ML17334A676: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 03/03/1998
| issue date = 03/03/1998
| title = LER 98-006-00:on 980129,determined That Procedural Option for Weighing of Ice Baskets in Modes 3 & 4 Was Potentially Unanalyzed Condition.Cause Undeterminate.Procedure Will Be Revised
| title = LER 98-006-00:on 980129,determined That Procedural Option for Weighing of Ice Baskets in Modes 3 & 4 Was Potentially Unanalyzed Condition.Cause Undeterminate.Procedure Will Be Revised
| author name = SCHOEPF P
| author name = Schoepf P
| author affiliation = AMERICAN ELECTRIC POWER CO., INC.
| author affiliation = AMERICAN ELECTRIC POWER CO., INC.
| addressee name =  
| addressee name =  
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:HRCFORM366(5.92)U.S.NUCLEARREGULA'TORY COMMISSION LICENSEEEVENTREPORT(LER)APPROVEDBYOMBNO.3150.0104 EXPIRES5/31/95ESTIMATED BURDENPERRESPOHSEToCOMPLYWITHTHIINFORMATION COLLECTION REQUEST:50.0HRS.FORWARCOHMENTSREGARDING BURDENESTIHATEToTHIHFORMATION ANDRECORDSMANAGEMENT BRANCH(MHB7714),U.S.NUCLEARREGULATORY COMHISSION, WASHINGTON, DC20555-0001, AND'IOTHEPAPERWORREDUCTIOH PROJECT(3150-0104),
{{#Wiki_filter:HRC FORM    366                                    U.S. NUCLEAR REGULA'TORY COMMISSION                   APPROVED BY OMB NO.       3150.0104 (5.92)                                                                                                              EXPIRES  5/31/95 ESTIMATED BURDEN PER RESPOHSE To COMPLY WITH THI INFORMATION COLLECTION REQUEST: 50.0 HRS.               FORWAR LICENSEE EVENT REPORT                        (LER)                      COHMENTS        REGARDING    BURDEN      ESTIHATE    To TH IHFORMATION AND RECORDS MANAGEMENT BRANCH (MHB 7714),     U.S.       NUCLEAR    REGULATORY      COMHISSION, WASHINGTON, DC 20555-0001, AND 'IO THE PAPERWOR REDUCTIOH        PROJECT     (3150-0104),       OFFICE    0 MANAGEHENT AND BUDGET WASHINGTON DC 20503.
OFFICE0MANAGEHENT ANDBUDGETWASHINGTON DC20503.FACILITYNAME(1)DonaldC.CookNuclearPlant-Unit1DOCKETNUMBER(2)50.315Page1of1TITLE(4)InterimLER-Procedural OptionforWeighingofIceBasketsinModes3and4Determined tobeaPotentially Unanalyzed Condition EVENTDATE5LERNUMBER6REPORTDA'TE7OTHERFACILITIES INVOLVED8MONTH01DAYYEAR2998YEAR98SEQUENTIAL HUHBER006REVISIONNUMBER00MONTHDAY0303YEARFACILITYNAMECook-Unit2FACILITYNAMEDOCKE'INUMBER50-316DOCKETNUMBEROPERA'TING MODE(9)POWERLEVEL(10)0THSREPORTISSUBMITTED PURSUANT20.2201(b) 20.2203a120.2203(a)(2)(I) 20.2203(a)(3)(l) 20.2203a3ii20.2203(a)(4) 50.73(a)(2)(iii) 50.73a2iv50.73(a)(2)(v) 73.71(b)73.710OTHERe11TOTHEREQUIREMENTS OF10CFR:Checkoneormor20.2203a2ii20.2203(a)(2)(iii) 20.2203(a)(2)(iv) 20.2203(a)(2)(v)
FACILITY NAME (1)                                                                             DOCKET NUMBER      (2)                   Page1 of1 Donald C. Cook Nuclear Plant - Unit 1                                                            50.315 TITLE    (4)
X50.36c150.36(c)(2) 50.73(a)(2)(l) 50.73(a)(2)(ii) 50.73a2vii50.73(a)(2)(viii)(A) 50.73(a)(2)(viii)(B) 50.73(a)(2)(x)
Interim LER - Procedural Option for Weighing of Ice Baskets in Modes 3 and 4 Determined to be a Potentially Unanalyzed Condition EVENT DATE    5                  LER NUMBER    6                  REPORT DA'TE  7                  OTHER    FACILITIES INVOLVED 8 SEQUENTIAL        REVI SION                          FACILITY NAME                            DOCKE'I NUMBER MONTH      DAY    YEAR      YEAR                                    MONTH    DAY    YEAR HUHBER          NUMBER                            Cook - Unit 2                            50-316 FACILITY NAME                            DOCKET NUMBER 01        29        98      98          006              00          03      03 OPERA'TING               TH S REPORT  IS SUBMITTED PURSUANT      TO THE REQUIREMENTS OF 10 CFR        :    Check one  or  mor e    11 MODE   (9)                   20.2201(b)                           20.2203(a)(3)(l)                 50.73(a)(2)(iii)                  73.71(b)
(SpecifyinAbstractbetoMandinText,NRCFore366A)NAMELICENSEECONTACTFORTHISI.ER12Mr.PaulSchoepf,SafetyRelatedMechanical Engineering Superintendent TELEPHONE NUMBER(IncludeAreaCode)616/465-5901, x2408COMPETEONELINEFOREACHCOMPONENT FAILUREDESCRIBED
POWER 0
'INTHISREPORT13CAUSESYSTEMCOMPONENT MANUFACTURER REPORTABLE
20.2203 a  1                        20.2203 a   3  ii              50.73 a 2 iv                      73.710 LEVEL  (10)                 20.2203(a)(2)(I)                      20.2203(a)(4)                   50.73(a)(2)(v)                     OTHER 20.2203 a    2  ii                    50.36 c  1                      50.73 a      2  vii            (Specify in 20.2203(a)(2)(iii)                     50.36(c)(2)                     50.73(a)(2)(viii)(A)           Abstract betoM 20.2203(a)(2)(iv)                      50.73(a)(2)(l)                   50.73(a)(2)(viii)(B)          and  in Text, NRC  Fore 366A) 20.2203(a)(2)(v)                 X 50.73(a)(2)(ii)                     50.73(a)(2)(x)
'oHPRDSCAUSESYSTEHCOHPONENT MANUFACTURER REPORTABLE ToNPRDSSUPPLEMENTAL REPORTEXPECTED14XYES(Ifyes,corpteteEXPEC'IED SUBMISSION DATE).NoEXPECTEDSUBMISSION DATE(15)MONTHDAYYEAR040398ABS'TRACT (Limitto1400spaces,i.e.,approximately 15single-spaced typeiiritten lines)(16)OnFebruary25,1998,anENSnotification wasmadeinaccordance with10CFR50.72(b)(2)(l)
