| {{#Wiki_filter:ENGINE SYSTEMS, INC. 175 Freight Road Rocky Mount, NC 27804 December 30, 2016 U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555-0001 Telephone: 252/977-2720 Fax: 252/446-1134 | | {{#Wiki_filter:ENGINE SYSTEMS, INC. |
| | 175 Freight Road Telephone: 252/977-2720 Rocky Mount, NC 27804 Fax: 252/446-1134 December 30, 2016 U.S. Nuclear Regulatory Commission Document Control Desk Washington , DC 20555-0001 |
|
| |
|
| ==Subject:== | | ==Subject:== |
| 1 OCFR21 Reporting of Defects and Non-Compliance -Engine Systems, Inc. Report No. 10CFR21-0114, Rev. 0 Subcover Assembly, P/N 1A-7846
| | 10CFR21 Reporting of Defects and Non-Compliance - |
| | Engine Systems, Inc. Report No. 10CFR21-0114, Rev. 0 Subcover Assembly, P/N 1A-7846 |
|
| |
|
| ==Dear Sir:== | | ==Dear Sir:== |
| The enclosed report addresses a reportable notification of an Enterprise emergency diesel generator subcover assembl, P/N 1A-7846 .. A copy of the report has been mailed to our affected nuclear customers. Please sign below, acknowledging receipt of this report, and return a copy to the attention of Document Control at the address above (or, fax to number 252/446-1134) within 10 working days after receipt. Yours very truly, ENGINE SYSTEMS, INC. Susan Woolard Document Control Please let us know if ANY of your mailing information changes -name of recipient, name of company/facility, address, etc. Mark the changes on this acknowledgment form and send to us by mail or FAX to the number above. RECEIVED:---------93 DATE: Quality Performance With Pride
| |
|
| |
|
| Report No. 1 OCFR21-0114 Record of Revisions Page: 1 of 1 REV DATE PAGE DESCRIPTION 0 12/28/16 Initial issue. | | The enclosed report addresses a reportable notification of an Enterprise emergency diesel generator subcover assembl , P/N 1A-7846 .. |
| COMPONENT: Subcover assembly, P/N 1A-7846. SUMMARY: Report No. Revision: Date: Page: 10CFR21-0114 0 12/28/16 1 of 3 Engine Systems Inc. (ESI) began a 1 OCFR21 evaluation on November 18, 2016 upon notification of an issue with a subcover assembly at Perry Nuclear Plant. Attempts to install the subcover on their Enterprise diesel engine revealed two issues that prevented successful installation. First, one of the bolt holes was not fully machined through the entire depth of the subcover. Though the bolt could be inserted into the top of its corresponding hole, it would not pass completely through. The second issue was an interference between the rocker arm shaft and its mating pedestal. It was found that incomplete machining of the pedestal prevented the shaft from sitting flat on the pedestal. The evaluation was concluded on 12/21 /16 and it was determined that this issue is a reportable defect as defined by 1 OCFR21. The figures and photos below and on the following page provide visual detail of the deficiencies. Item #2: Location of incomplete machining of pedestal Item #1 : Location of inadequately drilled bolt hole Figure 1: Outline Drawing of Subcover Item #2: Photo 1: Visual Depiction of Inadequately Drilled Bolt Hole Correct Machining (note radius) Figure 2: Ideal Pedestal Machining CC.TAlL 'Y' Report No. Revision: Date: Page: 1 OCFR21-0114 0 12/28/16 2 of 3 Photo 2: Attempted Bolt Install Photo 3: Actual Machining DISCUSSION: Report No. Revision: Date: Page: 10CFR21-0114 0 12/28/16 3 of 3 The subcover is a device that is fastened to the top of the cylinder head and provides support for the rocker arms and rocker shafts and encloses the valve stem area. There is one subcover per cylinder head and thus for a model OSRV-16-4 Enterprise engine there are 16 subcovers. Failure of a subcover would impact the ability of either of the corresponding rocker arms to provide the mechanical force to actuate the intake and exhaust valves. Without valve actuation, that particular power assembly would be unable to generate power which would reduce the output of the emergency diesel generator (EOG). Failure of the EOG to produce its nameplate rated power could prevent the safe shutdown of the nuclear power plant during an emergency situation. The issue regarding the inadequately drilled bolt hole would be detected during installation since it would prevent the bolt from passing