|
|
Line 39: |
Line 39: |
| NP QA PB Date/Time of Discovery: | | NP QA PB Date/Time of Discovery: |
| 6/10/2005 7:38:43 AM Date/Time of Occurrence: | | 6/10/2005 7:38:43 AM Date/Time of Occurrence: |
| Identified By: Equipment# | | Identified By: Equipment# |
| (1st): Equipment | | (1st): Equipment |
| # (2nd): Equipment | | # (2nd): Equipment |
|
---|
Category:- No Document Type Applies
MONTHYEARML22034A3992022-02-16016 February 2022 Enclosure 1 - IP 71130.03 Cy 2021 - IR 8 Baseline Inspection Completion ML22034A3972022-02-16016 February 2022 Enclosure 2 - IP 92707 CY2021 - IR 8 Baseline Inspection Completion ML22034A3952022-02-16016 February 2022 Enclosure 3 - IP 96001 CY2021 - IR 8 Baseline Inspection Completion ML16285A3202016-10-12012 October 2016 ROP PI Frequently Asked Questions (Faqs): 13-04 ML16159A4002016-06-16016 June 2016 Iepra Ror for Point Beach SE Section 3.4 ML16159A4022016-06-16016 June 2016 Fpra Ror for Point Beach SE Section 3.4 ML15261A7492015-09-14014 September 2015 NRC Supplement to NRC Letter - Notification of NRC Inspection and Request for Information Dated May 1, 2015 - NextEra Energy Point Beach Nuclear Plant (Msh) ML16072A0362015-06-0303 June 2015 Receipt of Cd Containing Revised I/O Files from NextEra Point Beach Nuclear Plant Flood Hazard Re-Evaluation Report ML15014A1602015-01-14014 January 2015 Attachment 2 - NRC Working Group Recommendations to Revise the Substantive Cross-Cutting Issue Process ML15014A1532015-01-14014 January 2015 Attachment 1- NEI Comments on NRC Working Group Recommendations to Revise the Substantive Cross-Cutting Issue Process ML14314A5122014-11-13013 November 2014 Enclosure 2 - Frequently Asked Questions (Faqs) Discussed During the October 22 2014 Reactor Oversight Process Public Meeting ML14147A0112014-06-20020 June 2014 Staff Assessment of the Flooding Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-ichi Nuclear Power Plant Accident ML14149A1532014-05-0101 May 2014 FOIA/PA-2014-0074 - Resp 4 - Partial. Group F (Records Already Publicly Available) ML12056A0522012-03-12012 March 2012 Enclosure 6 - List of Power Reactor Licensees and Holders of Construction Permits in Active or Deferred Status ML1017301232010-06-0909 June 2010 Green Ticket Tritium Releases ML0806704192008-03-0707 March 2008 CDBI Findings ML0732400242007-10-25025 October 2007 Examples of Max Thermal Power License Conditions ML0726203022007-09-28028 September 2007 Amendment to Indemnity Agreement No. B-41, Amendment No. 14 ML0726303192007-09-14014 September 2007 P. Paquin Ltr Amendment to Certificate of Compliance No. 6574 for the Model No. 3-82B Package (TAC L24116)/ Register User List ML0635404332006-12-20020 December 2006 Enclosure 2 - Consent and Hearing Waiver Form - the Nuclear Management Company, LLC ML0634705992006-12-14014 December 2006 Plant Service List ML0627903812006-09-29029 September 2006 Exhibit 26 to Case No. 2-2002-004, Interview Report ML0626801502006-09-22022 September 2006 Escort Ratio for Visitors ML0626503122006-09-0101 September 2006 Liquid Radiation Release Lessons Learned Task Force Final Report (Enclosure) ML0626504142005-11-0303 November 2005 RIII-2005-A-0062 Closure ML0626802782005-08-29029 August 2005 3rd ARB Action Plan RIII-05-A-0062 (Point Beach) ML0626802752005-08-22022 August 2005 2nd ARB Action Plan, RIII-05-A-0062 (Point Beach) ML0626504072005-07-19019 July 2005 Action Request - Corrective Action Program (CAP) ML0626802642005-07-18018 July 2005 Initial ARB Action Plan RIII-05-A-0062 (Point Beach) ML0518603982005-07-15015 July 2005 NRC Actions Under the Reactor Oversight Process for the Point Beach Nuclear Plant, Units 1 and 2 ML0518903972005-07-0101 July 2005 Log Entries Report ML0518903962005-07-0101 July 2005 U1R28 Outage Risk Plan Ppg Outage Management ML0518903952005-07-0101 July 2005 U1R28 Add/Delete Log ML0626504032005-06-22022 June 2005 Action Request - Corrective Action Program (CAP) (CAP065250) ML0626503992005-06-10010 June 2005 Action Request - Corrective Action Program (CAP) (CAP065041) ML0626504012005-06-10010 June 2005 Action Request - Corrective Action Program (CAP) (CAP065035) ML0515202282005-05-24024 May 2005 EP FFD Questions Not Asked ML0514700842005-05-24024 May 2005 COLR 28 Replaced with COLR 29 Prior to Vessel Removal. Attach: 04/14/2004 Condition Evaluation 013784. Attach: 04/12/2004 CAP 055612. Attach: Undated Bullet Nose Disconnected & Removed with Head ML0515202262005-05-24024 May 2005 2SI-825B Not Full Open with Handwritten Notations ML0515202242005-05-24024 May 2005 Phone