ML21218A008: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot change) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
(3 intermediate revisions by the same user not shown) | |||
Line 13: | Line 13: | ||
| document type = Memoranda | | document type = Memoranda | ||
| page count = 2 | | page count = 2 | ||
| project = CAC: | | project = CAC:000083, EPID:L-2021-SPR-0000 | ||
| stage = Approval | | stage = Approval | ||
}} | }} | ||
=Text= | =Text= | ||
{{#Wiki_filter:}} | {{#Wiki_filter:August 10, 2021 MEMORANDUM TO: Bruce A. Watson, Chief Reactor Decommissioning Branch Division of Decommissioning, Uranium Recovery and Waste Programs Office of Nuclear Material Safety and Safeguards Signed by Rivera, Alison FROM: Alison Rivera, Chief on 08/10/21 Materials Security Branch Division of Physical and Cyber Security Policy Office of Nuclear Security and Incident Response | ||
==SUBJECT:== | |||
STAFF REVIEW OF THE THREE MILE ISLAND SECURITY PLAN, TRAINING AND QUALIFICATION PLAN, AND SAFEGUARDS CONTINGENCY PLAN, REVISION 24 FOR THE VERFICATION OF ASM (EA-20-103) INCORPORATION (CAC/EPID NO: 000083/05000289/L-2021-SPR-0000) | |||
The staff has completed its review of Three Mile Island Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, Revision 24 (TMI PSP Rev. 24) which was submitted by Exelon Generation to the U.S. Nuclear Regulatory Commission (NRC) by {{letter dated|date=January 28, 2021|text=letter dated January 28, 2021}}. | |||
Based on our review, we find the submitted PSP to be acceptable and the TMI PSP Rev. 24 has met the applicable performance objectives and general requirements outlined in Title 10 of the Code of Federal Regulation, Section 73.55, and the additional security measures (ASM) imposed by the NRC Order EA-20-103. | |||
A physical security inspection (IR No. 07200077/2021401) was completed on July 20, 2021, which verified the PSP successfully meets the objectives outlined in IP 81311. Based on staff observations, the TMI PSP Rev. 24 has met the performance objectives, and general requirements outlined in Title 10 of the Code of Federal Regulation, Section 73.55 and the ASMs imposed by the NRC. | |||
Docket No. 50-289, 72-077 CONTACT: Douglas Garner, Materials Safety Branch 301-287-0929 | |||
ML21218A008 OFFICE NSIR/DPCP/MSB NSIR/DPCP/MSB NAME DGarner DG ARivera AR DATE Aug 8, 2021 Aug 10, 2021}} |
Latest revision as of 14:02, 6 April 2022
ML21218A008 | |
Person / Time | |
---|---|
Site: | Three Mile Island, 07200077 ![]() |
Issue date: | 08/10/2021 |
From: | Alison Rivera NRC/NSIR/DPCP/MSB |
To: | Bruce Watson Office of Nuclear Material Safety and Safeguards |
Garner D | |
References | |
CAC 000083, EPID L-2021-SPR-0000 | |
Download: ML21218A008 (2) | |
Text
August 10, 2021 MEMORANDUM TO: Bruce A. Watson, Chief Reactor Decommissioning Branch Division of Decommissioning, Uranium Recovery and Waste Programs Office of Nuclear Material Safety and Safeguards Signed by Rivera, Alison FROM: Alison Rivera, Chief on 08/10/21 Materials Security Branch Division of Physical and Cyber Security Policy Office of Nuclear Security and Incident Response
SUBJECT:
STAFF REVIEW OF THE THREE MILE ISLAND SECURITY PLAN, TRAINING AND QUALIFICATION PLAN, AND SAFEGUARDS CONTINGENCY PLAN, REVISION 24 FOR THE VERFICATION OF ASM (EA-20-103) INCORPORATION (CAC/EPID NO: 000083/05000289/L-2021-SPR-0000)
The staff has completed its review of Three Mile Island Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, Revision 24 (TMI PSP Rev. 24) which was submitted by Exelon Generation to the U.S. Nuclear Regulatory Commission (NRC) by letter dated January 28, 2021.
Based on our review, we find the submitted PSP to be acceptable and the TMI PSP Rev. 24 has met the applicable performance objectives and general requirements outlined in Title 10 of the Code of Federal Regulation, Section 73.55, and the additional security measures (ASM) imposed by the NRC Order EA-20-103.
A physical security inspection (IR No. 07200077/2021401) was completed on July 20, 2021, which verified the PSP successfully meets the objectives outlined in IP 81311. Based on staff observations, the TMI PSP Rev. 24 has met the performance objectives, and general requirements outlined in Title 10 of the Code of Federal Regulation, Section 73.55 and the ASMs imposed by the NRC.
Docket No. 50-289,72-077 CONTACT: Douglas Garner, Materials Safety Branch 301-287-0929
ML21218A008 OFFICE NSIR/DPCP/MSB NSIR/DPCP/MSB NAME DGarner DG ARivera AR DATE Aug 8, 2021 Aug 10, 2021