ML17333A317: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:ATTACHMENT2TOAEP:NRC:1243CURRENTTECHNICALSPECIFICATIONPAGESWITHCHANGESMARKED9602260308960222PDRADOCK05000315PPDR TABLE4.8"1DIESELGENERATORTESTSCHEDULENumberofFailuresinLast20ValidTests"~TFLessthanorequalto1Greaterthanorequalto2Atleastonceper31daysAtleastonceper7days"""Cr>ter)qfordeterminingnumberoffai1uresandnumbprofvalidtestsshallbein"accordancewithRegulatoryPositionC.2&ofRegulatoryGuide'I+A,!IS;,Riif,~hfdfifdeterminedgnaperdieselgeneratorbasis.Forthepurposesofthistestschedule,onlyvalidtestsconductedaftertheOLissuancedateshallbeincludedinthecomputationofthe"last20validtests.""*Thistestfrequencyshallbemaintaineduntilsevenconsecutivefailurefreedemandshavebeenperformedandthenumberoffailuresinthelast20validdemandshasbeenreducedtooneorless.D.C.COOK"UNIT13/48-8AMENDMENTNO.125 TASLE4.8"1DIESELGENERATORTESTSCHEDULENumberofFailuresinLast20YalidTests"TestFreuencLessthanorequalto1Greaterthanorequalto2Atleastonceper31daysAtleastonceper7days""Criteriafordeterminingnumberoffailuresandnumberofvalidt'estsshallbein.accordancewithRegulatoryPositionC.2AofRegulatoryGuideI'f.~Sf,Rii/,4WWA4%2h1fdfiideterminedanaperdieselgeneratorbasis.Forthepurposesofthistestschedule,onlyvalidtestsconductedaftertheOLissuancedateshhll'beincludedinthecomputationofthe"last20validtests."""Thistestfrequencyshallbemaintaineduntilsevenconsecdtivefailurefreedemandshavebeenperformedandthenumberoffailuresinthelast20validdemandshasbeenreducedtooneorless.D.C.COOK-UNIT23/48-8AMENDMENTNO.112 ATTACHMENT3TOAEP:NRC:1243PROPOSEDTECHNICALSPECIFICATIONPAGES 3/4LIMITINGCONDITIONSFOROPERATIONANDSURVEILLANCEREQUIREMENTS3)48ELECTRICALPOWERSYSTEMSTABLE4.8-1DIESELGENERATORTESTSCHEDULENumberofFailuresinLast20ValidTestsLessthanorequalto1Greaterthanorequalto2TestFreuencAtleastonceper31daysAtleastonceper7daysCriteriafordeterminingnumberoffailuresandvalidtestsshallbeinaccordancewithRegulatoryPositionC.2.1ofRegulatoryGuide1.9,Revision3,wherethenumberoftestsandfailuresisdeterminedonaperdieselgeneratorbasis.Forthepurposesofthistestschedule,onlyvalidtestsconductedaftertheOLissuancedateshallbeincludedinthecomputationofthe"last20validtests.Thistestfrequencyshallbemaintaineduntilsevenconsecutivefailurefreedemandshavebeenperformedandthenumberoffailuresinthelast20validdemandshasbeenreducedtooneorless.COOKNUCLEARPLANT-UNIT1Page3/48-8AMENDMENT43$,
{{#Wiki_filter:ATTACHMENT 2 TO AEP:NRC:1243 CURRENT TECHNICAL SPECIFICATION PAGES WITH CHANGES MARKED 9602260308 960222 PDR  ADOCK 05000315 P              PDR
3/4LIMITINGCONDITIONSFOROPERATIONANDSURVEILLANCEREQUIREMENTS314;8ELECTRICALPOWERSYSTEMSTABLE4.8-1DIESELGENERATORTESTSCHEDULENumberofFailuresinLast20ValidTestsLessthanorequalto1Greaterthanorequalto2TestFreuencAtleastonceper31daysAtleastonceper7daysCriteriafordeterminingnumberoffailuresandvalidtestsshallbeinaccordancewithRegulatoryPositionC.2.1ofRegulatoryGuide1.9,Revision3,wherethenumberoftestsandfailuresisdeterminedonaperdieselgeneratorbasis.Forthepurposesofthistestschedule,onlyvalidtestsconductedaftertheOLissuancedateshallbeincludedinthecomputationofthe"last20validtests."Thistestfrequencyshallbemaintaineduntilsevenconsecutivefailurefreedemandshavebeenperformedandthenumberoffailuresinthelast20validdemandshasbeenreducedtooneorless.COOKNUCLEARPLANT-UNIT2Page3/48-8AMENDMENT~,}}
 
