|
---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML18152B3571999-10-22022 October 1999 Requests Relief from Temporary Repair of Through Wall Leak Discovered on 30 Inch Component Cooling Heat Exchanger Discharge Pipe Associated with Service Water Sys Common to Surry Units 1 & 2 ML20217K4391999-10-18018 October 1999 Provides Response to RAI to Support USI A-46 Program Submittal for North Anna Power Station,Units 1 & 2.Rev 10 to BNL Rept 52361,encl ML20217H3301999-10-14014 October 1999 Forwards Rev 0 to COLR for North Anna 2 Cycle 14 Pattern Su. No New Commitments Intended by Ltr ML18152B3581999-10-14014 October 1999 Submits Response to Violations Noted in Insp Repts 50-280/98-201 & 50-281/98-201.Corrective Actions:Visual Insps Were Completed on Accessible Coatings Inside Containment for Both Units 1 & 2 ML18152B3541999-10-12012 October 1999 Requests Use of Code Case N-532 & N-619,per Provisions of 10CFR50.55a(a)(3).Detailed Info Supporting Request,Encl. Attachment 2 Includes Technical White Paper That Provides Further Technical Info ML20212J9101999-10-0101 October 1999 Forwards SE Accepting Licensee 990916 & 27 Relief Requests IWE-3 for Plant.Se Addresses Only IWE-3 Due to Util Urgent Need for Relief.Requests IWE-7 & IWE-8 Will Be Addressed at Later Date ML20216K1681999-10-0101 October 1999 Forwards Vols I-VIII of Rev 35 to UFSAR for Naps.Rev Also Includes Update to Chapter 17 of Ufsar,Which Contains Operational QA Program.Changes to Program Description Do Not Reduce Commitments Contained Therein ML18152B3391999-09-27027 September 1999 Forwards Revised Relief Request IWE-3,which Now Includes Addl Visual Exam Requirement After post-repair or Mod Pressure Testing Is Completed,Per Telcon with NRC ML18152B3401999-09-27027 September 1999 Requests That Ma Walker Be Removed from List of Individuals Scheduled to Take Exam IAW Guidance Provided in NUREG-1021, Operator Licensing Exam Stds for Power Reactors ML20212G5091999-09-22022 September 1999 Forwards in Triplicate,Applications for Renewal of Licenses for Listed Individuals.Encls Withheld,Per 10CFR2.790(a)(6) ML18152B3381999-09-21021 September 1999 Forwards in Triplicate,Applications for Renewal of License for Bf Jurewicz & JW Heide.Without Encls ML18152B3331999-09-17017 September 1999 Forwards Revised 180-day Response to NRC GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves. ML18152B6671999-09-17017 September 1999 Forwards Two NRC Forms 536,containing Info on Proposed Site Specific Operator Licensing Exam Schedules & Estimated Number of Applicants Planning to Take Exams And/Or Gfes,In Response to NRC Administrative Ltr 99-03 ML18152B3341999-09-16016 September 1999 Requests Relief from Specific Requirements of Subsection IWE of 1992 Edition with 1992 Addenda of ASME Section XI Re Containment Liner Examination Requirements,For North Anna & Surry Power Stations ML18152B4521999-09-14014 September 1999 Forwards Comments on Review of Preliminary Accident Sequence Precursor Analysis of Operational Event That Occurred at Plant,On 980508,as Reported in LER 98-009 ML20216F1381999-09-0808 September 1999 Forwards Retake Exam Repts 50-280/99-302 & 50-281/99-302 on 990824.One SRO Applicant Who Received re-take Operating Test Passed re-take Exam ML18152B4501999-09-0808 September 1999 Submits in Triplicate,Application for Renewal of License for Rd Scherer,Iaw 10CFR55.57.Requests That Certification of Medical Exam by Facility Licensee,Nrc Form 396,be Withheld from Public Disclosure,Per 10CFR2.790(a)(6) ML20211N2531999-09-0808 September 1999 Responds to Request to Exceed 60,000 Mwd/Mtu Lead Rod Burnup in Small Number of Fuel Rods in North Anna Unit 2.Informs That NRC Offers No Objection to Requested Use of Rods in Reconstituted Fuel Assembly.Se Supporting Request Encl ML20211L9151999-09-0101 September 1999 Forwards Response to NRC Request for Comments Re Closure of Review of Response to GL 92-01,Rev 1,Suppl 1, Reactor Vessel Structural Integrity ML18152B4471999-09-0101 September 1999 Requests That NRC Remove Listed Labels from Distribution ML20211J2211999-08-31031 August 1999 Approves Request to Remove