| title = Limerick Generating Station, Units 1 and 2, Draft Request for Additional Information (TAC Nos. MF6094 and MF6095)
| title = Draft Request for Additional Information
| author name = Ennis R B
| author name = Ennis R
| author affiliation = NRC/NRR/DORL/LPLI-2
| author affiliation = NRC/NRR/DORL/LPLI-2
| addressee name = Broaddus D A
| addressee name = Broaddus D
| addressee affiliation = NRC/NRR/DORL/LPLI-2
| addressee affiliation = NRC/NRR/DORL/LPLI-2
| docket = 05000352, 05000353
| docket = 05000352, 05000353
| license number = NPF-039, NPF-085
| license number = NPF-039, NPF-085
| contact person = Ennis R B, NRR/DORL/LPLI-2, 415-1420
| contact person = Ennis R, NRR/DORL/LPLI-2, 415-1420
| case reference number = TAC MF6094, TAC MF6095
| case reference number = TAC MF6094, TAC MF6095
| document type = Memoranda, Request for Additional Information (RAI)
| document type = Memoranda, Request for Additional Information (RAI)
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 July 21, 2015  
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 July 21, 2015 MEMORANDUM TO:           Douglas A. Broaddus, Chief Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation FROM:                     Richard B. Ennis, Senior Project Manager /RA/
 
Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
MEMORANDUM TO: Douglas A. Broaddus, Chief Plant Licensing Branch I-2  
 
Division of Operating Reactor Licensing  
 
Office of Nuclear Reactor Regulation FROM:   Richard B. Ennis, Senior Project Manager  
/RA/ Plant Licensing Branch I-2  
 
Division of Operating Reactor Licensing  
 
Office of Nuclear Reactor Regulation  


==SUBJECT:==
==SUBJECT:==
LIMERICK GENERATING STATION, UNITS 1 AND 2, DRAFT REQUEST FOR ADDITIONAL INFORMATION (TAC NOS. MF6094  
LIMERICK GENERATING STATION, UNITS 1 AND 2, DRAFT REQUEST FOR ADDITIONAL INFORMATION (TAC NOS. MF6094 AND MF6095)
 
The attached draft request for additional information (RAI) was transmitted on July 13, 2015, to Ms. Stephanie Hanson of Exelon Generation Company, LLC (Exelon, the licensee). This information was transmitted in order to clarify the licensees relief request dated April 13, 2015, for Limerick Generating Station (LGS), Units 1 and 2. The proposed relief request concerns the use American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code (Code) Case OMN-18, Alternate Testing Requirements for Pumps Tested Quarterly Within
AND MF6095)  
+/-20% of Design Flow.
 
The draft RAI was sent to Exelon to ensure that the questions are understandable, the regulatory basis for the questions is clear, and to determine if the information was previously docketed. This memorandum and the attachment do not convey or represent an NRC staff position regarding the licensee's request.
The attached draft request for additional information (RAI) was transmitted on July 13, 2015, to  
Docket Nos. 50-352 and 50-353
 
Ms. Stephanie Hanson of Exelon Generation Company, LLC (Exelon, the licensee). This  
 
information was transmitted in order to clarify the licensee's relief request dated April 13, 2015, for Limerick Generating Station (LGS), Units 1 and 2. The proposed relief request concerns the  
 
use American Society of Mechanical Engineers (ASME)
Boiler and Pressure Vessel Code (Code) Case OMN-18, "Alternate Testing Requirements for Pumps Tested Quarterly Within  
 
+/-20% of Design Flow."
 
The draft RAI was sent to Exelon to ensure that the questions are understandable, the  
 
regulatory basis for the questions is clear, and to determine if the information was previously  
 
docketed. This memorandum and the attachment do not convey or represent an NRC staff  
 
position regarding the licensee's request.  
 
Docket Nos. 50-352 and 50-353  


==Attachment:==
==Attachment:==
Draft RAI  
Draft RAI


July 21, 2015  
July 21, 2015 MEMORANDUM TO:             Douglas A. Broaddus, Chief Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation FROM:                     Richard B. Ennis, Senior Project Manager /RA/
 
Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
MEMORANDUM TO: Douglas A. Broaddus, Chief Plant Licensing Branch I-2  
 
Division of Operating Reactor Licensing  
 
Office of Nuclear Reactor Regulation FROM:   Richard B. Ennis, Senior Project Manager  
/RA/ Plant Licensing Branch I-2  
 
Division of Operating Reactor Licensing  
 
Office of Nuclear Reactor Regulation  


==SUBJECT:==
==SUBJECT:==
LIMERICK GENERATING STATION, UNITS 1 AND 2, DRAFT REQUEST FOR ADDITIONAL INFORMATION (TAC NOS. MF6094  
LIMERICK GENERATING STATION, UNITS 1 AND 2, DRAFT REQUEST FOR ADDITIONAL INFORMATION (TAC NOS. MF6094 AND MF6095)
 
The attached draft request for additional information (RAI) was transmitted on July 13, 2015, to Ms. Stephanie Hanson of Exelon Generation Company, LLC (Exelon, the licensee). This information was transmitted in order to clarify the licensees relief request dated April 13, 2015, for Limerick Generating Station (LGS), Units 1 and 2. The proposed relief request concerns the use American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code (Code) Case OMN-18, Alternate Testing Requirements for Pumps Tested Quarterly Within
AND MF6095)  
+/-20% of Design Flow.
 
