IR 05000244-09-001, Ginna Nuclear Power Plant Annual Assessment Letter, Dated 03/04/09
ML090630538
Person / Time
Site: Ginna Constellation icon.png
Issue date: 03/04/2009
From: Glenn Dentel
Reactor Projects Branch 1
To: John Carlin
Ginna
Dentel, G RGN-I/DRP/BR1/610-337-5233
Shared Package
ML090630530 List:
References
IR-09-001
Download: ML090630538 (6)


Text

March 4, 2009

SUBJECT:

ANNUAL ASSESSMENT LETTER - R. E. GINNA NUCLEAR POWER PLANT (REPORT 05000244/2009001)

Dear Mr. Carlin:

On February 9, 2009, the NRC staff completed its performance review of R. E. Ginna Nuclear Power Plant (Ginna). Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results for the period from January 1 through December 31, 2008.

The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.

This performance review and enclosed inspection plan do not include security information. A separate letter designated and marked as Official Use Only-Security Information will include the security cornerstone review and resultant inspection plan.

Overall, Ginna operated in a manner that preserved public health and safety and fully met all cornerstone objectives. Plant performance for the most recent quarter, as well as for the first three quarters of the assessment cycle, was within the Licensee Response column of the NRC=s Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct reactor oversight process (ROP) baseline inspections at your facility.

The enclosed inspection plan details the inspections, less those related to physical protection scheduled through June 30, 2010. In addition to baseline inspections, we plan on conducting an independent spent fuel storage installation inspection and a license renewal commitments inspection. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last nine months of the inspection plan are tentative and may be revised at the mid-cycle review.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). If circumstances arise which cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at 610-337-5233 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/ Original Signed By:

Glenn T. Dentel, Chief Projects Branch 1

Division of Reactor Projects

Docket No. 50-244 License No. DPR-18

cc w/encl:

M. J. Wallace, Vice - President, Constellation Energy B. Barron, President, CEO & Chief Nuclear Officer, Constellation Energy Nuclear Group, LLC P. Eddy, Electric Division, NYS Department of Public Service C. Donaldson, Esquire, Assistant Attorney General, New York Department of Law C. Fleming, Esquire, Senior Counsel, Nuclear Generation, Constellation Nuclear Energy Nuclear Group, LLC D. Wilson, Director, Licensing, Constellation Energy Nuclear Group, LLC J. Spath, Program Director, New York State Energy Research and Development Authority F, Murray, President & CEO, New York State Energy Research and Development Authority G. Bastedo, Director, Wayne County Emergency Management Office M. Meisenzahl, Administrator, Monroe County, Office of Emergency Preparedness T. Judson, Central New York Citizens Awareness Network If circumstances arise which cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at 610-337-5233 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/ Original Signed By:

Glenn T. Dentel, Chief Projects Branch 1

Division of Reactor Projects

Docket No. 50-244 License No. DPR-18

Distribution w/encl:

S. Collins, RA M. Dapas, DRA D. Lew, DRP J. Clifford, DRP S. Campbell, RI OEDO R. Nelson, NRR D. V. Pickett, PM, NRR B. Vaidya, PM, NRR G. Dentel, DRP N. Perry, DRP J. Hawkins, DRP K. Kolaczyk, DRP, SRI M. Marshfield, DRP, RI M. Rose, DRP, Resident OA Region I Docket Room (with concurrences)

ROPreports@nrc.gov RidsNrrDirslpabResources

@nrc.gov DRS Director DRS Deputy Director DRS Branch Chiefs L. Scholl, DRS D. Silk, DRS J. Trapp, DRS D. Screnci, PAO N. Sheehan, PAO R. Barkley, ORA

SUNSI Review Complete: GTD (Reviewer=s Initials)

DOCUMENT NAME: G:\\DRP\\BRANCH1\\ROP 9 AA Letters\\Ginna AA Ltr 2-5-09.doc After declaring this document AAn Official Agency Record@ it will/will not be released to the Public.

