| issue date = 02/18/1988
| issue date = 02/18/1988
| title = LER 87-023-01:on 871109 Problem Discovered Re Fuses Required for Isolation Between Local Shutdown & Indication Panels. Problems Confirmed on 871222.Caused by Engineer Design Oversight.Design Changes made.W/880218 Ltr
| title = LER 87-023-01:on 871109 Problem Discovered Re Fuses Required for Isolation Between Local Shutdown & Indication Panels. Problems Confirmed on 871222.Caused by Engineer Design Oversight.Design Changes made.W/880218 Ltr
| author name = BEILMAN T P, SMITH W G
| author name = Beilman T, Smith W
| author affiliation = INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
| author affiliation = INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
| addressee name =  
| addressee name =  
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:REGULATORY INFORMATION DISTR IBUTIQl'J SYSTEM (R IDS)ACCESSION NBR: 8802230067 DOC.DATE: 88/02/18 NOTARIZED:
{{#Wiki_filter:REGULATORY INFORMATION DISTR IBUTIQl'J SYSTEM (R IDS)
NO DOCKET 0 FACIL: 50-315 Donald C.Cook Nuclear Poeer P lant'nit ii Indiana 5 05000315 AUTH.NAME AUTHOR AFFILIATION BEILMANi T.P.Indiana Michigan Power Co.(formerly Indiana 8.Michigan Ele SMITHi W.G.Indiana Michigan power Co.(formerly Indiana 5 Michigan Ele RECIP.NAME RECIPIENT AFFILIATION
ACCESSION NBR: 8802230067           DOC. DATE: 88/02/18     NOTARIZED: NO         DOCKET 0 FACIL: 50-315 Donald       C. Cook Nuclear Poeer P AUTHOR AFFILIATION lant'nit     ii Indiana   5 05000315 AUTH. NAME BEILMANiT. P.         Indiana Michigan Power     Co.   (formerly Indiana   8. Michigan Ele SMITHi W. G.         Indiana Michigan power     Co.   (formerly Indiana   5 Michigan Ele RECIP. NAME           RECIPIENT AFFILIATION


==SUBJECT:==
==SUBJECT:==
LER 87-023-01:
LER 87-023-01:     on 871109 problem discovered re fuses required for isolation       between local shutdoen 8c indication panels.
on 871109 problem discovered re fuses required for isolation between local shutdoen 8c indication panels.Problems conf iTmed on 871222.Caused bg engineer design oversight.
Problems conf iTmed on 871222. Caused bg engineer design oversight. Design changes mode. W/880218 ltr.
Design changes mode.W/880218 ltr.DISTRIBUTION CODE: IE22D COPIES RECEIVED: LTR ENCL SIZE: TITLE: 50.73 Licensee Event Report (LER>i Incident Rpti etc.REC IP IENT ID CODE/NAME PD3-3 LA WIGGINGTQNi D CQP IES LTTR ENCL 1 1 REC I P IENT ID CODE/NAME PD3-3 PD CQP IES LTTR ENCL 1 1 INTERNAL: ACRS MICHELSON AEOD/DOA AEOD/DBP/ROAB ARM/DCTS/DAB NRR/DEBT/ADS NRR/DEST/ELB NRR/DEST/MEB NRR/DEST/PSB NRR/DEBT/SGB NRR/DLPG/GAB NRR/DREP/RAB B REG FILE 02 IB RGN3 FILE 01 1 1 1 0 1 1 1 1 1 1 1 1 1 1 ACRS MOELLER AEOD/DSP/NAS AEOD/DBP/TPAB DEDRO NRR/DEBT/CEB NRR/DEBT/I CSB NRR/DEBT/MTB NRR/DEST/RSB NRR/DLPG/HFB NRR/DOEA/E*B NRR/DREP/RPB NRR/PM*8/I LRB RES TELFORD>J RES/DRPS DIR 2 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 2 2 1 1 1 1 1 1 EXTERNAL: EG5G GROHi M H ST LOBBY WARD NRC PDR NSIC MAYSi G FORD BLDG HOYi A LPDR NSIC HARRIS'1 1 1 1 1 1 TOTAL NUMBER OF COPIES REQUIRED: LTTR 46 ENCL 45 Indiana Michigan Power Company Cook Nuclear Plant P.O.Box 458 Bridgman, MI 49106 616 465 5901 Z INDUNA NlCHtGAM POD February 18, 1988 United States Nuclear Regulatory Commission Document Control Desk Washington, D.C.20555 Operating License DPR-58 Docket No.50-315 Document Control Manager: In accordance with the criteria established by 10 CFR 50.73 entitled Licensee Event Re ortin S stem, the following report is being submitted:
DISTRIBUTION CODE: IE22D COPIES RECEIVED: LTR                 ENCL     SIZE:
87-023-01 Sincerely, W.G.Smith, Jr.Plant Manager WGS:afh Attachment cc: D.H.Williams, Jr.A.B.Davis, Region III M.P.Alexich R.F.Kroeger H.B.Brugger R.W.Jurgensen NRC Resident Inspector J.F.Stang, NRC R.C.Callen G.Charnoff, Esq.Dottie Sherman, ANI Library D.Hahn INPO PNSRC A.A.Blind P.A.Barrett/P.
TITLE: 50. 73 Licensee Event Report (LER>i Incident Rpti etc.
Lauzau M~pN NRC Form 345 (943)LICENSEE EVENT REPORT (LER)US.NUCLEAR REOULATOAY COMMISSION APPROVED OMB NO.31500104 EXPIRES: 5/31/SB FACILITY NAME (I)D.C.Cook Nuclear Plant-Unit 1 DOCKET NUMBER (2)PA E 3 0 5 00 0315>OF05"'""" Deficient Design Results in Failure to Provide Electrical Isolation Between Local Shutdown and Indication Panels MONTH OAY YEAR EVENT DATE (5)LER NUMBER (5)YEAR jPP~SEQUENTIAL NUMBER REVISION NUMBER REPORT DATE (7)MONTH OAY YEAR OTHER FACILITIES INVOLVED (Sl DOCKET NUMBERIS)0 5 0 0 0 3 FACILITY NAMES D.C.Cook-Unit 2 1 1 0 9 8 7 8 7 0 2 3 0 1 0 0 5 0 0 0 OPERATINQ MODE (9)POWE R LEVEL 00)0 9 0 20402(B)20AOS(e)(l
REC IP IENT         CQP IES          REC I P IENT        CQP IES ID CODE/NAME         LTTR ENCL      ID CODE/NAME        LTTR ENCL PD3-3 LA                   1     1   PD3-3 PD               1     1 WIGGINGTQNi D INTERNAL: ACRS MICHELSON                     1    ACRS MOELLER            2      2 AEOD/DOA                         1    AEOD/DSP/NAS            1      1 AEOD/DBP/ROAB                         AEOD/DBP/TPAB          1      1 ARM/DCTS/DAB                     1    DEDRO                  1      1 NRR/DEBT/ADS                     0    NRR/DEBT/CEB                  1 NRR/DEST/ELB                    1    NRR/DEBT/ I CSB        1      1 NRR/DEST/MEB                    1    NRR/DEBT/MTB            1     1 NRR/DEST/PSB                    1    NRR/DEST/RSB            1      1 NRR/DEBT/SGB                    1    NRR/DLPG/HFB            1      1 NRR/DLPG/GAB                    1    NRR/DOEA/E*B           1      1 NRR/DREP/RAB                    1    NRR/DREP/RPB           2      2 B                1    NRR/PM*8/ I LRB         1      1 REG  FILE        02            1    RES TELFORD>   J       1      1 IB                    1    RES/DRPS DIR           1     1 RGN3    FILE 01                1 EXTERNAL: EG5G GROHi M                           FORD BLDG HOYi A        1      1 H ST LOBBY WARD                       LPDR                    1      1 NRC PDR                               NSIC HARRIS'           1     1 NSIC MAYSi G TOTAL NUMBER OF COPIES REQUIRED:         LTTR   46   ENCL     45
)(I)20AOS(s)II)(S) 20AOS(e)(1)(ill) 20AOS(e)(1)(N)20AOS(~)(1)(v)20AOS(e)SOW(e)(I)50.35(el(2) 50.73(e)(2)(I)50.7 3(e)(2)(5)50.73(e)(2)(llil LICENSEE CONTACT FOR THIS LER (12)50.73(e)(2)(N)50,73(sl(2)(v) 50.73(el(2)(vill 50.73(e)(2)(vll I)(AI 50.73(e)(2)(vill)(BI 50,73(el(2)(rr)
 
