Latest revision as of 06:04, 16 September 2022
ML22068A231 | |
Person / Time | |
---|---|
Site: | Diablo Canyon |
Issue date: | 03/17/2022 |
From: | Vincent Gaddy NRC/RGN-IV/DORS |
To: | Gerfen P Pacific Gas & Electric Co |
References | |
IR 2022011 | |
Download: ML22068A231 (8) | |
See also: IR 05000275/2022011
Text
March 17, 2022
Ms. Paula A. Gerfen, Senior Vice President
and Chief Nuclear Officer
Pacific Gas and Electric Company
P.O. Box 56
Mail Code 104/6
Avila Beach, CA 93424
SUBJECT: DIABLO CANYON POWER PLANT, UNITS 1 AND 2 - NOTIFICATION OF
NUCLEAR REGULATORY COMMISSION DESIGN BASES ASSURANCE
INSPECTION (TEAM) 05000275/2022011 AND 05000323/2022011) AND INITIAL
REQUEST FOR INFORMATION
Dear Ms. Gerfen:
The purpose of this letter is to notify you that U.S. Nuclear Regulatory Commission (NRC) staff will
conduct a triennial baseline design bases assurance inspection at your Diablo Canyon Power Plant
Units 1 and 2 beginning on May 9, 2022. The inspection will be conducted in accordance with NRC
Inspection Procedure (IP) 71111.21M, Design Bases Assurance Inspection (Team), dated
December 8, 2016, by a team lead, two electrical engineering-focused inspectors, two mechanical
engineering -focused inspectors, and one operations-focused inspector.
The inspection will consist of an information gathering visit by the team lead, in-office
preparation, and two weeks of onsite inspection. The current inspection schedule is as follows:
- Onsite Information Gathering Visit: May 9-13, 2022.
- In-office Preparation Weeks: June 6-10, 2022, and June 20-24, 2022.
- Onsite Inspection Weeks: June 13-17, 2022, and June 27-July 1, 2022.
The purpose of the information gathering visit is to identify potential risk significant samples and
operator actions. Additionally, the team lead will request a tour of the plant and interviews with
operations and probabilistic safety assessment staff. During the onsite weeks, several days and
administration will be needed on the plant-referenced simulator to facilitate performance of
operator action-based scenarios and job performance measures. It has not yet been
determined if the inspection will be onsite or conducted remotely. If the inspection is performed
remotely, we are requesting that, as a minimum, actual on-site time be made available for 1-2
days to perform component and modification walkdowns. Simulator activities would have to be
performed on site. Additional information and documentation needed to support the inspection
will be identified during the inspection, including interviews with engineering managers,
engineers, and probabilistic safety assessment staff.
P. Gerfen 2
The objectives of this inspection are to gain reasonable assurance that, 1) risk
significant structures, systems, and components can adequately perform their design
basis function, 2) modifications affecting the design and licensing bases have been
adequately implemented, and 3) risk significant issues resulting from generic
communications (i.e., operating experience) have been adequately
addressed. Completion of this inspection procedure consists of a minimum sample size
of eight component and modification samples and one operating experience sample.
To minimize the impact the inspection has on the site and to ensure an efficient inspection,
we have enclosed a request for information needed for the inspection. It is important that
these requests are fulfilled as completely and accurately as possible to minimize any
additional requests during the preparation or onsite inspection weeks. The requests have
been divided into three groups.
- The first group lists information necessary for our initial inspection scoping
activities and sample selections. This information should be available to
the team lead no later than April 29, 2022. By the end of the information
gathering visit, the team lead will communicate the initial list of component,
modification, and operating experience samples.
- The second group of information requested includes those items needed to
support our in-office preparation activities. This set of documents should be
available no later than June 3, 2022. This information should be separated for
each sample, especially if provided electronically. Note that the team may
identify additional information needed to support the inspection during this week
and will communicate those requests as soon as practicable.
- The third group of information requested includes the additional documentation
identified during in-office preparation activities as well as other resource
requests necessary to support our onsite inspection activities. The additional
information or resources should be available throughout the week of onsite
inspection activities beginning on June 13, 2022.
All information requested are to be for the time period from the onsite inspection period back
to the last triennial design bases assurance inspection (team). If nothing addressing a
request was done in that time period, then the request applies to the last applicable
document. If a request does not apply for any sample, no response is necessary. Include all
attachments to the requests, especially corrective action program documents.