through the hole. Therefore, it is determined this issue would have no impact on operability since the cover could not be installed with an incompletely drilled bolt hole. With regard to the incompletely machined pedestal, there is the potential that a customer could install the rocker arm shaft without detecting this issue. In this situation, the shaft will partially fit on the pedestal and the bolt will thead into subcover; however, the shaft will not seat fully on the pedestal. This prevents full contact with the pedestal and inhibits adequate preload throughout the bolted joint. If a customer were to install the rocker arm shaft (with mating rocker arms, pushrods, etc) onto the engine without realizing this issue, operability and durability of the engine would be compromised. This could present a substantial safety hazard. AFFECTED USERS AND SHIPMENTS: All of the subcovers listed below are subject to the pedestal machining discrepancy and may subject to the inadequately drilled bolt hole. ESI Sales Order Order Date Customer Customer PO Quantity ESI Certification Shiooed Date 8001930 12/19/2011 First Energy -Perry 45307431 4 1/30/2013 (qty 1) (AFW#3168) 7/27/2013 (qty 3) 3006881 (qty 14) 2/4/2010 Korea -Yonggwang Y090528171 15 7/27/2013 (qty 14) 8001963 (qty 1) 10/18/2013 (atv 1) 3009694 2/23/2012 Korea -Yonggwang NY G 1-02 MOOO 7 -550 2 7/27/2013 3009847 4/5/2012 First Energy -Perry 45389292 8 7/27/2013 (qty 5) 9/27/2013 (qty 3) 3009695 2/23/2012 Korea -Yonggwang Y050089101 2 10/18/2013 3015101 12/29/2015 Georgia Power -Vogtle SNG10122963 2 4/21/2016 CORRECTIVE ACTIONS: Customers may elect to perform corrective machining to restore the subcover to its design dimensions. Otherwise, return the affected subcovers to ESI for inspection and rework. If customer rework is desired, perform the following: a) Inspect for the bolt hole (item #1 ). If rework is necessary, drill through to a diameter of 13/16". b) For the incomplete machining of the rocker arm pedestal (item #2), first remove the installed dowel which has 0.000" to 0.001" clearance. Then machine a 2" radius relief at the affected area. All other dimensions such as pedestal height shall remain unchanged. The root cause analysis determined the cause to be machining errors that were not detected during ESl's dedication activities. As subcovers are returned, they will be re-machined at the vendor's facility, inspected by ESI, and returned to customers within 60 days of receipt. ESI will also incorporate revisions to the dedication report prior to the supply of any new or reworked subcovers to further clarify the inspection of these features during the dedication process, thereby preventing reoccurrence.
| | A copy of the report has been mailed to our affected nuclear customers. |
| }} | | Please sign below, acknowledging receipt of this report, and return a copy to the attention of Document Control at the address above (or, fax to number 252/446-1134) within 10 working days after receipt. |
| | Yours very truly, ENGINE SYSTEMS , INC. |
| | Susan Woolard Document Control Please let us know if ANY of your mailing information changes - name of recipient, name of company/facility, address, etc. Mark the changes on this acknowledgment form and send to us by mail or FAX to the number above. |
| | RECEIVED:--------- |
| | 93 DATE: |
| | Quality Performance With Pride |
| | |
| | Report No. 10CFR21-0114 Record of Revisions Page: 1 of 1 REV DATE PAGE DESCRIPTION 0 12/28/16 Initial issue. |
| | |
| | Report No. 10CFR21-0114 Revision : 0 Date: 12/28/16 Page: 1 of 3 COMPONENT: |
| | Subcover assembly, P/N 1A-7846. |
| | |
| | ==SUMMARY== |
| | Engine Systems Inc. (ESI) began a 10CFR21 evaluation on November 18, 2016 upon notification of an issue with a subcover assembly at Perry Nuclear Plant. Attempts to install the subcover on their Enterprise diesel engine revealed two issues that prevented successful installation . First, one of the bolt holes was not fully machined through the entire depth of the subcover. Though the bolt could be inserted into the top of its corresponding hole, it would not pass completely through. The second issue was an interference between the rocker arm shaft and its mating pedestal. It was found that incomplete machining of the pedestal prevented the shaft from sitting flat on the pedestal. |
