{{#Wiki_filter:ATTACH1L1ENT 2 TO AEP:NRC:0659F PROPOSED CHANGES TO THE DONALD C.COOK NUCLEAR PLANT UNIT NOS.1 AND 2 TECHNICAL SPECIFICATIONS ogog ADOGK pOg~pqzooa~~8 oos~~,
{{#Wiki_filter:ATTACH1L1ENT 2 TO AEP:NRC:0659F PROPOSED   CHANGES TO THE DONALD C. COOK NUCLEAR PLANT   UNIT NOS. 1 AND 2 TECHNICAL SPECIFICATIONS ogog pqzooa~~ 8 oos~~,
ADMINISTRATIVE CONTROLS QUORUM 6.5.2.6 A quorum, the minimum number of regular members and alternates required to hold a NSDRC meeting, shall be eight (8)members, of whom no more than two (2)shall be Designated or Temporary Alternates.
ADOGK    pOg  ~
The Chairman or Acting Chairman"shall be present for all NSDRC meetings.If the number of members present*is greater than a quorum, then the majority participating and voting at the meeting shall not have line responsibility for operation of the facility.REVIEW 6.5.2.7 The NSDRC is responsible for assuring'ithat independent**
 
reviews of the following are performed:
ADMINISTRATIVE CONTROLS QUORUM 6.5.2.6 A quorum, the minimum number of regular members and alternates required to hold a NSDRC meeting, shall be eight (8) members, of whom no more than two (2) shall be Designated or Temporary Alternates.         The Chairman or Acting Chairman"shall be present for all NSDRC meetings. If the number of members present* is greater than a quorum, then the majority participating and voting at the meeting shall not have line responsibility for operation of the facility.
a~The safety evaluations for 1),,changes to procedures, equipment or systems and 2)tests or experiments compl'eted under'the provision of 10 CFR 50.59 to verify that such actions did not constitute an unreviewed safety, question.b.Proposed changes to procedures, equipment or systems which involve an unreviewed safety question as defined in 10 CFR 50.59.C~Proposed tests or experiments which involve an unreviewed safety question as defined in 10 CFR 50.59.d.Proposed changes to Technical Specifications or this Operating License.e.Violations of codes, regulations, orders, Technical Specifications, license requirements, or of internal procedures or instructions having nuclear safety significance.
REVIEW 6.5.2.7 The NSDRC is responsible     for assuring'ithat independent** reviews of the following are performed:
Significant operating abnormalities or deviations form normal and expected performance of plant equipment that affect nuclear safety.g All REPORTABLE EVENTS.h.All recognized indications of an unanticipated deficiency in some aspect of design or operation of safety related structures, systems, and components.
a~   The safety evaluations for 1),,changes to procedures, equipment or systems and 2) tests or experiments compl'eted under 'the provision of 10 CFR 50.59 to verify that such actions did not constitute an unreviewed safety, question.
*Regular NSDRC members are expected to attend the meeting whenever possible, and alternates may attend as voting members only on an irregular basis.If both a regular member and his alternate attend a meeting, only the regular member may participate as a voting member, and the alternate is considered a guest.**Independent reviews may be performed by groups which report directly to the NSDRC and which must have NSDRC membership participation.
: b. Proposed changes to procedures, equipment or systems which involve an unreviewed safety question as defined in 10 CFR 50.59.
D.C.COOK-UNIT 1 6-10~Amendment No.
C~   Proposed   tests or experiments which involve   an unreviewed   safety question as defined in   10 CFR 50.59.
l J~V 4\II II i ADMINISTRATIVE CONTROLS QUORUM 6.5.2.6 A quorum, the minimum number of regular members and alternates required to hold a NSDRC meeting, shall be eight (8)members, of whom no more than two (2)shall be Designated or Temporary Alternates.
: d. Proposed changes   to Technical Specifications or this Operating License.
The Chairman or Acting Chairman shall be present for all NSDRC meetings.If the number of members present*is greater than a quorum, then the majority participating and voting at the meeting shall not have line responsibility for operation of the facility.REVIEW 6.5.2.7 The NSDRC is responsible for assuring that independent**
: e. Violations of codes, regulations, orders, Technical Specifications, license requirements, or of internal procedures or instructions having nuclear safety significance.
reviews of the following are performed:
Significant operating abnormalities or deviations form normal       and expected performance   of plant equipment that affect nuclear safety.
a~The safety evaluations for 1)changes to procedures, equipment or systems and 2)tests or experiments completed under the provision of 10 CFR 50.59 to verify that such actions did not constitute an unreviewed safety question.b.Proposed changes to procedures, equipment or systems which involve an unreviewed safety question as defined in 10 CFR 50.59.co Proposed tests or experiments which involve an unreviewed safety question as defined in 10 CFR 50.59.d.Proposed changes to Technical Specifications or this Operating License.e.Violations of codes, regulations, orders, Technical Specifications, license requirements, or of internal procedures or instructions having nuclear safety significance.
g   All REPORTABLE EVENTS.
Significant operating abnormalities or deviations form normal and expected performance of plant equipment that affect nuclear safety.gi All REPORTABLE EVENTS.h.All recognized indications of an unanticipated deficiency in some aspect of design or operation of safety related structuresi systems, and components.
: h. All recognized indications of   an unanticipated deficiency in   some aspect of design or operation of safety related structures, systems, and components.
*Regular NSDRC members are expected to attend the meeting whenever possible, and alternates may attend as voting members only on an irregular basis.If both a regular member and his alternate attend a meeting, only the regular member may participate as a voting member, and the alternate is considered a guest.**Independent reviews may be performed by groups which report directly to the NSDRC and which must have NSDRC membership participation.
* Regular NSDRC members are expected to attend the meeting whenever possible, and alternates may attend as voting members only on an irregular basis. If both a regular member and his alternate attend a meeting, only the regular member may participate as a voting member, and the alternate is considered a guest.
D.C.COOK-UNIT 2 6-10 Amendment No.  
** Independent reviews   may be performed by groups which report     directly to the NSDRC and which must have NSDRC membership participation.
~1 C'P.g1 p-" W~'p,y n I."f I,}I ATTACHMENT 3 TO AEP:NRC:0659F AMERICAN ELECTRIC POMER SERVICE CORPORATION
D. C. COOK UNIT 1                   6-10                     ~
'k AND DONALD C.COOK NUCLEAR'PLANT ORGANIZATION l f'E' Attachment 3, page 1 The titles of the Regular Members of the NSDRC are given in Attachment 2 to our letter AEP:NRC:0659C, request for change to Technical Specification 6.5.2.2., Unit Nos.1 and 2.Eleven of the fourteen members are identified by number on the organization chart in this attachment.
Amendment No.
Clarifications of the positions of the other members are as follows: 2)Executive Assistant to the President, I&MECo.Mr.G.E.LeMasters, who currently holds this position, was Assistant Manager of the Kanawha River Plant from 1959 to 1966 and Manager of the Glen Lyn Plant from 1966 to 1969, when he was appointed to his present position.12)Consulting Engineer, Nuclear Operations Division.Mr.R.W.Jurgensen, who currently holds this position, was Manager of the D.C.Cook Nuclear Plant from 1968 to 1977.He was Manager of the Nuclear Operations Division (formerly called the Nuclear Engineering Division)from 1977 to 1982, and Assistant Vice President, Nuolear Operations, from 1980 to 1982.14)Vice President, Fossil Plant Operations.
 