THIS REPORT IS SUBMITTED PURSUANT T 0 THE REQUIREMENTS Of 10 CFR (Ir fCneclt one or more Of thr follovfinPI (11 73.71(B)73.71(c)OTHER (Specify In Abrtreet below enrf In Test, HRC Form 3SEAI NAME T.P.Beilman Instrumentation
Indiana Michigan Power Company Cook Nuclear Plant P.O. Box 458 Z
&Control Department Superintendent TELEPHONE NUMBER AREA CODE 616465-5901 COMPLETE ONE LINE FOR EACH COMPONENT FAILURE DESCRIBED IN THIS REPORT (13)CAUSE SYSTEM COMPONENT MANUFAC-TURER REPORTABLE I g+(p.'NoI TO>>ROS: ROu%a.4@MID!g A P N'n......Sk4 CAUSE SYSTEM COMPONENT MANUFAC.TURER EPORTABLE TO NPRDS'o&N"'P n o.-8o SUPPLEMENTAL REPORT EXPFCTED (14)EXPECTED SUBMISSION DATE (15)MONTH OAY YEAR YES (if yrr, complere EXPECTED SUSIeIISSIOH DATE)NO ABSTRACT fLlmit to 1400 epecer, I.r., rpprorrlmetrfy filtrrn elnpleeprcr typewritten Ilneel (IS)The primary purpose of this supplemental report is to provide additional information regarding the sequence of events.On November 9, 1987, during a review of an investigation con-cerning Regulatory Guide 1.97 compliance, it was discovered that a potential problem could exist involving the fuses required for isolation between the various Local Shutdown and Indication (LSI)panels (improperly located on Unit 2 and not incorporated into the existing design on Unit 1).On December 22, 1987 it was confirmed that a condition existed that, in the event of a fire local to a LSI panel, power (both normal and alternate) to some or all of the same units'emaining panels could have been lost.The cause of the event was an oversight by design engineers in the design and verification process associated with the initial Appendix R modifications.
Bridgman, MI 49106 616 465 5901 INDUNA NlCHtGAM POD February 18, 1988 United States Nuclear Regulatory Commission Document Control Desk Washington, D.C.             20555 Operating License DPR-58 Docket No. 50-315 Document         Control Manager:
Fire watches were assigned to tour the affected areas.Design changes have been implemented which provide the necessary isola-tion in the event of a fire.To prevent recurrence the appro-priate engineering procedures have been prefaced to address this specific electrical isolation concern.NRC Form 355 Nl 8802230067 880218 PDR ADOCK 05000315 S PDR NRC Form 366A (943)LICENSEE EVENT REPORT (LER)TEXT CONTINUATION U.S.NUCLEAR REGULATORY COMMISSION APPROVEO OMB NO.3150-0104 EXPIRES: 8/31/85 FACILITY NAME (I)'OCKET NUMBER (2)LER NUMBER (6)PAGE (3)YEAR~@@SEOUENTIAL NUMBER REVISION NUMBER D.C.Cook Nuclear Plant-Unit 1 TEXT/lf moro spsso/s isr)eked, oso sddi lions///RC Form 366A's/(I 2)0 5 0 0 0 3 1 5 8 7 0 2 3 0 1 0 OF 0 5 The primary purpose of this supplemental report is to provide additional information regarding the sequence of events leading up to the determination that the event was reportable.
In accordance with the criteria established by 10 CFR 50.73 entitled Licensee Event Re ortin S stem, the following report is being submitted:
87-023-01 Sincerely, W. G.       Smith,   Jr.
Plant Manager WGS:afh Attachment cc:       D. H. Williams, Jr.
A. B. Davis, Region M. P. Alexich III R. F. Kroeger H. B. Brugger R. W. Jurgensen NRC     Resident Inspector J. F. Stang, NRC R. C. Callen G. Charnoff, Esq.
Dottie     Sherman,   ANI Library D. Hahn INPO PNSRC A. A. Blind                                         M~pN P. A. Barrett/P. Lauzau
 