| | The evaluation was concluded on 12/21 /16 and it was determined that this issue is a reportable defect as defined by 10CFR21. The figures and photos below and on the following page provide visual detail of the deficiencies. |
| | Item #2 : Location of incomplete machining of pedestal Item #1 : Location of inadequately drilled bolt hole Figure 1: Outline Drawing of Subcover |
| | |
| | Report No. 10CFR21 -011 4 Revision : 0 Date : 12/28/16 Page : 2 of 3 Photo 1: Visual Depiction of Inadequately Photo 2: Attempted Bolt Install Drilled Bolt Hole Item #2: |
| | CC.TAlL 'Y' Correct Machining (note radius) |
| | Photo 3: Actual Machining Figure 2: Ideal Pedestal Machining |
| | |
| | Report No. 10CFR21-0114 Revision : 0 Date: 12/28/16 Page : 3 of 3 DISCUSSION: |
| | The subcover is a device that is fastened to the top of the cylinder head and provides support for the rocker arms and rocker shafts and encloses the valve stem area. There is one subcover per cylinder head and thus for a model OSRV-16-4 Enterprise eng ine there are 16 subcovers. Failure of a subcover would impact the ability of either of the corresponding rocker arms to provide the mechanical force to actuate the intake and exhaust valves. Without valve actuation, that particular power assembly would be unable to generate power which would reduce the output of the emergency diesel generator (EOG). |
| | Failure of the EOG to produce its nameplate rated power could prevent the safe shutdown of the nuclear power plant during an emergency situation. |
| | The issue regarding the inadequately drilled bolt hole would be detected during installation since it would prevent the bolt from passi ng through the hole. Therefore , it is determined this issue would have no impact on operability since the cover could not be installed with an incompletely drilled bolt hole. |
| | With regard to the incompletely machined pedestal , there is the potential that a customer could install the rocker arm shaft without detecting this issue. In this situation, the shaft will partially fit on the pedestal and the bolt will thead into subcover; however, the shaft will not seat fully on the pedestal. |
| | This prevents full contact with the pedestal and inhibits adequate preload throughout the bolted joint. |
| | If a customer were to install the rocker arm shaft (with mating rocker arms, pushrods, etc) onto the engine without realizing this issue, operability and durability of the engine would be compromised. |
| | This could present a substantial safety hazard . |
| | AFFECTED USERS AND SHIPMENTS: |
| | All of the subcovers listed below are subject to the pedestal machining discrepancy and may subject to the inadequately drilled bolt hole. |
| | Quantity ESI Certification ESI Sales Order Order Date Customer Customer PO Shiooed Date 45307431 1/30/2013 (qty 1) 8001930 12/ 19/2011 First Energy - Perry 4 (AFW#3168) 7/27/2013 (qty 3) 3006881 (qty 14) 7/27/2013 (qty 14) 2/4/2010 Korea - Yonggwang Y090528171 15 8001963 (qty 1) 10/18/2013 (atv 1) 3009694 2/23/2012 Korea - Yonggwang NY G 1-02 MOOO 7-550 2 7/27/2013 7/27/2013 (qty 5) 3009847 4/5/2012 First Energy - Perry 45389292 8 9/27/2013 (qty 3) 3009695 2/23/2012 Korea - Yonggwang Y050089 101 2 10/18/2013 3015101 12/29/2015 Georgia Power - Vogtle SNG10122963 2 4/21 /2016 CORRECTIVE ACTIONS: |
| | Customers may elect to perform corrective machining to restore the subcover to its design dimensions. |
| | Otherwise, return the affected subcovers to ESI for inspection and rework. If customer rework is desired , perform the following : |
| | a) Inspect for the bolt hole (item #1 ). If rework is necessary, drill through to a diameter of 13/16". |
| | b) For the incomplete machining of the rocker arm pedestal (item #2), first remove the installed dowel which has 0.000" to 0.001 " clearance . Then machine a 2" radius relief at the affected area. All other dimensions such as pedestal height shall remain unchanged. |
