| issue date = 07/12/2010
| issue date = 07/12/2010
| title = IR 05000220-10-402 and 05000410-10-402; on 06/07/10 - 06/11/2010; Nine Mile Point Nuclear Station; Security. (Letter Only)
| title = IR 05000220-10-402 and 05000410-10-402; on 06/07/10 - 06/11/2010; Nine Mile Point Nuclear Station; Security. (Letter Only)
| author name = Trapp J M
| author name = Trapp J
| author affiliation = NRC/RGN-I/DRS/PSB1
| author affiliation = NRC/RGN-I/DRS/PSB1
| addressee name = Belcher S
| addressee name = Belcher S
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:OFFICiAl US6 ONLY S6CURIlY R6lJl..T6D INFORMATION July 12, 2010 Mr. Sam Belcher Vice President Nine Mile Point Nuclear Station, LLC P.O. Box6S Lycoming, NY 13093-0063 NINE MILE POINT NUCLEAR STATION -NRC SECURITY INSPECTION REPORT NOS. 05000220/2010402 AND 05000410/2010402
{{#Wiki_filter:OFFICiAl US6 ONLY S6CURIlY R6lJl..T6D INFORMATION July 12, 2010 Mr. Sam Belcher Vice President Nine Mile Point Nuclear Station, LLC P.O. Box6S Lycoming, NY 13093-0063 SUBJECT NINE MILE POINT NUCLEAR STATION - NRC SECURITY INSPECTION REPORT NOS. 05000220/2010402 AND 05000410/2010402


==Dear Mr. Belcher:==
==Dear Mr. Belcher:==
On June 11, 2010, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Nine Mile Point Nuclear Station. The inspection covered one or more of the key attributes of the security cornerstone of the NRC's Reactor Oversight Process. The enclosed inspection report documents the inspection results, which were discussed on June 11,2010, with Mr. Thomas A. Lynch, Plant General Manager. and other members of your staff. . The inspection examined activities conducted under your licenses as they relate to security and compliance with the Commission's rules and regulations and with the conditions of your licenses.
On June 11, 2010, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Nine Mile Point Nuclear Station. The inspection covered one or more of the key attributes of the security cornerstone of the NRC's Reactor Oversight Process.


The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.
The enclosed inspection report documents the inspection results, which were discussed on June 11,2010, with Mr. Thomas A. Lynch, Plant General Manager. and other members of your staff.  .
The inspection examined activities conducted under your licenses as they relate to security and compliance with the Commission's rules and regulations and with the conditions of your licenses. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.


Based on the results of this inspection.
Based on the results of this inspection. no findings were identified.
 
no findings were identified.


In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system, ADAMS. ADAMS is accessibl*efrom the NRC Website at http://www.nrc.gov/reading-rm/adams.html(the Public Electronic Reading Room). However, because of the security-related information contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter's enclosure will not be available for public inspection.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system, ADAMS. ADAMS is accessibl*efrom the NRC Website at http://www.nrc.gov/reading-rm/adams.html(the Public Electronic Reading Room). However, because of the security-related information contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter's enclosure will not be available for public inspection.
Line 33: Line 32:
When separated from its Enclosure, this document is DECONTROLLED.
When separated from its Enclosure, this document is DECONTROLLED.


OFFICIAL US6 ONLY S6CURIlY R6bAT6D INFORMATION OffiCIAl USE ONlY SECURITY RElATED INFORMATION In accordance with 10 CFR 2.390(b }(1 }(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRC's document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response "Security-Related Information
OFFICIAL US6 ONLY S6CURIlY R6bAT6D INFORMATION
-Withhold Under 10 CFR 2.390" and follow the instructions for withholding in 10 CFR 2.390(b)(1}.


Sincerely,IRA! James M. Trapp, Chief Plant Support Branch 1 Division of Reactor Safety Docket Nos. 50-220,50-410 License Nos. DPR-63, NPF-69 Non-Public
OffiCIAl USE ONlY SECURITY RElATED INFORMATION In accordance with 10 CFR 2.390(b }(1 }(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRC's document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response "Security-Related Information - Withhold Under 10 CFR 2.390" and follow the instructions for withholding in 10 CFR 2.390(b)(1}.