We have discussed the schedule for this inspection with your staff and understand that our
regulatory contact for this inspection will be Ms. Amanda Sorensen. If there are any
questions about this inspection or the documents requested, please contact the lead
inspector, Ronald Kopriva, by telephone at 817-200-1104 or by e-mail at
Ron.Kopriva@nrc.gov.
P. Gerfen 3
PAPERWORK REDUCTION ACT STATEMENT
This letter contains mandatory information collections that are subject to the Paperwork
Reduction Act of 1995 (44 U.S.C. 3501 et seq.). The Office of Management and Budget
(OMB) approved these information collections (approval number 3150-0011).
Send comments regarding this information collection to the Information Services Branch,
Office of the Chief Information Officer, Mail Stop: T6 A10M, U.S. Nuclear Regulatory
Commission, Washington, DC 20555-0001, or by e-mail to
Infocollects.Resource@nrc.gov, and to the Desk Officer, Office of Information and
Regulatory Affairs, NEOB-10202, (3150-0011) Office of Management and Budget,
Washington, DC 20503.
PUBLIC PROTECTION NOTIFICATION
The NRC may not conduct nor sponsor, and a person is not required to respond to, a request
for information or an information collection requirement unless the requesting document
displays a currently valid OMB control number.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be
made available electronically for public inspection in the NRC Public Document Room or from
the Publicly Available Records (PARS) component of NRCs document system
(ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-
rm/adams.html (the Public Electronic Reading Room).
Sincerely,
Vincent G. Digitally signed by
Vincent G. Gaddy
Gaddy Date: 2022.03.17 15:11:26
-05'00'
Vincent G. Gaddy, Chief
Engineering Branch 1
Division of Operating Reactor Safety
Docket Nos. 05000275 and 05000323
License Nos. DPR-80 and DPR-82
Enclosure:
Design Bases Assurance Inspection
(Team) Request for Information
cc w/ encl: Distribution via LISTSERV
SUNSI Review: ADAMS: Non-Publicly Available Non-Sensitive Keyword:
By: RAK Yes No Publicly Available Sensitive NRC-002
OFFICE DORS:EB1 DORS:EB1
NAME RAKopriva VGGaddy
SIGNATURE /RA/ /RA/
DATE 3/16/2022 3/17/2022
Initial Request for Information
Design Bases Assurance Inspection (Team)
DIABLO CANYON POWER PLANT UNITS 1 & 2
Inspection Report: 05000275/2022011 and 05000323/2022011
EPID ID: I-2022-011-0009
Information Gathering Date: May 9 - 13, 2022
Inspection Dates: June 13-17, 2022, and June 27-July 1, 2022
Inspection Procedure: IP 71111, Attachment 21M, Design Bases Assurance
Inspection Team
Lead Inspector: Ronald A. Kopriva, Senior Reactor Inspector
I. Information Requested Prior to Information Gathering Visit (April 29, 2022)
The following information (Section I of this enclosure) should be sent to the Region
IV office in hard copy or electronic format (electronic database preferred), to the
attention of Ronald A. Kopriva, Senior Reactor Inspector, by April 29, 2022, to
facilitate the reduction in the items to be selected for a final list. The inspection
team will finalize the selected list during the prep week using the additional
documents requested in Section II of this enclosure. The specific items selected
from the lists shall be available and ready for review on the day indicated in this
request. *Please provide requested documentation electronically in pdf files,
Excel, or other searchable formats, if possible. The information should contain
descriptive names and be indexed and hyperlinked to facilitate ease of use.
Information in lists should contain enough information to be easily understood by
someone who has knowledge of boiling water reactor technology. If requested
documents are large and only hard copy formats are available, please inform the
inspector and provide subject documentation during the first day of the onsite
inspection.
1. A sortable list of equipment basic events (with definitions), including importance
measures sorted by risk achievement worth and Fussell-Vesely from your
internal events probabilistic risk assessment. Include basic events with risk
achievement worth value of 1.3 or greater.
2. A sortable list of the top 50 cut-sets from your PRA.
3. A copy of any probabilistic risk assessment system notebooks and the latest
probabilistic risk assessment summary document.
Enclosure
4. A sortable list of probabilistic risk assessment human action basic events or risk
ranking of operator actions from your site-specific PRA sorted by risk
achievement worth and Fussell-Vesely. Provide copies of your human reliability
worksheets for these items.
