ULNRC-05954, Response to Request for Additional Information Changes to Physical Security Plan (TAC No. D91660): Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:WAmeren MISSOURI Callaway Plant Certified mail number: 7007 2560 0002 1864 8318 January 28, 2013 ULNRC-05954 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 10 CFR 50.54(p)Ladies and Gentlemen:
{{#Wiki_filter:WAmeren                                                                                                                           Callaway Plant MISSOURI Certified mail number: 7007 2560 0002 1864 8318 January 28, 2013 ULNRC-05954 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 10 CFR 50.54(p)
DOCKET NUMBER 50-483 CALLA WAY PLANT UNIT 1 UNION ELECTRIC CO.FACILITY OPERATING LICENSE NPF-30 RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION RE: CHANGES TO PHYSICAL SECURITY PLAN (TAC NO. D91660)
Ladies and Gentlemen:
DOCKET NUMBER 50-483 CALLA WAY PLANT UNIT 1 UNION ELECTRIC CO.
FACILITY OPERATING LICENSE NPF-30 RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION RE: CHANGES TO PHYSICAL SECURITY PLAN (TAC NO. D91660)


==References:==
==References:==
: 1) Ameren Letter ULNRC-05889, "Physical Security Plan, Revision 10," dated August 3, 2012 2) Letter to Mr. Adam Heflin, Union Electric Company, from Mr. Carl F.Lyon, "Callaway Plant, Unit 1 -Request for Additional Information Re: Changes to Security Plan (TAC No. D91660)," dated September 18, 2012 3) Ameren Letter ULNRC-05921, "Response To Request For Additional Information Re: Changes To Security Plan (TAC NO. D91660)," dated October 18, 2012 4) Letter to Mr. Adam Heflin, Union Electric Company, from Mr. Carl F.Lyon, "Callaway Plant, Unit 1 -Request for Additional Information Re: Changes to Security Plan (TAC No. D91660)," dated November 20, 2012 5) Email to Tom Elwood from Mr. Carl F. Lyon dated December 18, 2012, extending response due date :(in Reference
: 1) Ameren Letter ULNRC-05889, "Physical Security Plan, Revision 10,"
: 4) to January 31, 2013.By letter dated August 3, 2012 (Reference 1), Union Electric (Ameren Missouri) submitted Physical Security Plan, Revision 10, for Callaway Plant, Unit 1 in accordance with 10 CFR 50.5 4 (p).Reference 2 transmitted a Request for Additional Information (RAI) from the NRC related to the Physical Security Plan revision in reference
dated August 3, 2012
: 1. Reference 3 transmitted Union Electric's response-to Reference
: 2) Letter to Mr. Adam Heflin, Union Electric Company, from Mr. Carl F.
: 2. The NRC requested additional information via Reference 4.Enclosure I to this letter contains the response to the RAI contained in Reference 4.The Enclosure to this letter contains Safeguards Information within the scope of 10 CFR 73.21.Removal of enclosure declassifies this document PO Box 620 Fulto: SP~2I*n, MO 65251 AmerenMissouri.com o
Lyon, "Callaway Plant, Unit 1 - Request for Additional Information Re:
ULNRC-05954 January 28, 2013 Page 2 There are no commitments contained in this letter.If you have any questions with regard to the response to the RAI, please contact Mr. Eric Olson at 573-676-8280.
Changes to Security Plan (TAC No. D91660)," dated September 18, 2012
I declare under penalty of perjury that the forgoing is true and correct.Sincerely, Executed on: I I-9 / '20 13 Scott Maglio Regulatory Affairs Manager SAM/csp  
: 3) Ameren Letter ULNRC-05921, "Response To Request For Additional Information Re: Changes To Security Plan (TAC NO. D91660)," dated October 18, 2012
: 4) Letter to Mr. Adam Heflin, Union Electric Company, from Mr. Carl F.
Lyon, "Callaway Plant, Unit 1 - Request for Additional Information Re:
Changes to Security Plan (TAC No. D91660)," dated November 20, 2012
: 5) Email to Tom Elwood from Mr. Carl F. Lyon dated December 18, 2012, extending response due date :(in Reference 4) to January 31, 2013.
By letter dated August 3, 2012 (Reference 1), Union Electric (Ameren Missouri) submitted Physical Security Plan, Revision 10, for Callaway Plant, Unit 1 in accordance with 10 CFR 50. 5 4 (p).
Reference 2 transmitted a Request for Additional Information (RAI) from the NRC related to the Physical Security Plan revision in reference 1. Reference 3 transmitted Union Electric's response- to Reference 2. The NRC requested additional information via Reference 4.
Enclosure I to this letter contains the response to the RAI contained in Reference 4.
The Enclosure to this letter contains Safeguards Information within the scope of 10 CFR 73.21.                                 SP~2I Removal of enclosure declassifies this document
** *******: ** ** : ** :* ** ** *: **........................** *** ** ** ** ** ** * ** ** ** ** ** **
* PO Box 620     Fulto*n,MO 65251 AmerenMissouri.com o
 