Augmented ISI (Aii) Program for RCS Bypass Lines from North Anna Licensing Basis.Se Re Request to Apply LBB to Eliminate Augmented Insp Program on RCS Bypass Lines Encl ML20211H4131999-08-27027 August 1999 Informs That Util Revised Encl Bases for TS 2.2.1, Reactor Trip Sys Instrumentation Setpoints, Discussing Steam Flow/ Feed Flow Mismatch Portion of Steam Flow/Feed Flow Mismatch & Low SG Water Level Reactor Trip Setpoint ML18152B3711999-08-27027 August 1999 Forwards LER 99-005-00,per Plant TS Table 3.7.6.Rept Has Been Reviewed by Station Nuclear Safety & Operating Committee.Commitment Made by Util,Listed ML18152B3851999-08-23023 August 1999 Forwards Revised TS Basis Pages for TS 3.1.B,deleting Reactor Vessel Toughness Data Duplicated in Ufsar.Ref to Applicable UFSAR Section Included in TS Basis ML20138B3241999-08-23023 August 1999 Forwards Draft Response to Question 1 Re NAPS USI A-46 ML20211D9041999-08-20020 August 1999 Forwards Revised Pages to Third Ten Year ISI Program & Relief Requests, Replacing Pages in 990408 Submittal ML18152B3651999-08-20020 August 1999 Requests Removal of License Condition from Sh Wightman Operator License SOP-21538.Updated NRC Form 396 Is Encl.Form NRC 396 Withheld,Per 10CFR2.790(a)(6) ML18152B3661999-08-20020 August 1999 Provides Medical Status Rept for E Washington,As Required by License Conditions.Summary of E Washington Current Physical Exam & Pertinent Lab Data Attached.Encl Withheld,Per 10CFR2.790(a)(6) ML18152B3681999-08-20020 August 1999 Submits 30-day Rept Re Two Instances in Which Conditions of Approval in Coc Were Not Observed in Making Shipment.Two Type B Shipments Using Model CNS 8-120B Package Were Made After Expiration of QA Program Approval Between 990531-0628 ML18152B3801999-08-18018 August 1999 Forwards Technical Rept NE-1206,Rev 0, Surry Unit 2,Cycle 16 Startup Physics Tests Rept, Summarizing Results of Physics Testing Program Performed After Initial Criticality on 990525 ML20211B3871999-08-17017 August 1999 Requests Permission to Routinely Discharge from SW Reservior to Waste Heat Treatment Facility Under Existing Vpdes Permit Through Outfalls 108 & 103.Discharges Are Scheduled to Commence on 990907,due to High Priority Placed on Project ML20210T0671999-08-13013 August 1999 Informs of Completion of Review of Proposed Revs of Schedule for Withdrawal of Rv Surveillance Capsules Submitted by VEPCO on 981217.Approves Proposed Revs.Forwards Safety Evaluation ML18152B3781999-08-13013 August 1999 Forwards ISI Summary Rept for Surry Power Station,Unit 2 for 1999 Refueling Outage.Rept Provides Summary of Examination Performed During Outage for Third ISI Interval.No New Commitments Were Made ML18152B3751999-08-13013 August 1999 Forwards LER 99-004-00,IAW 10CFR50.73.Commitment Made by Util,Listed ML20210Q9841999-08-12012 August 1999 Forwards Rev 1 to Vepc COLR for North Anna Unit 2,Cycle 13 Pattern Ud, Per TS 6.9.1.7.d.COLR Was Revised to Include Temp Coastdown Operation at End of Cycle 13 ML20210Q7661999-08-0606 August 1999 Requests Exception to 10CFR50.4 Requirement to Provide Total of Twelve Paper Copies When Submitting Surry & North Anna UFSAR Updates.Seek Approval to Submit Only Signed Original & One CD-ROM Version,Per Conversation with J Skoczlas ML18152B4081999-08-0606 August 1999 Forwards Response to NRC 990520 & 0525 RAIs Re North Anna & Surry Responses to GL 95-07, Pressure Locking & Thermal Binding of SR Power-Operated Gate Valves. ML18152B4091999-08-0505 August 1999 Forwards Vepc semi-annual fitness-for-duty Program Performance Data Rept for 990101-990630,IAW 10CFR26.71(d) ML20210N2921999-08-0505 August 1999 Discusses Which Submitted Proposed TSs Bases Change for Containment Leakage. Licensee Changes to Bases May Be Subj to Future Insps or Audits ML20210J8861999-08-0202 August 1999 Provides Clarification to Commitment Made in Identifying Extent by Which Existing Plant Design Complied with RG 1.97,specifically Re Variable, Radiation Exposure Rate ML18152B4001999-07-29029 July 1999 Requests Relief from Certain Impractical Requirements of ASME Section XI Code Associated with Partial Exams Conducted