Mr.R.F.Hering, who currently holds this position, was Assistant Vice President of the Mechanical Engineering Division from 1973 to 1977 and Vice President of that Division from 1977 to 1984, when he was named to his present position.Several current members of the NSDRC have served continually on the committee since it was required by the Technical Specifications in 1974: John E.Dolan, H.N.Scherer, Jr., R.W.Jurgensen, R.F.Hering, R.W.Reeves, and J.R.Struyk.Mr.LeMasters was an alternate member of the committee from 1974 to 1984, when he has made a regular member.Their experience and presence on the committee ensure the continuity of the review process.
l J~
C 4 4 I P J II~~1 V~ha'-VUC 11'~'4 O 1~"~11~I C a I U C lh~4 4 RU 4 I P~U ,P I,I 4'I'4 R C~~~1 Qll I' CHAIRMAN OF THE SOARD VICE CHAIRMAN ENGINEERING 6 CONSTRUCTION
V 4   \
~rt Dl K EX.VICE PRESIDENT 6 Qo~~~~~~o~CHIEF ENGINEER 7 VICE PRESIDENT NUCLEAR OPERATIONS MANAGER OF ll DUALITY ASSURANCE SST.VICE PRESIDENT (CONSTRUCTION SR.VICE PRESIDENT ELECTRICAL ENGINEERING 6 DEPUTY CHIEF ENGINEER SST.VICE PRESIDEN ENVIRONMENTAL ENGINEERING VICE PRESIDENT ENGINEERING ADMINISTRATION SSK.VICE PRESIDEN MECHANICAL ENGINEERING ELECTRICAL ENGINEERING DEPARTMENT PLANT MANAGER D.C.COOK PLANK ())ENVIRONMENTAL ENGINEERING DIVISION DIVISION MANAGER CIVIL ENGINEERING MECHANICAL ENGINEERING DIVISION DIVISION MANAGERS DEPARTMENT SUPERINKENDENKS
II   II i
())NUCLEAR OPERATIONS DIVISION PLANT CONSTRUCTION DIVISION SECTION MANAGERS SECTION MANAGERS SECTION MANAGERS SECTION MANAGERS SECTION MANAGERS SECTION MANAGERS SECTION MANAGERS DIVISION MANAGER lP DESIGN ADMINISTRATIVE AND FUNCTIONAL DIRECTION SECTION MANAGERS DIVISION MANAGER MATERIALS HANDLING~~o~~~~~~~~~i~~~~TECHNICAL LIAISON~,~~FUNCTIONAL DIRECTION FOR COOK PLANT ACTIVITIES AMERICAN ELECTRIC POWER SERVICE CORPORATION ORGANIZATION FOR THE SUPPORT OF THE DONALD C.COOK NUCLEAR PLANT SECTION MANAGERS NOTES: (1)NOT PART OF AEPSC ORGANIZATION, SHOWN FOR INFORMATION ONLY.
 
Atthchment 3, page 3 Vice President Nuclear Operations NOD Support Staff C i2 LE onsulting ngineer Manager Nuclear Materials 8 Fuel Management Manager Nuclear Safety h Licensing Manager Radiological Support Manager Nuclear Operations Nuclear Materials 8 Fuel Managemen Section'uclear , Safety 4" ," Licensing Section Radiological Support Section Nuclear Operations Section Organization of Nuclear Operations Division, AEPSC Attachment 3, page 4 Donald C.Cook Nuclear Plant Position Clarifications for Members of the PNSRC Plant Manager.Wilbur G.Smith, Jr., who currently holds this position, was hired in December 1,981.Prior to joining the Cook Plant, he held the position of Head Engineer, Nuclear Engineering Department, Norfolk Naval Shipyard from 1974 to 1981.Assistant Plant Manager, Operations.
ADMINISTRATIVE CONTROLS QUORUM 6.5.2.6 A quorum, the minimum number of regular members and alternates required to hold a NSDRC meeting, shall be eight (8) members, of whom no more than two (2) shall be Designated or Temporary Alternates.         The Chairman or Acting Chairman shall be present for all NSDRC meetings. If the number of members present* is greater than a quorum, then the majority participating and voting at the meeting shall not have line responsibility for operation of the facility.
-Bertil A.Svensson, who holds this position,-joined the Cook Plant in September 1969 as Operations Supervisor.
REVIEW 6.5.2.7 The NSDRC is responsible     for assuring that independent** reviews of the following are performed:
He was appointed=Assistant Plant Manager in 1977.An engineer with AEP since 1955, he has worked at Ohio Power's Kammer.Plant and as Lead Startup Engineer-at the Canton, Ohio offices.-He-was assigned to the New York office to assist in the design of the Cook Plant from 1968 to 1969, prior to his transfer to Cook.I Assistant Plant Manager, Maintenance.
a~   The safety evaluations for 1) changes to procedures, equipment or systems and 2) tests or experiments completed under the provision of 10 CFR 50.59 to verify that such actions did not constitute an unreviewed safety question.
-.A.Alan Blind was-promoted-to this position on April 1, 1985.Mr.Blind joined the Cook Plant in January 1976 as a Performance Engineer.He was promoted to Performance Supervising Engineer in 1980 and held this position until being named Technical Superintendent, Engineering in October 1983.Operations Superintendent.
: b. Proposed changes to procedures, equipment or systems which involve an unreviewed safety question as defined in 10 CFR 50.59.
Kenneth R.Baker has held this position since January=1982;From 1972 through 1980, Mr.Baker was an NRC Inspector and worked as Region III Section Chief in 1980 and 1981 prior to coming to the Cook Plant.From 1969 to 1972 he worked as a Startup Engineer for Combustion Engineering, involved with the construction and testing of Consumers Power's Palisades Plant.He holds a Senior Operator's License.Technical Superintendent, Engineering.
co   Proposed   tests or experiments which involve   an unreviewed safety question as defined in   10 CFR 50.59.
Louis S.Gibson, who has held this position-since April 1985, was formerly employed in'the.Power Plant Projects Department of Consumers Power Company.His prior experience with Consumers extended from 1970-to April 1985-and included engineering, quality assurance) and operations responsibilities at the utility's corporate offices and the Palisades Nuclear Plant,'here he held a Senior Operator's License.Technical Superintendent, Physical Sciences.Thomas A.Kriesel, who has held this position since October 1983, joined the AEP system=in June-1968 as a-Chemist Trainee at Huntington.
: d. Proposed changes   to Technical Specifications or this Operating License.
He was an engineer at Tanners Creek from 1969 to 1971, transfer ring to the Cook Plant as Chemioal Foreman in May 1971.He was promoted to Environmental'Coordinator in April 1976.'aintenance Superintendent.
: e. Violations of codes, regulations, orders, Technical Specifications, license requirements, or of internal procedures or instructions having nuclear safety significance.
John D.Allard was promoted-to this position on April 1, 1985.Mr.Allard-became a Cook Plant Maintenance Mechanic in November 1973 and was promoted to Maintenance Supervisor in July 1978.
Significant operating abnormalities or deviations form normal       and expected performance of plant equipment that     affect nuclear safety.
1,1 V~I)II I),.M))H I V Iy ll II M V P~~M gll g (y*a Attachment 3, page 5 Plant Radiation Protection Supervisor.
gi   All REPORTABLE EVENTS.
David C.Palmer has held this position since August 1977.From 1971 to 1977 he was employed at the Cook Plant as Radiation Protection Supervisor.
: h. All recognized indications of   an unanticipated deficiency in   some aspect of design or operation of safety related structuresi systems, and components.
His previous experience in the health physics field was with the Rural Cooperative Power Assooiation.
* Regular NSDRC members are expected to attend the meeting whenever possible, and alternates may attend as voting members only on an irregular basis. If both a regular member and his alternate attend a meeting, only the regular member may participate as a voting member, and the alternate is considered a guest.
Quality Control Superintendent.
** Independent reviews   may be performed by groups which report     directly to the NSDRC and which must have NSDRC membership participation.
James F.Stietzel has held this=position since July 1977.He worked in varying technical engineering-assignments with AEPSC, New York, beginning in March 1971.He transferred to the Cook Plant in February 1976 as Quality Assurance Auditor.
D. C. COOK UNIT 2                   6-10                     Amendment No.
I<<',',>()IF I I<<<<F<<A<<p~<<f~I I,~<<g~'Ilf I~<<*~~<<.I~A-X~~" f<<~I~fl<<a<<.F<<l~5"1 P I ,~~L)I,I-')P I<<<<F PLANT MANAGER/STAFF PAGE 1 or 9 5/22/85 PLANT MANAGER ADMINISTRATIVE RESPONSIBILITY
 