NRC Form 345                                                                                                                                         US. NUCLEAR REOULATOAY COMMISSION (943)
APPROVED OMB NO. 31500104 LICENSEE EVENT REPORT (LER)                                                            EXPIRES: 5/31/SB FACILITY NAME (I)                                                                                                                           DOCKET NUMBER (2)                          PA E 3 D. C. Cook               Nuclear Plant Unit 1
"'"""Deficient Design Results in Failure to Provide                                                                                         0    5  00 0315>OF05 Electrical Isolation Between Local Shutdown and Indication Panels EVENT DATE (5)                     LER NUMBER (5)                           REPORT DATE (7)                             OTHER FACILITIES INVOLVED (Sl MONTH      OAY      YEAR    YEAR    jPP SEQUENTIAL
                                            ~
REVISION MONTH          OAY    YEAR                  FACILITYNAMES                        DOCKET NUMBERIS)
NUMBER              NUMBER D.C. Cook                         Unit     2 0        5    0    0    0    3 1   1   0     9   8     7   8   7         0   2     3         0   1   0                                                                               0   5   0   0     0 THIS REPORT IS SUBMITTED PURSUANT T 0 THE REQUIREMENTS                  Of 10 CFR (Ir fCneclt one or more Of thr follovfinPI (11 OPERATINQ MODE (9)                   20402(B)                                     20AOS(e)                               50.73(e) (2) (N)                             73.71(B)
POWE R                        20AOS(e)(l ) (I)                             SOW(e)(I)                               50,73(sl(2)(v)                               73.71(c)
LEVEL
: 00)                                                                                                                           (vill)(BI 0    9    0      20AOS(s)II)(S)                             50.35(el(2)                             50.73(el(2)(vill                            OTHER (Specify In Abrtreet below enrf In Test, HRC Form 20AOS(e)(1)(ill)                           50.73(e) (2) (I)                         50.73(e) (2) (vllI) (AI                      3SEAI 20AOS(e) (1)(N)                             50.7 3(e) (2) (5)                        50.73(e) (2) 20AOS( ~ )(1)(v)                            50.73(e) (2)(llil                        50,73(el(2)(rr)
LICENSEE CONTACT FOR THIS LER (12)
NAME                                                                                                                                                         TELEPHONE NUMBER T. P. Beilman                                                                                                                                 AREA CODE Instrumentation                         &   Control Department Superintendent COMPLETE ONE LINE FOR EACH COMPONENT FAILURE DESCRIBED IN THIS REPORT (13) 616465-5901 CAUSE   SYSTEM       COMPONENT           MANUFAC-           REPORTABLE I         g+(p.     'NoI                                               MANUFAC.        EPORTABLE TURER            TO>>ROS:           ROu%a. 4       CAUSE  SYSTEM      COMPONENT TURER          TO NPRDS
                                                                              @MID!
g         A                                                                                           'o&N " 'P P                                                                                                   n N'n......     Sk4                                                                                   o
                                                                                                                                                                                                .-8o SUPPLEMENTAL REPORT EXPFCTED (14)                                                                                       MONTH        OAY    YEAR EXPECTED SUBMISSION DATE (15)
YES (if yrr, complere EXPECTED SUSIeIISSIOH DATE)                                       NO ABSTRACT fLlmit to 1400 epecer, I.r., rpprorrlmetrfy filtrrn elnpleeprcr typewritten Ilneel (IS)
The       primary purpose of this supplemental report is to provide additional information regarding the sequence of events.
On November 9, 1987, during a review of an investigation con-cerning Regulatory Guide 1.97 compliance, it was discovered that a potential problem could exist involving the fuses required for isolation between the various Local Shutdown and Indication (LSI) panels (improperly located on Unit 2 and not incorporated into the existing design on Unit 1). On December 22, 1987 confirmed that a condition existed that, in the event of a fire it    was local to a LSI panel, power (both normal and alternate) to some or all of the same units'emaining panels could have been lost.
The cause of the event was an oversight by design engineers in the design and verification process associated with the initial Appendix R modifications.
Fire watches were assigned to tour the affected areas. Design changes have been implemented which provide the necessary isola-tion in the event of a fire. To prevent recurrence the appro-priate engineering procedures have been prefaced to address this specific electrical isolation concern.
8802230067 880218 PDR         ADOCK 05000315 NRC Form 355 S                                       PDR
 
                      'OCKET NRC Form 366A                                                                                                                 U.S. NUCLEAR REGULATORY COMMISSION (943)
LICENSEE EVENT REPORT (LER) TEXT CONTINUATION                                           APPROVEO OMB NO. 3150-0104 EXPIRES: 8/31/85 FACILITY NAME (I)                                                                   NUMBER (2)                   LER NUMBER (6)                   PAGE (3)
SEOUENTIAL        REVISION YEAR ~@@   NUMBER         NUMBER D.C. Cook Nuclear                               Plant             Unit 1  0 5  0  0  0  3  1    5  8  7      0  2  3        0    1   0    OF    0 5 TEXT /lfmoro spsso /s isr)eked, oso sddi lions/ //RC Form 366A's/ (I2)
The         primary purpose of this supplemental report is to provide additional information regarding the sequence of events leading up to the determination that the event was reportable.
Conditions Prior to Occurrence (Conditions date of discovery)
Conditions Prior to Occurrence (Conditions date of discovery)
Unit 1-Mode 1 (power operation)
Unit 1 Mode 1 (power operation) 90 percent Reactor Thermal Power Unit           2         Mode         1   (power operation)             80     percent Reactor Thermal Power Descri tion of Event On       November 9, 1987,                             during an investigation into the feasibility of using existing Reactor Coolant System Wide Range T-Hot and T-Cold indications (EIIS/AB-TI) for Regulatory Guide 1.97 com-pliance,it was discovered that a potential problem could exist involving the fuses (EIIS/FU) required for isolation between the various Local Shutdown and Indication (LSI) panels (EIIS/PL)
-90 percent Reactor Thermal Power Unit 2-Mode 1 (power operation)
(improperly located on Unit 2 and not included in the existing design on Unit 1). On December 22, 1987 condition existed that, in                                     the event     of   a it  was confirmed that a fire   local to an LSI panel, power (both normal                                     and alternate)         to   some   or all of the same           units'emaining                           LSI   panels   could     be     lost.     If powerwould      was lost to               all         panels,             those   indications       available       locally                       be lost. In addition,                                     all Wide   Range   T-Hot     and   T-Cold       indications, 1 of 4 channels of pressurizer                                     level indication (EIIS/AB-LI), and both trains of the Reactor Vessel Level Indication System (EIIS/AB-LI) would be lost in the control room. This condition is not consistent with the requirements of 10 CFR 50, Appendix R and has existed since initial installation of the Appendix R modifications (Unit 1 September, 1985; Unit 2 June, 1986)'.
-80 percent Reactor Thermal Power Descri tion of Event On November 9, 1987, during an investigation into the feasibility of using existing Reactor Coolant System Wide Range T-Hot and T-Cold indications (EIIS/AB-TI) for Regulatory Guide 1.97 com-pliance,it was discovered that a potential problem could exist involving the fuses (EIIS/FU)required for isolation between the various Local Shutdown and Indication (LSI)panels (EIIS/PL)(improperly located on Unit 2 and not included in the existing design on Unit 1).On December 22, 1987 it was confirmed that a condition existed that, in the event of a fire local to an LSI panel, power (both normal and alternate) to some or all of the same units'emaining LSI panels could be lost.If power was lost to all panels, those indications available locally would be lost.In addition, all Wide Range T-Hot and T-Cold indications, 1 of 4 channels of pressurizer level indication (EIIS/AB-LI), and both trains of the Reactor Vessel Level Indication System (EIIS/AB-LI) would be lost in the control room.This condition is not consistent with the requirements of 10 CFR 50, Appendix R and has existed since initial installation of the Appendix R modifications (Unit 1-September, 1985;Unit 2-June, 1986)'.With the exception of the sub'ject LSI panels, there were no inoperable components, systems or structures that contributed to this event.The following provides the reason for time between (1)the date (November 9, 1987)that the configuration(i.e., a potential problem with the electrical isolation between power feeds to NRC FORM 3ddA (9 83)
With the exception of the sub'ject LSI panels, there were no inoperable components, systems or structures that contributed to this event.
NRC Form 366A u (94)3)LICENSEE EVENT REPORT (LER)TEXT CONTINUATION U.S.NUCLEAR REGULATORY COMMISSION APPROVEO OMB NO.3150-0104 EXPIRES: 6/31/95 FACILITY NAME (I)'OCK ET NUMBER (2)LER NUMBER (6)jSI SEGUENTIAL AIPieo REVISION NUMBER 66'O NUMBER PAGE (3)D.C.Cook Nuclear Plant-Unit 1 0 5 0 0 0 3 1 5 TEXT ill more spsoeis required, use sddicionsl llRC Form 3654's)(17)8 7-0 2 3-0 1 0 3 QF 0 5 Descri tion of Event-(Continued)
The following provides the reason for time between (1) the date (November 9, 1987) that the configuration(i.e., a potential problem with the electrical isolation between power feeds to NRC FORM 3ddA (9 83)
Local Shutdown Indication panels)was initially questioned and (2)the date (December 22, 1987)when the known problem was re-ported.Specifically, on November 9, 1987 the engineer who iden-tified the concern initiated a Problem Report.Problem Reports are used to document either known nonconformances or potential nonconformances and to assure proper investigation into the documented concern.For the case reported in this LER, the engineer later concluded, on November 9, 1987, that the concern identified on the Problem Report was not a problem (i.e., a condition which was contrary to regulatory requirements was not identified).
 
