#REDIRECT [[IR 05000387/2022404]]
{{Adams
| number = ML22146A102
| issue date = 05/26/2022
| title = Information Request for the Cyber Security Baseline Inspection, Notification to Perform Inspection 05000387/2022404 and 05000388/2022404
| author name = Dentel G
| author affiliation = NRC/RGN-I/DORS
| addressee name = Berryman B
| addressee affiliation = Susquehanna Nuclear, LLC
| docket = 05000387, 05000388
| license number = NPF-014, NPF-022
| contact person = Dentel G
| document report number = IR 2022404
| document type = Letter, Request for Additional Information (RAI)
| page count = 8
}}
See also: [[see also::IR 05000387/2022404]]
 
=Text=
{{#Wiki_filter:May 26, 2022
Mr. Brad Berryman
Senior Vice President and Chief Nuclear Officer
Susquehanna Nuclear, LLC
769 Salem Blvd., NUCSB3
Berwick, PA 18603
SUBJECT:        SUSQUEHANNA STEAM ELECTRIC STATION, UNITS 1 AND 2 -
                INFORMATION REQUEST FOR THE CYBER SECURITY BASELINE
                INSPECTION, NOTIFICATION TO PERFORM INSPECTION 05000387/2022404
                AND 05000388/2022404
Dear Mr. Berryman:
On October 3, 2022, the U.S. Nuclear Regulatory Commission (NRC) will begin a baseline
inspection in accordance with Inspection Procedure (IP) 71130.10, Cyber Security, dated
December 14, 2021, at Susquehanna Steam Electric Station, Units 1 and 2. The inspection will
be performed to evaluate and verify your ability to meet the requirements of the NRCs Cyber
Security Rule, Title 10 of the Code of Federal Regulations (10 CFR) Part 73, Section 54,
Protection of Digital Computer and Communication Systems and Networks. The onsite portion
of the inspection will take place October 3-7, 2022.
Experience has shown that baseline inspections are extremely resource intensive, both for the
NRC inspectors and the licensee staff. In order to minimize the inspection impact on the site
and to ensure a productive inspection for both parties, we have enclosed a request for
documents needed for the inspection. These documents have been divided into four groups.
The first group specifies information necessary to assist the inspection team in choosing the
focus areas (i.e., sample set) to be inspected by IP 71130.10. This information should be
made available either on an online repository (preferred) or digital media (CD/DVD) no later
than June 24, 2022. The inspection team will review this information and, by July 29, 2022, will
request the specific items that should be provided for review.
The second group of additional requested documents will assist the inspection team in the
evaluation of the critical systems and critical digital assets (CSs/CDAs), defensive architecture,
and the areas of the licensees Cyber Security Program selected for the cyber security
inspection. This information will be requested for review in the regional office prior to the
inspection by August 26, 2022, as identified above.
The third group of requested documents consists of those items that the inspection team will
review, or need access to, during the inspection. Please have this information available by the
first day of the onsite inspection, October 3, 2022.
 
B. Berryman                                        2
The fourth group of information is necessary to aid the inspection team in tracking issues
identified as a result of the inspection. It is requested that this information be provided to the
lead inspector as the information is generated during the inspection. It is important that all of
these documents are up to date and complete in order to minimize the number of additional
documents requested during the preparation and/or the onsite portions of the inspection.
The lead inspector for this inspection is Louis Dumont. We understand that our regulatory
contact for this inspection is Katie Brown of your organization. If there are any questions about
the inspection or the material requested, please contact the lead inspector at 610-337-5183 or
via e-mail at louis.dumont@nrc.gov.
This letter does not contain new or amended information collection requirements subject to the
Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection
requirements were approved by the Office of Management and Budget, control number 3150-
0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a
request for information or an information collection requirement unless the requesting document
displays a currently valid Office of Management and Budget control number.
In accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding,
of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available
electronically for public inspection in the NRCs Public Document Room or from the Publicly
Available Records (PARS) component of the NRC's Agencywide Documents Access and
Management System (ADAMS). ADAMS is accessible from the NRC Web site at
http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
                                                Sincerely,
                                                                    Digitally signed by Glenn T.
                                                Glenn T. Dentel Dentel
                                                                    Date: 2022.05.26 13:54:25
                                                                    -04'00'
                                                Glenn T. Dentel, Chief
                                                Engineering Branch 2
                                                Division of Operating Reactor Safety
Docket Nos. 05000387 and 05000388
License Nos. NPF-14 and NPF-22
Enclosure:
Cyber Security Inspection Document Request
cc: Distribution via ListServ
 