TABLE 4.8"1 DIESEL GENERATOR TEST SCHEDULE Number of Failures in Last 20 Valid Tests"                         ~TF Less than  or equal to 1                    At least once per 31 days Greater than or equal to 2                  At least once per 7 days""
  "Cr >ter)q shall
'I+A,!IS;,R be ii    f,~
for determining  number  of fai1ures h
and numbpr f
of valid tests in"accordance with Regulatory Position C.2& of Regulatory Guide dfif determined gn a per diesel generator basis. For the purposes of this test schedule, only valid tests conducted after the OL issuance date shall be included in the computation of the "last 20 valid tests."
  "*This test frequency shall be maintained until seven consecutive failure free demands have been performed and the number of failures in the last      20 valid demands has been reduced to one or less.
D.C. COOK " UNIT 1                    3/4 8-8              AMENDMENT NO. 125
 
TASLE 4.8"1 DIESEL GENERATOR TEST SCHEDULE Number of Failures in Last 20 Yalid Tests"                       Test Fre uenc Less than  or equal to  1                  At least once per 31 days Greater than or equal to    2              At least once per 7 days""
Criteria for determining    number of failures and number of valid t'ests shall  be in. accordance with Regulatory Position C.2A of Regulatory Guide I 'f.~Sf,     R  i i /,4WWA4%2            h      1          f        d f ii determined an a per diesel generator basis. For the purposes of this test schedule, only valid tests conducted after the OL issuance date shhll 'be included in the computation of the "last 20 valid tests."
    ""This test frequency shall be maintained until seven consecdtive failure free demands have been performed and the number of failures in the last    20 valid demands has been reduced to one or less.
D.C. COOK - UNIT 2                    3/4 8-8              AMENDMENT NO. 112
 
ATTACHMENT 3 TO AEP:NRC:1243 PROPOSED TECHNICAL SPECIFICATION PAGES
 
3/4  LIMITINGCONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS 3)4 8 ELECTRICAL POWER SYSTEMS TABLE 4.8-1 DIESEL GENERATOR TEST SCHEDULE Number of Failures in Last 20 Valid Tests                            Test Fre uenc Less than or equal to 1                        At least once per  31 days Greater than or equal to 2                    At least once per  7 days Criteria for determining number of failures and valid tests shall be in accordance with Regulatory Position C.2.1 of Regulatory Guide 1.9, Revision 3, where the number of tests and failures is determined on a per diesel generator basis. For the purposes of this test schedule, only valid tests conducted after the OL issuance date shall be included in the computation of the "last 20 valid tests.
This test frequency shall be maintained until seven consecutive failure free demands have been performed and the number of failures in the last 20 valid demands has been reduced to one or less.
COOK NUCLEAR PLANT-UNIT 1                        Page 3/4 8-8                          AMENDMENT43$ ,
 
3/4    LIMITINGCONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS 314;8  ELECTRICAL POWER SYSTEMS TABLE 4.8-1 DIESEL GENERATOR TEST SCHEDULE Number of Failures in Last 20 Valid Tests                            Test Fre uenc Less than or equal to 1                        At least once per  31 days Greater than or equal to 2                    At least once per 7 days Criteria for determining number of failures and valid tests shall be in accordance with Regulatory Position C.2.1 of Regulatory Guide 1.9, Revision 3, where the number of tests and failures is determined on a per diesel generator basis. For the purposes of this test schedule, only valid tests conducted after the OL issuance date shall be included in the computation of the "last 20 valid tests."
This test frequency shall be maintained until seven consecutive failure free demands have been performed and the number of failures in the last 20 valid demands has been reduced to one or less.
COOK NUCLEAR PLANT-UNIT2                        Page 3/4 8-8                          AMENDMENT        ~,}}