5. If you have an external events or fire PRA model, provide the information
requested in items 1-4 for external events and fire.
6. A copy of the Individual Plant Examination of External Events (IPEEE).
7. A sortable list of high large early release frequency (LERF) impact events and
associated components.
8. A sortable list of structures, systems, and components in the Maintenance Rule
(a)(1) category.
9. A sortable list of high-risk maintenance rule systems/components and functions
based on engineering or expert panel judgment.
10. A list of the stations top 10 issues if available.
11. A list of structures, systems, and components with associated calculations having
low design margins if available.
12. A list of any common-cause failures of components.
13. A list of root cause evaluations associated with component failures of design
issues initiated/completed in the last 5 years.
14. A copy of any time-critical and time-sensitive program procedures and a list of all
time-critical and/or time-sensitive operator actions in procedures if not included.
15. A copy of any procedures used to accomplish operator actions associated with
the basic events credited in your PRA.
16. A sortable list of current operator work arounds/burdens and any program
procedures related to operator work arounds/burdens.
17. A list, with brief descriptions, of permanent and temporary modifications
implemented in the past 5 years to structures, systems, and components.
Implemented means accepted or placed into service and declared functional or
operable, as applicable. Modifications include, for example, permanent or
temporary plant changes, design changes, set point changes, procedure
changes, equivalency evaluations, suitability analyses, calculations, and
18. A sortable list with brief descriptions of operating experience evaluations opened
and/or closed. Include whether it was applicable and if the evaluation and any
associated actions, such as modifications, procedure updates, etc., are
complete.
2
19. A copy of any internal/external self-assessments or audits and associated
corrective action documents generated in preparation for this inspection or
related to engineering or operations.
20. A copy of the technical specifications, surveillance frequency control program,
inservice testing program, preventive maintenance program, technical
requirements manual, and the final safety analysis report (as updated). Include
bases documents as applicable.
21. A copy of condition reports associated with inspection findings from the previous
NRC design bases inspection.
22. A list of licensee contacts for the inspection team with phone numbers.
23. A copy of the current management and engineering organizational charts.
II. Information Requested to be provided throughout the inspection. (To be
provided no later than June 3, 2022)
1. Components
a. A copy of the design bases document, system description, etc.
b. A copy of any vendor manuals (e.g., operation and maintenance)
c. A copy of any relevant, active calculations and drawings. If the number of
calculations and/or drawings is extensive, provide a list instead.
d. A list of the preventive maintenance schedule, including any inservice,
surveillance, etc. testing, and a copy of the most recent performance of each
e. A copy of the system health notebook
f. A copy of any corrective action documents covering the past 3 years
g. A copy of any relevant normal, abnormal, or emergency procedures
2. Modifications
a. A copy of the complete change package
b. A copy of the implementing work order, job, etc.
c. A copy of post-modification testing work orders, jobs, etc.
d. A copy of any associated corrective action documents
e. A copy of any vendor manuals (e.g., operation and maintenance)
3
f. A copy of any updated procedures, licensing basis documents, calculations,
drawings, etc.
3. Operating Experiences
a. A copy of the complete operating experience evaluation
b. A copy of any associated corrective action documents
c. A copy of any associated change packages
d. A copy of any updated procedures, licensing basis documents, calculations,
drawings, etc.
III. Additional Requests During Onsite Inspection Activities:
1. A copy of any corrective action documents generated because of the team's
requests or questions during this inspection.
2. A copy of a list of questions submitted by the team and the status/resolution of the
information requested (provide daily during the inspection to each team member).
Inspector Contact Information:
Ronald Kopriva, Lead Jonathan Braisted Dustin Reinert
Senior Reactor Inspector Reactor Inspector Reactor Inspector
817-200-1104 817-200-1469 817-200-1534
Ron.Kopriva@nrc.gov Jonathan.Braisted@nrc.gov Dustin.Reinert@nrc.gov
Shiattin Makor Nnaerika Okonkwo TBD
Reactor Inspector Reactor Inspector Operations Engineer
817-200-1507 817-200-1114
Shiattin.Makor@nrc.gov Nnaerika.Okonkwo@nrc.gov
Mailing Address:
U.S. NRC, Region IV
ATTN: Ronald A.
Kopriva 1600 East
Lamar Blvd.
Arlington, TX 76011-
4511
4