--"FUNCTIONAL RESPONSIBILITY ASSISTANT PLANT MANAGER MAINTENANCE PLANT NUCLEAR SAFETY REVIEW COMMITTEE ASSISTANT pLaN T MaNAGER OPERATIONS (SRO)MAINTENANCE SUPEfrINTENDENT PLANNING SUPERINTENDENT auauTY CONTROL SUPERINTE TEC HN ICAL SUPERINTENDENT ENGINEERING TECHNICAL SUPERINTENDENT PHYSICAL SCIENCE I ADMINISTRATIVE SUPERINTENDENT OPERATIONS SUPERINTENDENT (SRO This is a drawing and blueprint interlace with Planning Department activities.
C               'P .g1 p-"
0 Administrative Responsibility
~  1 W
---Functional Responsibility DEPARTMENT:
              ~ 'p,y         n I
OFFICE ADMINISTRATION/
        ."f I, }
SHIFT TECHNICAL ADVISORS PAGE 2 ot 9 5/22/85 STORES SUPERVISOR ASSISTANT PLANT MANAGER MAINTENANCE ACCOUNTING SUPERV ISOR ISUPERVISOR
I
(~l L I I I AFF ASSISTANT A SUPERVISOR(SRO STORES ADMINISTRATOR ACCOUNTING COOROINATOR ENT CNTRL COOROI NATO R SENIOR SHIFT TECH.ADVISOR SHIFT.ADVISOR IRO EMERGENCY PLANNING C~SRO-Senior Reactor Operator License RO-Reactor Operator License  
 
-Admlnlstrallve Responslblllly
ATTACHMENT 3 TO AEP:NRC:0659F AMERICAN ELECTRIC POMER SERVICE CORPORATION
---Funcllonel Responslblllly ASSISTANT PLANT MANAGER MAINTENANCE DEPARTMENT:
                                        'k AND DONALD C. COOK NUCLEAR'PLANT ORGANIZATION
MAINTENANCE PAGE 3 ol9 5/2Z/85 MAINTENANCE SUPERINTENDENT GENERAL SUPERVISOR PRODUCTION GENERAL SUPERVISOR ENGINEERING GENERAL SUPERVISOR PRODUCTION SUPPORT PRODUCTION CONTROLLER MAINTENANCE SUPERVISOR PERFORMANCE ENGINEER SENIOR PERFORMANCE ENGINEER UTILITY SUPERVISOR ADMINISTRATIVE COMPLIANCE COORDINATOR SENIOR ADMINISTRATIVE COMPLIANCE COORDINATOR Admlnlsttattve ResponslblHty
 
----Functional Responslbllily ASSISTANT Pt.ANT MANAGER MAINTENANCE DEPARTMENT:
l f
PLANNING PAGE/ol 9 5/22/85 PLANNING SUPERINTENDANT STAFF ENGINEER GENERAL ERVtSOR UNIT1-OUTAGE PRQIECTS MANAGEMENT INFORMATION SPECIALIST DESIGN CHANGE SUPERVISOR SENIOR OUTAGE PROJECT ENGINEER DESIGN CHA~NGE ADMINIST~RATOR ASSISTANT DESIGN CHANGE SUPERVtSOR PERFORMANCE ENGINEER-SENIOR DESIGN CHANGE COORDINATOR Adminislvetlve Responslblllly
    'E '
---Funcllonel Responslblllly P.LANT MANAGER I I ASSISTANT I LANT MANAGER MAINTENANCE I I I OUALITY CONTROL SUPERINTENDENT DEPARTMENT:
, page   1 The titles of the Regular Members of the NSDRC are given in Attachment 2 to our letter AEP:NRC:0659C, request for change to Technical Specification 6.5.2.2.,   Unit Nos. 1 and 2. Eleven of the fourteen members are identified by number on the   organization chart in this attachment.
QUALITY CONTROL PAGE 5 ol 9 5/22/85 ASSISTANT OUAUTV CONTROL SUPERINTENDENT NOH-DESTRUCTIVE EXAMINATION SUPERVISOR OUALIT'V CONTROL SUPERVISOR IS I/NPRDS SUPERVISOR ASSISTANT ISI SUPERVISOR NRPDS COORDINATOR FIRE PROTECTION COORDINATOR ADMINISTRATIVE COMPLIANCE COORDINATOR SENIOR ADMINISTRATIVE COMPLIANCE COORDIHATOR Admlnlslrelive RasponslbUlty
Clarifications of the positions of the other members are as follows:
---Funcllonel Responslblllly ASSISTANT PLANT MANAGER MAINTENANCE DEPARTMENT:
: 2)   Executive Assistant to the President, I&MECo. Mr. G. E. LeMasters, who currently holds this position, was Assistant Manager of the Kanawha River Plant from 1959 to 1966 and Manager of the Glen Lyn Plant from 1966 to 1969, when he was appointed to his present position.
TECHNICAL ENGINEERING PAGE 6 ol 9 5/2 2/85 TECHNICAL" SUPERINTENDENT ENGINEERING NUCLEAR ENGINEERING SUPERVISOR PERFORMANCE ENGINEER SENIOR PERFORMANCE ENGINEER ENGINEERIHG TECI IHOLOGIST PERFORMANCE SUPERVISING ENGINEER PERFORMANCE ENGINEER SENIOR PERFORMANCE ENGINEER ENGINEERING TECI%0LOGIST CONTROL INSTRUMENT SUPERVISOR INSTRUMENT MAINTENANCE SUPERVISOR PER FORAIANCE ENGINEER SENIOR PERFORMANCE ENGINEER COMPUTER/SECUBITT/STANDARDS SUPERVISOR COMPUTER ANALTST SIMULATOR SUPERVISOR SIMULATOR COMPUTER SPECIALIST OUTAGE COORDINATOR STAFF ENGIN ADMINISTRATIVE COMPLIANCE COORDINATOR SENIOR ADMINISTRATIVE COMPLIANCE COOB 0 INATOB PLA NT MANAGER I ff't 0-Administrative Responsibility
: 12) Consulting Engineer, Nuclear Operations Division. Mr. R. W.
----Funct iona I Responsibility ASSISTANT PLANT MANAGER-MAINTENANCE DEPARTMENT:
Jurgensen, who currently holds this position, was Manager of the D. C.
TECHNICAL-PHYSICAL SCIENCE PAGE Tel 9 5/22/85 TECHNI C A L SUPERINTENDENT PHYSICAL SCIENCE ENVIRONMENTAL COOBDINATOB RADIATION WASTE HAND LIN G SUPERVISOR PERFORMANCE ENGINEER SENIOR PERFORMANCE ENGINEER ENGINEERING TECHNOLOGIST PLANT CHEMICAL SUPERVISOR CHEMICAL SUPERVISOR CHEMIST SENIOR CHEMIST PERFORMANCE ENGINEER SENIOR PERFORMANCE ENGINEER PLANT RADIATION PROTECTI0 N SUPERVISOR RAD I AT I 0 N PROTECTION SUPERVISOR PERFORMANCE ENGINEER SENIOR PERFORMANCE ENGINEER ALAR A COORDINATOR ENGINEERING TECHNOLOGIST ADMINISTRATIVE COMPLIANCE COORDINATOR SENIOR ADMINISTRATIVE COMPLIANCE COO BD INAmR ADMINISTRATIVE REPORTING FUNCTIONAL REPORTING PLANT MANAGER ASSISTANT PLANT MANAGER (A OPERATIONS (SRO DEPAflTMEHT:
Cook Nuclear Plant from 1968 to 1977. He was Manager of the Nuclear Operations Division (formerly called the Nuclear Engineering Division) from 1977 to 1982, and Assistant Vice President, Nuolear Operations, from 1980 to 1982.
ADMlfi(STRATION PAGE 8 of 8 5 r22/85 AD MIN ISTRATIVE SUPERINTENDANT TRAINING COORDINATOR SIMULATOR (SRO CHIEF SECURITY SUPERVISOR TRAINING MANAGER PERSONNEL SUPERVISOR ACCESS CONTROL SUPERVISOR TRAINING COORDINATOR (SRO PERSONNEL ASSISTANT SHIFT SECURITY SUPERVISOR SKILLS TRAINING SUPE R OPERATIONS TRAINING SUPERVISOR ISRO)TRAINING SUPPORT SUPERVISOR SIMULATOR TRAINING SUPERVISOR (SRO SENIOR TRAINING INSTRUCTOR TRAINING INSTRUCTOR SENIOR TRAINING INSTRUCTOR (SRO>TRAINING INSTRUCTOR (RO)SENIOR TRAINING INSTRUCTOR TRAINING INSTRUCTOR CURRICULUM DEVELOPMENT COORDINATOR INSTRUCTIONAL TECHNOLOGIST SIMULATOR TRAINING INSTRUCTOR SRO S IMUL ATOR ENGINEER ASSOCIATE TRAINING INSTRUCTOR ASSOCIATE TRAINING INSTRUCTOR ASSOCIATE TRAINING INSTRUCTOR GRAPHICS SPECIALIST A.Onmatters relative to Plant Licensed Operator Training SRO-Senior Reactor Operator License RO-.Reactor Operator License Admlnlslrellve Responslblllty
: 14) Vice President, Fossil Plant Operations. Mr. R. F. Hering, who currently holds this position, was Assistant Vice President of the Mechanical Engineering Division from 1973 to 1977 and Vice President of that Division from 1977 to 1984, when he was named to his present position.
----Functional Responslblllly ASS ISTAH T PLANT MANAGER 0 P E R AT ION 9 DEPARTMENT:
Several current members of the NSDRC have served continually on the committee since   it was required by the Technical Specifications in 1974: John E. Dolan, H. N. Scherer, Jr., R. W. Jurgensen, R. F. Hering, R. W. Reeves, and J. R. Struyk. Mr. LeMasters was an alternate member of the committee from 1974 to 1984, when he has made a regular member. Their experience and presence on the committee ensure the continuity of the review process.
OPERATIONS PAGE 9 ol 9 5/22/85 OPERATIONS SUPERINTENDENTISBO PRODUCTION
 