 
ML22146A102
                                                Non-Sensitive                            Publicly Available
        SUNSI Review
                                                Sensitive                                Non-Publicly Available
  OFFICE            RI/DORS              RI/DORS
  NAME              LDumont              GDentel
  DATE              5/26/22              5/25/22
                                             
    SUSQUEHANNA STEAM ELECTRIC STATION, UNITS 1 AND 2 CYBER SECURITY
                            INSPECTION DOCUMENT REQUEST
Inspection Report:            05000387/2022404 AND 05000388/2022404
Inspection Dates:              October 3-7, 2022
Inspection Procedure:          IP 71130.10, Cyber Security, dated December 14, 2021
                              (ADAMS Accession Number: ML21271A106)
Reference:                    Guidance Document for Development of the Request for
                              Information (RFI) and Notification Letter for IP 71130.10, Cyber
                              Security (ML21330A088)
NRC Inspectors:                Louis Dumont, Lead                      Manan Patel
                              610-337-5183                            610-337-5304
                              Louis.Dumont@nrc.gov                    Manan.Patel@nrc.gov
                              Tim Hennessey
                              610-337-5135
                              Timothy.Hennessey@nrc.gov
NRC Contractors:              Casey Priester
                              Casey.Priester@nrc.gov
I.    Information Requested for In-Office Preparation
      The initial request for information (i.e., first RFI) concentrates on providing the inspection
      team with the general information necessary to select appropriate components and
      Cyber Security Program (CSP) elements to develop a site-specific inspection plan.
      The first RFI is used to identify the list of critical systems and critical digital assets
      (CSs/CDAs) plus operational and management (O&M) security control portions of the
      CSP to be chosen as the sample set required to be inspected by the cyber security
      inspection procedure. The first RFIs requested information is specified below in Table
      RFI #1. The Table RFI #1 information is requested to be provided to the regional office
      by June 24, 2022, or sooner, to facilitate the selection of the specific items that will be
      reviewed during the onsite inspection weeks.
      The inspection team will examine the returned documentation from the first RFI and
      identify/select specific systems and equipment (e.g., CSs/CDAs) to provide a more
      focused follow-up request to develop the second RFI. The inspection team will submit
      the specific systems and equipment list to your staff by July 29, 2022, which will identify
      the specific systems and equipment that will be utilized to evaluate the CSs/CDAs,
      defensive architecture, and the areas of the licensees CSP selected for the cyber
      security inspection. We request that the additional information provided from the second
      RFI be made available to the regional office prior to the inspection by August 26, 2022.
                                                                                            Enclosure
 