Therefore, the engineer did not forward the Problem Report to management.
u NRC Form 366A (94)3)
Approximately seven to nine days later, the engineer's supervisor questioned the engineer about the status of the concern.At that time (approximately, November 18, 1987)the supervisor concluded that the electrical isolation concern may have an impact on regulatory (10 CFR 50, Appendix R)compliance.
FACILITY NAME (I)
Therefore, the supervisor had the Problem Report forwarded to the appropriate management (Problem Assessment Group), so that an investigation would be conducted pursuant to the procedural requirements which govern such an investigation.
D.C. Cook Nuclear
On December 21, 1987 engineering and licensing reviews concluded that even though certain process variables required by 10 CFR 50, Appendix R could be lost in certain fire scenarios, sufficient alternative information was still available.
                          'OCK                LICENSEE EVENT REPORT (LER) TEXT CONTINUATION Plant            Unit 1 0 ET NUMBER (2) 5  0  0  0  3 1 5 8 7        2 3 U.S. NUCLEAR REGULATORY COMMISSION LER NUMBER (6) jSI SEGUENTIAL 0
Therefore, it was concluded that a regulatory compliance problem did not exist.However, on December 22, 1987 it was concluded that a problem did exist.Specifically, a single fire might eliminate the redundant Alternative Shutdown Capability instrumentation required by 10 CFR 50 Appendix R, Section III.L.At this time (December 22, 1987), when this problem was first identified as reportable:
NUMBER APPROVEO OMB NO. 3150-0104 EXPIRES: 6/31/95 AIPieo REVISION 66'O NUMBER 0        1  0 3 PAGE (3)
(1)the requirements of 10 CFR 50.72 were fulfilled (1650 hours)and (2)a report per 10 CFR 50.73 was initiated.
QF 0  5 TEXT  illmore spsoeis required, use sddicionsl llRC Form 3654's) (17)
In summary, on November 9, 1987, the engineer who had first questioned the LSI panel electrical isolation, concluded that a problem did not exist.On approximately November 18, 1987, the engineer's supervisor, through consultation with her assistant supervisor and a licensing engineer, concluded that the concern warranted formal investigation.
Descri tion of Event                                  (Continued)
On December 21, 1987 engineering and licensing concluded that the requirements of Appendix R were being fulfilled, in spite of electrical isolation concerns.On December 22, 1987, the conclusion was reached that certain concerns post-fire process variables (e.g., T-HOT and T-COLD)could not be assured.Therefore, appropriate reportability actions were initiated.
Local Shutdown Indication panels) was initially questioned and (2) the date (December 22, 1987) when the known problem was re-ported. Specifically, on November 9, 1987 the engineer who iden-tified the concern initiated a Problem Report. Problem Reports are used to document either known nonconformances or potential nonconformances and to assure proper investigation into the documented concern.                                 For the case reported in this LER, the engineer later concluded, on November 9, 1987, that the concern identified on the Problem Report was not a problem (i.e., a condition which was contrary to regulatory requirements was not identified). Therefore, the engineer did not forward the Problem Report to management.                                 Approximately seven to nine days later, the engineer's supervisor questioned the engineer about the status of the concern. At that time (approximately, November 18, 1987) the supervisor concluded that the electrical isolation concern may have an impact on regulatory (10 CFR 50, Appendix R) compliance. Therefore, the supervisor had the Problem Report forwarded to the appropriate management (Problem Assessment Group), so that an investigation would be conducted pursuant to the procedural requirements which govern such an investigation.
NRC FORM 366A 0)63I NRC Form 366A (643)LICENSEE EVEN REPORT (LER)TEXT CONTINUATION U.S.NUCLEAR REOULATORY COMMISSION APPROVED OMB NO.3150M(04 EXPIRES: 6/31/85 FACILITY NAME (I)DOCKET NUMBER (3)LER NUMBER (6)y 6 A R Q M;5 6 0 U 6 N T I A L~W~i<5 R 5 V I 5 I 0 N NUMSER i&rr NUMBER PACE (3)D.C.Cook Nuclear Plant-Unit 1 TEXT///more epeee/I requIred, uee eddi r)rrur//VRC Form 3564'5/()7)0 5 0 0 0 3 1 5 8 7-0 2 3-0 1 0 4 QF 0 5 Cause of Event The cause of the event was an oversight by design engineers in the design and verification process associated with the initial Appendix R modif ications.Anal sis of Event The condition is not consistent with the requirements of 10 CFR 50, Appendix R, and as such, is not consistent with our design basis.The event has been determined reportable per 10 CFR 50.73, (a)(2)(ii)(B).
On December                     21, 1987 engineering and licensing reviews concluded that even though certain process variables required by 10 CFR 50, Appendix R could be lost in certain fire scenarios, sufficient alternative information was still available. Therefore, it was concluded that a regulatory compliance problem did not exist.
Appendix R requires that adequate instrumentation be available to ensure safe shutdown in the case of a single fire.If a fire at one of the LSI panels had led to the loss of power to all of one Units'SI panels, Wide Range T-Hot and T-Cold indications would have been lost (both local and control room).According to IE Information Notice 84-09, these process variables are requ'ired for safe shutdown.However, sufficient information would have been available to the operator for achieving safe shutdown in the use of the in-core thermocouple indications and/or the use of main steam pressure and saturation temperature curves.If power was lost to all LSI panels due to a fire at any LSI panel location, all indications on all LSI panels would be lost.However, with the exception of Wide Range T-Hot and T-Cold, all of the process variables indicated locally at the LSI panels would not be required locally due to their availability in the control room and the fact that a fire at any LSI panel location would not require remote shutdown.Therefore, for the reasons detailed above, it has been concluded that the condition reported in this LER represents neither a significant risk to public health and safety, nor a significant degradation of our Appendix R safe shutdown capability.
However, on December 22, 1987 it was concluded that a problem did exist. Specifically, a single fire might eliminate the redundant Alternative Shutdown Capability instrumentation required by 10 CFR 50 Appendix R, Section III.L. At this time (December 22, 1987), when this problem was first identified as reportable:
Corrective Actions Roving fire watches were assigned to tour the affected areas on December 22, 1987 (LSI panel locations within both units).The roving fire watches were upgraded to continuous fire watches on December 24, 1987.These steps were taken to serve as an interim compensatory action until the necessary design changes could be implemented.
(1) the requirements of 10 CFR 50.72 were fulfilled (1650 hours) and (2) a report per 10 CFR 50.73 was initiated.
For Unit 2, design changes were implemented December 30, 1987 that removed the improperly located fuses and installed replacements to remedy the inadequacy.
In summary, on November 9, 1987, the engineer who had first questioned the LSI panel electrical isolation, concluded that a problem did not exist. On approximately November 18, 1987, the engineer's supervisor, through consultation with her assistant supervisor and a licensing engineer, concluded that the concern warranted formal investigation. On December 21, 1987 engineering and licensing concluded that the requirements of Appendix R were being fulfilled, in spite of electrical isolation concerns.                                                         On December 22, 1987, the conclusion was reached that certain concerns post-fire process variables (e.g., T-HOT and T-COLD) could not be assured.                                 Therefore, appropriate       reportability actions were initiated.
For Unit 1, fuses were installed on NRC FORM 35@A (9 63)
NRC FORM 366A
NRC Form 366A (94)3)LICENSEE EVENT REPORT (LER)TEXT CONTINUATION U.S.NUCLEAR REGULATORY COMMISSION APPROVED OMB NO.3(50-0 I 04 EXPIRES: 6/31i65 FACILITY NAME ('I)'OCKET NUMBER (3)LER NUMBER (6)YEAR oSs'EGUENTIAL NUMBER io.REVISION NUMBER PAGE (3)D.C.Cook Nuclear Plant-Unit 1 TEXT ilf more speosis seqoired, use eddirionel NRC Form 3654's)(17)0 5 0 0 0 3 1 5 8 7-0 2 3 0 1 0 5 OF 0 5 Corrective Actions-(Continued)
: 0) 63I
December 29, 1987.The existing configuration now provides the electrical isolation necessary in the event of a fire.We believe that this condition is an isolated event.Although consideration of 10 CFR 50, Appendix R electrical isolation criteria in the engineering and design process is required, additional emphasis will be placed on these electrical isolation requirements.
 