Line Through Containment Hatch While Fuel Movement in Progress ML0515202232005-05-24024 May 2005 Loss of SFP Cooling Due to Breaker Miss Alignment ML0515202212005-05-24024 May 2005 2SI-825B Not Full Open with Handwritten Notations ML0515202192005-05-24024 May 2005 U1R28 Interim Exit Meeting Notes ML0515202182005-05-24024 May 2005 Tsac Not Entered When Source Range Audible Count Rate Removed from Service ML0515202072005-05-24024 May 2005 Questions for Followup Based on Last Outage ISI Summary Report ML0514700772005-05-24024 May 2005 Refuel Outage 1R28 Resident Inspector Coverage ML0514700822005-05-24024 May 2005 Mikes 2004-03 IR Section Write Ups, 2T-34A Accumulator Level Indication ML0515201472005-05-24024 May 2005 Phone Line Through Containment Hatch While Fuel Movement in Progress ML0515202132005-05-24024 May 2005 Inservice Inspection Document Request ML0515201492005-05-24024 May 2005 Transient Combustible Materials in Containment & Turbine Building Without Administrative Controls 2022-02-16
[Table view] |
Text
TeamTrack Reports NMC > Sites > Point Beach -Action Request > Corrective Actn Program (CAP) AR Section I Page 4 of 62 6/1012005 7:40:40 AM Activity Request Id: Activity Type: @ One Line
Description:
Detailed
Description:
Initiator:
CAP065035 CAP Submit Date: Improvement Opportunity for Behavior Observation Program 6/10/2005 7:40:40 AM -WALESH, RUSS: This was identified during NOS assessment 2005-002-3-029.
10 CFR 26 requires that all individuals responsible for administering the testing program be subjected to the behavioral observation program. By virtue of employment, all personnel are subject to the observation program. However, some individuals are not employed by the Nuclear Management Company/ We Energies.
For example, the physicians are not employees.
In an Interview with the Site ANFFD Supervisor, he indicated that he and the Site Access Coordinator has almost daily communication with the physicians.
A similar situation exists with other testing personnel (such as in Appleton and Milwaukee).
Communications with these personnel is less frequent (several times per month). These constitute observations and therefore they are considered observed.
An opportunity for improvement was identified to formally document this observation, much like is done with personnel who have unescorted access to the site but are not stationed at the site (such as Milwaukee employees) using form QF-1707 (Access Authorization/Behavioral Observation Review).
Requirement:
10 CFR 26 Appendix A, Section 2.3 (3) Preventing Subversion of Testing.
Licensees shall carefully select and monitor persons responsible for administering the testing program (e.g., collection site persons, laboratory technicians, specimen couriers, and those selecting and notifying personnel to be tested), based upon the highest standards for honesty and integrity, and shall implement measures to ensure that these standards are maintained.
As a minimum, these measures shall ensure that the integrity of such persons is not compromised or subject to efforts to compromise due to personal relationships with any individuals subject to testing.
As a minimum: (3) Persons responsible for administering the testing program shall be subjected to a behavioral observation program designed to assure that they continue to meet the highest standards for honesty and integrity.
WALESH, RUSS 4 Initiator Department:
NP QA PB Date/Time of Discovery:
6/10/2005 7:38:43 AM Date/Time of Occurrence:
Identified By: Equipment#
(1st): Equipment
- (2nd): Equipment
- (3rd): Site/Unit:
Why did this occur?: External Other (None) (None) (None)System: Equipment Name (1st): Equipment Name (2nd): Equipment Name (3rd): 6/10/2005 7:38:43 AM (None) (None) (None) (None)Point Beach -None 6/10/2005 7:40:40 AM -WALESH, RUSS: Causes/Contributors:
There is no Issue. This is an opportunity for improvement.
Immediate Action Taken: 6/10/2005 7:40:40 AM -WALESH, RUSS: This was discussed with the Site AAIFFD Supervisor.
Recommendations:
6110/2005 7:40:40 AM -WALESH, RUSS: Evaluate this opportunity for improvement.
0 SRO Review Required?:
N Section 2 Operability Status: Basis for Operability:
Unplanned TSAC Entry: W 0 Compensatory Actions: N 6/10/2005 7:58:19 AM -MERKES, RICK: No System, Subsystem, or Component important to nuclear safety or power generation is identified as being impaired within the reported observed condition.
.1A1 S N External Notification:
N http://enws02/tmtrackltmtrack.dll?ReportPage&Template=reports%2Frptexec&ReportId=55 6/13/2005