.SUPERVISOR OPERATION S (SRUTI SHIFT SUPERVISOR (SBO r----m I DISTAFF ASSISTANT I STA SUPERVISOR L ASSISTANT SHIFT SUPERVISOR (SRO PRODUCTION S UPERVI SING ENGINEER PERFORMANCE ENGINEER SENIOR PER I OR MAN CE ENGINEER CONTROL BOOM ADMNISTBAT IVE COORDINATOR PROCEDQlE COORDINATOR ADMINISTRATIVE COMPLIANCE COORDINATOR SENIOR ADMINISTRATIVE COMPLIANCE COORDINATOR UNIT SUPERVISOR (SBO ENGVIEEBING TECHNOLOGIST IYDRO COOBDVIAlOB
J C                               II    ~ ~ 1 4
/ENGINEER}}
4 I P
V ~     ha '-VUC 11
                        ~
4 O   1 ~"
    ~ 11 ~ I                           C I
a                                                                   U C
lh
                                                    ~   4 4 I 4 RU                                 P
                                                                        ~     U I,I,P 4
                                'I R
      '4 C
                                          ~   ~                 ~ 1 Qll I'
 
CHAIRMANOF THE SOARD VICE CHAIRMAN ENGINEERING 6                                                                           ~       rt Dl CONSTRUCTION K
EX. VICE PRESIDENT 6
CHIEF ENGINEER Qo         ~       ~     ~ ~   ~   ~     o~
VICE PRESIDENT NUCLEAR OPERATIONS ll    MANAGER OF DUALITYASSURANCE SST. VICE PRESIDENT CONSTRUCTION
(
7 SR. VICE PRESIDENT ELECTRICAL ENGINEERING 6 DEPUTY CHIEF ENGINEER SST. VICE PRESIDEN VICE PRESIDENT SSK. VICE PRESIDEN                 ELECTRICAL PLANT MANAGER ENVIRONMENTAL      ENGINEERING      MECHANICAL                      ENGINEERING D.C. COOK PLANK ENGINEERING      ADMINISTRATION    ENGINEERING                      DEPARTMENT
())
ENVIRONMENTAL     DIVISION MANAGER    MECHANICAL                                                                              NUCLEAR                                  PLANT DIVISION                 DEPARTMENT ENGINEERING            CIVIL       ENGINEERING                                                                             OPERATIONS                          CONSTRUCTION MANAGERS                SUPERINKENDENKS DIVISION        ENGINEERING         DIVISION                                                                               DIVISION                              DIVISION
())
SECTION            SECTION          SECTION                          SECTION                                              SECTION              SECTION          SECTION MANAGERS         MANAGERS         MANAGERS                       MANAGERS                                               MANAGERS             MANAGERS         MANAGERS DIVISION MANAGER lP   DESIGN ADMINISTRATIVEAND FUNCTIONAL DIRECTION SECTION MANAGERS
                                                  ~ ~ o ~ ~ ~ ~ ~ ~ ~ ~ ~ i ~ ~ ~ ~ TECHNICAL LIAISON                         AMERICAN ELECTRIC POWER SERVICE CORPORATION ORGANIZATION FOR THE SUPPORT OF THE DONALD C. COOK NUCLEAR PLANT DIVISION MANAGER MATERIALS HANDLING
                                                  ~,            ~              ~
FUNCTIONAL DIRECTION FOR COOK PLANT ACTIVITIES SECTION                 NOTES: (1) NOT PART OF AEPSC MANAGERS                                    ORGANIZATION,SHOWN FOR INFORMATION ONLY.
 
Atthchment 3, page 3 Vice President Nuclear Operations NOD Support                             C onsulting Staff                          i2 LE ngineer Manager        Manager                  Manager              Manager Nuclear        Nuclear                  Radiological          Nuclear Materials     Safety h                 Support               Operations 8 Fuel         Licensing Management Nuclear          'uclear                   Radiological          Nuclear Materials      ,   Safety 4 "
Support              Operations 8  Fuel          ,"
Licensing             Section               Section Managemen            Section Section Organization of Nuclear Operations Division, AEPSC
 
Attachment 3, page 4 Donald C. Cook Nuclear Plant Position Clarifications for   Members               of the PNSRC Plant Manager. Wilbur G. Smith, Jr., who currently holds this position, was hired in December 1,981. Prior to joining the Cook Plant, he held the position of Head Engineer, Nuclear Engineering Department, Norfolk Naval Shipyard from 1974 to 1981.
Assistant Plant Manager, Operations. Bertil A. Svensson, who holds this position, -joined the Cook Plant in September 1969 as Operations Supervisor. He was appointed=Assistant Plant Manager in 1977. An engineer with AEP since 1955, he has worked at Ohio Power's Kammer. Plant and as Lead Startup Engineer-at the Canton, Ohio offices.- He-was assigned to the New York office to assist in the design of the Cook Plant from 1968 to 1969, prior to his transfer to Cook.
I Assistant Plant Manager, Maintenance. -.A. Alan Blind was-promoted- to this position on April 1, 1985. Mr. Blind joined the Cook Plant in January 1976 as a Performance Engineer. He was promoted to Performance Supervising Engineer in 1980 and held this position until being   named Technical Superintendent, Engineering in October 1983.
Operations Superintendent. Kenneth R. Baker has held this position since January= 1982; From 1972 through 1980, Mr. Baker was an NRC Inspector and worked as Region III Section Chief in 1980 and 1981 prior to coming to the Cook Plant. From 1969 to 1972 he worked as a Startup Engineer for Combustion Engineering, involved with the construction and testing of Consumers Power's Palisades Plant. He holds a Senior Operator's License.
Technical Superintendent, Engineering. Louis S. Gibson, who has held this position- since April 1985, was formerly employed in'the .Power Plant Projects Department of Consumers Power Company. His prior experience with Consumers extended from 1970-to April 1985-and included engineering, quality assurance) and operations responsibilities at the utility's corporate offices and the Palisades Nuclear Plant,'here he held a Senior Operator's License.
Technical Superintendent, Physical Sciences. Thomas A. Kriesel, who has held this position since October 1983, joined the AEP system=in June- 1968 as a
- Chemist Trainee at Huntington. He was an engineer at Tanners Creek from 1969 to 1971, transfer ring to the Cook Plant as Chemioal Foreman in May 1971. He was promoted to Environmental'Coordinator in April John D. Allard was promoted-to this position on 1976.'aintenance Superintendent.
April 1, 1985. Mr. Allard-became a Cook Plant Maintenance Mechanic in November 1973 and was promoted to Maintenance Supervisor in July 1978.
 