During 1998 Surry Unit 1 Refueling Outage.Relief Request SR-020 Encl ML18152B3981999-07-28028 July 1999 Forwards 60-day Response to GL 99-02, Lab Testing of Nuclear-Grade Activated Charcoal. Commitments Contained in Ltr,Listed ML20210F6121999-07-28028 July 1999 Forwards Supplemental Info on Proposed Irradiation of Fuel Rods Beyond Current Lead Rod Burnup Limit,Documenting Info Provided During 990624 Meeting & Suppl Original Submittal ML18152B3971999-07-26026 July 1999 Provides Estimates of Licensing Actions Expected to Be Submitted in Fys 2000 & 2001,in Response to NRC AL 99-02 ML18152B3961999-07-23023 July 1999 Forwards Preliminary,Uncertified License Application & Medical Certification for License to Operate Surry Power Station Units 1 & 2 for Ds Cobb.Encl Withheld,Per 10CFR2.790 (a)(6) ML18152B3991999-07-23023 July 1999 Requests That License for Jz Laplante Be Canceled as License Is No Longer Required ML18151A6281999-07-23023 July 1999 Forwards Revised Epips,Including Rev 19 to EPIP-4.02,rev 14 to EPIP-4.16,rev 8 to EPIP-4.21 & Rev 7 to EPIP-4.30.EP & EPIPs Continue to Meet Stds of 10CFR50.47(b) ML18152B3931999-07-16016 July 1999 Forwards Updated NRC Form 396 & Ltr,Which Documents Medical Status of Mb Gross,License SOP-20476-2.Encl Withheld from Public Disclosure,Per 10CFR2.790(a)(6) ML20209E7621999-07-0909 July 1999 Provides Addl Info to Justify Use of Less than One Gpm Detectable Leakage Rate to Establish Required Margin for Crack Stability in LBB Analysis,Per 980623 Application on Reactor Coolant Loop Bypass Lines 05000338/LER-1999-005, Forwards LER 99-005-00,IAW 10CFR50.73.Commitment Made by Util Encl1999-07-0808 July 1999 Forwards LER 99-005-00,IAW 10CFR50.73.Commitment Made by Util Encl 1999-09-08
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML18152B3571999-10-22022 October 1999 Requests Relief from Temporary Repair of Through Wall Leak Discovered on 30 Inch Component Cooling Heat Exchanger Discharge Pipe Associated with Service Water Sys Common to Surry Units 1 & 2 ML20217K4391999-10-18018 October 1999 Provides Response to RAI to Support USI A-46 Program Submittal for North Anna Power Station,Units 1 & 2.Rev 10 to BNL Rept 52361,encl ML20217H3301999-10-14014 October 1999 Forwards Rev 0 to COLR for North Anna 2 Cycle 14 Pattern Su. No New Commitments Intended by Ltr ML18152B3581999-10-14014 October 1999 Submits Response to Violations Noted in Insp Repts 50-280/98-201 & 50-281/98-201.Corrective Actions:Visual Insps Were Completed on Accessible Coatings Inside Containment for Both Units 1 & 2 ML18152B3541999-10-12012 October 1999 Requests Use of Code Case N-532 & N-619,per Provisions of 10CFR50.55a(a)(3).Detailed Info Supporting Request,Encl. Attachment 2 Includes Technical White Paper That Provides Further Technical Info ML20216K1681999-10-0101 October 1999 Forwards Vols I-VIII of Rev 35 to UFSAR for Naps.Rev Also Includes Update to Chapter 17 of Ufsar,Which Contains Operational QA Program.Changes to Program Description Do Not Reduce Commitments Contained Therein ML18152B3401999-09-27027 September 1999 Requests That Ma Walker Be Removed from List of Individuals Scheduled to Take Exam IAW Guidance Provided in NUREG-1021, Operator Licensing Exam Stds for Power Reactors ML18152B3391999-09-27027 September 1999 Forwards Revised Relief Request IWE-3,which Now Includes Addl Visual Exam Requirement After post-repair or Mod Pressure Testing Is Completed,Per Telcon with NRC ML20212G5091999-09-22022 September 1999 Forwards in Triplicate,Applications for Renewal of Licenses for Listed Individuals.Encls Withheld,Per 10CFR2.790(a)(6) ML18152B3381999-09-21021 September 1999 Forwards in Triplicate,Applications for Renewal of License for Bf Jurewicz & JW Heide.Without Encls ML18152B6671999-09-17017 September 1999 Forwards Two NRC Forms 536,containing Info on Proposed Site Specific Operator Licensing Exam Schedules & Estimated Number of Applicants Planning to Take Exams And/Or Gfes,In Response to NRC Administrative Ltr 99-03 ML18152B3331999-09-17017 September 1999 Forwards Revised 180-day Response to NRC GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves. ML18152B3341999-09-16016 