The appropriate engineering procedures, dealing with Appendix R design details, have been prefaced (via a letter)to include this electrical isolation concern.The letter was reviewed during a monthly training session (01/21/88) attended by electrical engineering personnel.
NRC Form 366A                                                                                                                     U.S. NUCLEAR REOULATORY COMMISSION (643)
Failed Com onent Identification None Previous Similar Events None NRC FORM 366A (9 93I}}
LICENSEE EVEN                 REPORT (LER) TEXT CONTINUATION                                 APPROVED OMB NO. 3150M(04 EXPIRES: 6/31/85 FACILITY NAME (I)                                                             DOCKET NUMBER (3)                 LER NUMBER (6)                                PACE (3) y 6 AR          NUMSER
                                                                                                                                        ~ i W <5 R 5 V I5 I0 N Q M; 5 6 0 U 6 N T I A L ~
i&rr NUMBER D.C. Cook Nuclear Plant                                             Unit 1 0  5  0  0  0  3 1 5 8 7    0          2 3          0          1    0 4  QF  0  5 TEXT /// more epeee /I requIred, uee eddi r)rrur//VRC Form 3564'5/ ()7)
Cause            of Event The        cause of the event                           was an   oversight by design engineers in the design                         and       verification     process associated with the initial Appendix                             R     modif ications.
Anal sis of Event The       condition is not consistent with the requirements of 10 CFR 50, Appendix R, and as such, is not consistent with our design basis.
The event has been determined reportable per 10 CFR 50.73, (a)(2)(ii)(B). Appendix R requires that adequate instrumentation be available to ensure safe shutdown in the case of a single fire.
If       a fire at one of the LSI panels had led to the loss of power to all of one Units'SI panels, Wide Range T-Hot and T-Cold indications would have been lost (both local and control room).
According to IE Information Notice 84-09, these process variables are requ'ired for safe shutdown. However, sufficient information would have been available to the operator for achieving safe shutdown in the use of the in-core thermocouple indications and/or the use of main steam pressure and saturation temperature curves.
If       power was lost to all LSI panels due to a fire at any LSI panel location, all indications on all LSI panels would be lost. However, with the exception                                   of Wide Range     T-Hot and T-Cold, all of the process variables indicated locally at the LSI panels would not be required locally due to their availability in the control room and the fact that a fire at any LSI panel location would not require remote shutdown.
Therefore, for the reasons detailed above, that the condition reported in this LER represents neither a it    has been concluded significant risk to public health and safety, nor a significant degradation of our Appendix R safe shutdown capability.
Corrective Actions Roving             fire watches were assigned to tour the affected areas The                                                            on December 22, 1987 (LSI panel locations                                           within   both         units).
roving fire watches were upgraded to continuous fire watches on December 24, 1987. These steps were taken to serve as an interim compensatory action until the necessary design changes could be implemented.
For Unit 2, design changes were implemented December 30, 1987 that removed the improperly located fuses and installed replacements to remedy the inadequacy. For Unit 1, fuses were installed on NRC FORM 35@A (9 63)
 
