{{#Wiki_filter:UNITED STATES               NUCLEAR REGULATORY COMMISSION                                                         REGION I 475 ALLENDALE ROAD                               KING OF PRUSSIA, PA 19406-1415 April 17, 2009 MEETING SUMMMARY  
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 475 ALLENDALE ROAD KING OF PRUSSIA, PA 19406-1415 April 17, 2009 MEETING SUMMMARY LICENSEE:       CONSTELLATION ENERGY FACILITY:       R. E. GINNA NUCLEAR POWER PLANT
 
LICENSEE: CONSTELLATION ENERGY  
 
FACILITY: R. E. GINNA NUCLEAR POWER PLANT  


==SUBJECT:==
==SUBJECT:==


==SUMMARY==
==SUMMARY==
OF THE MARCH 2009 ANNUAL ASSESSMENT OPEN-HOUSE PUBLIC MEETING  
OF THE MARCH 2009 ANNUAL ASSESSMENT OPEN-HOUSE PUBLIC MEETING On March 25, 2009, at 3:00 p.m., the NRC conducted an Annual Assessment Open-House Meeting at the Ontario Town Hall in Ontario, NY. The NRC conducted the open-house meeting to discuss the NRCs assessment of the safety performance of the R. E. Ginna Nuclear Power Plant for the calendar year 2008.
 
A notice of the open-house meeting was issued on March 10, 2009, and was posted on the NRCs external (public) web page (ADAMS Accession No. ML090690527).
On March 25, 2009, at 3:00 p.m., the NRC conducted an Annual Assessment Open-House Meeting at the Ontario Town Hall in Ontario, NY. The NRC conducted the open-house meeting to discuss the NRC's assessment of the safety performance of the R. E. Ginna Nuclear Power Plant for the calendar year 2008.  
The NRC presented poster boards and was available to discuss its assessment of the safety performance of R. E. Ginna Nuclear Power Plant for the period of January 1 through December 31, 2008, as documented in our letter dated March 4, 2009 (ADAMS Accession No. ML090630538). The NRC poster boards presented included background on the Reactor Oversight Process (ROP). Additional information relative to the NRC's Annual Assessment Process and the safety performance of R. E. Ginna Nuclear Power Plant can be found on the NRC's web site at: www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.
 
A number of local officials and Constellation employees attended the open-house and were offered the opportunity to question the NRC regarding Constellations performance and the role of the agency in ensuring safe plant operations.
A notice of the open-house meeting was issued on March 10, 2009, and was posted on the NRC's external (public) web page (ADAMS Accession No. ML090690527).  
Sincerely,
 
                                                      /RA/
The NRC presented poster boards and was available to discuss its assessment of the safety performance of R. E. Ginna Nuclear Power Plant for the period of January 1 through December 31, 2008, as documented in our letter dated March 4, 2009 (ADAMS Accession No.
Glenn T. Dentel, Chief Projects Branch 1 Division of Reactor Projects
ML090630538). The NRC poster boards presented included background on the Reactor Oversight Process (ROP). Additional information relative to the NRC's Annual Assessment Process and the safety performance of R. E. Ginna Nuclear Power Plant can be found on the NRC's web site at: www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.
A number of local officials and Constellation employees attended the open-house and were offered the opportunity to question the NRC regarding Constellation's performance and the role of the agency in ensuring safe plant operations.  
 
Sincerely,         /RA/
Glenn T. Dentel, Chief Projects Branch 1 Division of Reactor Projects  


==Attachment:==
==Attachment:==
List of Attendees  
List of Attendees
 
MEETING SUMMMARY


LICENSEE: CONSTELLATION ENERGY  
MEETING SUMMMARY LICENSEE:             CONSTELLATION ENERGY FACILITY:             R. E. GINNA NUCLEAR POWER PLANT
 
FACILITY: R. E. GINNA NUCLEAR POWER PLANT  


==SUBJECT:==
==SUBJECT:==


==SUMMARY==
==SUMMARY==
OF THE MARCH 2009 ANNUAL ASSESSMENT OPEN-HOUSE PUBLIC MEETING  
OF THE MARCH 2009 ANNUAL ASSESSMENT OPEN-HOUSE PUBLIC MEETING On March 25, 2009, at 3:00 p.m., the NRC conducted an Annual Assessment Open-House Meeting at the Ontario Town Hall in Ontario, NY. The NRC conducted the open-house meeting to discuss the NRCs assessment of the safety performance of the R. E. Ginna Nuclear Power Plant for the calendar year 2008.
 