SUSQUEHANNA STEAM ELECTRIC STATION, UNITS 1 AND 2 CYBER SECURITY
                            INSPECTION DOCUMENT REQUEST
  The required Table RFI #1 information shall be provided on an online repository
  (preferred) or digital media (CD/DVD) to the lead inspector by June 24, 2022. The
  preferred file format for all lists is a searchable Excel spreadsheet file. The information
  should be indexed and hyper-linked to facilitate ease of use. If you have any questions
  regarding this information, please call the inspection team leader as soon as possible.
                                                Table RFI #1
  Section 3,
  Paragraph Number/Title:                                                              IP Ref
        A list of all Identified Critical Systems and Critical Digital Assets -
        highlight/note any additions, deletions or reclassifications due to new
    1                                                                                Overall
        guidance from white papers, changes to NEI 10-04, 13-10, etc. since the last
        cyber security inspection.
    2 A list of EP and Security onsite and offsite digital communication systems      Overall
        Network Topology Diagrams to include information and data flow for
    3                                                                                Overall
        critical systems in levels 2, 3 and 4 (If available)
    4 Ongoing Monitoring and Assessment program documentation                        03.01(a)
    5 The most recent effectiveness analysis of the Cyber Security Program            03.01(b)
    6 Vulnerability screening/assessment and scan program documentation              03.01(c)
        Cyber Security Incident response documentation, including incident
        detection, response, and recovery documentation as well as contingency        03.02(a)
    7 plan development and implementation, including any program                        and
        documentation that requires testing of security boundary device              03.04(b)
        functionality
    8 Device Access and Key Control documentation                                    03.02(c)
    9 Password/Authenticator documentation                                            03.02(c)
    10 User Account/Credential documentation                                          03.02(d)
        Portable Media and Mobile Device control documentation, including kiosk
    11                                                                                03.02(e)
        security control assessment/documentation
        Design change/modification program documentation and a list of all design
        changes that affected CDAs that have actually been installed and completed
    12                                                                                03.03(a)
        since the last cyber security inspection, including either a summary of the
        design change or the 50.59 documentation of the change.
                                                                                      03.03(a),
        Supply Chain Management documentation including any security impact
    13                                                                                (b) and
        analysis for new acquisitions
                                                                                          (c)
        Configuration Management documentation including any security impact          03.03(a)
    14
        analysis performed due to configuration changes since the last inspection    and (b)
        Cyber Security Plan and any 50.54(p) analysis to support changes to the
    15                                                                                03.04(a)
        plan since the last inspection
    16  Cyber Security Metrics tracked (if applicable)                              03.06 (b)
        Provide documentation describing any cyber security changes to the access
    17                                                                                Overall
        authorization program since the last cyber security inspection.
        Provide a list of all procedures and policies provided to the NRC with their
    18                                                                                Overall
        descriptive name and associated number (if available)
    19  Performance testing report (if applicable)                                  03.06 (a)
                                                  2
 
    SUSQUEHANNA STEAM ELECTRIC STATION, UNITS 1 AND 2 CYBER SECURITY
                              INSPECTION DOCUMENT REQUEST
      In addition to the above information please provide the following:
          (1) Electronic copy of the UFSAR and technical specifications.
          (2) Name(s) and phone numbers for the regulatory and technical contacts.
          (3) Current management and engineering organizational charts.
      Based on this information, the inspection team will identify and select specific systems
      and equipment (e.g., CSs/CDAs) from the information requested by Table RFI #1 and
      submit a list of specific systems and equipment to your staff by July 29, 2022, for the
      second RFI (i.e., RFI #2).
II.  Additional Information Requested to be Available Prior to Inspection.
      As stated in Section I above, the inspection team will examine the returned
      documentation requested from Table RFI #1 and submit the list of specific systems and
      equipment to your staff by July 29, 2022, for the second RFI (i.e., RFI #2). The second
      RFI will request additional information required to evaluate the CSs/CDAs, defensive
      architecture, and the areas of the licensees CSP selected for the cyber security
      inspection. The additional information requested for the specific systems and equipment
      is identified in Table RFI #2.
      The Table RFI #2 information shall be provided to the lead inspector by August 26,
      2022. The preferred file format for all lists is a searchable Excel spreadsheet. The
      information should be indexed and hyper-linked to facilitate ease of use. If you have any
      questions regarding this information, please call the inspection team leader as soon as
      possible.
                                                  Table RFI #2
      Section 3,
      Paragraph Number/Title:                                                          Items
              For the system(s) chosen for inspection provide:
          1 Ongoing Monitoring and Assessment activity performed on the system(s)      03.01(a)
          2 All Security Control Assessments for the selected system(s)                03.01(a)
              All vulnerability screenings/assessments associated with or scans
          3 performed on the selected system(s) since the last cyber security          03.01(c)
              inspection
              Documentation (including configuration files and rules sets) for Network-
              based Intrusion Detection/Protection Systems (NIDS/NIPS), Host-based
          4                                                                            03.02(b)
              Intrusion Detection Systems (HIDS), and Security Information and Event
              Management (SIEM) systems for system(s) chosen for inspection)
              Documentation (including configuration files and rule sets) for intra-
          5 security level firewalls and boundary devices used to protect the selected  03.02(c)
              system(s)
              Copies of all periodic reviews of the access authorization list for the
          6                                                                            03.02(d)
              selected systems since the last inspection
          7 Baseline configuration data sheets for the selected CDAs                    03.03(a)
                                                    3
 