1,1 V
              ~ I)   II I
                              ),.M
    ) I)H V
Iy ll II M
V P   ~
      ~ M gll g (y
* a
, page 5 Plant Radiation Protection Supervisor. David C. Palmer has held this position since August 1977. From 1971 to 1977 he was employed at the Cook Plant as Radiation Protection Supervisor. His previous experience in the health physics field was with the Rural Cooperative Power Assooiation.
Quality Control Superintendent. James F. Stietzel has held this=position since July 1977. He worked in varying technical engineering-assignments with AEPSC, New York, beginning in March 1971. He transferred to the Cook Plant in February 1976 as Quality Assurance Auditor.
 
                                                                                          <<F I
    ',',>()IF                     I                               I       <<
A p                                               I,
                                    ~I             ~ <<g                                 I
                                                                                        ~
              ~ <<
                                                                                    ~
L)I,I   -')P
                                                          ~ fl f  ~ << * ~ ~ <<. I~A   - X ~
                                              ~" f<<~I         <<a   << . F<<l
                                ~  'Ilf          I              ~   5"1 P I<<
F
 
                                                                                                                                /
PLANT MANAGER STAFF PAGE 1 or 9 5/22/85 ADMINISTRATIVE RESPONSIBILITY PLANT                --"FUNCTIONAL RESPONSIBILITY MANAGER PLANT NUCLEAR ASSISTANT                SAFETY REVIEW ASSISTANT PLANT MANAGER                  COMMITTEE                         pLaN T MaNAGER MAINTENANCE                                                    OPERATIONS (SRO) auauTY     TEC HN ICAL       TECHNICAL MAINTENANCE        PLANNING        CONTROL  SUPERINTENDENT  SUPERINTENDENT           ADMINISTRATIVE      OPERATIONS SUPEfrINTENDENT SUPERINTENDENT SUPERINTE      ENGINEERING   PHYSICAL SCIENCE I SUPERINTENDENT     SUPERINTENDENT (SRO This is a drawing and blueprint interlace with Planning Department activities.
 
0 DEPARTMENT: OFFICE ADMINISTRATION/
Administrative Responsibility                          SHIFT TECHNICAL ADVISORS
- -Functional Responsibility                                    PAGE 2   ot 9 5/22/85 ASSISTANT PLANT MANAGER ISUPERVISOR L            (~l MAINTENANCE                                                    I I
I STORES                    ACCOUNTING                                  AFF ASSISTANT SUPERVISOR                  SUPERV ISOR                                  A SUPERVISOR(SRO STORES                     ACCOUNTING ADMINISTRATOR                                                             SENIOR SHIFT COOROINATOR TECH. ADVISOR SHIFT
                                                                                  . ADVISOR IRO ENT CNTRL COOROI NATOR EMERGENCY PLANNING C
                                                              ~ SRO- Senior Reactor Operator   License RO- Reactor Operator License
 
Admlnlstrallve Responslblllly Funcllonel Responslblllly DEPARTMENT: MAINTENANCE PAGE 3 ol9 ASSISTANT                    5/2Z/85 PLANT MANAGER MAINTENANCE MAINTENANCE SUPERINTENDENT GENERAL                           GENERAL                    GENERAL                  PRODUCTION SUPERVISOR                          SUPERVISOR                  SUPERVISOR                 CONTROLLER PRODUCTION                         ENGINEERING                 PRODUCTION SUPPORT ADMINISTRATIVE MAINTENANCE                                                                               COMPLIANCE PERFORMANCE SUPERVISOR                         ENGINEER                                             COORDINATOR UTILITY                  SENIOR SENIOR                  SUPERVISOR ADMINISTRATIVE PERFORMANCE                                            COMPLIANCE ENGINEER                                              COORDINATOR
 
Admlnlsttattve ResponslblHty                                 DEPARTMENT: PLANNING
----Functional Responslbllily                           ASSISTANT             PAGE/ ol 9 Pt.ANT MANAGER             5/22/85 MAINTENANCE PLANNING SUPERINTENDANT STAFF                           GENERAL        MANAGEMENT                          DESIGN CHANGE ENGINEER                         ERVtSOR UNIT1-   INFORMATION                        SUPERVISOR OUTAGE PRQIECTS     SPECIALIST DESIGN CHA~NGE ADMINIST~RATOR SENIOR OUTAGE PROJECT ENGINEER ASSISTANT DESIGN CHANGE SUPERVtSOR PERFORMANCE ENGINEER-SENIOR DESIGN CHANGE COORDINATOR
 
Adminislvetlve Responslblllly                           P.LANT              DEPARTMENT: QUALITY CONTROL MANAGER
---Funcllonel Responslblllly                                                                       PAGE  5 ol 9 5/22/85 I
I     ASSISTANT I LANT MANAGER MAINTENANCE I
I I
OUALITY CONTROL SUPERINTENDENT ASSISTANT OUAUTV CONTROL SUPERINTENDENT NOH- DESTRUCTIVE                  OUALIT'VCONTROL        IS I /NPRDS                   FIRE PROTECTION        ADMINISTRATIVE EXAMINATION                      SUPERVISOR         SUPERVISOR                       COORDINATOR             COMPLIANCE SUPERVISOR                                                                                                    COORDINATOR SENIOR ASSISTANT                                            ADMINISTRATIVE ISI  SUPERVISOR                                          COMPLIANCE COORDIHATOR NRPDS COORDINATOR
 
Admlnlslrelive RasponslbUlty                                                     DEPARTMENT: TECHNICAL     ENGINEERING Funcllonel Responslblllly                                                                                PAGE 6 ol 9 ASSISTANT                                  5/2 2/85 PLANT MANAGER MAINTENANCE TECHNICAL SUPERINTENDENT ENGINEERING NUCLEAR                           PERFORMANCE  CONTROL                                                    OUTAGE                STAFF COMPUTER/
ENGINEERING                       SUPERVISING  INSTRUMENT                                              COORDINATOR            ENGIN SECUBITT/
SUPERVISOR                           ENGINEER SUPERVISOR                  STANDARDS SUPERVISOR ADMINISTRATIVE COMPLIANCE PERFORMANCE                          PERFORMANCE INSTRUMENT ENGINEER                                                                               COORDINATOR ENGINEER                                       MAINTENANCE                COMPUTER                                            SENIOR SENIOR                              SENIOR    SUPERVISOR                  ANALTST PERFORMANCE                         PERFORMANCE                                                                                ADMINISTRATIVE ENGINEER                            ENGINEER                              SIMULATOR                                        COMPLIANCE PER FORAIANCE SUPERVISOR                                        COOB 0 INATOB ENGINEER SENIOR ENGINEERIHG                          ENGINEERING TECI IHOLOGIST                      TECI%0LOGIST PERFORMANCE                SIMULATOR ENGINEER                 COMPUTER SPECIALIST
 
I PLA NT                                                         ff't MANAGER 0
Administrative Responsibility
  - - - -Funct iona I Responsibility ASSISTANT PLANT DEPARTMENT: TECHNICAL- PHYSICAL SCIENCE PAGE Tel 9 MANAGER-MAINTENANCE                          5/22/85 TECHNI C A L SUPERINTENDENT PHYSICAL SCIENCE ENVIRONMENTAL                         PLANT CHEMICAL                              ALARA COOBDINATOB                                         PLANT RADIATION                                       ADMINISTRATIVE SUPERVISOR                            COORDINATOR PROTECTI0 N                                          COMPLIANCE SUPERVISOR                                           COORDINATOR SENIOR RADIATION WASTE                            CHEMICAL                              ENGINEERING HANDLING                                                                      TECHNOLOGIST               ADMINISTRATIVE SUPERVISOR SUPERVISOR                                                                                                   COMPLIANCE RAD I AT I 0 N COO BD INAmR PROTECTION CHEMIST SENIOR  SUPERVISOR PERFORMANCE ENGINEER                               CHEMIST SENIOR PERFORMANCE PERFORMANCE                            PERFORMANCE      ENGINEER ENGINEER                              ENGINEER        SENIOR SENIOR PERFORMANCE PERFORMANCE      ENGINEER ENGINEERING TECHNOLOGIST                             ENGINEER
 