Latest revision as of 12:21, 22 October 2019

Proposed Tech Specs,Modifying Table 4.8-1,DG Test Schedule by Ref Rg 1.9,Rev 3 Rather than Rg 1.108,Rev 1 Criteria for Determination of Valid DG Test
ML17333A317
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 02/22/1996
From:
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
Shared Package
ML17333A316 List:
References
RTR-REGGD-01.009, RTR-REGGD-01.108, RTR-REGGD-1.009, RTR-REGGD-1.108 NUDOCS 9602260308
Download: ML17333A317 (6)


Text

ATTACHMENT 2 TO AEP:NRC:1243 CURRENT TECHNICAL SPECIFICATION PAGES WITH CHANGES MARKED 9602260308 960222 PDR ADOCK 05000315 P PDR

TABLE 4.8"1 DIESEL GENERATOR TEST SCHEDULE Number of Failures in Last 20 Valid Tests" ~TF Less than or equal to 1 At least once per 31 days Greater than or equal to 2 At least once per 7 days""

"Cr >ter)q shall

'I+A,!IS;,R be ii f,~

for determining number of fai1ures h

and numbpr f

of valid tests in"accordance with Regulatory Position C.2& of Regulatory Guide dfif determined gn a per diesel generator basis. For the purposes of this test schedule, only valid tests conducted after the OL issuance date shall be included in the computation of the "last 20 valid tests."

"*This test frequency shall be maintained until seven consecutive failure free demands have been performed and the number of failures in the last 20 valid demands has been reduced to one or less.

D.C. COOK " UNIT 1 3/4 8-8 AMENDMENT NO. 125

TASLE 4.8"1 DIESEL GENERATOR TEST SCHEDULE Number of Failures in Last 20 Yalid Tests" Test Fre uenc Less than or equal to 1 At least once per 31 days Greater than or equal to 2 At least once per 7 days""

Criteria for determining number of failures and number of valid t'ests shall be in. accordance with Regulatory Position C.2A of Regulatory Guide I 'f.~Sf, R i i /,4WWA4%2 h 1 f d f ii determined an a per diesel generator basis. For the purposes of this test schedule, only valid tests conducted after the OL issuance date shhll 'be included in the computation of the "last 20 valid tests."

""This test frequency shall be maintained until seven consecdtive failure free demands have been performed and the number of failures in the last 20 valid demands has been reduced to one or less.

D.C. COOK - UNIT 2 3/4 8-8 AMENDMENT NO. 112

ATTACHMENT 3 TO AEP:NRC:1243 PROPOSED TECHNICAL SPECIFICATION PAGES

3/4 LIMITINGCONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS 3)4 8 ELECTRICAL POWER SYSTEMS TABLE 4.8-1 DIESEL GENERATOR TEST SCHEDULE Number of Failures in Last 20 Valid Tests Test Fre uenc Less than or equal to 1 At least once per 31 days Greater than or equal to 2 At least once per 7 days Criteria for determining number of failures and valid tests shall be in accordance with Regulatory Position C.2.1 of Regulatory Guide 1.9, Revision 3, where the number of tests and failures is determined on a per diesel generator basis. For the purposes of this test schedule, only valid tests conducted after the OL issuance date shall be included in the computation of the "last 20 valid tests.

This test frequency shall be maintained until seven consecutive failure free demands have been performed and the number of failures in the last 20 valid demands has been reduced to one or less.

COOK NUCLEAR PLANT-UNIT 1 Page 3/4 8-8 AMENDMENT43$ ,

3/4 LIMITINGCONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS 314;8 ELECTRICAL POWER SYSTEMS TABLE 4.8-1 DIESEL GENERATOR TEST SCHEDULE Number of Failures in Last 20 Valid Tests Test Fre uenc Less than or equal to 1 At least once per 31 days Greater than or equal to 2 At least once per 7 days Criteria for determining number of failures and valid tests shall be in accordance with Regulatory Position C.2.1 of Regulatory Guide 1.9, Revision 3, where the number of tests and failures is determined on a per diesel generator basis. For the purposes of this test schedule, only valid tests conducted after the OL issuance date shall be included in the computation of the "last 20 valid tests."

This test frequency shall be maintained until seven consecutive failure free demands have been performed and the number of failures in the last 20 valid demands has been reduced to one or less.

COOK NUCLEAR PLANT-UNIT2 Page 3/4 8-8 AMENDMENT ~,