    SUSQUEHANNA STEAM ELECTRIC STATION, UNITS 1 AND 2 CYBER SECURITY
                                INSPECTION DOCUMENT REQUEST
              Documentation on any changes, including Security Impact Analyses,
          8                                                                                03.03(b)
              performed on the selected system(s) since the last inspection
              Copies of the purchase order documentation for any new equipment
          9                                                                                03.03(c)
              purchased for the selected systems since the last inspection
              Copies of any reports/assessment for cyber security drills performed since  03.02(a)
        10
              the last inspection.                                                        03.04(b)
              Copy of the individual recovery plan(s) for the selected system(s) including 03.02(a)
        11
              documentation of the results the last time the backups were executed.        03.04(b)
              Corrective actions taken as a result of cyber security incidents/issues to
        12    include previous NRC violations and Licensee Identified Violations since      03.05
              the last cyber security inspection
              For the selected systems, provide design change/modification packages
        13                                                                                03.03(a)
              including completed work orders since the last cyber security inspection
III.  Information Requested to be Available on First Day of Inspection
      For the specific systems and equipment identified in Section II above, provide the
      following RFI (i.e., Table 1ST Week Onsite) to the team by October 3, 2022, the first day
      of the inspection.
                                              Table 1ST Week Onsite
        Section 3,
        Paragraph Number/Title:                                                              Items
              Any cyber security event reports submitted in accordance with 10 CFR
          1                                                                                03.04(b)
              73.77 since the last cyber security inspection
              Updated Copies of corrective actions taken as a result of cyber security
              incidents/issues, to include previous NRC violations and Licensee
          2                                                                                03.05
              Identified Violations since the last cyber security inspection, as well as
              vulnerability-related corrective actions
      In addition to the above information please provide the following:
            (1) Copies of the following documents do not need to be solely available to the
                inspection team as long as the inspectors have easy and unrestrained access
                to them.
                a. UFSAR, if not previously provided;
                b. Original SER and Supplements;
                c. Quality Assurance Plan;
                d. Technical specifications, if not previously provided; and
                e. Latest IPE/PRA Report.
                                                      4
 
    SUSQUEHANNA STEAM ELECTRIC STATION, UNITS 1 AND 2 CYBER SECURITY
                              INSPECTION DOCUMENT REQUEST
            (2) Vendor Manuals, Assessment and Corrective Actions:
                a. The most recent Cyber Security Quality Assurance (QA) audit and/or
                    self-assessment; and
                b. Corrective action documents (e.g., condition reports, including status of
                    corrective actions) generated as a result of the most recent Cyber Security
                    QA audit and/or self-assessment.
IV.    Information Requested To Be Provided Throughout the Inspection
            (1) Copies of any corrective action documents generated as a result of the
                inspection teams questions or queries during the inspection.
            (2) Copies of the list of questions submitted by the inspection team members and
                the status/resolution of the information requested (provided daily during the
                inspection to each inspection team member).
If you have any questions regarding the information requested, please contact the inspection
team leader.
                                                  5
}}

Latest revision as of 14:22, 30 December 2022

Information Request for the Cyber Security Baseline Inspection, Notification to Perform Inspection 05000387/2022404 and 05000388/2022404
ML22146A102
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 05/26/2022
From: Glenn Dentel
NRC/RGN-I/DORS
To: Berryman B
Susquehanna
Dentel G
References
IR 2022404
Download: ML22146A102 (8)


See also: IR 05000387/2022404

Text

May 26, 2022

Mr. Brad Berryman

Senior Vice President and Chief Nuclear Officer

Susquehanna Nuclear, LLC

769 Salem Blvd., NUCSB3

Berwick, PA 18603

SUBJECT: SUSQUEHANNA STEAM ELECTRIC STATION, UNITS 1 AND 2 -

INFORMATION REQUEST FOR THE CYBER SECURITY BASELINE

INSPECTION, NOTIFICATION TO PERFORM INSPECTION 05000387/2022404

AND 05000388/2022404

Dear Mr. Berryman:

On October 3, 2022, the U.S. Nuclear Regulatory Commission (NRC) will begin a baseline

inspection in accordance with Inspection Procedure (IP) 71130.10, Cyber Security, dated

December 14, 2021, at Susquehanna Steam Electric Station, Units 1 and 2. The inspection will

be performed to evaluate and verify your ability to meet the requirements of the NRCs Cyber

Security Rule, Title 10 of the Code of Federal Regulations (10 CFR) Part 73, Section 54,

Protection of Digital Computer and Communication Systems and Networks. The onsite portion

of the inspection will take place October 3-7, 2022.