PLANT MANAGER DEPAflTMEHT: ADMlfi(STRATION ADMINISTRATIVE REPORTING                                                                                            PAGE   8 of 8 FUNCTIONAL REPORTING                                                    ASSISTANT PLANT MANAGER                                  5 r22/85 (A OPERATIONS (SRO AD MIN ISTRATIVE SUPERINTENDANT TRAINING COORDINATOR SIMULATOR (SRO CHIEF SECURITY                                         TRAINING                                                                                PERSONNEL SUPERVISOR                                         MANAGER                                                                               SUPERVISOR ACCESS CONTROL                                                     TRAINING                                                                   PERSONNEL SUPERVISOR                                                  COORDINATOR (SRO ASSISTANT SHIFT SECURITY SUPERVISOR                 SKILLS     OPERATIONS                              TRAINING                  SIMULATOR TRAINING        TRAINING                              SUPPORT                    TRAINING SUPE       R SUPERVISOR ISRO)                         SUPERVISOR               SUPERVISOR (SRO SENIOR         SENIOR                    SENIOR                CURRICULUM      SIMULATOR TRAINING       TRAINING                  TRAINING                DEVELOPMENT      TRAINING INSTRUCTOR   INSTRUCTOR (SRO>           INSTRUCTOR              COORDINATOR  INSTRUCTOR    SRO TRAINING       TRAINING                  TRAINING              INSTRUCTIONAL      S IMULATOR INSTRUCTOR   INSTRUCTOR  ( RO)           INSTRUCTOR             TECHNOLOGIST        ENGINEER ASSOCIATE       ASSOCIATE                 ASSOCIATE                           A. Onmatters relative to Plant Licensed Operator Training TRAINING      TRAINING                  TRAINING                GRAPHICS INSTRUCTOR    INSTRUCTOR                INSTRUCTOR SPECIALIST SRO-Senior Reactor Operator License RO -.Reactor Operator License
 
DEPARTMENT: OPERATIONS Admlnlslrellve Responslblllty                     ASS ISTAH T                                PAGE 9 ol 9
        ---Functional Responslblllly                           PLANT MANAGER                               5/22/85 0 P E R AT ION 9 OPERATIONS SUPERINTENDENTISBO PRODUCTION
                                                                                    . SUPERVISOR OPERATION S (SRUTI SHIFT             PRODUCTION      CONTROL BOOM                        PROCEDQlE        ADMINISTRATIVE SUPERVISOR (SBO          UPERVI SING    ADMNISTBATIVE                      COORDINATOR S                                                                        COMPLIANCE r- m ASSISTANT I
I ENGINEER      COORDINATOR                                            COORDINATOR SENIOR L
DISTAFF STA SUPERVISOR                                PERFORMANCE ENGINEER ADMINISTRATIVE COMPLIANCE SENIOR                                                              COORDINATOR ASSISTANT SHIFT SUPERVISOR (SRO       PER IOR MANCE ENGINEER UNIT SUPERVISOR (SBO ENGVIEEBING TECHNOLOGIST IYDRO COOBDVIAlOB
                                                / ENGINEER}}

Latest revision as of 01:33, 4 February 2020

Proposed Tech Specs Clarifying Definition of Quorum & Adding Footnote to Clarify That Alternates Are Not to Be Regular Voting Members on Nuclear Safety & Design Review Committees
ML17321A658
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 06/04/1985
From:
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
Shared Package
ML17321A657 List:
References
NUDOCS 8506100261
Download: ML17321A658 (24)


Text

ATTACH1L1ENT 2 TO AEP:NRC:0659F PROPOSED CHANGES TO THE DONALD C. COOK NUCLEAR PLANT UNIT NOS. 1 AND 2 TECHNICAL SPECIFICATIONS ogog pqzooa~~ 8 oos~~,

ADOGK pOg ~

ADMINISTRATIVE CONTROLS QUORUM 6.5.2.6 A quorum, the minimum number of regular members and alternates required to hold a NSDRC meeting, shall be eight (8) members, of whom no more than two (2) shall be Designated or Temporary Alternates. The Chairman or Acting Chairman"shall be present for all NSDRC meetings. If the number of members present* is greater than a quorum, then the majority participating and voting at the meeting shall not have line responsibility for operation of the facility.

REVIEW 6.5.2.7 The NSDRC is responsible for assuring'ithat independent** reviews of the following are performed:

a~ The safety evaluations for 1),,changes to procedures, equipment or systems and 2) tests or experiments compl'eted under 'the provision of 10 CFR 50.59 to verify that such actions did not constitute an unreviewed safety, question.

b. Proposed changes to procedures, equipment or systems which involve an unreviewed safety question as defined in 10 CFR 50.59.

C~ Proposed tests or experiments which involve an unreviewed safety question as defined in 10 CFR 50.59.

d. Proposed changes to Technical Specifications or this Operating License.
e. Violations of codes, regulations, orders, Technical Specifications, license requirements, or of internal procedures or instructions having nuclear safety significance.

Significant operating abnormalities or deviations form normal and expected performance of plant equipment that affect nuclear safety.

g All REPORTABLE EVENTS.

h. All recognized indications of an unanticipated deficiency in some aspect of design or operation of safety related structures, systems, and components.
  • Regular NSDRC members are expected to attend the meeting whenever possible, and alternates may attend as voting members only on an irregular basis. If both a regular member and his alternate attend a meeting, only the regular member may participate as a voting member, and the alternate is considered a guest.
    • Independent reviews may be performed by groups which report directly to the NSDRC and which must have NSDRC membership participation.

D. C. COOK UNIT 1 6-10 ~

Amendment No.

l J~

V 4 \

II II i

ADMINISTRATIVE CONTROLS QUORUM 6.5.2.6 A quorum, the minimum number of regular members and alternates required to hold a NSDRC meeting, shall be eight (8) members, of whom no more than two (2) shall be Designated or Temporary Alternates. The Chairman or Acting Chairman shall be present for all NSDRC meetings. If the number of members present* is greater than a quorum, then the majority participating and voting at the meeting shall not have line responsibility for operation of the facility.

REVIEW 6.5.2.7 The NSDRC is responsible for assuring that independent** reviews of the following are performed:

a~ The safety evaluations for 1) changes to procedures, equipment or systems and 2) tests or experiments completed under the provision of 10 CFR 50.59 to verify that such actions did not constitute an unreviewed safety question.

b. Proposed changes to procedures, equipment or systems which involve an unreviewed safety question as defined in 10 CFR 50.59.

co Proposed tests or experiments which involve an unreviewed safety question as defined in 10 CFR 50.59.

d. Proposed changes to Technical Specifications or this Operating License.
e. Violations of codes, regulations, orders, Technical Specifications, license requirements, or of internal procedures or instructions having nuclear safety significance.

Significant operating abnormalities or deviations form normal and expected performance of plant equipment that affect nuclear safety.

gi All REPORTABLE EVENTS.

h. All recognized indications of an unanticipated deficiency in some aspect of design or operation of safety related structuresi systems, and components.
  • Regular NSDRC members are expected to attend the meeting whenever possible, and alternates may attend as voting members only on an irregular basis. If both a regular member and his alternate attend a meeting, only the regular member may participate as a voting member, and the alternate is considered a guest.
    • Independent reviews may be performed by groups which report directly to the NSDRC and which must have NSDRC membership participation.

D. C. COOK UNIT 2 6-10 Amendment No.

C 'P .g1 p-"

~ 1 W

~ 'p,y n I

."f I, }

I

ATTACHMENT 3 TO AEP:NRC:0659F AMERICAN ELECTRIC POMER SERVICE CORPORATION

'k AND DONALD C. COOK NUCLEAR'PLANT ORGANIZATION

l f

'E '

, page 1 The titles of the Regular Members of the NSDRC are given in Attachment 2 to our letter AEP:NRC:0659C, request for change to Technical Specification 6.5.2.2., Unit Nos. 1 and 2. Eleven of the fourteen members are identified by number on the organization chart in this attachment.

Clarifications of the positions of the other members are as follows:

2) Executive Assistant to the President, I&MECo. Mr. G. E. LeMasters, who currently holds this position, was Assistant Manager of the Kanawha River Plant from 1959 to 1966 and Manager of the Glen Lyn Plant from 1966 to 1969, when he was appointed to his present position.
12) Consulting Engineer, Nuclear Operations Division. Mr. R. W.

