ML102440876: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 2: Line 2:
| number = ML102440876
| number = ML102440876
| issue date = 09/01/2010
| issue date = 09/01/2010
| title = St. Lucie Report 22 - 2010 Mid Cycle
| title = Report 22 - 2010 Mid Cycle
| author name =  
| author name =  
| author affiliation = NRC/RGN-II
| author affiliation = NRC/RGN-II
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:Inspection / Activity Plan Page 1 of 2 09/01/2010 08:15:20 Report 22 09/01/2010
{{#Wiki_filter:Page 1 of 2                                                                             Turkey Point 09/01/2010     08:15:20                                                         Inspection / Activity Plan Report 22 09/01/2010 - 12/31/2011 Unit         Planned Dates                                                                                                                                   No. of Staff Number        Start     End     Inspection Activity                                                             Title                                         on Site OL EXAM       - INITIAL EXAM PREP WEEK 1                                                                                               5 3     09/27/2010   10/01/2010     V23312              TURKEY POINT/OCTOBER 2010 EXAM AT POWER FACILITIES PSB1-RP       - RP ACCESS CONTROLS                                                                                                     2 3, 4   09/27/2010   10/01/2010   IP 71124.01            Radiological Hazard Assessment and Exposure Controls 3, 4   09/27/2010   10/01/2010   IP 71151                Performance Indicator Verification PSB1-TI       - TI-179 NSTS VERIFICATION                                                                                               2 3, 4   09/27/2010  10/01/2010  IP 2515/179            Verification of Licensee Responses to NRC Requirement for Inventories of Materials Tracked in NSTS OL EXAM       - INITIAL EXAM PREP WEEK 2                                                                                               4 3     10/04/2010   10/07/2010     V23312              TURKEY POINT/OCTOBER 2010 EXAM AT POWER FACILITIES EB3ISI       - UNIT 3 INSERVICE INSPECTION                                                                                           1 3     10/04/2010   10/08/2010   IP 7111108P            Inservice Inspection Activities - PWR EB3SGISI     - UNIT 3 SG INSERVICE INSPECTION                                                                                         1 3     10/11/2010   10/15/2010   IP 7111108P            Inservice Inspection Activities - PWR OL EXAM       - INITIAL EXAM WEEK 1                                                                                                   8 3     10/25/2010   10/29/2010     V23312              TURKEY POINT/OCTOBER 2010 EXAM AT POWER FACILITIES OL EXAM       - INITIAL EXAM WEEK 3                                                                                                   5 3     11/15/2010   11/19/2010     V23312              TURKEY POINT/OCTOBER 2010 EXAM AT POWER FACILITIES DRP/BR3       - 95001 SUPPLEMENTAL INSPECTION                                                                                         3 3     11/29/2010  12/02/2010  IP 95001                Supplemental Inspection For One Or Two White Inputs In A Strategic Performance Area DRP/NR3       - 92702 FOLLOWUP CORRECTIVE ACTIONS                                                                                     2 3     11/29/2010   12/02/2010   IP 92702                Followup On Corrective Actions For Violations And Deviations TI-177       - TI-177 GAS INTRUSION                                                                                                   3 3, 4   01/10/2011  01/14/2011  IP 2515/177            Managing Gas Accumulation In Emergency Core Cooling, Decay Heat Removal & Containment Spray System PSB1EP       - EMERGENCY PREPAREDNESS EXERCISE                                                                                       3 3, 4   02/07/2011   02/11/2011   IP 7111401              Exercise Evaluation 3, 4   02/07/2011   02/11/2011   IP 7111404              Emergency Action Level and Emergency Plan Changes 3, 4   02/07/2011   02/11/2011   IP 71151                Performance Indicator Verification EB3 ISI       - UNIT 4 IN-SERVICE INSPECTION                                                                                           1 4   03/28/2011   04/01/2011   IP 7111108P            Inservice Inspection Activities - PWR EB3SGISI     - UNIT 4 SG INSERVICE INSPECTION                                                                                         1 4   04/04/2011   04/08/2011   IP 7111108P            Inservice Inspection Activities - PWR PSB1-RP       - RP OCCUPATIONAL WEEK 1                                                                                                 4 3, 4   04/11/2011  04/15/2011  IP 71124.01            Radiological Hazard Assessment and Exposure Controls 3, 4  04/11/2011   04/15/2011   IP 71124.02            Occupational ALARA Planning and Controls 3, 4  04/11/2011   04/15/2011   IP 71124.03            In-Plant Airborne Radioactivity Control and Mitigation This report does not include INPO and OUTAGE activities.