Experience has shown that baseline inspections are extremely resource intensive, both for the

NRC inspectors and the licensee staff. In order to minimize the inspection impact on the site

and to ensure a productive inspection for both parties, we have enclosed a request for

documents needed for the inspection. These documents have been divided into four groups.

The first group specifies information necessary to assist the inspection team in choosing the

focus areas (i.e., sample set) to be inspected by IP 71130.10. This information should be

made available either on an online repository (preferred) or digital media (CD/DVD) no later

than June 24, 2022. The inspection team will review this information and, by July 29, 2022, will

request the specific items that should be provided for review.

The second group of additional requested documents will assist the inspection team in the

evaluation of the critical systems and critical digital assets (CSs/CDAs), defensive architecture,

and the areas of the licensees Cyber Security Program selected for the cyber security

inspection. This information will be requested for review in the regional office prior to the

inspection by August 26, 2022, as identified above.

The third group of requested documents consists of those items that the inspection team will

review, or need access to, during the inspection. Please have this information available by the

first day of the onsite inspection, October 3, 2022.

B. Berryman 2

The fourth group of information is necessary to aid the inspection team in tracking issues

identified as a result of the inspection. It is requested that this information be provided to the

lead inspector as the information is generated during the inspection. It is important that all of

these documents are up to date and complete in order to minimize the number of additional

documents requested during the preparation and/or the onsite portions of the inspection.

The lead inspector for this inspection is Louis Dumont. We understand that our regulatory

contact for this inspection is Katie Brown of your organization. If there are any questions about

the inspection or the material requested, please contact the lead inspector at 610-337-5183 or

via e-mail at louis.dumont@nrc.gov.

This letter does not contain new or amended information collection requirements subject to the

Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection

requirements were approved by the Office of Management and Budget, control number 3150-

0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a

request for information or an information collection requirement unless the requesting document

displays a currently valid Office of Management and Budget control number.

In accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding,

of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available

electronically for public inspection in the NRCs Public Document Room or from the Publicly

Available Records (PARS) component of the NRC's Agencywide Documents Access and

Management System (ADAMS). ADAMS is accessible from the NRC Web site at

http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

Digitally signed by Glenn T.

Glenn T. Dentel Dentel

Date: 2022.05.26 13:54:25

-04'00'

Glenn T. Dentel, Chief

Engineering Branch 2

Division of Operating Reactor Safety

Docket Nos. 05000387 and 05000388

License Nos. NPF-14 and NPF-22

Enclosure:

Cyber Security Inspection Document Request

cc: Distribution via ListServ

ML22146A102

Non-Sensitive Publicly Available

SUNSI Review

Sensitive Non-Publicly Available

OFFICE RI/DORS RI/DORS

NAME LDumont GDentel

DATE 5/26/22 5/25/22

SUSQUEHANNA STEAM ELECTRIC STATION, UNITS 1 AND 2 CYBER SECURITY

INSPECTION DOCUMENT REQUEST

Inspection Report: 05000387/2022404 AND 05000388/2022404

Inspection Dates: October 3-7, 2022

Inspection Procedure: IP 71130.10, Cyber Security, dated December 14, 2021

(ADAMS Accession Number: ML21271A106)

Reference: Guidance Document for Development of the Request for

Information (RFI) and Notification Letter for IP 71130.10, Cyber

Security (ML21330A088)

NRC Inspectors: Louis Dumont, Lead Manan Patel

610-337-5183 610-337-5304

Louis.Dumont@nrc.gov Manan.Patel@nrc.gov

Tim Hennessey

610-337-5135

Timothy.Hennessey@nrc.gov

NRC Contractors: Casey Priester

Casey.Priester@nrc.gov

I. Information Requested for In-Office Preparation

The initial request for information (i.e., first RFI) concentrates on providing the inspection

team with the general information necessary to select appropriate components and

Cyber Security Program (CSP) elements to develop a site-specific inspection plan.

