IR 05000324-14-502 and 05000325-14-502; 07/21/2014 - 07/25/2014; Brunswick Steam Electric Station, Unit 1 and 2; Emergency Preparedness Baseline Inspection
ML14210A393
Person / Time
Site: Brunswick  Duke energy icon.png
Issue date: 07/29/2014
From: Bonser B R
NRC/RGN-II/DRS/PSB1
To: Hamrick G T
Progress Energy Carolinas
Linda K. Gruhler 404-997-4633
References
IR-14-502
Download: ML14210A393 (11)


Text

July 29, 2014

Mr. George Vice President Brunswick Steam Electric Station P.O. Box 10429 Southport, NC 28461

SUBJECT: BRUNSWICK STEAM ELECTRIC STATION - U.S NUCLEAR REGULATORY COMMISSION EMERGENCY PREPAREDNESS INSPECTION REPORT 05000325/2014502 AND 05000324/2014502

Dear Mr. Hamrick:

On July 24, 2014, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Brunswick Steam Electric Station. The enclosed inspection report documents the inspection results that were discussed on July 24, 2014, with you and members of your staff.

The inspection examined activities conducted under your license as they relate to safety and compliance with the Commission's rules and regulations, and with the conditions of your license. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.

No findings were identified during this inspection.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRC's "Rules of Practice," a copy of this letter, its Enclosure, and your response if any, will be available electronically for public inspection in the NRC Public Document Room, or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,/RA/

Brian Bonser, Chief Plant Support Branch 1 Division of Reactor Safety Docket Nos. 50-324, 50-325 License Nos. DPR-62, DPR-71

Enclosure:

Inspection Report 05000324/2014502 and 05000325/2014502

w/Attachment:

Supplementary Information cc: Distribution via Listserv

SUMMARY

Inspection Report (IR) 05000324/2014502 and 05000325/2014502; 07/21/2014 - 07/25/2014; Brunswick Steam Electric Station, Unit 1 and 2; Emergency Preparedness Baseline Inspection The report covered an announced inspection by three emergency preparedness inspectors, one radiation protection inspector, and one physical security inspector. No findings were identified.

The NRC's program for overseeing the safe operation of commercial nuclear power reactors is described in NUREG-1649, "Reactor Oversight Process."

REPORT DETAILS

REACTOR SAFETY

Cornerstone:

Emergency Preparedness 1EP4 Emergency Action Level and Emergency Plan Changes

a. Inspection Scope

Since the last NRC inspection of this program area, Revisions 84 and 85 were made to the Brunswick Radiological Emergency Plan (REP). The licensee implemented several changes to emergency plan implementing procedures and determined that, in accordance with 10 CFR 50.54(q), the changes made in these revisions resulted in no reduction in the effectiveness of the Plan, and that the Plan continued to meet the requirements of 10 CFR 50.47(b) and Appendix E to 10 CFR Part 50. The inspectors reviewed a sampling of the implementing procedure changes made between September 2013 and July 2014, to evaluate for potential reductions in the effectiveness of the Plan.

However, this review was not documented in a Safety Evaluation Report (SER) and does not constitute formal NRC approval of the changes. Therefore, these changes remain subject to future NRC inspection in their entirety.

The inspection was conducted in accordance with NRC Inspection Procedure 71114, Attachment 04, Emergency Action Level and Emergency Plan Changes. The applicable planning standards of 10 CFR 50.47(b), and its related requirements in 10 CFR 50, Appendix E, were used as reference criteria.

The inspectors reviewed various documents that are listed in the Attachment to this report. This inspection activity satisfied one inspection sample for the emergency action level and emergency plan changes on an annual basis.

b. Findings

No findings were identified.

1EP7 Exercise Evaluation - Hostile Action Event

a. Inspection Scope

Title 10 of the Code of Federal Regulations (10 CFR) 50, Appendix E, Section IV.F.2.j, requires in part that nuclear power reactor licensees, in each 8-calendar year exercise cycle, provide the opportunity for their emergency response organization (ERO) to demonstrate proficiency in the key skills necessary to respond to a hostile action (HA)directed at the plant site. The licensee designed the July 22, 2014, exercise to satisfy that requirement, and the NRC inspected the HA event exercise to assess the licensee's ability to effectively implement their Emergency Plan during an HA event, and adequately protect public health and safety.