To receive a copy of this document, indicate in he box: "C" = Copy w thout attachment/enclosure "E = Copy with attachment/en losure "N" = No copy t

i

"

c

OFFICE

RI/DRP

RI/DRP

NAME

JHawkins/jrh

GDentel/gtd

DATE

02/23/09

02/23/09

OFFICIAL RECORD COPY Inspection / Activity Plan Page 1 of 2 03/03/2009 09:08:44 Report 22 01/01/2009 - 06/30/2010 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Ginna 7111111B

- BIENNIAL REQUAL INSPECTION

1 IP Licensed Operator Requalification Program 7111111B 01/12/2009 01/16/2009 7112103

- OCC RAD SAFETY - INSTRUMENTS

1 IP Radiation Monitoring Instrumentation and Protective Equipment 7112103 04/13/2009 04/17/2009 EP EXER

- EP EXERCISE INSPECTION & PI VERIFICATION

1 IP Exercise Evaluation 7111401 05/03/2009 05/09/2009

IP Emergency Action Level and Emergency Plan Changes 7111404 05/03/2009 05/09/2009

IP Performance Indicator Verification 71151 05/03/2009 05/09/2009 71003

- LR COMMITMENTS INSP - NON-OUTAGE

1 IP Post-Approval Site Inspection for License Renewal 71003 05/04/2009 05/08/2009

IP Post-Approval Site Inspection for License Renewal 71003 05/18/2009 05/22/2009 7112201

- PUB RAD SAFETY - RETS

1 IP Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 7112201 06/01/2009 06/05/2009

IP Performance Indicator Verification 71151 06/01/2009 06/05/2009 71121

- OCC RAD SAFETY

1 IP Access Control to Radiologically Significant Areas 7112101 07/06/2009 07/10/2009

IP ALARA Planning and Controls 7112102 07/06/2009 07/10/2009

IP Radiation Monitoring Instrumentation and Protective Equipment 7112103 07/06/2009 07/10/2009

IP Performance Indicator Verification 71151 07/06/2009 07/10/2009 7111108P

- INSERVICE INSPECTION

1 IP Inservice Inspection Activities - PWR 7111108P 09/14/2009 09/25/2009 71121

- OCC RAD SAFETY

1 IP Access Control to Radiologically Significant Areas 7112101 09/21/2009 09/25/2009

IP ALARA Planning and Controls 7112102 09/21/2009 09/25/2009

IP Radiation Monitoring Instrumentation and Protective Equipment 7112103 09/21/2009 09/25/2009

IP Performance Indicator Verification 71151 09/21/2009 09/25/2009 ISFSI

- ISFSI WELD - PAD DEMO

1 IP Preoperational Testing Of An ISFSI 60854 10/19/2009 10/30/2009 TRI FIRE

- TRIENNIAL FIRE PROTECTION INSPECTION

1 IP Fire Protection [Triennial]

7111105T 11/02/2009 11/06/2009

IP Fire Protection [Triennial]

7111105T 11/16/2009 11/20/2009 71121

- OCC RADIATION SAFETY

1 IP Access Control to Radiologically Significant Areas 7112101 01/11/2010 01/15/2010

IP ALARA - Required 7112102-7112102R 01/11/2010 01/15/2010 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Inspection / Activity Plan Page 2 of 2 03/03/2009 09:08:44 Report 22 01/01/2009 - 06/30/2010 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Ginna EP PROG

- EP PROGRAM INSPECTION

1 IP Alert and Notification System Testing 7111402 02/08/2010 02/12/2010

IP Emergency Response Organization Augmentation Testing 7111403 02/08/2010 02/12/2010

IP Emergency Action Level and Emergency Plan Changes 7111404 02/08/2010 02/12/2010

IP Correction of Emergency Preparedness Weaknesses and Deficiencies 7111405 02/08/2010 02/12/2010

IP Drill/Exercise Performance 71151-EP01 02/08/2010 02/12/2010

IP ERO Drill Participation 71151-EP02 02/08/2010 02/12/2010

IP Alert & Notification System 71151-EP03 02/08/2010 02/12/2010 6/21EXAM

- OPERATOR LICENSING INITIAL EXAMS

1 FY10 - GINNA INITIAL OPERATOR LICENSING EXAM U01766 05/24/2010 05/28/2010

FY10 - GINNA INITIAL OPERATOR LICENSING EXAM U01766 06/21/2010 07/02/2010 71122.02

- RAD MATERIAL PROCESSING AND TRANSPORT

1 IP Radioactive Material Processing and Transportation 7112202 04/05/2010 04/09/2010 71152B

- PI&R

1 IP Identification and Resolution of Problems 71152B 05/24/2010 05/28/2010

IP Identification and Resolution of Problems 71152B 06/07/2010 06/11/2010 2515/173

- INDUSTRY GROUND WATER INITIATIVE

1 IP Review of the Implementation of the Industry Ground Water Protection Voluntary Initiative 2515/173 06/21/2010 06/25/2010 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.