LICENSEE CONTACT FOR THIS I.ER      12 NAME                                                                                                    TELEPHONE NUMBER      (Include Area      Code)
~foracondition foundwhilethereactorwasshutdown, whichifithadbeenfoundwhilethereactor'was operating, couldhaveresultedintheplantbeinginanunanalyzed condition.
Mr. Paul Schoepf, Safety Related Mechanical Engineering Superintendent                               616/465-5901, x2408 COMP ETE ONE  LINE  FOR EACH COMPONENT    FAILURE DESCRIBED 'IN  T HIS    REPORT  13 CAUSE      SYSTEM      COMPONENT      MANUFACTURER     'o REPORTABLE HPRDS CAUSE    SYSTEH      COHPONENT        MANUFACTURER REPORTABLE To NPRDS SUPPLEMENTAL REPORT EXPECTED        14                                  EXPECTED                MONTH          DAY        YEAR YES                                                                                          SUBMISSION X  (If yes,   corptete EXPEC'IED SUBMISSION DATE).                         No DATE   (15)               04            03        98 ABS'TRACT   (Limit to 1400 spaces, i.e., approximately         15  single-spaced typeiiritten lines) (16)
Thisnotification wastheresultofanissueraisedinlateJanuary,1998regarding thebasisforastepintheicebasketweighingprocedure whichallowedforupto60basketstobeunpinnedatatimeforweighingduringModes3and4.Asearchforthebasisfortheprocedural stepallowingtheunpinning ofthe60basketswasconducted andnodocumentation couldbelocated.Itwassubsequently determined thattheplantcouldhavebeeninanunanalyzed condition duringtheperiodswhenthatspecificportionoftheprocedure wasperformed, andtheFebruary25,1998notification wasmade.ThisinterimLERistherefore submitted inaccordance with10CFR50.73(a)(2)(l)(B),
On February 25, 1998, an ENS notification was made in accordance with 10CFR50.72(b)(2)(l) for a condition found while the
foranunanalyzed condition.
                                                                                                                ~
Theicecondenser consistsof24bayscontaining 81basketseach,arrangedina300degreearcbetweenthecontainment andcranewalls.Thebasketsarerequiredtocontainaminimumweightofboratedice,andasurveillance isperiodically performed toweigharepresentative sampleofthebasketstoassurethattheminimumweightrequirement ismet.Toperformthissurveillance, thebasketsarephysically liftedandweighed.Theicebasketsarehelddownbyau-boltarrangement attachedtothelowersupportbeamwithaclevispin,whichisnecessary topreventmovementofthebasketduringLOCAandseismicevents.Theclevispinmustberemovedtoliftandweighthebasket.IcebasketsarenolongerunpinnedduringModes3and4,andrecollection ofcognizant plantpersonnel isthatthisprocedural optionhasnotbeenusedinmorethantenyears.Archiverecordsarebeingreviewedtoascertain thelasttimethebasketswereunpinnedinthismanner.Becauseonlinebasketunpinning isnolongernecessary fortheperformance ofbasketweighing, theprocedure willberevisedtoeliminate thisoption.ItisexpectedthatanupdatetothisinterimLERwillbesubmitted byApril3,1998.q8Psi20055 PDRADOCI4,0S}}
reactor was shutdown, which if it had been found while the reactor'was operating, could have resulted in the plant being in an unanalyzed condition. This notification was the result of an issue raised in late January, 1998 regarding the basis for a step in the ice basket weighing procedure which allowed for up to 60 baskets to be unpinned at a time for weighing during Modes 3 and
: 4. A search for the basis for the procedural step allowing the unpinning of the 60 baskets was conducted and no documentation could be located. It was subsequently determined that the plant could have been in an unanalyzed condition during the periods when that specific portion of the procedure was performed, and the February 25, 1998 notification was made. This interim LER is therefore submitted in accordance with 10CFR50.73(a)(2)(l)(B), for an unanalyzed condition.
The ice condenser consists of 24 bays containing 81 baskets each, arranged in a 300 degree arc between the containment and crane walls. The baskets are required to contain a minimum weight of borated ice, and a surveillance is periodically performed to weigh a representative sample of the baskets to assure that the minimum weight requirement is met. To perform this surveillance, the baskets are physically lifted and weighed. The ice baskets are held down by a u-bolt arrangement attached to the lower support beam with a clevis pin, which is necessary to prevent movement of the basket during LOCA and seismic events. The clevis pin must be removed to lift and weigh the basket.
Ice baskets are no longer unpinned during Modes 3 and 4, and recollection of cognizant plant personnel is that this procedural option has not been used in more than ten years. Archive records are being reviewed to ascertain the last time the baskets were unpinned in this manner. Because online basket unpinning is no longer necessary for the performance of basket weighing, the procedure will be revised to eliminate this option. It is expected that an update to this interim LER will be submitted by April 3, 1998.
q8Psi20055 0 PDR      ADOCI4, S}}