U.S. NUCLEAR REGULATORY COMMISSION
                    'OCKET NRC Form 366A (94)3)
LICENSEE EVENT REPORT (LER) TEXT CONTINUATION                                 APPROVED OMB NO. 3(50-0 I 04 EXPIRES: 6/31i65 FACILITY NAME ('I)                                                             NUMBER (3)             LER NUMBER (6)                   PAGE (3)
YEAR oSs'EGUENTIAL       REVISION NUMBER   io. NUMBER D.C. Cook Nuclear Plant                                         Unit 1 0 5  0  0  0 3 1 5 8 7 0     2 3         0   1   0 5 OF 0       5 TEXT ilfmore speosis seqoired, use eddirionel NRC Form 3654's) (17)
Corrective Actions                                  (Continued)
December 29, 1987.                                 The existing configuration       now     provides the electrical isolation necessary in the event of a fire. We believe that this condition is an isolated event. Although consideration of 10 CFR 50, Appendix R electrical isolation criteria in the engineering and design process is required, additional emphasis will be placed on these electrical isolation with                                  requirements.                 The appropriate engineering procedures, dealing                                               Appendix R design details, have been prefaced (via a letter) to include this electrical isolation concern. The letter was reviewed during a monthly training session (01/21/88) attended by electrical engineering personnel.
Failed             Com       onent         Identification None Previous Similar Events None NRC FORM 366A (9 93I}}

Latest revision as of 06:51, 29 October 2019

LER 87-023-01:on 871109 Problem Discovered Re Fuses Required for Isolation Between Local Shutdown & Indication Panels. Problems Confirmed on 871222.Caused by Engineer Design Oversight.Design Changes made.W/880218 Ltr
ML17325A621
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 02/18/1988
From: Beilman T, Will Smith
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
RTR-REGGD-01.097, RTR-REGGD-1.097 IEIN-84-09, IEIN-84-9, LER-87-023-01, LER-87-23-1, NUDOCS 8802230067
Download: ML17325A621 (7)


Text

REGULATORY INFORMATION DISTR IBUTIQl'J SYSTEM (R IDS)

ACCESSION NBR: 8802230067 DOC. DATE: 88/02/18 NOTARIZED: NO DOCKET 0 FACIL: 50-315 Donald C. Cook Nuclear Poeer P AUTHOR AFFILIATION lant'nit ii Indiana 5 05000315 AUTH. NAME BEILMANiT. P. Indiana Michigan Power Co. (formerly Indiana 8. Michigan Ele SMITHi W. G. Indiana Michigan power Co. (formerly Indiana 5 Michigan Ele RECIP. NAME RECIPIENT AFFILIATION

SUBJECT:

LER 87-023-01: on 871109 problem discovered re fuses required for isolation between local shutdoen 8c indication panels.

Problems conf iTmed on 871222. Caused bg engineer design oversight. Design changes mode. W/880218 ltr.

DISTRIBUTION CODE: IE22D COPIES RECEIVED: LTR ENCL SIZE:

TITLE: 50. 73 Licensee Event Report (LER>i Incident Rpti etc.

REC IP IENT CQP IES REC I P IENT CQP IES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD3-3 LA 1 1 PD3-3 PD 1 1 WIGGINGTQNi D INTERNAL: ACRS MICHELSON 1 ACRS MOELLER 2 2 AEOD/DOA 1 AEOD/DSP/NAS 1 1 AEOD/DBP/ROAB AEOD/DBP/TPAB 1 1 ARM/DCTS/DAB 1 DEDRO 1 1 NRR/DEBT/ADS 0 NRR/DEBT/CEB 1 NRR/DEST/ELB 1 NRR/DEBT/ I CSB 1 1 NRR/DEST/MEB 1 NRR/DEBT/MTB 1 1 NRR/DEST/PSB 1 NRR/DEST/RSB 1 1 NRR/DEBT/SGB 1 NRR/DLPG/HFB 1 1 NRR/DLPG/GAB 1 NRR/DOEA/E*B 1 1 NRR/DREP/RAB 1 NRR/DREP/RPB 2 2 B 1 NRR/PM*8/ I LRB 1 1 REG FILE 02 1 RES TELFORD> J 1 1 IB 1 RES/DRPS DIR 1 1 RGN3 FILE 01 1 EXTERNAL: EG5G GROHi M FORD BLDG HOYi A 1 1 H ST LOBBY WARD LPDR 1 1 NRC PDR NSIC HARRIS' 1 1 NSIC MAYSi G TOTAL NUMBER OF COPIES REQUIRED: LTTR 46 ENCL 45

Indiana Michigan Power Company Cook Nuclear Plant P.O. Box 458 Z

Bridgman, MI 49106 616 465 5901 INDUNA NlCHtGAM POD February 18, 1988 United States Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555 Operating License DPR-58 Docket No. 50-315 Document Control Manager:

In accordance with the criteria established by 10 CFR 50.73 entitled Licensee Event Re ortin S stem, the following report is being submitted:

87-023-01 Sincerely, W. G. Smith, Jr.

Plant Manager WGS:afh Attachment cc: D. H. Williams, Jr.

A. B. Davis, Region M. P. Alexich III R. F. Kroeger H. B. Brugger R. W. Jurgensen NRC Resident Inspector J. F. Stang, NRC R. C. Callen G. Charnoff, Esq.