ULNRC-05954 January 28, 2013 Page 2 There are no commitments contained in this letter.
If you have any questions with regard to the response to the RAI, please contact Mr. Eric Olson at 573-676-8280.
I declare under penalty of perjury that the forgoing is true and correct.
Sincerely, Executed on: I   I-9   / '2013 Scott Maglio Regulatory Affairs Manager SAM/csp


==Enclosure:==
==Enclosure:==
Response to Request for Additional Information - Physical Security Plan
ULNRC-05954 January 28, 2013 Page 3 cc:
(copy without Enclosure except as noted with asterisk*)
Mr. Elmo E. Collins*
Regional Administrator U. S. Nuclear Regulatory Commission Region IV 1600 East Lamar Boulevard Arlington, TX 76011-4511 Physical Security Inspector U.S. Nuclear Regulatory Commission 1600 East Lamar Boulevard Arlington, TX 76011-4511 Senior Resident Inspector
      -CallaEdWiy Residhtl-tOffice - .
U.S. Nuclear Regulatory Commission 8201 NRC Road Steedman, MO 65077 Mr. Fred Lyon*
Project Manager, Callaway Plant Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop O-8G14 Washington, DC 20555-2738


Response to Request for Additional Information
ULNRC-05954 January 28, 2013 Page 4 Index and send hardcopy to QA File A160.0761 Hardcopy:
-Physical Security Plan ULNRC-05954 January 28, 2013 Page 3 cc: (copy without Enclosure except as noted with asterisk*)
Certrec Corporation 4150 International Plaza Suite 820 Fort Worth, TX 76109 (Certrec receives ALL attachments as long as they are non-safeguards and may be publicly disclosed.)
Mr. Elmo E. Collins*Regional Administrator U. S. Nuclear Regulatory Commission Region IV 1600 East Lamar Boulevard Arlington, TX 76011-4511 Physical Security Inspector U.S. Nuclear Regulatory Commission 1600 East Lamar Boulevard Arlington, TX 76011-4511 Senior Resident Inspector-C allaEdWiy Re sidhtl-tOffice
Electronic distribution for the following can be made via Security Plan ULNRC Distribution:
-.U.S. Nuclear Regulatory Commission 8201 NRC Road Steedman, MO 65077 Mr. Fred Lyon*Project Manager, Callaway Plant Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop O-8G14 Washington, DC 20555-2738 ULNRC-05954 January 28, 2013 Page 4 Index and send hardcopy to QA File A160.0761 Hardcopy: Certrec Corporation 4150 International Plaza Suite 820 Fort Worth, TX 76109 (Certrec receives ALL attachments as long as they are non-safeguards and may be publicly disclosed.)
(electronic copy without Enclosure)
Electronic distribution for the following can be made via Security Plan ULNRC Distribution: (electronic copy without Enclosure)
A. C. Heflin F. M. Diya C. 0. Reasoner III D. W. Neterer L. H. Graessle E.-C.-Olson.
A. C. Heflin F. M. Diya C. 0. Reasoner III D. W. Neterer L. H. Graessle E.-C.-Olson.
S. A. Maglio R. Holmes-Bobo NSRB Secretary T. B. Elwood Mr. Mike Westman (WCNOC)Mr. Tim Hope (Luminant Power)Mr. Ron Barnes (APS)Mr. Tom Baldwin (PG&E)Mr Mike Murray (STPNOC)Ms. Linda Conklin (SCE)Mr. John O'Neill (Pillsbury Winthrop Shaw Pittman LLP)Missouri Public Service Commission}}
S. A. Maglio R. Holmes-Bobo NSRB Secretary T. B. Elwood Mr. Mike Westman (WCNOC)
Mr. Tim Hope (Luminant Power)
Mr. Ron Barnes (APS)
Mr. Tom Baldwin (PG&E)
Mr Mike Murray (STPNOC)
Ms. Linda Conklin (SCE)
Mr. John O'Neill (Pillsbury Winthrop Shaw Pittman LLP)
Missouri Public Service Commission}}

Revision as of 23:38, 4 November 2019

Response to Request for Additional Information Changes to Physical Security Plan (TAC No. D91660)
ML13038A014
Person / Time
Site: Callaway Ameren icon.png
Issue date: 01/28/2013
From: Maglio S
Ameren Missouri, Union Electric Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
TAC D91660, ULNRC-05954
Download: ML13038A014 (4)


Text

WAmeren Callaway Plant MISSOURI Certified mail number: 7007 2560 0002 1864 8318 January 28, 2013 ULNRC-05954 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 10 CFR 50.54(p)

Ladies and Gentlemen:

DOCKET NUMBER 50-483 CALLA WAY PLANT UNIT 1 UNION ELECTRIC CO.