A notice of the open-house meeting was issued on March 10, 2009, and was posted on the NRCs external (public) web page (ADAMS Accession No. ML090690527).
On March 25, 2009, at 3:00 p.m., the NRC conducted an Annual Assessment Open-House Meeting at the Ontario Town Hall in Ontario, NY. The NRC conducted the open-house meeting to discuss the NRC's assessment of the safety performance of the R. E. Ginna Nuclear Power Plant for the calendar year 2008.  
The NRC presented poster boards and was available to discuss its assessment of the safety performance of R. E. Ginna Nuclear Power Plant for the period of January 1 through December 31, 2008, as documented in our letter dated March 4, 2009 (ADAMS Accession No. ML090630538). The NRC poster boards presented included background on the Reactor Oversight Process (ROP). Additional information relative to the NRC's Annual Assessment Process and the safety performance of R. E. Ginna Nuclear Power Plant can be found on the NRC's web site at: www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.
 
A number of local officials and Constellation employees attended the open-house and were offered the opportunity to question the NRC regarding Constellations performance and the role of the agency in ensuring safe plant operations.
A notice of the open-house meeting was issued on March 10, 2009, and was posted on the NRC's external (public) web page (ADAMS Accession No. ML090690527).  
Sincerely,
 
                                                                        /RA/
The NRC presented poster boards and was available to discuss its assessment of the safety performance of R. E. Ginna Nuclear Power Plant for the period of January 1 through December 31, 2008, as documented in our letter dated March 4, 2009 (ADAMS Accession No.
Glenn T. Dentel, Chief Projects Branch 1 Division of Reactor Projects Distribution:                     N. Perry, DRP                        L. Casey, DRP,                 D. V. Pickett, PM S. Collins, RA                    J. Hawkins, DRP                       Resident Inspector              B. Vaidya, PM M. Dapas, ORA                      S. Ibarrola, DRP                     M. Rose - Resident D. Lew, DRP                       K. Kolaczyk, DRP,                     OA J. Clifford, DRP                   Senior Resident                       S. Campbell, RI G. Dentel, DRP                    Inspector                            OEDO After declaring this document An Official Agency Record it will be released to the Public. SUNSI REVIEW COMPLETE ____JH___
ML090630538). The NRC poster boards presented included background on the Reactor Oversight Process (ROP). Additional information relative to the NRC's Annual Assessment Process and the safety performance of R. E. Ginna Nuclear Power Plant can be found on the NRC's web site at: www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.
Document Name: S:\ROP-9 EOC REVIEW\BRANCH 1\GINNA 2009 AA MEETING  
A number of local officials and Constellation employees attended the open-house and were offered the opportunity to question the NRC regarding Constellation's performance and the role of the agency in ensuring safe plant operations.  
 
Sincerely,       /RA/
Glenn T. Dentel, Chief Projects Branch 1 Division of Reactor Projects Distribution
:   S. Collins, RA M. Dapas, ORA D. Lew, DRP J. Clifford, DRP G. Dentel, DRP N. Perry, DRP J. Hawkins, DRP  
 
S. Ibarrola, DRP K. Kolaczyk, DRP, Senior Resident Inspector L. Casey, DRP, Resident Inspector M. Rose - Resident OA S. Campbell, RI OEDO  D. V. Pickett, PM B. Vaidya, PM After declaring this document An Official Agency Record it will be released to the Public. SUNSI REVIEW COMPLETE ____JH___
Document Name: S:\ROP-9 EOC REVIEW\BRANCH 1\GINNA 2009 AA MEETING  