Dottie Sherman, ANI Library D. Hahn INPO PNSRC A. A. Blind M~pN P. A. Barrett/P. Lauzau

NRC Form 345 US. NUCLEAR REOULATOAY COMMISSION (943)

APPROVED OMB NO. 31500104 LICENSEE EVENT REPORT (LER) EXPIRES: 5/31/SB FACILITY NAME (I) DOCKET NUMBER (2) PA E 3 D. C. Cook Nuclear Plant Unit 1

"'"""Deficient Design Results in Failure to Provide 0 5 00 0315>OF05 Electrical Isolation Between Local Shutdown and Indication Panels EVENT DATE (5) LER NUMBER (5) REPORT DATE (7) OTHER FACILITIES INVOLVED (Sl MONTH OAY YEAR YEAR jPP SEQUENTIAL

~

REVISION MONTH OAY YEAR FACILITYNAMES DOCKET NUMBERIS)

NUMBER NUMBER D.C. Cook Unit 2 0 5 0 0 0 3 1 1 0 9 8 7 8 7 0 2 3 0 1 0 0 5 0 0 0 THIS REPORT IS SUBMITTED PURSUANT T 0 THE REQUIREMENTS Of 10 CFR (Ir fCneclt one or more Of thr follovfinPI (11 OPERATINQ MODE (9) 20402(B) 20AOS(e) 50.73(e) (2) (N) 73.71(B)

POWE R 20AOS(e)(l ) (I) SOW(e)(I) 50,73(sl(2)(v) 73.71(c)

LEVEL

00) (vill)(BI 0 9 0 20AOS(s)II)(S) 50.35(el(2) 50.73(el(2)(vill OTHER (Specify In Abrtreet below enrf In Test, HRC Form 20AOS(e)(1)(ill) 50.73(e) (2) (I) 50.73(e) (2) (vllI) (AI 3SEAI 20AOS(e) (1)(N) 50.7 3(e) (2) (5) 50.73(e) (2) 20AOS( ~ )(1)(v) 50.73(e) (2)(llil 50,73(el(2)(rr)

LICENSEE CONTACT FOR THIS LER (12)

NAME TELEPHONE NUMBER T. P. Beilman AREA CODE Instrumentation & Control Department Superintendent COMPLETE ONE LINE FOR EACH COMPONENT FAILURE DESCRIBED IN THIS REPORT (13) 616465-5901 CAUSE SYSTEM COMPONENT MANUFAC- REPORTABLE I g+(p. 'NoI MANUFAC. EPORTABLE TURER TO>>ROS: ROu%a. 4 CAUSE SYSTEM COMPONENT TURER TO NPRDS

@MID!

g A 'o&N " 'P P n N'n...... Sk4 o

.-8o SUPPLEMENTAL REPORT EXPFCTED (14) MONTH OAY YEAR EXPECTED SUBMISSION DATE (15)

YES (if yrr, complere EXPECTED SUSIeIISSIOH DATE) NO ABSTRACT fLlmit to 1400 epecer, I.r., rpprorrlmetrfy filtrrn elnpleeprcr typewritten Ilneel (IS)

The primary purpose of this supplemental report is to provide additional information regarding the sequence of events.

On November 9, 1987, during a review of an investigation con-cerning Regulatory Guide 1.97 compliance, it was discovered that a potential problem could exist involving the fuses required for isolation between the various Local Shutdown and Indication (LSI) panels (improperly located on Unit 2 and not incorporated into the existing design on Unit 1). On December 22, 1987 confirmed that a condition existed that, in the event of a fire it was local to a LSI panel, power (both normal and alternate) to some or all of the same units'emaining panels could have been lost.

The cause of the event was an oversight by design engineers in the design and verification process associated with the initial Appendix R modifications.

Fire watches were assigned to tour the affected areas. Design changes have been implemented which provide the necessary isola-tion in the event of a fire. To prevent recurrence the appro-priate engineering procedures have been prefaced to address this specific electrical isolation concern.

8802230067 880218 PDR ADOCK 05000315 NRC Form 355 S PDR

'OCKET NRC Form 366A U.S. NUCLEAR REGULATORY COMMISSION (943)

LICENSEE EVENT REPORT (LER) TEXT CONTINUATION APPROVEO OMB NO. 3150-0104 EXPIRES: 8/31/85 FACILITY NAME (I) NUMBER (2) LER NUMBER (6) PAGE (3)

SEOUENTIAL REVISION YEAR ~@@ NUMBER NUMBER D.C. Cook Nuclear Plant Unit 1 0 5 0 0 0 3 1 5 8 7 0 2 3 0 1 0 OF 0 5 TEXT /lfmoro spsso /s isr)eked, oso sddi lions/ //RC Form 366A's/ (I2)

The primary purpose of this supplemental report is to provide additional information regarding the sequence of events leading up to the determination that the event was reportable.

Conditions Prior to Occurrence (Conditions date of discovery)

Unit 1 Mode 1 (power operation) 90 percent Reactor Thermal Power Unit 2 Mode 1 (power operation) 80 percent Reactor Thermal Power Descri tion of Event On November 9, 1987, during an investigation into the feasibility of using existing Reactor Coolant System Wide Range T-Hot and T-Cold indications (EIIS/AB-TI) for Regulatory Guide 1.97 com-pliance,it was discovered that a potential problem could exist involving the fuses (EIIS/FU) required for isolation between the various Local Shutdown and Indication (LSI) panels (EIIS/PL)

(improperly located on Unit 2 and not included in the existing design on Unit 1). On December 22, 1987 condition existed that, in the event of a it was confirmed that a fire local to an LSI panel, power (both normal and alternate) to some or all of the same units'emaining LSI panels could be lost. If powerwould was lost to all panels, those indications available locally be lost. In addition, all Wide Range T-Hot and T-Cold indications, 1 of 4 channels of pressurizer level indication (EIIS/AB-LI), and both trains of the Reactor Vessel Level Indication System (EIIS/AB-LI) would be lost in the control room. This condition is not consistent with the requirements of 10 CFR 50, Appendix R and has existed since initial installation of the Appendix R modifications (Unit 1 September, 1985; Unit 2 June, 1986)'.

With the exception of the sub'ject LSI panels, there were no inoperable components, systems or structures that contributed to this event.