September 1999 Requests Relief from Specific Requirements of Subsection IWE of 1992 Edition with 1992 Addenda of ASME Section XI Re Containment Liner Examination Requirements,For North Anna & Surry Power Stations ML18152B4521999-09-14014 September 1999 Forwards Comments on Review of Preliminary Accident Sequence Precursor Analysis of Operational Event That Occurred at Plant,On 980508,as Reported in LER 98-009 ML18152B4501999-09-0808 September 1999 Submits in Triplicate,Application for Renewal of License for Rd Scherer,Iaw 10CFR55.57.Requests That Certification of Medical Exam by Facility Licensee,Nrc Form 396,be Withheld from Public Disclosure,Per 10CFR2.790(a)(6) ML18152B4471999-09-0101 September 1999 Requests That NRC Remove Listed Labels from Distribution ML20211L9151999-09-0101 September 1999 Forwards Response to NRC Request for Comments Re Closure of Review of Response to GL 92-01,Rev 1,Suppl 1, Reactor Vessel Structural Integrity ML20211H4131999-08-27027 August 1999 Informs That Util Revised Encl Bases for TS 2.2.1, Reactor Trip Sys Instrumentation Setpoints, Discussing Steam Flow/ Feed Flow Mismatch Portion of Steam Flow/Feed Flow Mismatch & Low SG Water Level Reactor Trip Setpoint ML18152B3711999-08-27027 August 1999 Forwards LER 99-005-00,per Plant TS Table 3.7.6.Rept Has Been Reviewed by Station Nuclear Safety & Operating Committee.Commitment Made by Util,Listed ML18152B3851999-08-23023 August 1999 Forwards Revised TS Basis Pages for TS 3.1.B,deleting Reactor Vessel Toughness Data Duplicated in Ufsar.Ref to Applicable UFSAR Section Included in TS Basis ML20138B3241999-08-23023 August 1999 Forwards Draft Response to Question 1 Re NAPS USI A-46 ML20211D9041999-08-20020 August 1999 Forwards Revised Pages to Third Ten Year ISI Program & Relief Requests, Replacing Pages in 990408 Submittal ML18152B3681999-08-20020 August 1999 Submits 30-day Rept Re Two Instances in Which Conditions of Approval in Coc Were Not Observed in Making Shipment.Two Type B Shipments Using Model CNS 8-120B Package Were Made After Expiration of QA Program Approval Between 990531-0628 ML18152B3661999-08-20020 August 1999 Provides Medical Status Rept for E Washington,As Required by License Conditions.Summary of E Washington Current Physical Exam & Pertinent Lab Data Attached.Encl Withheld,Per 10CFR2.790(a)(6) ML18152B3651999-08-20020 August 1999 Requests Removal of License Condition from Sh Wightman Operator License SOP-21538.Updated NRC Form 396 Is Encl.Form NRC 396 Withheld,Per 10CFR2.790(a)(6) ML18152B3801999-08-18018 August 1999 Forwards Technical Rept NE-1206,Rev 0, Surry Unit 2,Cycle 16 Startup Physics Tests Rept, Summarizing Results of Physics Testing Program Performed After Initial Criticality on 990525 ML18152B3781999-08-13013 August 1999 Forwards ISI Summary Rept for Surry Power Station,Unit 2 for 1999 Refueling Outage.Rept Provides Summary of Examination Performed During Outage for Third ISI Interval.No New Commitments Were Made ML18152B3751999-08-13013 August 1999 Forwards LER 99-004-00,IAW 10CFR50.73.Commitment Made by Util,Listed ML20210Q9841999-08-12012 August 1999 Forwards Rev 1 to Vepc COLR for North Anna Unit 2,Cycle 13 Pattern Ud, Per TS 6.9.1.7.d.COLR Was Revised to Include Temp Coastdown Operation at End of Cycle 13 ML20210Q7661999-08-0606 August 1999 Requests Exception to 10CFR50.4 Requirement to Provide Total of Twelve Paper Copies When Submitting Surry & North Anna UFSAR Updates.Seek Approval to Submit Only Signed Original & One CD-ROM Version,Per Conversation with J Skoczlas ML18152B4081999-08-0606 August 1999 Forwards Response to NRC 990520 & 0525 RAIs Re North Anna & Surry Responses to GL 95-07, Pressure Locking & Thermal Binding of SR Power-Operated Gate Valves. ML18152B4091999-08-0505 August 1999 Forwards Vepc semi-annual fitness-for-duty Program Performance Data Rept for 990101-990630,IAW 10CFR26.71(d) ML20210J8861999-08-0202 August 1999 Provides Clarification to Commitment Made in Identifying Extent by Which Existing Plant Design Complied with RG 1.97,specifically Re Variable, Radiation Exposure Rate