Latest revision as of 12:48, 22 October 2019

LER 98-006-00:on 980129,determined That Procedural Option for Weighing of Ice Baskets in Modes 3 & 4 Was Potentially Unanalyzed Condition.Cause Undeterminate.Procedure Will Be Revised
ML17334A676
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 03/03/1998
From: Schoepf P
AMERICAN ELECTRIC POWER CO., INC.
To:
Shared Package
ML17334A675 List:
References
LER-98-006, LER-98-6, NUDOCS 9803120055
Download: ML17334A676 (1)


Text

HRC FORM 366 U.S. NUCLEAR REGULA'TORY COMMISSION APPROVED BY OMB NO. 3150.0104 (5.92) EXPIRES 5/31/95 ESTIMATED BURDEN PER RESPOHSE To COMPLY WITH THI INFORMATION COLLECTION REQUEST: 50.0 HRS. FORWAR LICENSEE EVENT REPORT (LER) COHMENTS REGARDING BURDEN ESTIHATE To TH IHFORMATION AND RECORDS MANAGEMENT BRANCH (MHB 7714), U.S. NUCLEAR REGULATORY COMHISSION, WASHINGTON, DC 20555-0001, AND 'IO THE PAPERWOR REDUCTIOH PROJECT (3150-0104), OFFICE 0 MANAGEHENT AND BUDGET WASHINGTON DC 20503.