| | The root cause analysis determined the cause to be machining errors that were not detected during ESl's dedication activities. As subcovers are returned, they will be re-machined at the vendor's facility, inspected by ESI , and returned to customers within 60 days of receipt. ESI will also incorporate revisions to the dedication report prior to the supply of any new or reworked subcovers to further clarify the inspection of these features during the dedication process, thereby preventing reoccurrence.}} |
|
---|
Category:Deficiency Report (per 10CFR50.55e and Part 21)
MONTHYEARML23241A0022023-08-25025 August 2023 Paragon Final Part 21 Report on Defect with Eaton/Cutler Hammer Size 4 and 5 Freedom Series Contactors Modified by Paragon with Special Coils And/Or with RTV to Improve the Securing of Shading Coils ML23221A3702023-08-0303 August 2023 Paragon Energy Solutions, 10CFR Part 21 Initial Notification: P21-08032023-IN, Rev. 0 ML23087A1292023-03-23023 March 2023 Trillium Valves USA - Part 21 Written Notification - Event Number: 56420 ML23082A1122023-03-17017 March 2023 10 CFR Part 21 Report Inconsistent Crimping of Motor Leads to Ring Terminal Connectors and Failure to Comply. Trillium Valves USA Part 21 Evaluation I211003 ML23038A0192023-02-0606 February 2023 Curtiss-Wright Part 21 Notification for Qualtech Np Supplied Eaton TMR5 Timing Relays ML22341A0322022-11-30030 November 2022 10 CFR Part 21 Notification from Curtiss-Wright Nuclear Division for Qualtech Np Supplied Eaton TRM5 Timing Relays ML21168A2172021-06-17017 June 2021 GE Hitachi Nuclear Energy Americas, LLC - 10 CFR Part 21.21(d)-Reportable Condition: Fuel Support Side Entry Orifice Meta-Stable Flow for 2 Beam Locations in the BWR/6 Reactors M210077, GE Hitachi Nuclear Energy Americas, LLC - 10 CFR Part 21.21(d)-Reportable Condition: Fuel Support Side Entry Orifice Meta-Stable Flow for 2 Beam Locations in the BWR/6 Reactors2021-06-17017 June 2021 GE Hitachi Nuclear Energy Americas, LLC - 10 CFR Part 21.21(d)-Reportable Condition: Fuel Support Side Entry Orifice Meta-Stable Flow for 2 Beam Locations in the BWR/6 Reactors ML20366A0482020-12-0707 December 2020 10CFR21 Reporting of Defects and Non-Compliance - Engine Systems, Inc. Report No. 10 CFR21-0114, Rev. 1 ML20366A0472020-11-18018 November 2020 Curtiss-Wright 10 CFR Part 21 Notification for SF-1154 Hydraulic Fluid Batch 17BLVS293 NL-20-0764, Initial 10 CFR 21 Notification - Continuously Energized Eaton D26 Relays Could Fail to Deenergize Because of an Organic C3 Insulating Material2020-06-24024 June 2020 Initial 10 CFR 21 Notification - Continuously Energized Eaton D26 Relays Could Fail to Deenergize Because of an Organic C3 Insulating Material M200087, GE-Hitachi Nuclear Energy Americas, LLC - 10 CFR Part 21.21(d)-Reportable Condition: Non-Conservative BWR/6 Side Entry Orifice (SEO) Loss Coefficients2020-06-24024 June 2020 GE-Hitachi Nuclear Energy Americas, LLC - 10 CFR Part 21.21(d)-Reportable Condition: Non-Conservative BWR/6 Side Entry Orifice (SEO) Loss Coefficients ML20176A4322020-06-24024 June 2020 GE-Hitachi Nuclear Energy Americas, LLC - 10 CFR Part 21.21(d)-Reportable Condition: Non-Conservative BWR/6 Side Entry Orifice (SEO) Loss Coefficients ML20049A0752020-02-11011 February 2020 C&D Technologies, Inc. -10 CFR Part 21 Evaluation Regarding Container Failure in KCR-07 Batteries ML19346H8732019-12-12012 December 2019 Westinghouse Electric Company - Notification of the Potential Existence of Defect Pursuant to 10 CFR Part 21 ML19121A1552019-04-15015 April 2019 Curtiss-Wright Nuclear Division, Enertech - 10 CFR Part 21 Notification for SF-1154 Hydraulic Fluid ML19072A0632019-03-0606 March 2019 10 CFR Part 21 Report Notification of a Defect with Target Rock Modulating Valve Positioner; Model 810000-X ML18225A1182018-07-27027 July 2018 Ametek Solidstate Controls - Notification of Potential Defect-10CFR Part 21 ML17340A3922017-11-28028 November 2017 10CFR21 Reporting of Defects and Non-Compliance - Engine Systems, Inc. Report No. 10CFR21-0119, Rev. 0 ML17333A3792017-11-21021 November 2017 Engine Systems, Inc. 10 CFR 21 Reportable Notification on a Power Supply (P/N 2938604) ML17194A8252017-07-11011 July 2017 Part 21 Report Re Wedge Pin Failure in Anchor Darling Motor Operated Double Disc Gate Valves with Threaded Stem to Upper Wedge Connections ML17142A3222017-05-15015 May 2017 Part 21 - Potential Defect in Grayboot Socket Contacts ML17090A3982017-03-27027 March 2017 Engine Systems, Inc. - Part 21 Report Regarding Identification of Failed Diode Surge Suppressor with Internal Manufacturing Defect ML17081A4532017-03-20020 March 2017 Part 21 - Plastic Jar Dedication Sampling ML17055C1772017-02-0909 February 2017 10 CFR 21 Evaluation Regarding Design Basis Calculation Error Using FL0-2D Software ML17026A4142017-01-20020 January 2017 C&D Technologies, Inc. - Part 21 - Plastic Jar Dedication Sampling ML17032A0802016-12-30030 December 2016 Engine Systems, Inc., 10CFR21 Reporting of Defects and Non-Compliance, Report No. 10CFR21-0114, Rev. 0 ML17006A0102016-12-29029 December 2016 Engine Systems, Inc. - Part 21 Issues Identified with the Enterprise Diesel Engine Subcover ML17006A0142016-12-13013 December 2016 Enercon - Part 21 - Notification-Design Basis Errors Using Flo-2D Software ML16342A9812016-11-23023 November 2016 Enercon - Part 21 Notification - Design Basis Errors Using FLO-2D Software ML16321A4512016-10-21021 October 2016 Part 21 Reporting of Defects and Noncompliance ML16251A0982016-09-0202 September 2016 Part 21 - Potential Failure of Battery System Connections ML16252A2742016-08-29029 August 2016 Azz/Nli - Part 21 Report - Potential Allen Bradley Timing Relay ML16243A4742016-08-26026 August 2016 Potential Part 21 Unqualified Component in Certain Allen Bradley Timing Relays ML16243A4722016-08-25025 August 2016 Part 21 Reporting of Defects and Noncompliance ML16238A1862016-08-15015 August 2016 Update - Report of Potential l0CFR Part 21, Allen Bradley Timing Relay Model 700RTC-NRC Event Number 51030, Accession Number ML15134A016 ML16232A6042016-08-15015 August 2016 Potentially Unqualified Component in Certain Allen Bradley Timing Relays ML16188A3742016-06-30030 June 2016 Part 21 - Inadequate Swaging and Adherence of Silicone O-Ring and Silicone PAD Soft Seat Main Disc and Pilot Disc Assemblies ML16174A3952016-06-21021 June 2016 Fisher Information Notice, (FIN) 2016-05 - Insufficient Valve Cage Hardfacing ML16188A3772016-06-21021 June 2016 Part 21 - Insufficient Valve Cage Hardfacing ML16154A2072016-05-26026 May 2016 Part 21, Azz/Nli Nuclear Logistics, Inc., Potentially Unqualified Component in Certain Allen Bradley Timing Relays Model 700RTC ML16139A8342016-05-10010 May 2016 Electroswitch - Transmittal of 10CFR Part 21 Reporting of Defects and Noncompliance Regarding Vendor Inspection of Electroswitch Corporation Docket No. 99900833 ML16111A4202016-04-0808 April 2016 Part 21 Report No. P21-04302015, Rev. 1 Regarding Potentially Unqualified Component in Certain Allen Bradley Timing Relays, Per Browns Ferry, Ginna, Millstone, Nine Mile Point, North Anna, Ft. Calhoun, Perry, River Bend, South Texas Project ML16098A4462016-03-22022 March 2016 United Controls International - Part 21 Report Regarding Defective Fuses, Per Perry Nuclear Power Plant ML15217A3032015-08-0404 August 2015 Notification of Part 21 - Report - Ferraz Shawmut/Mersen Fuses P/N: AJT25 and AJT60 ML15140A2182015-05-11011 May 2015 Part 21 Report Regarding Defect Identified 6 Inch Gear Operated Ball Valves (Part Number GBV-B2-60-0020 & GBV-B2-60-0112), Notification No. 15-1 ML15134A0162015-05-0101 May 2015 Part 21 Report Regarding Potentially Unqualified Component in Certain Allen Bradley Timing Relays ML15159A5682015-04-30030 April 2015 Report of Potential 10CFR Part 21, Allen Bradley Timing Relay Model 700RTC ML15103A4852015-04-0707 April 2015 Itt Engineered Valves - 2nd Interim Report to the NRC of 10 CFR 21 Event 50285, Reported by Itt 07/18/14 Concerning M I Diaphragms, Customer Testing ML15103A2442015-04-0606 April 2015 Part 21 Report - Deviation of Hk Circuit Breaker Close Latch Spring 2023-08-03
[Table view] Category:Letter