-12/31/2011 Unit Number Planned Dates Start           End Inspection Activity Title No. of Staff on Site Turkey Point OL EXAM-INITIAL EXAM PREP WEEK 1 5   3 TURKEY POINT/OCTOBER 2010 EXAM AT POWER FACILITIES V23312 09/27/2010 10/01/2010 PSB1-RP-RP ACCESS CONTROLS 2   3, 4 IP Radiological Hazard Assessment and Exposure Controls 71124.01 09/27/2010 10/01/2010 3, 4 IP Performance Indicator Verification 71151 09/27/2010 10/01/2010 PSB1-TI-TI-179 NSTS VERIFICATION 2   3, 4 IP Verification of Licensee Responses to NRC Requirement for Inventories of Materials Tracked in NSTS 2515/179 09/27/2010 10/01/2010 OL EXAM-INITIAL EXAM PREP WEEK 2 4   3 TURKEY POINT/OCTOBER 2010 EXAM AT POWER FACILITIES V23312 10/04/2010 10/07/2010 EB3ISI-UNIT 3 INSERVICE INSPECTION 1   3 IP Inservice Inspection Activities - PWR 7111108P 10/04/2010 10/08/2010 EB3SGISI-UNIT 3 SG INSERVICE INSPECTION 1   3 IP Inservice Inspection Activities - PWR 7111108P 10/11/2010 10/15/2010 OL EXAM-INITIAL EXAM WEEK 1 8   3 TURKEY POINT/OCTOBER 2010 EXAM AT POWER FACILITIES V23312 10/25/2010 10/29/2010 OL EXAM-INITIAL EXAM WEEK 3 5   3 TURKEY POINT/OCTOBER 2010 EXAM AT POWER FACILITIES V23312 11/15/2010 11/19/2010 DRP/BR3-95001 SUPPLEMENTAL INSPECTION 3   3 IP Supplemental Inspection For One Or Two White Inputs In A Strategic Performance Area 95001 11/29/2010 12/02/2010 DRP/NR3-92702 FOLLOWUP CORRECTIVE ACTIONS 2   3 IP Followup On Corrective Actions For Violations And Deviations 92702 11/29/2010 12/02/2010 TI-177-TI-177 GAS INTRUSION 3   3, 4 IP Managing Gas Accumulation In Emergency Core Cooling, Decay Heat Removal & Containment Spray System 2515/177 01/10/2011 01/14/2011 PSB1EP-EMERGENCY PREPAREDNESS EXERCISE 3   3, 4 IP Exercise Evaluation 7111401 02/07/2011 02/11/2011 3, 4 IP Emergency Action Level and Emergency Plan Changes 7111404 02/07/2011 02/11/2011 3, 4 IP Performance Indicator Verification 71151 02/07/2011 02/11/2011 EB3 ISI-UNIT 4 IN-SERVICE INSPECTION 1     4 IP Inservice Inspection Activities - PWR 7111108P 03/28/2011 04/01/2011 EB3SGISI-UNIT 4 SG INSERVICE INSPECTION 1     4 IP Inservice Inspection Activities - PWR 7111108P 04/04/2011 04/08/2011 PSB1-RP-RP OCCUPATIONAL WEEK 1 4   3, 4 IP Radiological Hazard Assessment and Exposure Controls 71124.01 04/11/2011 04/15/2011 3, 4 IP Occupational ALARA Planning and Controls 71124.02 04/11/2011 04/15/2011 3, 4 IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 04/11/2011 04/15/2011 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.                                             Enclosure
This report shows only on-site and announced inspection procedures.