The draft RAI was sent to Exelon to ensure that the questions are understandable, the regulatory basis for the questions is clear, and to determine if the information was previously docketed. This memorandum and the attachment do not convey or represent an NRC staff position regarding the licensee's request.
The attached draft request for additional information (RAI) was transmitted on July 13, 2015, to  
Docket Nos. 50-352 and 50-353
 
Ms. Stephanie Hanson of Exelon Generation Company, LLC (Exelon, the licensee). This  
 
information was transmitted in order to clarify the licensee's relief request dated April 13, 2015, for Limerick Generating Station (LGS), Units 1 and 2. The proposed relief request concerns the  
 
use American Society of Mechanical Engineers (ASME)
Boiler and Pressure Vessel Code (Code) Case OMN-18, "Alternate Testing Requirements for Pumps Tested Quarterly Within  
 
+/-20% of Design Flow."
 
The draft RAI was sent to Exelon to ensure that the questions are understandable, the  
 
regulatory basis for the questions is clear, and to determine if the information was previously  
 
docketed. This memorandum and the attachment do not convey or represent an NRC staff  
 
position regarding the licensee's request.  
 
Docket Nos. 50-352 and 50-353  


==Attachment:==
==Attachment:==
Draft RAI  
Draft RAI DISTRIBUTION PUBLIC LPL1-2 R/F RidsNrrDorlLpl1-2 Resource RidsNrrDorlDpr Resource RidsNrrPMLimerick Resource RidsNrrDeEpnb Resource RWolfgang, NRR/EPNB ACCESSION NO.: ML15202A378 OFFICE       LPL1-2/PM NAME         REnnis DATE         7/21/15 OFFICIAL RECORD COPY
 
DISTRIBUTION PUBLIC LPL1-2 R/F RidsNrrDorlLpl1-2 Resource RidsNrrDorlDpr Resource RidsNrrPMLimerick Resource RidsNrrDeEpnb Resource RWolfgang, NRR/EPNB ACCESSION NO.: ML15202A378 OFFICE LPL1-2/PM NAME REnnis DATE 7/21/15 OFFICIAL RECORD COPY DRAFT REQUEST FOR ADDITIONAL INFORMATION REGARDING PROPOSED RELIEF REQUEST TO UTILIZE CODE CASE OMN-18 EXELON GENERATION COMPANY, LLC LIMERICK GENERATING STATION, UNITS 1 AND 2 DOCKET NOS. 50-352 AND 50-353
 
By letter dated April 13, 2015 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML15104A531), Exelon Gener ation Company, LLC submitted a relief request for Limerick Generating Station, Units 1 and 2. The proposed relief request concerns
 
the use American Society of Mechanical Engineers (ASME)
Boiler and Pressure Vessel Code (Code) Case OMN-18, "Alternate Testing Requirements for Pumps Tested Quarterly Within
 
+/-20% of Design Flow."
 
The Nuclear Regulatory Commission (NRC) staff has reviewed the information the licensee
 
provided that supports the proposed relief request and would like to discuss the following issues
 
to clarify the submittal.
RAI 1  Code Case OMN-18 has a note that states, "Subsection ISTB allows the Owner to categorize
 
the pumps in their program. As such, an Owner could categorize a pump that otherwise meets
 
the requirements of Group B, as a Group A pump, and test according to this Code Case. 
 
However, in doing so they are obtaining additional data (vibration and flow or differential
 
pressure) quarterly, rather than once every 2 yr."  Confirm that the pumps listed in Section 1, "ASME Code Component(s) Affected," of the relief request that are categorized as Group B


pumps, will be re-categorized as Group A pumps.  
DRAFT REQUEST FOR ADDITIONAL INFORMATION REGARDING PROPOSED RELIEF REQUEST TO UTILIZE CODE CASE OMN-18 EXELON GENERATION COMPANY, LLC LIMERICK GENERATING STATION, UNITS 1 AND 2 DOCKET NOS. 50-352 AND 50-353 By letter dated April 13, 2015 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML15104A531), Exelon Generation Company, LLC submitted a relief request for Limerick Generating Station, Units 1 and 2. The proposed relief request concerns the use American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code (Code) Case OMN-18, Alternate Testing Requirements for Pumps Tested Quarterly Within
+/-20% of Design Flow.
The Nuclear Regulatory Commission (NRC) staff has reviewed the information the licensee provided that supports the proposed relief request and would like to discuss the following issues to clarify the submittal.