ML18152B4001999-07-29029 July 1999 Requests Relief from Certain Impractical Requirements of ASME Section XI Code Associated with Partial Exams Conducted During 1998 Surry Unit 1 Refueling Outage.Relief Request SR-020 Encl ML18152B3981999-07-28028 July 1999 Forwards 60-day Response to GL 99-02, Lab Testing of Nuclear-Grade Activated Charcoal. Commitments Contained in Ltr,Listed ML20210F6121999-07-28028 July 1999 Forwards Supplemental Info on Proposed Irradiation of Fuel Rods Beyond Current Lead Rod Burnup Limit,Documenting Info Provided During 990624 Meeting & Suppl Original Submittal ML18152B3971999-07-26026 July 1999 Provides Estimates of Licensing Actions Expected to Be Submitted in Fys 2000 & 2001,in Response to NRC AL 99-02 ML18152B3991999-07-23023 July 1999 Requests That License for Jz Laplante Be Canceled as License Is No Longer Required ML18152B3961999-07-23023 July 1999 Forwards Preliminary,Uncertified License Application & Medical Certification for License to Operate Surry Power Station Units 1 & 2 for Ds Cobb.Encl Withheld,Per 10CFR2.790 (a)(6) ML18151A6281999-07-23023 July 1999 Forwards Revised Epips,Including Rev 19 to EPIP-4.02,rev 14 to EPIP-4.16,rev 8 to EPIP-4.21 & Rev 7 to EPIP-4.30.EP & EPIPs Continue to Meet Stds of 10CFR50.47(b) ML18152B3931999-07-16016 July 1999 Forwards Updated NRC Form 396 & Ltr,Which Documents Medical Status of Mb Gross,License SOP-20476-2.Encl Withheld from Public Disclosure,Per 10CFR2.790(a)(6) ML20209E7621999-07-0909 July 1999 Provides Addl Info to Justify Use of Less than One Gpm Detectable Leakage Rate to Establish Required Margin for Crack Stability in LBB Analysis,Per 980623 Application on Reactor Coolant Loop Bypass Lines 05000338/LER-1999-005, Forwards LER 99-005-00,IAW 10CFR50.73.Commitment Made by Util Encl1999-07-0808 July 1999 Forwards LER 99-005-00,IAW 10CFR50.73.Commitment Made by Util Encl ML18152B4401999-07-0101 July 1999 Informs NRC That on 990511,Dominion Resources,Inc,Executed Amended & Restated Agreement & Plan of Merger with Consolidated Natural Gas Co ML18152B4371999-06-24024 June 1999 Forwards Response to NRC Request for Clarification of Relief Requests Submitted on 990212,requesting Relief from Performing Hydrostatic Testing for Certain Small Diameter Class 1,RCS Pressure Boundary Connections ML18152B4361999-06-22022 June 1999 Forwards Response to RAI Re Surry & North Anna Power Stations,Units 1 & 2,per GL 96-06 ML20196F1151999-06-22022 June 1999 Forwards Relief Requests NDE-047 & NDE-048 for North Anna Power Station,Unit 1 Re ASME Section XI ISI Program ML20212J2951999-06-22022 June 1999 Forwards Corrected Markup & Typed Version of Affected Pages. Requests That Attached Pages for Those Previously Provided in 990506 Submittal Be Replaced & Incorporated Into NRC Review of Proposed TS ML20195J7011999-06-15015 June 1999 Forwards Revised EPIP 2.01 Which Corrects Typo That Was Found in Step 10 of Procedure.Rev Does Not Implement Actions That Decrease Effectiveness of EP ML18152B4301999-06-0303 June 1999 Informs of Util Intention to Revise Schedule for Submittal of License Renewal Applications for Surry & North Anna Power Stations to March 2002 1999-09-08
[Table view] |
Text
e e VIRGINIA.
ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 March 14, 1996 United States Nuclear Regulatory Commission Attention:
Document Control Desk Washington, D.C. 20555 Gentlemen:
VIRGINIA ELECTRIC AND POWER COMPANY Serial No. NAF/KFF/GDM Docket Nos. License Nos. NORTH ANNA AND SURRY POWER STATIONS UNITS 1 AND 2 REPORT OF ECCS EVALUATION MODEL CHANGES AND 30-DAY REPORT OF ECCS EVALUATION MODEL CHANGES PER REQUIREMENTS OF 10CFR50.46 96-111 RO 50-338 50-339 50-280 50-281 NPF-4 NPF-7 DPR-32 DPR-37 Pursuant to 1 OCFR50.46(a)(3)(ii), Virginia Electric and Power Company is providing information concerning changes to the ECCS Evaluation Models and their application in existing licensing analyses.
Information is also provided which quantifies the effect of these changes upon reported results for North Anna and Surry Power Stations, and demonstrates continued compliance with the acceptance criteria of 1 OCFR50.46.