MONTHYEARML24032A0252024-02-0505 February 2024 NRC Initial Test Program and Operational Programs Integrated Inspection Report 05200026-2023009 ML24010A0712024-01-31031 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (Security Notifications, Reports and Recordkeeping and Suspicious Activity Reporting) ML24031A6102024-01-31031 January 2024 Cyber Security Inspection Report 05200026/2024401 - Public ML24029A0592024-01-30030 January 2024 Request for Withholding Information from Public Disclosure Responses to NRC Request for Additional Information for Refueling Outage 1R24 Steam Generator Tube Inspection Report Enclosure 2, GAE-NRCD-RF-LR-000002 P-Attachment, Rev. 0 ML24016A1132024-01-30030 January 2024 Correction of Unit 1 Amendment Nos. 96 and 190 and Unit 2 Amendment Nos. 74 and 173 Adoption of Standard Technical Specifications Westinghouse Plants IR 05000440/20230042024-01-30030 January 2024 Integrated Inspection Report 05000440/2023004 NL-24-0031, Inservice Inspection Program Owner'S Activity Report (OAR-1) for Outage 2R232024-01-29029 January 2024 Inservice Inspection Program Owner'S Activity Report (OAR-1) for Outage 2R23 IR 05000424/20244032024-01-26026 January 2024 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000424/2024403; 05000425/2024403 L-23-207, License Amendment Request (LAR) for Adoption of TSTF-264-A Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs2024-01-24024 January 2024 License Amendment Request (LAR) for Adoption of TSTF-264-A Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs L-24-017, 30-Day Voluntary Report in Accordance with Industry Groundwater Protection Initiative2024-01-24024 January 2024 30-Day Voluntary Report in Accordance with Industry Groundwater Protection Initiative NL-24-0020, Plan, Unit 1 Responses to NRC Request for Additional Information for Refueling Outage 1R24 Steam Generator Tube Inspection Report2024-01-22022 January 2024 Plan, Unit 1 Responses to NRC Request for Additional Information for Refueling Outage 1R24 Steam Generator Tube Inspection Report ML23279A0042024-01-17017 January 2024 Amendment No. 194 to Remove Combined License Appendix C ML23347A2092024-01-17017 January 2024 Voluntary Requests for Data, Information, And/Or Observation ML23341A2042024-01-12012 January 2024 Request for Additional Information Exemption Requests for Physical Barriers (EPID L-2023-LLE-0018 & L-2023-LLE-0021) NL-23-0926, Correction of Technical Specification Typographical Error2024-01-12012 January 2024 Correction of Technical Specification Typographical Error IR 05000440/20234022024-01-10010 January 2024 Cyber Security Inspection Report 05000440/2023402 ML24003A8032024-01-0303 January 2024 Notification of NRC Fire Protection Team Inspection Request for Information ML23345A1312024-01-0303 January 2024 Withholding Letter - SNC Fleet - Physical Barriers Exemption (L-2023-LLE-0018 and L-2023-LLE-0021) ML23317A2072023-12-22022 December 2023 Issuance of Amendments 223 and 206 Regarding Revision to Technical Specifications to Adopt TSTF-339-A, Relocate Technical Specification Parameters to the COLR Consistent with WCAP-1448 ML23321A0472023-12-20020 December 2023 Letter to Rod L. Penfield - Perry Nuclear Power Plant, Unit 1 - License Renewal Regulatory Audit Regarding the Environmental Review of the License Renewal Application ML23335A1222023-12-19019 December 2023 Safety Evaluation Regarding Implementation of Mitigating Strategies Related to Order EA-12-049 (EPID L-2023-LRQ-0002) - Letter ML23353A1702023-12-19019 December 2023 LAR-22-002, TS 3.8.3 Inverters Operating Completion Time Extension Letter L-23-171, CFR 50.55a Request Number VR-9. Revision 0, Feedwater Check Valve Exercising Test Frequency2023-12-0808 December 2023 CFR 50.55a Request Number VR-9. Revision 0, Feedwater Check Valve Exercising Test Frequency ML23310A2922023-12-0707 December 2023 Issuance of Amendment for Exception to Regulatory Guide 1.163, LAR 23 007 ML23339A1812023-12-0707 December 2023 Correction Letter Regarding License Amendment Request: More Restrictive Action for Technical Specification 3.1.9 ML23338A2182023-12-0606 December 2023 Project Manager Reassignment L-23-244, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-0606 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation NL-23-0878, Request for Exemption from Security Event Notification Implementation2023-11-29029 November 2023 Request for Exemption from Security Event Notification Implementation ML23289A1632023-11-28028 November 2023 Letter and Amendment 195 and 192 LAR-23-006R1 TS 3.1.9 More Restrictive Action IR 05000440/20230112023-11-28028 November 2023 Biennial Problem Identification and Resolution Inspection Report 