 
Inspection / Activity Plan Page 2 of 2 09/01/2010 08:15:20 Report 22 09/01/2010
Page 2 of 2                                                                           Turkey Point 09/01/2010     08:15:20                                                       Inspection / Activity Plan Report 22 09/01/2010 - 12/31/2011 Unit         Planned Dates                                                                                                                                 No. of Staff Number        Start     End     Inspection Activity                                                             Title                                       on Site PSB1-RP       - RP OCCUPATIONAL WEEK 1                                                                                               4 3, 4   04/11/2011  04/15/2011  IP 71124.04            Occupational Dose Assessment 3, 4  04/11/2011   04/15/2011   IP 71124.08            Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 3, 4  04/11/2011   04/15/2011   IP 71151                Performance Indicator Verification PSB1-RP       - RP OCCUPATIONAL WEEK 2                                                                                               3 3, 4   04/18/2011  04/18/2011  IP 71124.01            Radiological Hazard Assessment and Exposure Controls 3, 4  04/18/2011   04/18/2011   IP 71124.02            Occupational ALARA Planning and Controls 3, 4  04/18/2011   04/18/2011   IP 71124.03            In-Plant Airborne Radioactivity Control and Mitigation 3, 4  04/18/2011   04/18/2011   IP 71124.04            Occupational Dose Assessment 3, 4  04/18/2011   04/18/2011   IP 71124.08            Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 3, 4  04/18/2011   04/18/2011   IP 71151                Performance Indicator Verification ISFSI         - ISFSI DRY RUN                                                                                                         5 3, 4   05/16/2011  05/20/2011  IP 60855.1              Operation of an Independent Spent Fuel Storage Installation at Operating Plants CDBI         - COMPONENT DESIGN BASES INSPECTION                                                                                     9 3, 4   06/27/2011   07/01/2011   IP 7111121              Component Design Bases Inspection 3, 4  07/11/2011   07/14/2011   IP 7111121              Component Design Bases Inspection 3, 4  07/25/2011   07/29/2011   IP 7111121              Component Design Bases Inspection 3, 4  08/08/2011   08/12/2011   IP 7111121              Component Design Bases Inspection ISFSI         - ISFSI FIRST CAMPAIGN                                                                                                 2 3, 4   07/18/2011  07/22/2011  IP 60855.1              Operation of an Independent Spent Fuel Storage Installation at Operating Plants OL EXAM       - INITIAL EXAM PREP                                                                                                     3 3     10/31/2011   11/04/2011     V23364              TURKEY POINT / DECEMBER 2011 EXAM AT POWER FACILITIES OL EXAM       - INITIAL EXAM - WEEK 1                                                                                                 3 3     12/05/2011   12/09/2011     V23364              TURKEY POINT / DECEMBER 2011 EXAM AT POWER FACILITIES OL EXAM       - INITIAL EXAM - WEEK 2                                                                                                 3 3     12/12/2011   12/16/2011     V23364              TURKEY POINT / DECEMBER 2011 EXAM AT POWER FACILITIES This report does not include INPO and OUTAGE activities.