==SUMMARY==
==SUMMARY==
.DOC To receive a copy of this document, indicate in the box:
.DOC To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy                                                 ADAMS ACCESSION NO. ML091150003 OFFICE           RI/DRP                     RI/DRP                       RI/DRP NAME             JHawkins/jh                 GDentel/gtd DATE             04/21/09                   04/17/09
" C" = Copy without attachment/enclosure   " E" = Copy with attachment/enclosure   " N" = No copy     ADAMS ACCESSION NO. ML091150003 OFFICE RI/DRP RI/DRP   RI/DRP   NAME JHawkins/jh GDentel/gtd DATE 04/21/09 04/17/09
 
A-1  LIST OF ATTENDEES R. E. GINNA NUCLEAR POWER PLANT MARCH 2009 ANNUAL ASSESSMENT OPEN-HOUSE PUBLIC MEETING WEDNESDAY, MARCH 25, 2009
 
NAME    TITLE      ORGANIZATION


J. Carlin Site VP, Ginna   CENG D. Holm Plant Manager   GINNA T. Hedges EP Director   GINNA D. Wilson Licensing Director   GINNA D. Bierbrauer Nuclear Safety and Security Mgr GINNA B. Kelsch Town Supervisor   Ontario, NY R. Watts Emergency Management Monroe County J. O'Toole  Emergency Management Wayne County G. Dentel Branch Chief   NRC/RI/DRP K. Kolaczyk Senior Resident Inspector NRC/RI/DRP L. Casey Resident Inspector   NRC/RI/DRP}}
A-1 LIST OF ATTENDEES R. E. GINNA NUCLEAR POWER PLANT MARCH 2009 ANNUAL ASSESSMENT OPEN-HOUSE PUBLIC MEETING WEDNESDAY, MARCH 25, 2009 NAME              TITLE                          ORGANIZATION J. Carlin         Site VP, Ginna                 CENG D. Holm           Plant Manager                   GINNA T. Hedges         EP Director                     GINNA D. Wilson         Licensing Director             GINNA D. Bierbrauer     Nuclear Safety and Security Mgr GINNA B. Kelsch         Town Supervisor                 Ontario, NY R. Watts           Emergency Management           Monroe County J. OToole        Emergency Management           Wayne County G. Dentel         Branch Chief                   NRC/RI/DRP K. Kolaczyk       Senior Resident Inspector       NRC/RI/DRP L. Casey           Resident Inspector             NRC/RI/DRP}}

Latest revision as of 14:29, 12 March 2020

Summary of the March 2009 Annual Assessment Open-House Public Meeting for the R. E. Ginna Nuclear Power Plant, Dated 04/17/09
ML091150003
Person / Time
Site: Ginna Constellation icon.png
Issue date: 04/17/2009
From: Glenn Dentel
Reactor Projects Branch 1
To:
NRC Region 1
References
Download: ML091150003 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 475 ALLENDALE ROAD KING OF PRUSSIA, PA 19406-1415 April 17, 2009 MEETING SUMMMARY LICENSEE: CONSTELLATION ENERGY FACILITY: R. E. GINNA NUCLEAR POWER PLANT

SUBJECT:

SUMMARY

OF THE MARCH 2009 ANNUAL ASSESSMENT OPEN-HOUSE PUBLIC MEETING On March 25, 2009, at 3:00 p.m., the NRC conducted an Annual Assessment Open-House Meeting at the Ontario Town Hall in Ontario, NY. The NRC conducted the open-house meeting to discuss the NRCs assessment of the safety performance of the R. E. Ginna Nuclear Power Plant for the calendar year 2008.

A notice of the open-house meeting was issued on March 10, 2009, and was posted on the NRCs external (public) web page (ADAMS Accession No. ML090690527).