The following provides the reason for time between (1) the date (November 9, 1987) that the configuration(i.e., a potential problem with the electrical isolation between power feeds to NRC FORM 3ddA (9 83)

u NRC Form 366A (94)3)

FACILITY NAME (I)

D.C. Cook Nuclear

'OCK LICENSEE EVENT REPORT (LER) TEXT CONTINUATION Plant Unit 1 0 ET NUMBER (2) 5 0 0 0 3 1 5 8 7 2 3 U.S. NUCLEAR REGULATORY COMMISSION LER NUMBER (6) jSI SEGUENTIAL 0

NUMBER APPROVEO OMB NO. 3150-0104 EXPIRES: 6/31/95 AIPieo REVISION 66'O NUMBER 0 1 0 3 PAGE (3)

QF 0 5 TEXT illmore spsoeis required, use sddicionsl llRC Form 3654's) (17)

Descri tion of Event (Continued)

Local Shutdown Indication panels) was initially questioned and (2) the date (December 22, 1987) when the known problem was re-ported. Specifically, on November 9, 1987 the engineer who iden-tified the concern initiated a Problem Report. Problem Reports are used to document either known nonconformances or potential nonconformances and to assure proper investigation into the documented concern. For the case reported in this LER, the engineer later concluded, on November 9, 1987, that the concern identified on the Problem Report was not a problem (i.e., a condition which was contrary to regulatory requirements was not identified). Therefore, the engineer did not forward the Problem Report to management. Approximately seven to nine days later, the engineer's supervisor questioned the engineer about the status of the concern. At that time (approximately, November 18, 1987) the supervisor concluded that the electrical isolation concern may have an impact on regulatory (10 CFR 50, Appendix R) compliance. Therefore, the supervisor had the Problem Report forwarded to the appropriate management (Problem Assessment Group), so that an investigation would be conducted pursuant to the procedural requirements which govern such an investigation.

On December 21, 1987 engineering and licensing reviews concluded that even though certain process variables required by 10 CFR 50, Appendix R could be lost in certain fire scenarios, sufficient alternative information was still available. Therefore, it was concluded that a regulatory compliance problem did not exist.

However, on December 22, 1987 it was concluded that a problem did exist. Specifically, a single fire might eliminate the redundant Alternative Shutdown Capability instrumentation required by 10 CFR 50 Appendix R, Section III.L. At this time (December 22, 1987), when this problem was first identified as reportable:

(1) the requirements of 10 CFR 50.72 were fulfilled (1650 hours0.0191 days <br />0.458 hours <br />0.00273 weeks <br />6.27825e-4 months <br />) and (2) a report per 10 CFR 50.73 was initiated.

In summary, on November 9, 1987, the engineer who had first questioned the LSI panel electrical isolation, concluded that a problem did not exist. On approximately November 18, 1987, the engineer's supervisor, through consultation with her assistant supervisor and a licensing engineer, concluded that the concern warranted formal investigation. On December 21, 1987 engineering and licensing concluded that the requirements of Appendix R were being fulfilled, in spite of electrical isolation concerns. On December 22, 1987, the conclusion was reached that certain concerns post-fire process variables (e.g., T-HOT and T-COLD) could not be assured. Therefore, appropriate reportability actions were initiated.

NRC FORM 366A

0) 63I

NRC Form 366A U.S. NUCLEAR REOULATORY COMMISSION (643)

LICENSEE EVEN REPORT (LER) TEXT CONTINUATION APPROVED OMB NO. 3150M(04 EXPIRES: 6/31/85 FACILITY NAME (I) DOCKET NUMBER (3) LER NUMBER (6) PACE (3) y 6 AR NUMSER

~ i W <5 R 5 V I5 I0 N Q M; 5 6 0 U 6 N T I A L ~

i&rr NUMBER D.C. Cook Nuclear Plant Unit 1 0 5 0 0 0 3 1 5 8 7 0 2 3 0 1 0 4 QF 0 5 TEXT /// more epeee /I requIred, uee eddi r)rrur//VRC Form 3564'5/ ()7)

Cause of Event The cause of the event was an oversight by design engineers in the design and verification process associated with the initial Appendix R modif ications.

Anal sis of Event The condition is not consistent with the requirements of 10 CFR 50, Appendix R, and as such, is not consistent with our design basis.

The event has been determined reportable per 10 CFR 50.73, (a)(2)(ii)(B). Appendix R requires that adequate instrumentation be available to ensure safe shutdown in the case of a single fire.

If a fire at one of the LSI panels had led to the loss of power to all of one Units'SI panels, Wide Range T-Hot and T-Cold indications would have been lost (both local and control room).

According to IE Information Notice 84-09, these process variables are requ'ired for safe shutdown. However, sufficient information would have been available to the operator for achieving safe shutdown in the use of the in-core thermocouple indications and/or the use of main steam pressure and saturation temperature curves.

If power was lost to all LSI panels due to a fire at any LSI panel location, all indications on all LSI panels would be lost. However, with the exception of Wide Range T-Hot and T-Cold, all of the process variables indicated locally at the LSI panels would not be required locally due to their availability in the control room and the fact that a fire at any LSI panel location would not require remote shutdown.

Therefore, for the reasons detailed above, that the condition reported in this LER represents neither a it has been concluded significant risk to public health and safety, nor a significant degradation of our Appendix R safe shutdown capability.

Corrective Actions Roving fire watches were assigned to tour the affected areas The on December 22, 1987 (LSI panel locations within both units).

roving fire watches were upgraded to continuous fire watches on December 24, 1987. These steps were taken to serve as an interim compensatory action until the necessary design changes could be implemented.

For Unit 2, design changes were implemented December 30, 1987 that removed the improperly located fuses and installed replacements to remedy the inadequacy. For Unit 1, fuses were installed on NRC FORM 35@A (9 63)

U.S. NUCLEAR REGULATORY COMMISSION

'OCKET NRC Form 366A (94)3)

LICENSEE EVENT REPORT (LER) TEXT CONTINUATION APPROVED OMB NO. 3(50-0 I 04 EXPIRES: 6/31i65 FACILITY NAME ('I) NUMBER (3) LER NUMBER (6) PAGE (3)

YEAR oSs'EGUENTIAL REVISION NUMBER io. NUMBER D.C. Cook Nuclear Plant Unit 1 0 5 0 0 0 3 1 5 8 7 0 2 3 0 1 0 5 OF 0 5 TEXT ilfmore speosis seqoired, use eddirionel NRC Form 3654's) (17)

Corrective Actions (Continued)

December 29, 1987. The existing configuration now provides the electrical isolation necessary in the event of a fire. We believe that this condition is an isolated event. Although consideration of 10 CFR 50, Appendix R electrical isolation criteria in the engineering and design process is required, additional emphasis will be placed on these electrical isolation with requirements. The appropriate engineering procedures, dealing Appendix R design details, have been prefaced (via a letter) to include this electrical isolation concern. The letter was reviewed during a monthly training session (01/21/88) attended by electrical engineering personnel.

Failed Com onent Identification None Previous Similar Events None NRC FORM 366A (9 93I