Attachment 1 contains excerpted portions of the Westinghouse report describing the changes to the Westinghouse ECCS Evaluation Models which are applicable to Surry and North Anna and have been implemented during calendar year 1995. Information regarding the effect of the EGGS Evaluation Model changes upon the reported LOCA analysis of record results is provided for North Anna and Surry Power Stations in Attachments 2 and 3, respectively.
To summarize the information in Attachments 2 and 3, the calculated peak cladding temperature (PCT) for the small and large break LOCA analyses for North Anna and Surry are given below. Results which represent significant changes, based on the criterion established in 1 OCFR50.46(a)(3)(i), are designated with an asterisk.
North Anna Units 1 and 2 -Small break: 1709° F North Anna Units 1 and 2 -Large break: 2053°F Surry Units 1 and 2 -Small break: 184 7° F (*) Surry Units 1 and 2 -Large break: 2098° F 9603190250 960314 PDR ADOCK 05000280 P
- PDR J e We have evaluated these issues and the associated changes in the applicable licensing basis PCT results. These results demonstrate compliance with the requirements of 1 OCFR50.46(b).
Although the Surry small break LOCA changes described in Attachment 3 are significant, as defined in 1 OCFR50.46(a)(3)(i), the licensing basis PCT results have adequate margin to the limit. 1 OCFR50.46(a)(3)(ii) specifically requests that the 30-day report include a proposed schedule for providing a reanalysis or taking other action as may be needed to show compliance with 1 OCFR50.46 requirements.
A reanalysis of the small break LOCA accident for Surry Units 1 and 2 is scheduled to be completed by the end of the fourth quarter 1996. No further action is required to demonstrate compliance with 1 OCFR50.46 requirements.
If you have further questions or require additional information, please contact us. Very truly yours, James P. O'Hanlon Senior Vice President
-Nuclear Attachments:
- 1) Westinghouse Report of ECCS Evaluation Model Changes for 1995 -North Anna Units 1 and 2 and Surry Units 1 and 2 2) Effect of ECCS Evaluation Model Changes -North Anna Units 1 and 2 3) Effect of ECCS Evaluation Model Changes -Surry Units 1 and 2 e e ATTACHMENT 1 WESTINGHOUSE REPORT OF ECCS EVALUATION MODEL CHANGES FOR 1995 NORTH ANNA UNITS 1 AND 2 AND SURRY UNITS 1 AND 2 e e NOTRUMP SPECIFIC ENTHALPY ERROR Background A typographical error was found in a line of coding in the NOTRUMP code. 'This line of coding was intended to model the calculation found in Equation L-127 of WCAP-10079-P-A.
Although the equation in the topical report is correct. the coding represented the last term as a partial derivative with respect to the fluid node mixture region total energy instead of the mixture region total mass. 'This correction is a Non-Discretionary Change in accordance with Section 4.1.2 of WCAP--13451.
Affected Evaluation Model 1985 Westinghouse Small Break LOCA Evaluation Model Using NOTRUMP Estimated Effect Representative plant calculations have led to an estimated effect of +20°F for this error correction.
e SALIBRARY DOUBLE PRECISION ERRORS Background During migration of the LOCA codes from the CRAY computer to UNIX-based platforms, programming errors were made in two library routines related to improper specification of double precision variables.
These errors were found and fixed during later code maintenance.
Affected Evaluation Models 1981 Westinghouse Large Break LOCA Evaluation Model Using BASH 1985 Westinghouse Small Break LOCA Evaluation Model Using NOTRUMP Estimated Effect Test cases with individual codes in the models demonstrated very small differences in only the SATAN . and NOTRUMP code results, with correspondingly minor effects on final peak clad temperature predictions.
Because the error only affects a very limited number of LBLOCA analyses which were performed on the UNIX platform prior to correcting the codes, the evaluation of effects for LBLOCA analyses were assessed on a plant-specific basis. For SBLOCA analyses performed on the UNIX platform, representative plant calculations resulted in an estimated generic impact of -15°F for affected analyses.
e MACBETH CORRELATION ERROR Background An error was found in the implementation of the Macbeth correlation for critical heat flux calculations.
Tilis error involved an incorrect determination of the boundary between the low flow and high flow regimes in that model leading to the possibility of using the incorrect regime correlation in some circumstances.
Tilis correction is a Non-Discretionary Change in accordance with Section 4.1.2 of WCAP-13451. Affected Evaluation Models 1975 Westinghouse Small Break LOCA Evaluation Model Using WFLASH 1985 Westinghouse Small Break LOCA Evaluation Model Using NOTRUMP 1981 Westinghouse Large Break LOCA Evaluation Model 1981 Westinghouse Large Break LOCA Evaluation Model Using BART 1981 Westinghouse Large Break LOCA Evaluation Model Using BASH Estimated Effect Representative plant calculations have led to an estimated non-significant effect of +0°F for this correction in all of the LBLOCA and SBLOCA Evaluation Models. .