The NRC presented poster boards and was available to discuss its assessment of the safety performance of R. E. Ginna Nuclear Power Plant for the period of January 1 through December 31, 2008, as documented in our letter dated March 4, 2009 (ADAMS Accession No. ML090630538). The NRC poster boards presented included background on the Reactor Oversight Process (ROP). Additional information relative to the NRC's Annual Assessment Process and the safety performance of R. E. Ginna Nuclear Power Plant can be found on the NRC's web site at: www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.

A number of local officials and Constellation employees attended the open-house and were offered the opportunity to question the NRC regarding Constellations performance and the role of the agency in ensuring safe plant operations.

Sincerely,

/RA/

Glenn T. Dentel, Chief Projects Branch 1 Division of Reactor Projects

Attachment:

List of Attendees

MEETING SUMMMARY LICENSEE: CONSTELLATION ENERGY FACILITY: R. E. GINNA NUCLEAR POWER PLANT

SUBJECT:

SUMMARY

OF THE MARCH 2009 ANNUAL ASSESSMENT OPEN-HOUSE PUBLIC MEETING On March 25, 2009, at 3:00 p.m., the NRC conducted an Annual Assessment Open-House Meeting at the Ontario Town Hall in Ontario, NY. The NRC conducted the open-house meeting to discuss the NRCs assessment of the safety performance of the R. E. Ginna Nuclear Power Plant for the calendar year 2008.

A notice of the open-house meeting was issued on March 10, 2009, and was posted on the NRCs external (public) web page (ADAMS Accession No. ML090690527).

The NRC presented poster boards and was available to discuss its assessment of the safety performance of R. E. Ginna Nuclear Power Plant for the period of January 1 through December 31, 2008, as documented in our letter dated March 4, 2009 (ADAMS Accession No. ML090630538). The NRC poster boards presented included background on the Reactor Oversight Process (ROP). Additional information relative to the NRC's Annual Assessment Process and the safety performance of R. E. Ginna Nuclear Power Plant can be found on the NRC's web site at: www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.

A number of local officials and Constellation employees attended the open-house and were offered the opportunity to question the NRC regarding Constellations performance and the role of the agency in ensuring safe plant operations.

Sincerely,

/RA/

Glenn T. Dentel, Chief Projects Branch 1 Division of Reactor Projects Distribution: N. Perry, DRP L. Casey, DRP, D. V. Pickett, PM S. Collins, RA J. Hawkins, DRP Resident Inspector B. Vaidya, PM M. Dapas, ORA S. Ibarrola, DRP M. Rose - Resident D. Lew, DRP K. Kolaczyk, DRP, OA J. Clifford, DRP Senior Resident S. Campbell, RI G. Dentel, DRP Inspector OEDO After declaring this document An Official Agency Record it will be released to the Public. SUNSI REVIEW COMPLETE ____JH___

Document Name: S:\ROP-9 EOC REVIEW\BRANCH 1\GINNA 2009 AA MEETING

SUMMARY

.DOC To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy ADAMS ACCESSION NO. ML091150003 OFFICE RI/DRP RI/DRP RI/DRP NAME JHawkins/jh GDentel/gtd DATE 04/21/09 04/17/09

A-1 LIST OF ATTENDEES R. E. GINNA NUCLEAR POWER PLANT MARCH 2009 ANNUAL ASSESSMENT OPEN-HOUSE PUBLIC MEETING WEDNESDAY, MARCH 25, 2009 NAME TITLE ORGANIZATION J. Carlin Site VP, Ginna CENG D. Holm Plant Manager GINNA T. Hedges EP Director GINNA D. Wilson Licensing Director GINNA D. Bierbrauer Nuclear Safety and Security Mgr GINNA B. Kelsch Town Supervisor Ontario, NY R. Watts Emergency Management Monroe County J. OToole Emergency Management Wayne County G. Dentel Branch Chief NRC/RI/DRP K. Kolaczyk Senior Resident Inspector NRC/RI/DRP L. Casey Resident Inspector NRC/RI/DRP