FACILITY OPERATING LICENSE NPF-30 RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION RE: CHANGES TO PHYSICAL SECURITY PLAN (TAC NO. D91660)

References:

1) Ameren Letter ULNRC-05889, "Physical Security Plan, Revision 10,"

dated August 3, 2012

2) Letter to Mr. Adam Heflin, Union Electric Company, from Mr. Carl F.

Lyon, "Callaway Plant, Unit 1 - Request for Additional Information Re:

Changes to Security Plan (TAC No. D91660)," dated September 18, 2012

3) Ameren Letter ULNRC-05921, "Response To Request For Additional Information Re: Changes To Security Plan (TAC NO. D91660)," dated October 18, 2012
4) Letter to Mr. Adam Heflin, Union Electric Company, from Mr. Carl F.

Lyon, "Callaway Plant, Unit 1 - Request for Additional Information Re:

Changes to Security Plan (TAC No. D91660)," dated November 20, 2012

5) Email to Tom Elwood from Mr. Carl F. Lyon dated December 18, 2012, extending response due date :(in Reference 4) to January 31, 2013.

By letter dated August 3, 2012 (Reference 1), Union Electric (Ameren Missouri) submitted Physical Security Plan, Revision 10, for Callaway Plant, Unit 1 in accordance with 10 CFR 50. 5 4 (p).

Reference 2 transmitted a Request for Additional Information (RAI) from the NRC related to the Physical Security Plan revision in reference 1. Reference 3 transmitted Union Electric's response- to Reference 2. The NRC requested additional information via Reference 4.

Enclosure I to this letter contains the response to the RAI contained in Reference 4.

The Enclosure to this letter contains Safeguards Information within the scope of 10 CFR 73.21. SP~2I Removal of enclosure declassifies this document

    • *******: ** ** : ** :* ** ** *: **........................** *** ** ** ** ** ** * ** ** ** ** ** **
  • PO Box 620 Fulto*n,MO 65251 AmerenMissouri.com o

ULNRC-05954 January 28, 2013 Page 2 There are no commitments contained in this letter.

If you have any questions with regard to the response to the RAI, please contact Mr. Eric Olson at 573-676-8280.

I declare under penalty of perjury that the forgoing is true and correct.

Sincerely, Executed on: I I-9 / '2013 Scott Maglio Regulatory Affairs Manager SAM/csp

Enclosure:

Response to Request for Additional Information - Physical Security Plan

ULNRC-05954 January 28, 2013 Page 3 cc:

(copy without Enclosure except as noted with asterisk*)

Mr. Elmo E. Collins*

Regional Administrator U. S. Nuclear Regulatory Commission Region IV 1600 East Lamar Boulevard Arlington, TX 76011-4511 Physical Security Inspector U.S. Nuclear Regulatory Commission 1600 East Lamar Boulevard Arlington, TX 76011-4511 Senior Resident Inspector

-CallaEdWiy Residhtl-tOffice - .

U.S. Nuclear Regulatory Commission 8201 NRC Road Steedman, MO 65077 Mr. Fred Lyon*

Project Manager, Callaway Plant Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop O-8G14 Washington, DC 20555-2738

ULNRC-05954 January 28, 2013 Page 4 Index and send hardcopy to QA File A160.0761 Hardcopy:

Certrec Corporation 4150 International Plaza Suite 820 Fort Worth, TX 76109 (Certrec receives ALL attachments as long as they are non-safeguards and may be publicly disclosed.)

Electronic distribution for the following can be made via Security Plan ULNRC Distribution:

(electronic copy without Enclosure)

A. C. Heflin F. M. Diya C. 0. Reasoner III D. W. Neterer L. H. Graessle E.-C.-Olson.

S. A. Maglio R. Holmes-Bobo NSRB Secretary T. B. Elwood Mr. Mike Westman (WCNOC)

Mr. Tim Hope (Luminant Power)

Mr. Ron Barnes (APS)

Mr. Tom Baldwin (PG&E)

Mr Mike Murray (STPNOC)

Ms. Linda Conklin (SCE)

Mr. John O'Neill (Pillsbury Winthrop Shaw Pittman LLP)

Missouri Public Service Commission