SPADES UPPER HEAD ENTIIALPY ERROR Background An error was discovered in the SPADES computer code in which the code incorrectly sets the initial NOTRUMP upper head enthalpy equal to the top core node enthalpy for Thot upper head plants. In the current NOTRUMP methodology, the upper head enthalpy is set equal to the hot leg enthalpy for Thot upper head plants. lbis was determined to be a Non-Discretionary change and corrected as described in section 4.1.3 of WCAP-13451.
Affected Evaluation Model 1985 Westinghouse Small Break LOC~ Evaluation Model Using NOTRUMP Estimated Effect The difference between the hot leg enthalpy and top core node enthalpy calculated using SP ADES is negligible.
Additionally, the primary side pressure and temperature conditions typically change during the process of generating a suitable steady state calculation by more than the initial differences introduced by this error. As such, this error is estimated to result in a net PCf effect of 0°F for all analyses.
e CORE BARREL STRUCTURAL METAL MODEL ERRORS Background Errors were discovered in the calculations of the effective equivalent diameter of the heat links connecting metal from the core barrel to fluid nodes in the BASH model. These calculations are performed with the BASHER input processor which is used to generate input decks for the BASH code. The effective equivalent diameter is a minor parameter in the entire strucrural metal heat transfer model. Affected Evaluation Model 1981 Westinghouse Large Break LOCA Evaluation Model Using BASH Estimated Effects Evaluation of the effect of the corrections determined that there was negligible effect on calculated peak cladding temperatures.
No penalty or benefit will be assessed to existing analyses.
e ATTACHMENT 2 EFFECT OF ECCS EVALUATION MODEL CHANGES NORTH ANNA UNITS 1 AND 2 Effect of ECCS Evaluation Model Changes -North Anna The information provided herein is applicable to North Anna Power Station, Units 1 and 2. It is based upon reports from Westinghouse Electric Corporation for issues involving
- -the ECCS evaluation models and plant-specific application of the models in the existing analyses.
Peak cladding temperature (PCT) values and margin allocations represent issues for which permanent resolutions have been implemented.
The assessments for small break and large break LOCA are presented in Sections A and B, respectively.
Section A -Small Break LOCA Margin Utilization
-North Anna Units 1 and 2 A. PCT for Analysis of Record (AOR) 1704°F B. Prior PCT Assessments Allocated to AOR 0°F SBLOCA Augmented PCT for AOR 1704°F C. PCT Assessments for 1 OCFR50.46(a)(3)(i)
Accumulation 35°F 1. NOTRUMP Specific Enthalpy Error {1} {2} +20°F 2. SALIBRARY Double Precision Errors {1} {2} -15°F SBLOCA Licensing Basis PCT (AOR PCT+ PCT Assessments) 1709°F Section B -Large Break LOCA Margin Utilization
-North Anna Units 1 and 2 A. PCT for Analysis of Record (AOR) B. Prior PCT Assessments Allocated to AOR 1 . LBLOCNSeismic SG Tube Collapse 2. BASH Accumulator Empty Flag LBLOCA Augmented PCT for AOR 2013°F 40°F +30°F +10°F 2053°F C. PCT Assessments for 1 OCFR50.46(a)(3)(i)
Accumulation 0° F LBLOCA Licensing Basis PCT (AOR PCT+ PCT Assessments) 2053° F (Notes { } and References ( ) on the following page.) (1) (1) (1) (1)
Notes: {1} The current report is the initial quantification of effects for this issue. {2} Refer to the Westinghouse Report of ECCS Evaluation Model Changes for 1995 provided in Attachment 1 .
Reference:
(1) Letter from J. P. O'Hanlon (VEPCO) to Document Control Desk (USNRC), "Virginia Electric and Power Company, North Anna Power Station Units 1 and 2, 30-Day Report of ECCS Evaluation Model Changes Per Requirements of 10CFR50.46," Serial No.95-608, November 29, 1995.
ATTACHMENT 3 EFFECT OF ECCS EVALUATION MODEL CHANGES SURRY UNITS 1 AND 2 e e Effect of Westinghouse ECCS Evaluation Model Changes -Surry The information provided herein is applicable to Surry Power Station, Units 1 and 2. It is based upon reports from Westinghouse Electric Corporation for issues involving the ECCS evaluation models and plant-specific application of the models in the existing analyses.
Peak cladding temperature (PCT) values and margin allocations represent issues for which permanent resolutions have been implemented.
The assessments for small break and large break LOCA are presented in Sections A and B, respectively.