05000440/2023011 IR 05000440/20234032023-11-27027 November 2023 Security Baseline Inspection Report 05000440/2023403 ML23292A2972023-11-17017 November 2023 Table of Contents LAR (L-2023-LLA-0111) NL-23-0827, Response to Requests for Additional Information for a License Amendment Request and a Proposed Alternative Related to TS 3.4.142023-11-17017 November 2023 Response to Requests for Additional Information for a License Amendment Request and a Proposed Alternative Related to TS 3.4.14 ML23312A3502023-11-14014 November 2023 Integrated Inspection Report 05200026/2023003 ML23318A4582023-11-14014 November 2023 Integrated Inspection Report 05200025/2023003 L-23-238, Mid-Cycle Revision to the Core Operating Limits Report for Operating Cycle 202023-11-10010 November 2023 Mid-Cycle Revision to the Core Operating Limits Report for Operating Cycle 20 ML23306A3552023-11-0808 November 2023 NRC Initial Test Program and Operational Programs Integrated Inspection Report 052000/262023008 ML23268A0572023-11-0707 November 2023 Issuance of Amendments 194 & 191 Request for License Amendment Relocation of Technical Specification 3.7.9, Spent Fuel Pool Makeup Water Sources (LAR-23-003) IR 05000424/20234022023-11-0606 November 2023 Security Baseline Inspection Report 05000424/2023402 and 05000425/2023402 IR 05000424/20230032023-10-27027 October 2023 Integrated Inspection Report 05000424/2023003 and 05000425/2023003 L-23-052, Submittal of the Updated Safety Analysis Report, Revision 232023-10-27027 October 2023 Submittal of the Updated Safety Analysis Report, Revision 23 ML23292A2472023-10-19019 October 2023 Fws to NRC, Perry Nuclear Plant, Unit 1, License Renewal List of Threatened and Endangered Species That May Occur in Your Proposed Project Location or May Be Affected ML23292A2482023-10-19019 October 2023 Fws to NRC, Federal Agency Coordination Under ESA Section 7 for Perry Nuclear Plant, Unit 1, License Renewal, and Concurrence with Not Likely to Adversely Affect Determination for Northern Long-eared Bat ML23291A1512023-10-18018 October 2023 Information Request for the Cyber Security Baseline Inspection, Notification to Perform Inspection 0520026/2024401 2024-02-05
[Table view] |
Text
ENGINE SYSTEMS, INC.
175 Freight Road Telephone: 252/977-2720 Rocky Mount, NC 27804 Fax: 252/446-1134 December 30, 2016 U.S. Nuclear Regulatory Commission Document Control Desk Washington , DC 20555-0001
Subject:
10CFR21 Reporting of Defects and Non-Compliance -
Engine Systems, Inc. Report No. 10CFR21-0114, Rev. 0 Subcover Assembly, P/N 1A-7846
Dear Sir:
The enclosed report addresses a reportable notification of an Enterprise emergency diesel generator subcover assembl , P/N 1A-7846 ..
A copy of the report has been mailed to our affected nuclear customers.
Please sign below, acknowledging receipt of this report, and return a copy to the attention of Document Control at the address above (or, fax to number 252/446-1134) within 10 working days after receipt.
Yours very truly, ENGINE SYSTEMS , INC.
Susan Woolard Document Control Please let us know if ANY of your mailing information changes - name of recipient, name of company/facility, address, etc. Mark the changes on this acknowledgment form and send to us by mail or FAX to the number above.
RECEIVED:---------
93 DATE:
Quality Performance With Pride
Report No. 10CFR21-0114 Record of Revisions Page: 1 of 1 REV DATE PAGE DESCRIPTION 0 12/28/16 Initial issue.
Report No. 10CFR21-0114 Revision : 0 Date: 12/28/16 Page: 1 of 3 COMPONENT:
Subcover assembly, P/N 1A-7846.
SUMMARY
Engine Systems Inc. (ESI) began a 10CFR21 evaluation on November 18, 2016 upon notification of an issue with a subcover assembly at Perry Nuclear Plant. Attempts to install the subcover on their Enterprise diesel engine revealed two issues that prevented successful installation . First, one of the bolt holes was not fully machined through the entire depth of the subcover. Though the bolt could be inserted into the top of its corresponding hole, it would not pass completely through. The second issue was an interference between the rocker arm shaft and its mating pedestal. It was found that incomplete machining of the pedestal prevented the shaft from sitting flat on the pedestal.