Jurgensen, who currently holds this position, was Manager of the D. C.

Cook Nuclear Plant from 1968 to 1977. He was Manager of the Nuclear Operations Division (formerly called the Nuclear Engineering Division) from 1977 to 1982, and Assistant Vice President, Nuolear Operations, from 1980 to 1982.

14) Vice President, Fossil Plant Operations. Mr. R. F. Hering, who currently holds this position, was Assistant Vice President of the Mechanical Engineering Division from 1973 to 1977 and Vice President of that Division from 1977 to 1984, when he was named to his present position.

Several current members of the NSDRC have served continually on the committee since it was required by the Technical Specifications in 1974: John E. Dolan, H. N. Scherer, Jr., R. W. Jurgensen, R. F. Hering, R. W. Reeves, and J. R. Struyk. Mr. LeMasters was an alternate member of the committee from 1974 to 1984, when he has made a regular member. Their experience and presence on the committee ensure the continuity of the review process.

J C II ~ ~ 1 4

4 I P

V ~ ha '-VUC 11

~

4 O 1 ~"

~ 11 ~ I C I

a U C

lh

~ 4 4 I 4 RU P

~ U I,I,P 4

'I R

'4 C

~ ~ ~ 1 Qll I'

CHAIRMANOF THE SOARD VICE CHAIRMAN ENGINEERING 6 ~ rt Dl CONSTRUCTION K

EX. VICE PRESIDENT 6

CHIEF ENGINEER Qo ~ ~ ~ ~ ~ ~ o~

VICE PRESIDENT NUCLEAR OPERATIONS ll MANAGER OF DUALITYASSURANCE SST. VICE PRESIDENT CONSTRUCTION

(

7 SR. VICE PRESIDENT ELECTRICAL ENGINEERING 6 DEPUTY CHIEF ENGINEER SST. VICE PRESIDEN VICE PRESIDENT SSK. VICE PRESIDEN ELECTRICAL PLANT MANAGER ENVIRONMENTAL ENGINEERING MECHANICAL ENGINEERING D.C. COOK PLANK ENGINEERING ADMINISTRATION ENGINEERING DEPARTMENT

())

ENVIRONMENTAL DIVISION MANAGER MECHANICAL NUCLEAR PLANT DIVISION DEPARTMENT ENGINEERING CIVIL ENGINEERING OPERATIONS CONSTRUCTION MANAGERS SUPERINKENDENKS DIVISION ENGINEERING DIVISION DIVISION DIVISION

())

SECTION SECTION SECTION SECTION SECTION SECTION SECTION MANAGERS MANAGERS MANAGERS MANAGERS MANAGERS MANAGERS MANAGERS DIVISION MANAGER lP DESIGN ADMINISTRATIVEAND FUNCTIONAL DIRECTION SECTION MANAGERS

~ ~ o ~ ~ ~ ~ ~ ~ ~ ~ ~ i ~ ~ ~ ~ TECHNICAL LIAISON AMERICAN ELECTRIC POWER SERVICE CORPORATION ORGANIZATION FOR THE SUPPORT OF THE DONALD C. COOK NUCLEAR PLANT DIVISION MANAGER MATERIALS HANDLING

~, ~ ~

FUNCTIONAL DIRECTION FOR COOK PLANT ACTIVITIES SECTION NOTES: (1) NOT PART OF AEPSC MANAGERS ORGANIZATION,SHOWN FOR INFORMATION ONLY.

Atthchment 3, page 3 Vice President Nuclear Operations NOD Support C onsulting Staff i2 LE ngineer Manager Manager Manager Manager Nuclear Nuclear Radiological Nuclear Materials Safety h Support Operations 8 Fuel Licensing Management Nuclear 'uclear Radiological Nuclear Materials , Safety 4 "

Support Operations 8 Fuel ,"

Licensing Section Section Managemen Section Section Organization of Nuclear Operations Division, AEPSC

Attachment 3, page 4 Donald C. Cook Nuclear Plant Position Clarifications for Members of the PNSRC Plant Manager. Wilbur G. Smith, Jr., who currently holds this position, was hired in December 1,981. Prior to joining the Cook Plant, he held the position of Head Engineer, Nuclear Engineering Department, Norfolk Naval Shipyard from 1974 to 1981.

Assistant Plant Manager, Operations. Bertil A. Svensson, who holds this position, -joined the Cook Plant in September 1969 as Operations Supervisor. He was appointed=Assistant Plant Manager in 1977. An engineer with AEP since 1955, he has worked at Ohio Power's Kammer. Plant and as Lead Startup Engineer-at the Canton, Ohio offices.- He-was assigned to the New York office to assist in the design of the Cook Plant from 1968 to 1969, prior to his transfer to Cook.

I Assistant Plant Manager, Maintenance. -.A. Alan Blind was-promoted- to this position on April 1, 1985. Mr. Blind joined the Cook Plant in January 1976 as a Performance Engineer. He was promoted to Performance Supervising Engineer in 1980 and held this position until being named Technical Superintendent, Engineering in October 1983.

Operations Superintendent. Kenneth R. Baker has held this position since January= 1982; From 1972 through 1980, Mr. Baker was an NRC Inspector and worked as Region III Section Chief in 1980 and 1981 prior to coming to the Cook Plant. From 1969 to 1972 he worked as a Startup Engineer for Combustion Engineering, involved with the construction and testing of Consumers Power's Palisades Plant. He holds a Senior Operator's License.

Technical Superintendent, Engineering. Louis S. Gibson, who has held this position- since April 1985, was formerly employed in'the .Power Plant Projects Department of Consumers Power Company. His prior experience with Consumers extended from 1970-to April 1985-and included engineering, quality assurance) and operations responsibilities at the utility's corporate offices and the Palisades Nuclear Plant,'here he held a Senior Operator's License.

Technical Superintendent, Physical Sciences. Thomas A. Kriesel, who has held this position since October 1983, joined the AEP system=in June- 1968 as a

- Chemist Trainee at Huntington. He was an engineer at Tanners Creek from 1969 to 1971, transfer ring to the Cook Plant as Chemioal Foreman in May 1971. He was promoted to Environmental'Coordinator in April John D. Allard was promoted-to this position on 1976.'aintenance Superintendent.

April 1, 1985. Mr. Allard-became a Cook Plant Maintenance Mechanic in November 1973 and was promoted to Maintenance Supervisor in July 1978.

1,1 V

~ I) II I

),.M

) I)H V

Iy ll II M

V P ~

~ M gll g (y

  • a

, page 5 Plant Radiation Protection Supervisor. David C. Palmer has held this position since August 1977. From 1971 to 1977 he was employed at the Cook Plant as Radiation Protection Supervisor. His previous experience in the health physics field was with the Rural Cooperative Power Assooiation.

Quality Control Superintendent. James F. Stietzel has held this=position since July 1977. He worked in varying technical engineering-assignments with AEPSC, New York, beginning in March 1971. He transferred to the Cook Plant in February 1976 as Quality Assurance Auditor.

<<F I

',',>()IF I I <<

A p I,

~I ~ <<g I

~

~ <<

~

L)I,I -')P

~ fl f ~ << * ~ ~ <<. I~A - X ~

~" f<<~I <<a << . F<<l

~ 'Ilf I ~ 5"1 P I<<

F

/

PLANT MANAGER STAFF PAGE 1 or 9 5/22/85 ADMINISTRATIVE RESPONSIBILITY PLANT --"FUNCTIONAL RESPONSIBILITY MANAGER PLANT NUCLEAR ASSISTANT SAFETY REVIEW ASSISTANT PLANT MANAGER COMMITTEE pLaN T MaNAGER MAINTENANCE OPERATIONS (SRO) auauTY TEC HN ICAL TECHNICAL MAINTENANCE PLANNING CONTROL SUPERINTENDENT SUPERINTENDENT ADMINISTRATIVE OPERATIONS SUPEfrINTENDENT SUPERINTENDENT SUPERINTE ENGINEERING PHYSICAL SCIENCE I SUPERINTENDENT SUPERINTENDENT (SRO This is a drawing and blueprint interlace with Planning Department activities.