Section A -Small Break LOCA Margin Utilization
-Surry Units 1 and 2 A. PCT for Analysis of Record (AOR) B. Prior PCT Assessments Allocated to AOR 1. Safety Injection in the Broken Loop (NOTRUMP)
- 2. NOTRUMP Drift Flux Flow Regime Map Errors 3. Vessel & SG Calculation Errors in LUCIFER 4. SBLOCA Limiting Time in Life -Zirc/Water Oxidation
- 5. NOTRUMP Boiling Heat Transfer Correlation Errors 6. NOTRUMP Steam Line Isolation Logic Errors 7. ZIRLOTM Cladding {1} SBLOCA Augmented PCT for AOR C. PCT Assessments for 1 OCFR50.46(a)(3)(i)
Accumulation
{2} 1 . SBLOCTA Revisions and Axial Nodization Errors 2. Automatic Containment Spray Actuation
- 3. NOTRUMP Specific Enthalpy Error {3} {4} SBLOCA Licensing Basis PCT (AOR PCT+ PCT Assessments)
Section B -Large Break LOCA Margin Utilization
-Surry Units 1 and 2 A. PCT for Analysis of Record (AOR) B. Prior PCT Assessments Allocated to AOR (None) 1. ZIRLOŽ Cladding {1} . LBLOCA Augmented PCT for AOR C. PCT Assessments for 1 OCFR50.46(a)(3)(i)
Accumulation
- 1. Vessel & SG Calculation Errors in LUCIFER 2. LBLOCA Rod Internal Pressure Issues LBLOCA Licensing Basis PCT (AOR PCT+ PCT Assessments) (Notes { } and References ( ) on the following page.) 1852°F (1) +13°F 0°F (2) -13°F (2) -16°F (3) +15°F (3) -6°F (4) +18°F (4) +15°F (5,6) 1865°F 58°F -38°F (7) 0°F (7) +20°F 1847°F 2120°F (3) -16°F -16°F 2104°F 6°F -6°F (3) 0°F (3) 2098°F Notes: {1} Virginia Electric and Power Company in Reference 5 requested changes to the Technical Specifications of Surry Power Station Units 1 and 2 to allow the use of ZIRLO as a fuel cladding material.
The supporting safety evaluation presented changes in the application of the ECCS Evaluation Models Small and Large Break LOCA. The proposed Technical Specification changes were reviewed and approved by the NRC in Reference
- 6. {2} The accumulation of changes (sum of absolute magnitudes) exceeds 50° F and is significant, as defined in 1 OCFR50.46(a)(3)(i).
{3}.. The current report is the initial quantification of effects for this issue. {4} Refer to the Report of Westinghouse ECCS Evaluation Model Changes for 1995 provided in Attachment 1 .
References:
(1) Letter from W. L. Stewart (Va. Electric & Power Co.) to NRC, "Surry Power Station Units 1 and 2 -Proposed Technical Specifications Changes -FDH Increase/Statistical DNBR Methodology," Serial No.91-374; July 8, 1991. (2) Letter from W. L. Stewart (Va. Electric & Power Co.) to NRC, "Report of ECCS Evaluation Model Changes and 30-Day Report Per Requirements of 1 OCFR50.46-Surry Power Station Units 1 and 2, North Anna Power Station Units 1 and 2," Serial No. 93-182B, November 9, 1993. (3) Letter from W. L. Stewart (VEPCO) to Document Control Desk (USNRC), "Virginia Electric and Power Company, Surry Power Station Units 1 and 2, 30-Day Report of ECCS Evaluation Model Changes Per Requirements of 1 OCFR50.46," Serial No.94-254, April 27, 1994. (4) Letter from W. L. Stewart (VEPCO) to Document Control Desk (USNRC), "Virginia Electric and Power Company, Surry Power Station Units 1 and 2, 30-Day Report of ECCS Evaluation Model Changes Per Requirements of 1 OCFR50.46," Serial No. 94-254A, September 26, 1994. (5) Letter from J. P. O'Hanlon (Va. Electric & Power Co.) to USNRC (Document Control Desk), "Virginia Electric and Power Company, Surry Power Station Units 1 and 2, Proposed Technical Specification Changes to Implement ZIRLO Fuel Cladding," Serial No.94-673, November 29, 1994.
e e *~ (6) Letter from B.C. Buckley (USNRC) to J. P. O'Hanlon (Va. Electric & Power Co.), "Surry Units 1 and 2 -Issuance of Amendments Re: Use of ZIRLO (TAC Nos.
- M91003 and M91004)," July 27, 1995. (7) Letter from J. P. O'Hanlon (Va. Electric & Power Co.) to USNRC, "Virginia Electric and Power Company, North Anna Power Station Units 1 and 2, Surry Power Station Units 1 and 2, Report of ECCS Evaluation Model Changes Pursuant to Requirements of 1 OCFR50.46" Serial No.95-198, April 25, 1995.