The evaluation was concluded on 12/21 /16 and it was determined that this issue is a reportable defect as defined by 10CFR21. The figures and photos below and on the following page provide visual detail of the deficiencies.
Item #2 : Location of incomplete machining of pedestal Item #1 : Location of inadequately drilled bolt hole Figure 1: Outline Drawing of Subcover
Report No. 10CFR21 -011 4 Revision : 0 Date : 12/28/16 Page : 2 of 3 Photo 1: Visual Depiction of Inadequately Photo 2: Attempted Bolt Install Drilled Bolt Hole Item #2:
CC.TAlL 'Y' Correct Machining (note radius)
Photo 3: Actual Machining Figure 2: Ideal Pedestal Machining
Report No. 10CFR21-0114 Revision : 0 Date: 12/28/16 Page : 3 of 3 DISCUSSION:
The subcover is a device that is fastened to the top of the cylinder head and provides support for the rocker arms and rocker shafts and encloses the valve stem area. There is one subcover per cylinder head and thus for a model OSRV-16-4 Enterprise eng ine there are 16 subcovers. Failure of a subcover would impact the ability of either of the corresponding rocker arms to provide the mechanical force to actuate the intake and exhaust valves. Without valve actuation, that particular power assembly would be unable to generate power which would reduce the output of the emergency diesel generator (EOG).
Failure of the EOG to produce its nameplate rated power could prevent the safe shutdown of the nuclear power plant during an emergency situation.
The issue regarding the inadequately drilled bolt hole would be detected during installation since it would prevent the bolt from passi ng through the hole. Therefore , it is determined this issue would have no impact on operability since the cover could not be installed with an incompletely drilled bolt hole.
With regard to the incompletely machined pedestal , there is the potential that a customer could install the rocker arm shaft without detecting this issue. In this situation, the shaft will partially fit on the pedestal and the bolt will thead into subcover; however, the shaft will not seat fully on the pedestal.
This prevents full contact with the pedestal and inhibits adequate preload throughout the bolted joint.
If a customer were to install the rocker arm shaft (with mating rocker arms, pushrods, etc) onto the engine without realizing this issue, operability and durability of the engine would be compromised.
This could present a substantial safety hazard .
AFFECTED USERS AND SHIPMENTS:
All of the subcovers listed below are subject to the pedestal machining discrepancy and may subject to the inadequately drilled bolt hole.
Quantity ESI Certification ESI Sales Order Order Date Customer Customer PO Shiooed Date 45307431 1/30/2013 (qty 1) 8001930 12/ 19/2011 First Energy - Perry 4 (AFW#3168) 7/27/2013 (qty 3) 3006881 (qty 14) 7/27/2013 (qty 14) 2/4/2010 Korea - Yonggwang Y090528171 15 8001963 (qty 1) 10/18/2013 (atv 1) 3009694 2/23/2012 Korea - Yonggwang NY G 1-02 MOOO 7-550 2 7/27/2013 7/27/2013 (qty 5) 3009847 4/5/2012 First Energy - Perry 45389292 8 9/27/2013 (qty 3) 3009695 2/23/2012 Korea - Yonggwang Y050089 101 2 10/18/2013 3015101 12/29/2015 Georgia Power - Vogtle SNG10122963 2 4/21 /2016 CORRECTIVE ACTIONS:
Customers may elect to perform corrective machining to restore the subcover to its design dimensions.
Otherwise, return the affected subcovers to ESI for inspection and rework. If customer rework is desired , perform the following :
a) Inspect for the bolt hole (item #1 ). If rework is necessary, drill through to a diameter of 13/16".
b) For the incomplete machining of the rocker arm pedestal (item #2), first remove the installed dowel which has 0.000" to 0.001 " clearance . Then machine a 2" radius relief at the affected area. All other dimensions such as pedestal height shall remain unchanged.
The root cause analysis determined the cause to be machining errors that were not detected during ESl's dedication activities. As subcovers are returned, they will be re-machined at the vendor's facility, inspected by ESI , and returned to customers within 60 days of receipt. ESI will also incorporate revisions to the dedication report prior to the supply of any new or reworked subcovers to further clarify the inspection of these features during the dedication process, thereby preventing reoccurrence.