===RAI 1===
Code Case OMN-18 has a note that states, Subsection ISTB allows the Owner to categorize the pumps in their program. As such, an Owner could categorize a pump that otherwise meets the requirements of Group B, as a Group A pump, and test according to this Code Case.
However, in doing so they are obtaining additional data (vibration and flow or differential pressure) quarterly, rather than once every 2 yr. Confirm that the pumps listed in Section 1, ASME Code Component(s) Affected, of the relief request that are categorized as Group B pumps, will be re-categorized as Group A pumps.
Attachment}}
Attachment}}

Latest revision as of 10:42, 19 March 2020

Draft Request for Additional Information
ML15202A378
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 07/21/2015
From: Richard Ennis
Plant Licensing Branch 1
To: Doug Broaddus
Plant Licensing Branch 1
Ennis R, NRR/DORL/LPLI-2, 415-1420
References
TAC MF6094, TAC MF6095
Download: ML15202A378 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 July 21, 2015 MEMORANDUM TO: Douglas A. Broaddus, Chief Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation FROM: Richard B. Ennis, Senior Project Manager /RA/

Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

SUBJECT:

LIMERICK GENERATING STATION, UNITS 1 AND 2, DRAFT REQUEST FOR ADDITIONAL INFORMATION (TAC NOS. MF6094 AND MF6095)

The attached draft request for additional information (RAI) was transmitted on July 13, 2015, to Ms. Stephanie Hanson of Exelon Generation Company, LLC (Exelon, the licensee). This information was transmitted in order to clarify the licensees relief request dated April 13, 2015, for Limerick Generating Station (LGS), Units 1 and 2. The proposed relief request concerns the use American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code (Code) Case OMN-18, Alternate Testing Requirements for Pumps Tested Quarterly Within

+/-20% of Design Flow.

The draft RAI was sent to Exelon to ensure that the questions are understandable, the regulatory basis for the questions is clear, and to determine if the information was previously docketed. This memorandum and the attachment do not convey or represent an NRC staff position regarding the licensee's request.

Docket Nos. 50-352 and 50-353

Attachment:

Draft RAI

July 21, 2015 MEMORANDUM TO: Douglas A. Broaddus, Chief Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation FROM: Richard B. Ennis, Senior Project Manager /RA/

Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

SUBJECT:

LIMERICK GENERATING STATION, UNITS 1 AND 2, DRAFT REQUEST FOR ADDITIONAL INFORMATION (TAC NOS. MF6094 AND MF6095)

The attached draft request for additional information (RAI) was transmitted on July 13, 2015, to Ms. Stephanie Hanson of Exelon Generation Company, LLC (Exelon, the licensee). This information was transmitted in order to clarify the licensees relief request dated April 13, 2015, for Limerick Generating Station (LGS), Units 1 and 2. The proposed relief request concerns the use American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code (Code) Case OMN-18, Alternate Testing Requirements for Pumps Tested Quarterly Within

+/-20% of Design Flow.

The draft RAI was sent to Exelon to ensure that the questions are understandable, the regulatory basis for the questions is clear, and to determine if the information was previously docketed. This memorandum and the attachment do not convey or represent an NRC staff position regarding the licensee's request.

Docket Nos. 50-352 and 50-353

Attachment:

Draft RAI DISTRIBUTION PUBLIC LPL1-2 R/F RidsNrrDorlLpl1-2 Resource RidsNrrDorlDpr Resource RidsNrrPMLimerick Resource RidsNrrDeEpnb Resource RWolfgang, NRR/EPNB ACCESSION NO.: ML15202A378 OFFICE LPL1-2/PM NAME REnnis DATE 7/21/15 OFFICIAL RECORD COPY

DRAFT REQUEST FOR ADDITIONAL INFORMATION REGARDING PROPOSED RELIEF REQUEST TO UTILIZE CODE CASE OMN-18 EXELON GENERATION COMPANY, LLC LIMERICK GENERATING STATION, UNITS 1 AND 2 DOCKET NOS. 50-352 AND 50-353 By letter dated April 13, 2015 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML15104A531), Exelon Generation Company, LLC submitted a relief request for Limerick Generating Station, Units 1 and 2. The proposed relief request concerns the use American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code (Code) Case OMN-18, Alternate Testing Requirements for Pumps Tested Quarterly Within

+/-20% of Design Flow.

The Nuclear Regulatory Commission (NRC) staff has reviewed the information the licensee provided that supports the proposed relief request and would like to discuss the following issues to clarify the submittal.

RAI 1

Code Case OMN-18 has a note that states, Subsection ISTB allows the Owner to categorize the pumps in their program. As such, an Owner could categorize a pump that otherwise meets the requirements of Group B, as a Group A pump, and test according to this Code Case.

However, in doing so they are obtaining additional data (vibration and flow or differential pressure) quarterly, rather than once every 2 yr. Confirm that the pumps listed in Section 1, ASME Code Component(s) Affected, of the relief request that are categorized as Group B pumps, will be re-categorized as Group A pumps.

Attachment