The first RFI is used to identify the list of critical systems and critical digital assets

(CSs/CDAs) plus operational and management (O&M) security control portions of the

CSP to be chosen as the sample set required to be inspected by the cyber security

inspection procedure. The first RFIs requested information is specified below in Table

RFI #1. The Table RFI #1 information is requested to be provided to the regional office

by June 24, 2022, or sooner, to facilitate the selection of the specific items that will be

reviewed during the onsite inspection weeks.

The inspection team will examine the returned documentation from the first RFI and

identify/select specific systems and equipment (e.g., CSs/CDAs) to provide a more

focused follow-up request to develop the second RFI. The inspection team will submit

the specific systems and equipment list to your staff by July 29, 2022, which will identify

the specific systems and equipment that will be utilized to evaluate the CSs/CDAs,

defensive architecture, and the areas of the licensees CSP selected for the cyber

security inspection. We request that the additional information provided from the second

RFI be made available to the regional office prior to the inspection by August 26, 2022.

Enclosure

SUSQUEHANNA STEAM ELECTRIC STATION, UNITS 1 AND 2 CYBER SECURITY

INSPECTION DOCUMENT REQUEST

The required Table RFI #1 information shall be provided on an online repository

(preferred) or digital media (CD/DVD) to the lead inspector by June 24, 2022. The

preferred file format for all lists is a searchable Excel spreadsheet file. The information

should be indexed and hyper-linked to facilitate ease of use. If you have any questions

regarding this information, please call the inspection team leader as soon as possible.

Table RFI #1

Section 3,

Paragraph Number/Title: IP Ref

A list of all Identified Critical Systems and Critical Digital Assets -

highlight/note any additions, deletions or reclassifications due to new

1 Overall

guidance from white papers, changes to NEI 10-04, 13-10, etc. since the last

cyber security inspection.

2 A list of EP and Security onsite and offsite digital communication systems Overall

Network Topology Diagrams to include information and data flow for

3 Overall

critical systems in levels 2, 3 and 4 (If available)

4 Ongoing Monitoring and Assessment program documentation 03.01(a)

5 The most recent effectiveness analysis of the Cyber Security Program 03.01(b)

6 Vulnerability screening/assessment and scan program documentation 03.01(c)

Cyber Security Incident response documentation, including incident

detection, response, and recovery documentation as well as contingency 03.02(a)

7 plan development and implementation, including any program and

documentation that requires testing of security boundary device 03.04(b)

functionality

8 Device Access and Key Control documentation 03.02(c)

9 Password/Authenticator documentation 03.02(c)

10 User Account/Credential documentation 03.02(d)

Portable Media and Mobile Device control documentation, including kiosk

11 03.02(e)

security control assessment/documentation

Design change/modification program documentation and a list of all design

changes that affected CDAs that have actually been installed and completed

12 03.03(a)

since the last cyber security inspection, including either a summary of the

design change or the 50.59 documentation of the change.

03.03(a),

Supply Chain Management documentation including any security impact

13 (b) and

analysis for new acquisitions

(c)

Configuration Management documentation including any security impact 03.03(a)

14

analysis performed due to configuration changes since the last inspection and (b)

Cyber Security Plan and any 50.54(p) analysis to support changes to the

15 03.04(a)

plan since the last inspection

16 Cyber Security Metrics tracked (if applicable) 03.06 (b)

Provide documentation describing any cyber security changes to the access

17 Overall

authorization program since the last cyber security inspection.

Provide a list of all procedures and policies provided to the NRC with their

18 Overall

descriptive name and associated number (if available)

19 Performance testing report (if applicable) 03.06 (a)

2

SUSQUEHANNA STEAM ELECTRIC STATION, UNITS 1 AND 2 CYBER SECURITY

INSPECTION DOCUMENT REQUEST

In addition to the above information please provide the following:

(1) Electronic copy of the UFSAR and technical specifications.

(2) Name(s) and phone numbers for the regulatory and technical contacts.

(3) Current management and engineering organizational charts.

Based on this information, the inspection team will identify and select specific systems

and equipment (e.g., CSs/CDAs) from the information requested by Table RFI #1 and

submit a list of specific systems and equipment to your staff by July 29, 2022, for the

second RFI (i.e., RFI #2).

II. Additional Information Requested to be Available Prior to Inspection.

As stated in Section I above, the inspection team will examine the returned

documentation requested from Table RFI #1 and submit the list of specific systems and

equipment to your staff by July 29, 2022, for the second RFI (i.e., RFI #2). The second

RFI will request additional information required to evaluate the CSs/CDAs, defensive

architecture, and the areas of the licensees CSP selected for the cyber security

inspection. The additional information requested for the specific systems and equipment

is identified in Table RFI #2.