===Enclosure:===
Sincerely, IRA!
NRC Inspection Report Nos. 05000220/2010402 and 05000410/2010402 w/Atlachment:
James M. Trapp, Chief Plant Support Branch 1 Division of Reactor Safety Docket Nos. 50-220,50-410 License Nos. DPR-63, NPF-69 Non-Public Enclosure: NRC Inspection Report Nos. 05000220/2010402 and 05000410/2010402 w/Atlachment: Supplemental Information (CONTAINS SECURITY RELATED INFORMATION) (OUO-SRI)
Supplemental Information (CONTAINS ) (OUO-SRI)
cc w/encl; (w/OUO-SRI)
cc w/encl; (w/OUO-SRI)
A. Verno, Manager, Nuclear Security F. Murray, President and CEO, NYSERDA, State of New York R. Douglas Frazier, NY State Office of Homeland Security OfFICIAl USE ONlY SECURITY RElATED INfORMATION OFFICIAl USE ONlY SECURITY RElATED INFORMATION
A. Verno, Manager, Nuclear Security F. Murray, President and CEO, NYSERDA, State of New York R. Douglas Frazier, NY State Office of Homeland Security OfFICIAl USE ONlY SECURITY RElATED INfORMATION
 
OFFICIAl USE ONlY SECURITY RElATED INFORMATION
}}
}}

Latest revision as of 17:17, 13 November 2019

IR 05000220-10-402 and 05000410-10-402; on 06/07/10 - 06/11/2010; Nine Mile Point Nuclear Station; Security. (Letter Only)
ML101930321
Person / Time
Site: Nine Mile Point  Constellation icon.png
Issue date: 07/12/2010
From: James Trapp
Plant Support Branch 1
To: Belcher S
Nine Mile Point
References
IR-10-402
Download: ML101930321 (4)


Text

OFFICiAl US6 ONLY S6CURIlY R6lJl..T6D INFORMATION July 12, 2010 Mr. Sam Belcher Vice President Nine Mile Point Nuclear Station, LLC P.O. Box6S Lycoming, NY 13093-0063 SUBJECT NINE MILE POINT NUCLEAR STATION - NRC SECURITY INSPECTION REPORT NOS. 05000220/2010402 AND 05000410/2010402

Dear Mr. Belcher:

On June 11, 2010, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Nine Mile Point Nuclear Station. The inspection covered one or more of the key attributes of the security cornerstone of the NRC's Reactor Oversight Process.

The enclosed inspection report documents the inspection results, which were discussed on June 11,2010, with Mr. Thomas A. Lynch, Plant General Manager. and other members of your staff. .

The inspection examined activities conducted under your licenses as they relate to security and compliance with the Commission's rules and regulations and with the conditions of your licenses. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.

Based on the results of this inspection. no findings were identified.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system, ADAMS. ADAMS is accessibl*efrom the NRC Website at http://www.nrc.gov/reading-rm/adams.html(the Public Electronic Reading Room). However, because of the security-related information contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter's enclosure will not be available for public inspection.

When separated from its Enclosure, this document is DECONTROLLED.

OFFICIAL US6 ONLY S6CURIlY R6bAT6D INFORMATION

OffiCIAl USE ONlY SECURITY RElATED INFORMATION In accordance with 10 CFR 2.390(b }(1 }(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRC's document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response "Security-Related Information - Withhold Under 10 CFR 2.390" and follow the instructions for withholding in 10 CFR 2.390(b)(1}.

Sincerely, IRA!

James M. Trapp, Chief Plant Support Branch 1 Division of Reactor Safety Docket Nos. 50-220,50-410 License Nos. DPR-63, NPF-69 Non-Public Enclosure: NRC Inspection Report Nos. 05000220/2010402 and 05000410/2010402 w/Atlachment: Supplemental Information (CONTAINS SECURITY RELATED INFORMATION) (OUO-SRI)

cc w/encl; (w/OUO-SRI)

A. Verno, Manager, Nuclear Security F. Murray, President and CEO, NYSERDA, State of New York R. Douglas Frazier, NY State Office of Homeland Security OfFICIAl USE ONlY SECURITY RElATED INfORMATION

OFFICIAl USE ONlY SECURITY RElATED INFORMATION