0 DEPARTMENT: OFFICE ADMINISTRATION/

Administrative Responsibility SHIFT TECHNICAL ADVISORS

- -Functional Responsibility PAGE 2 ot 9 5/22/85 ASSISTANT PLANT MANAGER ISUPERVISOR L (~l MAINTENANCE I I

I STORES ACCOUNTING AFF ASSISTANT SUPERVISOR SUPERV ISOR A SUPERVISOR(SRO STORES ACCOUNTING ADMINISTRATOR SENIOR SHIFT COOROINATOR TECH. ADVISOR SHIFT

. ADVISOR IRO ENT CNTRL COOROI NATOR EMERGENCY PLANNING C

~ SRO- Senior Reactor Operator License RO- Reactor Operator License

Admlnlstrallve Responslblllly Funcllonel Responslblllly DEPARTMENT: MAINTENANCE PAGE 3 ol9 ASSISTANT 5/2Z/85 PLANT MANAGER MAINTENANCE MAINTENANCE SUPERINTENDENT GENERAL GENERAL GENERAL PRODUCTION SUPERVISOR SUPERVISOR SUPERVISOR CONTROLLER PRODUCTION ENGINEERING PRODUCTION SUPPORT ADMINISTRATIVE MAINTENANCE COMPLIANCE PERFORMANCE SUPERVISOR ENGINEER COORDINATOR UTILITY SENIOR SENIOR SUPERVISOR ADMINISTRATIVE PERFORMANCE COMPLIANCE ENGINEER COORDINATOR

Admlnlsttattve ResponslblHty DEPARTMENT: PLANNING


Functional Responslbllily ASSISTANT PAGE/ ol 9 Pt.ANT MANAGER 5/22/85 MAINTENANCE PLANNING SUPERINTENDANT STAFF GENERAL MANAGEMENT DESIGN CHANGE ENGINEER ERVtSOR UNIT1- INFORMATION SUPERVISOR OUTAGE PRQIECTS SPECIALIST DESIGN CHA~NGE ADMINIST~RATOR SENIOR OUTAGE PROJECT ENGINEER ASSISTANT DESIGN CHANGE SUPERVtSOR PERFORMANCE ENGINEER-SENIOR DESIGN CHANGE COORDINATOR

Adminislvetlve Responslblllly P.LANT DEPARTMENT: QUALITY CONTROL MANAGER

---Funcllonel Responslblllly PAGE 5 ol 9 5/22/85 I

I ASSISTANT I LANT MANAGER MAINTENANCE I

I I

OUALITY CONTROL SUPERINTENDENT ASSISTANT OUAUTV CONTROL SUPERINTENDENT NOH- DESTRUCTIVE OUALIT'VCONTROL IS I /NPRDS FIRE PROTECTION ADMINISTRATIVE EXAMINATION SUPERVISOR SUPERVISOR COORDINATOR COMPLIANCE SUPERVISOR COORDINATOR SENIOR ASSISTANT ADMINISTRATIVE ISI SUPERVISOR COMPLIANCE COORDIHATOR NRPDS COORDINATOR

Admlnlslrelive RasponslbUlty DEPARTMENT: TECHNICAL ENGINEERING Funcllonel Responslblllly PAGE 6 ol 9 ASSISTANT 5/2 2/85 PLANT MANAGER MAINTENANCE TECHNICAL SUPERINTENDENT ENGINEERING NUCLEAR PERFORMANCE CONTROL OUTAGE STAFF COMPUTER/

ENGINEERING SUPERVISING INSTRUMENT COORDINATOR ENGIN SECUBITT/

SUPERVISOR ENGINEER SUPERVISOR STANDARDS SUPERVISOR ADMINISTRATIVE COMPLIANCE PERFORMANCE PERFORMANCE INSTRUMENT ENGINEER COORDINATOR ENGINEER MAINTENANCE COMPUTER SENIOR SENIOR SENIOR SUPERVISOR ANALTST PERFORMANCE PERFORMANCE ADMINISTRATIVE ENGINEER ENGINEER SIMULATOR COMPLIANCE PER FORAIANCE SUPERVISOR COOB 0 INATOB ENGINEER SENIOR ENGINEERIHG ENGINEERING TECI IHOLOGIST TECI%0LOGIST PERFORMANCE SIMULATOR ENGINEER COMPUTER SPECIALIST

I PLA NT ff't MANAGER 0

Administrative Responsibility

- - - -Funct iona I Responsibility ASSISTANT PLANT DEPARTMENT: TECHNICAL- PHYSICAL SCIENCE PAGE Tel 9 MANAGER-MAINTENANCE 5/22/85 TECHNI C A L SUPERINTENDENT PHYSICAL SCIENCE ENVIRONMENTAL PLANT CHEMICAL ALARA COOBDINATOB PLANT RADIATION ADMINISTRATIVE SUPERVISOR COORDINATOR PROTECTI0 N COMPLIANCE SUPERVISOR COORDINATOR SENIOR RADIATION WASTE CHEMICAL ENGINEERING HANDLING TECHNOLOGIST ADMINISTRATIVE SUPERVISOR SUPERVISOR COMPLIANCE RAD I AT I 0 N COO BD INAmR PROTECTION CHEMIST SENIOR SUPERVISOR PERFORMANCE ENGINEER CHEMIST SENIOR PERFORMANCE PERFORMANCE PERFORMANCE ENGINEER ENGINEER ENGINEER SENIOR SENIOR PERFORMANCE PERFORMANCE ENGINEER ENGINEERING TECHNOLOGIST ENGINEER

PLANT MANAGER DEPAflTMEHT: ADMlfi(STRATION ADMINISTRATIVE REPORTING PAGE 8 of 8 FUNCTIONAL REPORTING ASSISTANT PLANT MANAGER 5 r22/85 (A OPERATIONS (SRO AD MIN ISTRATIVE SUPERINTENDANT TRAINING COORDINATOR SIMULATOR (SRO CHIEF SECURITY TRAINING PERSONNEL SUPERVISOR MANAGER SUPERVISOR ACCESS CONTROL TRAINING PERSONNEL SUPERVISOR COORDINATOR (SRO ASSISTANT SHIFT SECURITY SUPERVISOR SKILLS OPERATIONS TRAINING SIMULATOR TRAINING TRAINING SUPPORT TRAINING SUPE R SUPERVISOR ISRO) SUPERVISOR SUPERVISOR (SRO SENIOR SENIOR SENIOR CURRICULUM SIMULATOR TRAINING TRAINING TRAINING DEVELOPMENT TRAINING INSTRUCTOR INSTRUCTOR (SRO> INSTRUCTOR COORDINATOR INSTRUCTOR SRO TRAINING TRAINING TRAINING INSTRUCTIONAL S IMULATOR INSTRUCTOR INSTRUCTOR ( RO) INSTRUCTOR TECHNOLOGIST ENGINEER ASSOCIATE ASSOCIATE ASSOCIATE A. Onmatters relative to Plant Licensed Operator Training TRAINING TRAINING TRAINING GRAPHICS INSTRUCTOR INSTRUCTOR INSTRUCTOR SPECIALIST SRO-Senior Reactor Operator License RO -.Reactor Operator License

DEPARTMENT: OPERATIONS Admlnlslrellve Responslblllty ASS ISTAH T PAGE 9 ol 9

---Functional Responslblllly PLANT MANAGER 5/22/85 0 P E R AT ION 9 OPERATIONS SUPERINTENDENTISBO PRODUCTION

. SUPERVISOR OPERATION S (SRUTI SHIFT PRODUCTION CONTROL BOOM PROCEDQlE ADMINISTRATIVE SUPERVISOR (SBO UPERVI SING ADMNISTBATIVE COORDINATOR S COMPLIANCE r- m ASSISTANT I

I ENGINEER COORDINATOR COORDINATOR SENIOR L

DISTAFF STA SUPERVISOR PERFORMANCE ENGINEER ADMINISTRATIVE COMPLIANCE SENIOR COORDINATOR ASSISTANT SHIFT SUPERVISOR (SRO PER IOR MANCE ENGINEER UNIT SUPERVISOR (SBO ENGVIEEBING TECHNOLOGIST IYDRO COOBDVIAlOB