The Table RFI #2 information shall be provided to the lead inspector by August 26,

2022. The preferred file format for all lists is a searchable Excel spreadsheet. The

information should be indexed and hyper-linked to facilitate ease of use. If you have any

questions regarding this information, please call the inspection team leader as soon as

possible.

Table RFI #2

Section 3,

Paragraph Number/Title: Items

For the system(s) chosen for inspection provide:

1 Ongoing Monitoring and Assessment activity performed on the system(s) 03.01(a)

2 All Security Control Assessments for the selected system(s) 03.01(a)

All vulnerability screenings/assessments associated with or scans

3 performed on the selected system(s) since the last cyber security 03.01(c)

inspection

Documentation (including configuration files and rules sets) for Network-

based Intrusion Detection/Protection Systems (NIDS/NIPS), Host-based

4 03.02(b)

Intrusion Detection Systems (HIDS), and Security Information and Event

Management (SIEM) systems for system(s) chosen for inspection)

Documentation (including configuration files and rule sets) for intra-

5 security level firewalls and boundary devices used to protect the selected 03.02(c)

system(s)

Copies of all periodic reviews of the access authorization list for the

6 03.02(d)

selected systems since the last inspection

7 Baseline configuration data sheets for the selected CDAs 03.03(a)

3

SUSQUEHANNA STEAM ELECTRIC STATION, UNITS 1 AND 2 CYBER SECURITY

INSPECTION DOCUMENT REQUEST

Documentation on any changes, including Security Impact Analyses,

8 03.03(b)

performed on the selected system(s) since the last inspection

Copies of the purchase order documentation for any new equipment

9 03.03(c)

purchased for the selected systems since the last inspection

Copies of any reports/assessment for cyber security drills performed since 03.02(a)

10

the last inspection. 03.04(b)

Copy of the individual recovery plan(s) for the selected system(s) including 03.02(a)

11

documentation of the results the last time the backups were executed. 03.04(b)

Corrective actions taken as a result of cyber security incidents/issues to

12 include previous NRC violations and Licensee Identified Violations since 03.05

the last cyber security inspection

For the selected systems, provide design change/modification packages

13 03.03(a)

including completed work orders since the last cyber security inspection

III. Information Requested to be Available on First Day of Inspection

For the specific systems and equipment identified in Section II above, provide the

following RFI (i.e., Table 1ST Week Onsite) to the team by October 3, 2022, the first day

of the inspection.

Table 1ST Week Onsite

Section 3,

Paragraph Number/Title: Items

Any cyber security event reports submitted in accordance with 10 CFR

1 03.04(b)

73.77 since the last cyber security inspection

Updated Copies of corrective actions taken as a result of cyber security

incidents/issues, to include previous NRC violations and Licensee

2 03.05

Identified Violations since the last cyber security inspection, as well as

vulnerability-related corrective actions

In addition to the above information please provide the following:

(1) Copies of the following documents do not need to be solely available to the

inspection team as long as the inspectors have easy and unrestrained access

to them.

a. UFSAR, if not previously provided;

b. Original SER and Supplements;

c. Quality Assurance Plan;

d. Technical specifications, if not previously provided; and

e. Latest IPE/PRA Report.

4

SUSQUEHANNA STEAM ELECTRIC STATION, UNITS 1 AND 2 CYBER SECURITY

INSPECTION DOCUMENT REQUEST

(2) Vendor Manuals, Assessment and Corrective Actions:

a. The most recent Cyber Security Quality Assurance (QA) audit and/or

self-assessment; and

b. Corrective action documents (e.g., condition reports, including status of

corrective actions) generated as a result of the most recent Cyber Security

QA audit and/or self-assessment.

IV. Information Requested To Be Provided Throughout the Inspection

(1) Copies of any corrective action documents generated as a result of the

inspection teams questions or queries during the inspection.

(2) Copies of the list of questions submitted by the inspection team members and

the status/resolution of the information requested (provided daily during the

inspection to each inspection team member).

If you have any questions regarding the information requested, please contact the inspection

team leader.

5