for both unit CRD pumps changed to "Drip Tray Drain Valves", or something more descriptive. The ECR number is 17561.