-12/31/2011 Unit Number Planned Dates Start           End Inspection Activity Title No. of Staff on Site Turkey Point PSB1-RP-RP OCCUPATIONAL WEEK 1 4   3, 4 IP Occupational Dose Assessment 71124.04 04/11/2011 04/15/2011 3, 4 IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 71124.08 04/11/2011 04/15/2011 3, 4 IP Performance Indicator Verification 71151 04/11/2011 04/15/2011 PSB1-RP-RP OCCUPATIONAL WEEK 2 3   3, 4 IP Radiological Hazard Assessment and Exposure Controls 71124.01 04/18/2011 04/18/2011 3, 4 IP Occupational ALARA Planning and Controls 71124.02 04/18/2011 04/18/2011 3, 4 IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 04/18/2011 04/18/2011 3, 4 IP Occupational Dose Assessment 71124.04 04/18/2011 04/18/2011 3, 4 IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 71124.08 04/18/2011 04/18/2011 3, 4 IP Performance Indicator Verification 71151 04/18/2011 04/18/2011 ISFSI-ISFSI DRY RUN 5   3, 4 IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants 60855.1 05/16/2011 05/20/2011 CDBI-COMPONENT DESIGN BASES INSPECTION 9   3, 4 IP Component Design Bases Inspection 7111121 06/27/2011 07/01/2011 3, 4 IP Component Design Bases Inspection 7111121 07/11/2011 07/14/2011 3, 4 IP Component Design Bases Inspection 7111121 07/25/2011 07/29/2011 3, 4 IP Component Design Bases Inspection 7111121 08/08/2011 08/12/2011 ISFSI-ISFSI FIRST CAMPAIGN 2   3, 4 IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants 60855.1 07/18/2011 07/22/2011 OL EXAM-INITIAL EXAM PREP 3   3 TURKEY POINT / DECEMBER 2011 EXAM AT POWER FACILITIES V23364 10/31/2011 11/04/2011 OL EXAM-INITIAL EXAM - WEEK 1 3   3 TURKEY POINT / DECEMBER 2011 EXAM AT POWER FACILITIES V23364 12/05/2011 12/09/2011 OL EXAM-INITIAL EXAM - WEEK 2 3   3 TURKEY POINT / DECEMBER 2011 EXAM AT POWER FACILITIES V23364 12/12/2011 12/16/2011 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.                                             Enclosure}}
This report shows only on-site and announced inspection procedures.}}

Latest revision as of 14:51, 13 November 2019

Report 22 - 2010 Mid Cycle
ML102440876
Person / Time
Site: Saint Lucie, 07200061  NextEra Energy icon.png
Issue date: 09/01/2010
From:
NRC/RGN-II
To:
Shared Package
ML102440858 List:
References
Download: ML102440876 (2)


Text

Page 1 of 2 Turkey Point 09/01/2010 08:15:20 Inspection / Activity Plan Report 22 09/01/2010 - 12/31/2011 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site OL EXAM - INITIAL EXAM PREP WEEK 1 5 3 09/27/2010 10/01/2010 V23312 TURKEY POINT/OCTOBER 2010 EXAM AT POWER FACILITIES PSB1-RP - RP ACCESS CONTROLS 2 3, 4 09/27/2010 10/01/2010 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 3, 4 09/27/2010 10/01/2010 IP 71151 Performance Indicator Verification PSB1-TI - TI-179 NSTS VERIFICATION 2 3, 4 09/27/2010 10/01/2010 IP 2515/179 Verification of Licensee Responses to NRC Requirement for Inventories of Materials Tracked in NSTS OL EXAM - INITIAL EXAM PREP WEEK 2 4 3 10/04/2010 10/07/2010 V23312 TURKEY POINT/OCTOBER 2010 EXAM AT POWER FACILITIES EB3ISI - UNIT 3 INSERVICE INSPECTION 1 3 10/04/2010 10/08/2010 IP 7111108P Inservice Inspection Activities - PWR EB3SGISI - UNIT 3 SG INSERVICE INSPECTION 1 3 10/11/2010 10/15/2010 IP 7111108P Inservice Inspection Activities - PWR OL EXAM - INITIAL EXAM WEEK 1 8 3 10/25/2010 10/29/2010 