FACILITY NAME (1) DOCKET NUMBER (2) Page1 of1 Donald C. Cook Nuclear Plant - Unit 1 50.315 TITLE (4)

Interim LER - Procedural Option for Weighing of Ice Baskets in Modes 3 and 4 Determined to be a Potentially Unanalyzed Condition EVENT DATE 5 LER NUMBER 6 REPORT DA'TE 7 OTHER FACILITIES INVOLVED 8 SEQUENTIAL REVI SION FACILITY NAME DOCKE'I NUMBER MONTH DAY YEAR YEAR MONTH DAY YEAR HUHBER NUMBER Cook - Unit 2 50-316 FACILITY NAME DOCKET NUMBER 01 29 98 98 006 00 03 03 OPERA'TING TH S REPORT IS SUBMITTED PURSUANT TO THE REQUIREMENTS OF 10 CFR  : Check one or mor e 11 MODE (9) 20.2201(b) 20.2203(a)(3)(l) 50.73(a)(2)(iii) 73.71(b)

POWER 0

20.2203 a 1 20.2203 a 3 ii 50.73 a 2 iv 73.710 LEVEL (10) 20.2203(a)(2)(I) 20.2203(a)(4) 50.73(a)(2)(v) OTHER 20.2203 a 2 ii 50.36 c 1 50.73 a 2 vii (Specify in 20.2203(a)(2)(iii) 50.36(c)(2) 50.73(a)(2)(viii)(A) Abstract betoM 20.2203(a)(2)(iv) 50.73(a)(2)(l) 50.73(a)(2)(viii)(B) and in Text, NRC Fore 366A) 20.2203(a)(2)(v) X 50.73(a)(2)(ii) 50.73(a)(2)(x)

LICENSEE CONTACT FOR THIS I.ER 12 NAME TELEPHONE NUMBER (Include Area Code)

Mr. Paul Schoepf, Safety Related Mechanical Engineering Superintendent 616/465-5901, x2408 COMP ETE ONE LINE FOR EACH COMPONENT FAILURE DESCRIBED 'IN T HIS REPORT 13 CAUSE SYSTEM COMPONENT MANUFACTURER 'o REPORTABLE HPRDS CAUSE SYSTEH COHPONENT MANUFACTURER REPORTABLE To NPRDS SUPPLEMENTAL REPORT EXPECTED 14 EXPECTED MONTH DAY YEAR YES SUBMISSION X (If yes, corptete EXPEC'IED SUBMISSION DATE). No DATE (15) 04 03 98 ABS'TRACT (Limit to 1400 spaces, i.e., approximately 15 single-spaced typeiiritten lines) (16)

On February 25, 1998, an ENS notification was made in accordance with 10CFR50.72(b)(2)(l) for a condition found while the

~

reactor was shutdown, which if it had been found while the reactor'was operating, could have resulted in the plant being in an unanalyzed condition. This notification was the result of an issue raised in late January, 1998 regarding the basis for a step in the ice basket weighing procedure which allowed for up to 60 baskets to be unpinned at a time for weighing during Modes 3 and

4. A search for the basis for the procedural step allowing the unpinning of the 60 baskets was conducted and no documentation could be located. It was subsequently determined that the plant could have been in an unanalyzed condition during the periods when that specific portion of the procedure was performed, and the February 25, 1998 notification was made. This interim LER is therefore submitted in accordance with 10CFR50.73(a)(2)(l)(B), for an unanalyzed condition.

The ice condenser consists of 24 bays containing 81 baskets each, arranged in a 300 degree arc between the containment and crane walls. The baskets are required to contain a minimum weight of borated ice, and a surveillance is periodically performed to weigh a representative sample of the baskets to assure that the minimum weight requirement is met. To perform this surveillance, the baskets are physically lifted and weighed. The ice baskets are held down by a u-bolt arrangement attached to the lower support beam with a clevis pin, which is necessary to prevent movement of the basket during LOCA and seismic events. The clevis pin must be removed to lift and weigh the basket.

Ice baskets are no longer unpinned during Modes 3 and 4, and recollection of cognizant plant personnel is that this procedural option has not been used in more than ten years. Archive records are being reviewed to ascertain the last time the baskets were unpinned in this manner. Because online basket unpinning is no longer necessary for the performance of basket weighing, the procedure will be revised to eliminate this option. It is expected that an update to this interim LER will be submitted by April 3, 1998.

q8Psi20055 0 PDR ADOCI4, S