The exercise evaluation consisted of the following reviews and assessments:

  • The adequacy of the licensee's performance in the biennial exercise, conducted on July 22, 2014, was reviewed and assessed regarding the implementation of the Risk Significant Planning Standards (RSPS) in 10 CFR 50.47(b)(4), (5), (9), and (10) which address emergency classification, offsite notification, radiological assessment, and protective action recommendations, respectively.
  • The overall adequacy of the licensee's emergency response facilities with regard to NUREG-0696, "Functional Criteria for Emergency Response Facilities," and Emergency Plan commitments. The facilities assessed were the Control Room Simulator, Joint Information Center (JIC), simulated Central Alarm and Secondary Alarm Stations, Incident Command Post (ICP), and the Alternate Emergency Facility (AEF).
  • A review of other performance areas, such as: the ERO's recognition of abnormal plant conditions; command and control, including interactions with site security staff, intra- and inter-facility communications; prioritization of mitigation activities; utilization of repair and field monitoring teams; interface with offsite agencies, including local law enforcement agencies; staffing and procedure adequacy; and the overall implementation of the emergency plan and its implementing procedures.
  • The adequacy of the licensee's post-exercise critiques, to evaluate licensee self-assessment of its ERO performance during the July 22, 2014, exercise to ensure compliance with 10 CFR 50, Appendix E, Subsection IV.F.2.g.

The inspectors reviewed various documents which are listed in the Attachment. This inspection activity satisfied one inspection sample for the exercise evaluation on a biennial basis.

b. Findings

No findings were identified. 1EP8 Exercise Evaluation - Scenario Review

a. Inspection Scope

Prior to the inspection activity, the inspectors conducted an in-office review of the exercise objectives and scenario submitted to the NRC using IP 71114.08, "Exercise Evaluation - Scenario Review," to determine if the exercise would test major elements of the emergency plan as required by 10 CFR 50.47(b)(14).

The inspectors reviewed various documents which are listed in the Attachment to this report. This inspection activity satisfied one inspection sample for the exercise valuation on a biennial basis.

b. Findings

No findings were identified.

OTHER ACTIVITIES

4OA1 Performance Indicator Verification

a. Inspection Scope

The inspectors sampled licensee submittals relative to the performance indicators (PIs)listed below for the period July 1, 2013, through March 31, 2014. To verify the accuracy of the PI data reported during that period, PI definitions and guidance contained in Nuclear Energy Institute (NEI) 99-02, "Regulatory Assessment Performance Indicator Guideline," Revision 7, was used to confirm the reporting basis for each data element.

Emergency Preparedness Cornerstone

  • Emergency Response Organization Drill/Exercise Performance (DEP)
  • Emergency Response Organization Readiness (ERO)
  • Alert and Notification System Reliability (ANS) For the specified review period, the inspectors examined data reported to the NRC, procedural guidance for reporting PI information, and records used by the licensee to identify potential PI occurrences. The inspectors verified the accuracy of the DEP through review of a sample of drill and event records. The inspectors reviewed selected training records to verify the accuracy of the ERO PI for personnel assigned to key positions in the ERO. The inspectors verified the accuracy of the PI for ANS reliability through review of a sample of the licensee's records of periodic system tests. Licensee procedures, records, and other documents reviewed within this inspection area are listed in the Attachment. This inspection activity satisfied one inspection sample for each of the three Emergency Preparedness PIs (i.e., DEP, ERO, and ANS) on an annual basis.

b. Findings

No findings were identified.

4OA6 Meetings, Including Exit

On July 24, 2014, the lead inspector presented the inspection results to Mr. G. Hamrick, Site Vice President, and other members of the plant staff. The inspectors confirmed that proprietary information was not provided during the inspection.

ATTACHMENT:

SUPPLEMENTARY INFORMATION