V23312 TURKEY POINT/OCTOBER 2010 EXAM AT POWER FACILITIES OL EXAM - INITIAL EXAM WEEK 3 5 3 11/15/2010 11/19/2010 V23312 TURKEY POINT/OCTOBER 2010 EXAM AT POWER FACILITIES DRP/BR3 - 95001 SUPPLEMENTAL INSPECTION 3 3 11/29/2010 12/02/2010 IP 95001 Supplemental Inspection For One Or Two White Inputs In A Strategic Performance Area DRP/NR3 - 92702 FOLLOWUP CORRECTIVE ACTIONS 2 3 11/29/2010 12/02/2010 IP 92702 Followup On Corrective Actions For Violations And Deviations TI-177 - TI-177 GAS INTRUSION 3 3, 4 01/10/2011 01/14/2011 IP 2515/177 Managing Gas Accumulation In Emergency Core Cooling, Decay Heat Removal & Containment Spray System PSB1EP - EMERGENCY PREPAREDNESS EXERCISE 3 3, 4 02/07/2011 02/11/2011 IP 7111401 Exercise Evaluation 3, 4 02/07/2011 02/11/2011 IP 7111404 Emergency Action Level and Emergency Plan Changes 3, 4 02/07/2011 02/11/2011 IP 71151 Performance Indicator Verification EB3 ISI - UNIT 4 IN-SERVICE INSPECTION 1 4 03/28/2011 04/01/2011 IP 7111108P Inservice Inspection Activities - PWR EB3SGISI - UNIT 4 SG INSERVICE INSPECTION 1 4 04/04/2011 04/08/2011 IP 7111108P Inservice Inspection Activities - PWR PSB1-RP - RP OCCUPATIONAL WEEK 1 4 3, 4 04/11/2011 04/15/2011 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 3, 4 04/11/2011 04/15/2011 IP 71124.02 Occupational ALARA Planning and Controls 3, 4 04/11/2011 04/15/2011 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures. Enclosure

Page 2 of 2 Turkey Point 09/01/2010 08:15:20 Inspection / Activity Plan Report 22 09/01/2010 - 12/31/2011 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site PSB1-RP - RP OCCUPATIONAL WEEK 1 4 3, 4 04/11/2011 04/15/2011 IP 71124.04 Occupational Dose Assessment 3, 4 04/11/2011 04/15/2011 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 3, 4 04/11/2011 04/15/2011 IP 71151 Performance Indicator Verification PSB1-RP - RP OCCUPATIONAL WEEK 2 3 3, 4 04/18/2011 04/18/2011 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 3, 4 04/18/2011 04/18/2011 IP 71124.02 Occupational ALARA Planning and Controls 3, 4 04/18/2011 04/18/2011 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 3, 4 04/18/2011 04/18/2011 IP 71124.04 Occupational Dose Assessment 3, 4 04/18/2011 04/18/2011 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 3, 4 04/18/2011 04/18/2011 IP 71151 Performance Indicator Verification ISFSI - ISFSI DRY RUN 5 3, 4 05/16/2011 05/20/2011 IP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants CDBI - COMPONENT DESIGN BASES INSPECTION 9 3, 4 06/27/2011 07/01/2011 IP 7111121 Component Design Bases Inspection 3, 4 07/11/2011 07/14/2011 IP 7111121 Component Design Bases Inspection 3, 4 07/25/2011 07/29/2011 IP 7111121 Component Design Bases Inspection 3, 4 08/08/2011 08/12/2011 IP 7111121 Component Design Bases Inspection ISFSI - ISFSI FIRST CAMPAIGN 2 3, 4 07/18/2011 07/22/2011 IP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants OL EXAM - INITIAL EXAM PREP 3 3 10/31/2011 11/04/2011 V23364 TURKEY POINT / DECEMBER 2011 EXAM AT POWER FACILITIES OL EXAM - INITIAL EXAM - WEEK 1 3 3 12/05/2011 12/09/2011 V23364 TURKEY POINT / DECEMBER 2011 EXAM AT POWER FACILITIES OL EXAM - INITIAL EXAM - WEEK 2 3 3 12/12/2011 12/16/2011 V23364 TURKEY POINT / DECEMBER 2011 EXAM AT POWER FACILITIES This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures. Enclosure